SlideShare a Scribd company logo
International Space Station
Configuration Analysis & Integration
WE16 Lightning Talk
Rebekah Anchondo
Lead Engineer, Booz Allen Hamilton
B.S. in Aerospace Engineering, University of Texas at Austin
M.S. in Systems Engineering, University of Houston at Clear Lake
- Modeling, Analysis, Visualization, Robotics, and
Integration Center (MAVRIC) Team
- NASA’s International Space Station (ISS) Program
Office
- ISS Internal Volume Configuration Lead
With the first ISS element launched in 1998 and assembly completion in 2011, ISS can
support a permanent 6 person astronaut crew, and is used to test technologies needed for
tomorrow’s exploration.
Mass ~920,000 lbs
Habitable
Volume
13,693 ft3
Max Speed 17,150 mph
(orbits Earth every 1.5 hours)
Orbital
Height
268 miles
What Booz Allen Does:
External
Configuration
Trade Studies
Internal
Configuration
Booz Allen tracks and analyzes past, present, and future external configurations to perform
static, dynamic, and kinematic analysis and to calculate aerodynamic and mass properties.
Performing clearance analysis with DC1 and FGB
Kurs with Solar Array Static Envelopes
Clearance Envelopes, Keep Out Zones, Field of
View, and Motion Envelopes
Booz Allen tracks and analyzes past, present, and future external configurations to perform
static, dynamic, and kinematic analysis and to calculate aerodynamic and mass properties.
Visiting vehicle approach, capture, separation,
and departure corridor envelope creation and
clearance analysis
MRM1 Departure Corridor
Booz Allen assesses internal configurations of ISS against safety and habitability volumetric
requirements such as visibility, lighting, translation paths, and environmental control.
Translation path calculation and optimization
for astronauts and large hardware through ISS
Rack Translation though Node 3
Booz Allen performs multidisciplinary trade studies of ISS configurations by working with
stakeholders to make sure their needs are correctly matched against evaluation criteria.
Trade Studies Include:
- Docking and Berthing Port Study
- Rack Topology Study
- Sleep Station Location Study
Advanced Resistive Exercise Devise Location Study
within Node 3
Stakeholders Include:
- Astronauts
- Hardware Owners
- Program Management
- Operation teams
Evaluation Criteria:
- Safety
- Cost
- Habitability
- Design Feasibility
- Operational Impacts
- Science Impacts
We do it all with…
Thank you!

More Related Content

DOCX
Thomas Doyle Resume 5-2-2015 Dad Edit
PPT
AAS National Conference 2008: John Olson
PPT
200712103
DOCX
Kalendrix Cook - Resume (2016) 4.0
PPTX
Enhanced Mobility
PPT
Indian Space Transportation Systems
PPT
Plate Wizard Updates within PaleoGIS by John Watson, Robertson-CGG: 2013/Thir...
DOCX
KA_Rsm_June2016
Thomas Doyle Resume 5-2-2015 Dad Edit
AAS National Conference 2008: John Olson
200712103
Kalendrix Cook - Resume (2016) 4.0
Enhanced Mobility
Indian Space Transportation Systems
Plate Wizard Updates within PaleoGIS by John Watson, Robertson-CGG: 2013/Thir...
KA_Rsm_June2016

Viewers also liked (20)

PPT
WE16 - Leaving a Legacy - Donating to SWE & Inspiring the Future
PDF
WE16 - Unfortunately Money Doesn't Grow on Trees: How to Fund Your Graduate S...
PPT
WE16 - Go for the Hot Career Field - Cybersecurity
PDF
WE16 - The State of Women in Engineering
PPT
WE16 - Are You Smarter than a Ninth Grader? Tips for Mentoring a P-Tech Student
PPT
WE16 - Starting a Company in College
PDF
WE16 - The Perfect Resume
PPT
WE16 - Gotcha! Ethical Challenges at Work
PPT
WE16 - SWE Advocacy: Learn It to Live It
PPT
WE16 - Lean in Togeher: Promoting Gender Inclusion in the Workplace
PPT
WE16 - Project Collaboration in a Changing World
PPT
WE16 - Managing Your First Project
PDF
WE16 - Women Engineers and Academics - The Nigerian Perspective
PDF
WE16 - Stressed??
PPT
WE16 - Unlocking Your Leadership Potential
PPT
WE16 - Artfully Embracing Change
PDF
WE16 - Embracing the "Five Practices of Exemplary Leadership"
PPT
WE16 - Project Management As Your Next Career Move
PDF
WE16 - How do Faculty Ensure Student Competency at Course Completion?
PDF
WE16 - Navigating the Corporate Maze Effectively
WE16 - Leaving a Legacy - Donating to SWE & Inspiring the Future
WE16 - Unfortunately Money Doesn't Grow on Trees: How to Fund Your Graduate S...
WE16 - Go for the Hot Career Field - Cybersecurity
WE16 - The State of Women in Engineering
WE16 - Are You Smarter than a Ninth Grader? Tips for Mentoring a P-Tech Student
WE16 - Starting a Company in College
WE16 - The Perfect Resume
WE16 - Gotcha! Ethical Challenges at Work
WE16 - SWE Advocacy: Learn It to Live It
WE16 - Lean in Togeher: Promoting Gender Inclusion in the Workplace
WE16 - Project Collaboration in a Changing World
WE16 - Managing Your First Project
WE16 - Women Engineers and Academics - The Nigerian Perspective
WE16 - Stressed??
WE16 - Unlocking Your Leadership Potential
WE16 - Artfully Embracing Change
WE16 - Embracing the "Five Practices of Exemplary Leadership"
WE16 - Project Management As Your Next Career Move
WE16 - How do Faculty Ensure Student Competency at Course Completion?
WE16 - Navigating the Corporate Maze Effectively
Ad

Similar to WE16 - International Space Station - Configuration Analysis & Integration (20)

DOC
Scott Roberts-RESUME 2016 v2
DOC
resume_Beda4
PDF
Profile in isro 1
PDF
Curriculum Vitae (updated)
DOC
McGinnis_Adam_Resume_June2016
PPT
4 Super Lightweight Tank - Risk Management
PDF
Orbital Report
DOC
Stu_Walker_ Resume#3
PPTX
Overview of NASA JSC White Sands Test Facility (WSTF)
PDF
igwe_resume_pm_032116
PDF
Thompson Portfolio
DOCX
jana_resume1.wiz
PPS
Conceptual Design of a Crewed Lunar Lander
PPTX
DayleAlexander_EngineeringPortfolio
PDF
IEEE 2012 Big Sky Aerospace Conf Thom McVittie Session 18 Jan 2012 Final
PPTX
Astronauts and Robots 2015: John Grunsfeld, NASA
PDF
Pushover Analysis of Balance Cantilever Bridge
PDF
AI4Space –Artificial Intelligence at ISTA - Hülsmann & Haser
PDF
Thompson Resume
PPT
Mitchell.michael
Scott Roberts-RESUME 2016 v2
resume_Beda4
Profile in isro 1
Curriculum Vitae (updated)
McGinnis_Adam_Resume_June2016
4 Super Lightweight Tank - Risk Management
Orbital Report
Stu_Walker_ Resume#3
Overview of NASA JSC White Sands Test Facility (WSTF)
igwe_resume_pm_032116
Thompson Portfolio
jana_resume1.wiz
Conceptual Design of a Crewed Lunar Lander
DayleAlexander_EngineeringPortfolio
IEEE 2012 Big Sky Aerospace Conf Thom McVittie Session 18 Jan 2012 Final
Astronauts and Robots 2015: John Grunsfeld, NASA
Pushover Analysis of Balance Cantilever Bridge
AI4Space –Artificial Intelligence at ISTA - Hülsmann & Haser
Thompson Resume
Mitchell.michael
Ad

More from Society of Women Engineers (20)

PPTX
Schneider electric overview laurie addisonlavelle_2
PPTX
PPTX
Moonshot rodriguez slides
PPTX
Moonshot fetch slides
PPTX
H ivs ai_wehr_slides
PPTX
H ivs ai_faust_slides
PPTX
H ivs ai_bestelmeyer_slides
PPTX
PPTX
How to Develop Your Section's Corporate Relations
PPTX
How to Find Your Section's Next Officer Team
PPTX
Using SWE to Complement your Career
PPTX
How to Have a Difficult Conversation with an Underperforming SWE Leader
PPTX
How to Get the Most out of your LCC Coach!
PPTX
The Mars Ice Challenge (RASC-AL)
PPTX
Beyond Disruption
Schneider electric overview laurie addisonlavelle_2
Moonshot rodriguez slides
Moonshot fetch slides
H ivs ai_wehr_slides
H ivs ai_faust_slides
H ivs ai_bestelmeyer_slides
How to Develop Your Section's Corporate Relations
How to Find Your Section's Next Officer Team
Using SWE to Complement your Career
How to Have a Difficult Conversation with an Underperforming SWE Leader
How to Get the Most out of your LCC Coach!
The Mars Ice Challenge (RASC-AL)
Beyond Disruption

Recently uploaded (20)

PPTX
Current and future trends in Computer Vision.pptx
PPTX
ASME PCC-02 TRAINING -DESKTOP-NLE5HNP.pptx
PDF
Design Guidelines and solutions for Plastics parts
PPTX
Module 8- Technological and Communication Skills.pptx
PPTX
Management Information system : MIS-e-Business Systems.pptx
PDF
BIO-INSPIRED ARCHITECTURE FOR PARSIMONIOUS CONVERSATIONAL INTELLIGENCE : THE ...
PDF
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
PDF
Visual Aids for Exploratory Data Analysis.pdf
PDF
SMART SIGNAL TIMING FOR URBAN INTERSECTIONS USING REAL-TIME VEHICLE DETECTI...
PPTX
CyberSecurity Mobile and Wireless Devices
PPT
Total quality management ppt for engineering students
PPTX
Graph Data Structures with Types, Traversals, Connectivity, and Real-Life App...
PDF
distributed database system" (DDBS) is often used to refer to both the distri...
PDF
ChapteR012372321DFGDSFGDFGDFSGDFGDFGDFGSDFGDFGFD
PPTX
Feature types and data preprocessing steps
PPTX
Amdahl’s law is explained in the above power point presentations
PDF
III.4.1.2_The_Space_Environment.p pdffdf
PPTX
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
PPTX
AUTOMOTIVE ENGINE MANAGEMENT (MECHATRONICS).pptx
PPTX
Sorting and Hashing in Data Structures with Algorithms, Techniques, Implement...
Current and future trends in Computer Vision.pptx
ASME PCC-02 TRAINING -DESKTOP-NLE5HNP.pptx
Design Guidelines and solutions for Plastics parts
Module 8- Technological and Communication Skills.pptx
Management Information system : MIS-e-Business Systems.pptx
BIO-INSPIRED ARCHITECTURE FOR PARSIMONIOUS CONVERSATIONAL INTELLIGENCE : THE ...
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
Visual Aids for Exploratory Data Analysis.pdf
SMART SIGNAL TIMING FOR URBAN INTERSECTIONS USING REAL-TIME VEHICLE DETECTI...
CyberSecurity Mobile and Wireless Devices
Total quality management ppt for engineering students
Graph Data Structures with Types, Traversals, Connectivity, and Real-Life App...
distributed database system" (DDBS) is often used to refer to both the distri...
ChapteR012372321DFGDSFGDFGDFSGDFGDFGDFGSDFGDFGFD
Feature types and data preprocessing steps
Amdahl’s law is explained in the above power point presentations
III.4.1.2_The_Space_Environment.p pdffdf
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
AUTOMOTIVE ENGINE MANAGEMENT (MECHATRONICS).pptx
Sorting and Hashing in Data Structures with Algorithms, Techniques, Implement...

WE16 - International Space Station - Configuration Analysis & Integration

  • 1. International Space Station Configuration Analysis & Integration WE16 Lightning Talk
  • 2. Rebekah Anchondo Lead Engineer, Booz Allen Hamilton B.S. in Aerospace Engineering, University of Texas at Austin M.S. in Systems Engineering, University of Houston at Clear Lake - Modeling, Analysis, Visualization, Robotics, and Integration Center (MAVRIC) Team - NASA’s International Space Station (ISS) Program Office - ISS Internal Volume Configuration Lead
  • 3. With the first ISS element launched in 1998 and assembly completion in 2011, ISS can support a permanent 6 person astronaut crew, and is used to test technologies needed for tomorrow’s exploration. Mass ~920,000 lbs Habitable Volume 13,693 ft3 Max Speed 17,150 mph (orbits Earth every 1.5 hours) Orbital Height 268 miles
  • 4. What Booz Allen Does: External Configuration Trade Studies Internal Configuration
  • 5. Booz Allen tracks and analyzes past, present, and future external configurations to perform static, dynamic, and kinematic analysis and to calculate aerodynamic and mass properties. Performing clearance analysis with DC1 and FGB Kurs with Solar Array Static Envelopes Clearance Envelopes, Keep Out Zones, Field of View, and Motion Envelopes
  • 6. Booz Allen tracks and analyzes past, present, and future external configurations to perform static, dynamic, and kinematic analysis and to calculate aerodynamic and mass properties. Visiting vehicle approach, capture, separation, and departure corridor envelope creation and clearance analysis MRM1 Departure Corridor
  • 7. Booz Allen assesses internal configurations of ISS against safety and habitability volumetric requirements such as visibility, lighting, translation paths, and environmental control. Translation path calculation and optimization for astronauts and large hardware through ISS Rack Translation though Node 3
  • 8. Booz Allen performs multidisciplinary trade studies of ISS configurations by working with stakeholders to make sure their needs are correctly matched against evaluation criteria. Trade Studies Include: - Docking and Berthing Port Study - Rack Topology Study - Sleep Station Location Study Advanced Resistive Exercise Devise Location Study within Node 3 Stakeholders Include: - Astronauts - Hardware Owners - Program Management - Operation teams Evaluation Criteria: - Safety - Cost - Habitability - Design Feasibility - Operational Impacts - Science Impacts
  • 9. We do it all with…