Intelligent Project Acceleration:


                  goal-based acceleration


     Dr. Dan Patterson | CEO & Founder Acumen
2




Agenda
�    Introductions
�    Schedule acceleration
�    Case Study using Fuse 360
�    Q&A




    November 17, 2011
Acumen: Proven Project Analytics
�      Project Management Software Company
�      Improving CPM scheduling & analysis
�      Thought leader in Analytics
�      Schedule maturity framework

       S1 > S5™ Framework                                    Acumen Core Offerings
                                                  S5:             Acumen Fuse®
                                                  Validate
                                       S4:
                                       Optimize
                           S3: Risk-
                S2:
                           Adjust                            Risk Assessment Workshops
                Critique
    S1: Build


                                                                 Software Training
4




Fuse 360 Goal-Based Acceleration
�     Module for Fuse platform
�     Automated:
       �    Scenario generation    Logic
                                  Analysis
       �    Acceleration
       �    Decision support      Forensic Metric
                                  Analysis Analysis




    November 17, 2011
Goal-Based Acceleration
    Accelerate schedule…

      by applying criteria

  …to achieve a given goal
6




Acceleration
�     Planning: Schedule alignment
�     Execution: Delay recovery
�     Goal:
       �    Target date
       �    % of remaining duration
       �    Best date possible
       �    Project or activity

    November 17, 2011
Criteria Sets
�   Drive acceleration
                                     Criteria Set
    �   Reduce duration
                                        Script
    �   Change calendars         “Cleanse & accelerate
                                     construction”
    �   Reduce logic lags       Step 1         Step 2        Step 3
                             Remove all    Filter for     Reduce
    �   Remove constraints   constraints   Construction
                                           activities
                                                          remaining
                                                          duration by
                                                          20%
8




How Does it Work?
�     CPM simulation
�     Critical path focus
�     Incremental push
�     Prioritize
       �    Earliest/latest
       �    Longest durations
       �    Least resistance

    November 17, 2011
Accept or Reject Scenario
�   Number of days accelerated?
�   Goal achieved?
10




Decision Support
�     Scenario Insight:
       �    Fuse forensics: what changed?
       �    Fuse analysis: which option?
�     New plan:
       �    Publish back to Primavera or MS Project




    November 17, 2011
11




Baseline Compliance™
�     Traditional measures include:
       �    Earned value
       �    % complete
       �    Ahead/behind baseline
�     Baseline Compliance™
       �    True measure of how plan is being executed
       �    More than just date comparison


    November 17, 2011
Compliance Scenarios
Case Study
  Baseline Compliance™ Analysis

100%
 80%
 60%
 40%
  20%
   0%
14




 Demo
 Based on case study
            Project slipped by 6 months
            Acceleration used to recover delay
            Result was faster, more achievable plan




November 17, 2011
Example 1                                       Example 2
�   2 day project acceleration                  �   2 day project acceleration
�   Requires 2 days of reduction                �   Requires 2 days of reduction
�                               100%            �                              67%




                             2 day activity
                               reduction                                     2 day activity
                                                                               reduction

                                                                             1 day activity
    3                                                                          reduction




                                2 day project                                   2 day project
                                acceleration                                    acceleration
Fuse 360 Summary
Goal-based Schedule Acceleration
Based on true CPM analysis
Uses your
Generate alternate scenarios
Publish to native scheduling tool
  Faster schedules through intelligent acceleration
   Decision support through advanced analytics
More information:
White papers: www.projectacumen.com
Software Trial: www.projectacumen.com/trial
Twitter: @projectacumen
Email: info@projectacumen.com

More Related Content

PPTX
Agile Release Planning
PPTX
Risk Management
PPTX
Release Planning. For Agile Teams. A Quick Overview
PDF
A Fresh Take on Project Forensics
PDF
Dr. McNatty Webinar: An Introduction to Acumen 360
PDF
2011 Acumen Annual Summit Keynote
PDF
Advanced Project Analysis: An Introduction to Fuse 3.0
PPTX
Fuse Customer Perspectives Webinar: EPC
Agile Release Planning
Risk Management
Release Planning. For Agile Teams. A Quick Overview
A Fresh Take on Project Forensics
Dr. McNatty Webinar: An Introduction to Acumen 360
2011 Acumen Annual Summit Keynote
Advanced Project Analysis: An Introduction to Fuse 3.0
Fuse Customer Perspectives Webinar: EPC

Similar to Intelligent Project Acceleration: An Introduction to Acumen 360 (20)

PDF
Does Better Scheduling Drive Execution Success?
PDF
Successful Dispute Resolution
PDF
Agile Leadership - Agile Dev Practices 2011
PDF
What are we supposed to do with these managers now?
PDF
Acumen Fuse World Tour 2012
PDF
Faster, Yet Less Risky Projects through Goal-Based Schedule Acceleration
PDF
Agile2011 - What do we supposed to do with these managers now?
PDF
Johnson smith
PDF
5 free things 15 aug-12
PDF
Meet or Exceed Schedule Expectations through Intelligent Acceleration
PPTX
XP Day: Using cost of delay – Joshua Arnold
PDF
Fuse Customer Perspectives Webinar: Project Compliance
PDF
Adapting agile to the entreprise
PDF
Short Term Planning and Lean
PDF
Full Cycle Traceability via a Product Portfolio Kanban
PDF
Design For Rapid Product Realization (DFRPR)
PPTX
The agile vision
PDF
Fuse Customer Perspectives: Oil & Gas / Energy
PPTX
Horn thomas
PPTX
[AUDIO] Agile Adoptions that Work...and Last - Jose Casal - BCS Agile Methods SG
Does Better Scheduling Drive Execution Success?
Successful Dispute Resolution
Agile Leadership - Agile Dev Practices 2011
What are we supposed to do with these managers now?
Acumen Fuse World Tour 2012
Faster, Yet Less Risky Projects through Goal-Based Schedule Acceleration
Agile2011 - What do we supposed to do with these managers now?
Johnson smith
5 free things 15 aug-12
Meet or Exceed Schedule Expectations through Intelligent Acceleration
XP Day: Using cost of delay – Joshua Arnold
Fuse Customer Perspectives Webinar: Project Compliance
Adapting agile to the entreprise
Short Term Planning and Lean
Full Cycle Traceability via a Product Portfolio Kanban
Design For Rapid Product Realization (DFRPR)
The agile vision
Fuse Customer Perspectives: Oil & Gas / Energy
Horn thomas
[AUDIO] Agile Adoptions that Work...and Last - Jose Casal - BCS Agile Methods SG
Ad

More from Acumen (20)

PDF
How Traditional Risk Reporting Has Let Us Down
PDF
Developing Standards for Enterprise Schedule Quality
PDF
Simplifiying cost and schedule risk analysis with acumen risk
PPTX
Benchmarking Execution Performance and Earned Value
PDF
PMICOS Webinar: Building a Sound Schedule in an Enterprise Environment
PDF
Smarter Project Analysis and Improved Project Performance
PDF
Meeting Project Schedule Compliance Standards
PDF
Acumen Fuse & Customer Case Study
PPTX
Acumen & ARES: Simplified Cost & Schedule Integration
PDF
Calgary Breakfast Seminar: Predict and Influence Project Success
PDF
Achieving the Unachievable: Aligning a Project with Stakeholder Expectations
PDF
Advanced Project Analysis and Project Benchmarking with Acumen Cloud™
PDF
Acumen Risk Workshops Overview
PDF
Acumen Fuse Independent Review
PDF
Fuse Information Sheet
PDF
Improved Schedule Risk Analysis through Metric Assessment
PDF
Why Scheduling Mustn't Be Allowed to Become an Extinct Science
PDF
Project Simplification through Metric Analysis
PDF
Measuring Risk Exposure through Risk Range Certainty
PDF
The Art and Science Behind Successful Risk Workshops
How Traditional Risk Reporting Has Let Us Down
Developing Standards for Enterprise Schedule Quality
Simplifiying cost and schedule risk analysis with acumen risk
Benchmarking Execution Performance and Earned Value
PMICOS Webinar: Building a Sound Schedule in an Enterprise Environment
Smarter Project Analysis and Improved Project Performance
Meeting Project Schedule Compliance Standards
Acumen Fuse & Customer Case Study
Acumen & ARES: Simplified Cost & Schedule Integration
Calgary Breakfast Seminar: Predict and Influence Project Success
Achieving the Unachievable: Aligning a Project with Stakeholder Expectations
Advanced Project Analysis and Project Benchmarking with Acumen Cloud™
Acumen Risk Workshops Overview
Acumen Fuse Independent Review
Fuse Information Sheet
Improved Schedule Risk Analysis through Metric Assessment
Why Scheduling Mustn't Be Allowed to Become an Extinct Science
Project Simplification through Metric Analysis
Measuring Risk Exposure through Risk Range Certainty
The Art and Science Behind Successful Risk Workshops
Ad

Recently uploaded (20)

DOCX
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement
PPTX
The Marketing Journey - Tracey Phillips - Marketing Matters 7-2025.pptx
PPTX
Belch_12e_PPT_Ch18_Accessible_university.pptx
PPTX
CkgxkgxydkydyldylydlydyldlyddolydyoyyU2.pptx
PPTX
AI-assistance in Knowledge Collection and Curation supporting Safe and Sustai...
PDF
20250805_A. Stotz All Weather Strategy - Performance review July 2025.pdf
PPTX
ICG2025_ICG 6th steering committee 30-8-24.pptx
PDF
WRN_Investor_Presentation_August 2025.pdf
PDF
Solara Labs: Empowering Health through Innovative Nutraceutical Solutions
PDF
Ôn tập tiếng anh trong kinh doanh nâng cao
PDF
Business model innovation report 2022.pdf
PDF
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
PDF
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
PPTX
Lecture (1)-Introduction.pptx business communication
PPT
340036916-American-Literature-Literary-Period-Overview.ppt
PPTX
HR Introduction Slide (1).pptx on hr intro
PDF
Types of control:Qualitative vs Quantitative
PDF
Power and position in leadershipDOC-20250808-WA0011..pdf
PPTX
Probability Distribution, binomial distribution, poisson distribution
PDF
Roadmap Map-digital Banking feature MB,IB,AB
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement
The Marketing Journey - Tracey Phillips - Marketing Matters 7-2025.pptx
Belch_12e_PPT_Ch18_Accessible_university.pptx
CkgxkgxydkydyldylydlydyldlyddolydyoyyU2.pptx
AI-assistance in Knowledge Collection and Curation supporting Safe and Sustai...
20250805_A. Stotz All Weather Strategy - Performance review July 2025.pdf
ICG2025_ICG 6th steering committee 30-8-24.pptx
WRN_Investor_Presentation_August 2025.pdf
Solara Labs: Empowering Health through Innovative Nutraceutical Solutions
Ôn tập tiếng anh trong kinh doanh nâng cao
Business model innovation report 2022.pdf
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
Lecture (1)-Introduction.pptx business communication
340036916-American-Literature-Literary-Period-Overview.ppt
HR Introduction Slide (1).pptx on hr intro
Types of control:Qualitative vs Quantitative
Power and position in leadershipDOC-20250808-WA0011..pdf
Probability Distribution, binomial distribution, poisson distribution
Roadmap Map-digital Banking feature MB,IB,AB

Intelligent Project Acceleration: An Introduction to Acumen 360

  • 1. Intelligent Project Acceleration: goal-based acceleration Dr. Dan Patterson | CEO & Founder Acumen
  • 2. 2 Agenda � Introductions � Schedule acceleration � Case Study using Fuse 360 � Q&A November 17, 2011
  • 3. Acumen: Proven Project Analytics � Project Management Software Company � Improving CPM scheduling & analysis � Thought leader in Analytics � Schedule maturity framework S1 > S5™ Framework Acumen Core Offerings S5: Acumen Fuse® Validate S4: Optimize S3: Risk- S2: Adjust Risk Assessment Workshops Critique S1: Build Software Training
  • 4. 4 Fuse 360 Goal-Based Acceleration � Module for Fuse platform � Automated: � Scenario generation Logic Analysis � Acceleration � Decision support Forensic Metric Analysis Analysis November 17, 2011
  • 5. Goal-Based Acceleration Accelerate schedule… by applying criteria …to achieve a given goal
  • 6. 6 Acceleration � Planning: Schedule alignment � Execution: Delay recovery � Goal: � Target date � % of remaining duration � Best date possible � Project or activity November 17, 2011
  • 7. Criteria Sets � Drive acceleration Criteria Set � Reduce duration Script � Change calendars “Cleanse & accelerate construction” � Reduce logic lags Step 1 Step 2 Step 3 Remove all Filter for Reduce � Remove constraints constraints Construction activities remaining duration by 20%
  • 8. 8 How Does it Work? � CPM simulation � Critical path focus � Incremental push � Prioritize � Earliest/latest � Longest durations � Least resistance November 17, 2011
  • 9. Accept or Reject Scenario � Number of days accelerated? � Goal achieved?
  • 10. 10 Decision Support � Scenario Insight: � Fuse forensics: what changed? � Fuse analysis: which option? � New plan: � Publish back to Primavera or MS Project November 17, 2011
  • 11. 11 Baseline Compliance™ � Traditional measures include: � Earned value � % complete � Ahead/behind baseline � Baseline Compliance™ � True measure of how plan is being executed � More than just date comparison November 17, 2011
  • 13. Case Study Baseline Compliance™ Analysis 100% 80% 60% 40% 20% 0%
  • 14. 14 Demo Based on case study   Project slipped by 6 months   Acceleration used to recover delay   Result was faster, more achievable plan November 17, 2011
  • 15. Example 1 Example 2 � 2 day project acceleration � 2 day project acceleration � Requires 2 days of reduction � Requires 2 days of reduction � 100% � 67% 2 day activity reduction 2 day activity reduction 1 day activity 3 reduction 2 day project 2 day project acceleration acceleration
  • 16. Fuse 360 Summary Goal-based Schedule Acceleration Based on true CPM analysis Uses your Generate alternate scenarios Publish to native scheduling tool Faster schedules through intelligent acceleration Decision support through advanced analytics
  • 17. More information: White papers: www.projectacumen.com Software Trial: www.projectacumen.com/trial Twitter: @projectacumen Email: info@projectacumen.com