SlideShare a Scribd company logo
IR-CAP
Condition Assessment Program
An Indian Register of Shipping
Program
IR-CAP Service
Independent assessment carried out at the
request of ship owner.
One or more aspects, viz. Ship’s Structure,
Machinery & Cargo Systems can be
assessed – as desired.
The extent of survey is larger than that
carried out at ESP or CAS survey and the
Report is very detailed.
IR-CAP Service
Detailed documentary evidence is now
available to all interested parties.
Assessment is carried out on as-is-basis,
considering all repairs & renewals that have
been carried out during the CAP survey
They can now judge the condition of vessel
better & have better confidence on her
ability to provide good service without any
repairs in the near future.
Insurers Ship Charters
Cargo Shippers Terminal Operators
Benefits to Ship Owner…
The CAP survey also provides the ship
owner, a basis to plan the maintenance that
ensures continued asset utilization.
The Ship owner can obtain better charters
by demonstrating better quality of his ships.
What is Special about IR-CAP ?
IRS surveyors are required to examine and
rate each such attribute, separately, for all
components.
Each “ System” is rated based on the ratings
of various sub-systems/components.
Specially designed software enables quick
analysis and identifies the repairs that are
required to secure the desired CAP Rating.
Each component is rated considering all its
relevant attributes, together.
CAP Rating Process - Hull
CAP Rating Process - Hull
Local Strength
Rating
Longitudinal
Strength Rating
Total Hull
Rating
Satisfactory survey of Hull Fittings
Anchor, Cable, Windlass, Rudder & Steering
Gear, Weather-tightness, Shipside valvesTank Testing is a pre-requisite !
and
Local Strength Rating Process
Ship
A Compartment
Compartments in Cargo
region + APT & FPT
The Compartment Boundaries
Structural Panels
Plating + Secondary Stiffeners + Primary Girders
Rating
process
starts at
Panel
Level
Local Strength Rating Process
Local Strength Rating Process
Dry-dock External
Examination
Internal
Examination
Local Strength
Rating of
Each Panel
Overall survey
Close-up survey
Thickness
Measurements
Attributes that are reported from
External and Internal Examinations
General condition Buckling, Indentations, Cracks
These attributes are considered together with
the Thickness Measurement to rate each panel
Wastage Pitting, Localized thinning
Coating condition Good, Fair or Poor
Anode condition Good, Adequate, In-adequate
Typical Job card for input from Surveyors
Our software enables us to quickly prepare the required
“Job-Cards” which are sent to the attending surveyors.
Longitudinal Strength Rating
The software enables quick assessment
of the available Longitudinal Strength,
at various sections in the cargo region
Available Strength is then compared
with that required at the location.
Longitudinal Strength Rating for the
Vessel = the poorest rating obtained.
Longitudinal Strength Rating
The software also helps evaluation of
various repair options to improve the
longitudinal strength, where required,
in an optimum way.
CAP Rating
Machinery / Cargo Systems
CAP Rating – Machinery / Cargo
Systems
Overall Survey
Functional Test
Predictive Test
Audit of
Maintenance
Practices
Machinery
Rating
Maintenance
Rating
Total
Machinery
Rating
Overall Survey / Function Test
Each machine is
examined as per
the items
identified on the
Job- cards
Function test of
each machinery is
witnessed and it’s
current capability
assessed
Overall Survey / Function Test
Overall Survey
•Examination of each machine component for
any deterioration, corrosion, wear etc.
•Verify the condition of instrumentation, and
•Note presence of any leakages, etc.
Overall Survey / Function Test
Functional Testing
• To verify that the intended function of the
machinery is being performed satisfactorily
• Verify the Operational Parameters / Measure the
output and
• Verify the functioning of safety devices
Job Cards are prepared by grouping the machinery
into well defined systems - Propulsion System etc.
Machinery job cards
Note the detailed list of components for each
machinery unit, for which information is reported
These job cards prepared by H.O. for each ship, and
are filled up by the surveyor performing the survey
Predictive Testing
All machinery is subjected to predictive
testing, as applicable, to ensure no hidden
defects exist
Depending on the machinery one or more of
the following tests employed:
•Vibration measurements
•Used oil analysis
•IR ( Insulation Resistance) Measurement
Vibration Measurements :
L – Left hand when facing the
coupling flange
R –Right hand when facing the
coupling flange
1 – Machine end of mounting
2 – Crankshaft level
3 – Top end of frame
A – Coupling end
B -- Mid machine
C – Free end of machine
Locations for Reciprocating Machinery
Measurements at :
Motor Drive End
Motor Free End
Pump Drive End
Pump Free End
At each location:
a = Axial readings
x & y = Radial readings 90 deg
apart in horizontal plane
Locations for Rotating Machinery
Vibration Measurements :
Measured vibration levels are compared against
acceptable levels and ratings assigned.
Acceptable levels adopted are derived from ISO
Std. 7919, and from our past experience.
Vibration Measurements :
Audit of Maintenance Practices
The audit verifies that:
Maintenance routines are as per
manufacturer’s recommendations and good
engineering practice
Maintenance routines are carried out as per
schedule and records maintained
A good system of Inventory Control for
spares and stores exists for maintenance
activity
In Summary…
IR- CAP is a comprehensive scheme
for assessment of Tankers
The implementation of the scheme is
also as disciplined
Well Accepted by our clients as a Value
Adding Service
Another example of Quality Service
from IRS
Thank you !

More Related Content

DOC
Fleet ride pts training brief update & guidance 12 oct 10
PPT
Iver2 AUV Control Design Thesis Defense
PPTX
Design & application of cdo for ahmedabad airport within ahmedabad tma
PPT
THE INDUSTRY PERSPECTIVE ON RPAS by Luc Lallouette
PDF
A highly versatile autonomous underwater vehicle
DOCX
New Resume
DOC
Dereks_Resume_2016
DOCX
Sreekanth Resume Final 17 06 16
Fleet ride pts training brief update & guidance 12 oct 10
Iver2 AUV Control Design Thesis Defense
Design & application of cdo for ahmedabad airport within ahmedabad tma
THE INDUSTRY PERSPECTIVE ON RPAS by Luc Lallouette
A highly versatile autonomous underwater vehicle
New Resume
Dereks_Resume_2016
Sreekanth Resume Final 17 06 16

What's hot (20)

PDF
Appointment system tru x_usc_hackathon
DOC
Haris.CV15
PPT
India Aviation ICT Forum 2013 - Manish Sinha, Deputy COO, Hyderabad Internati...
PPTX
Perform to Serve msc ccc crash course
PDF
PDF
Career Waypoint USER Guide 2013 June 4
PPT
USCG R&D Center’s Analysis of Standard Boat Asset Project Office (APO’s) Met...
PDF
PPTX
Crane Safety in California
PDF
Process flow chart vibration data gather
PDF
PDF
AKKA Technologies Singapore Services
PPT
Dematic Parts Repair
DOC
Logistics transporter assessment
PPT
Automatic Guided Vehicle
PPTX
Separation Standard
PPTX
Airport Collaborative Decision Making
DOCX
Maltman Wayne Resume Defence
PDF
Airport security 2013 steve batt
Appointment system tru x_usc_hackathon
Haris.CV15
India Aviation ICT Forum 2013 - Manish Sinha, Deputy COO, Hyderabad Internati...
Perform to Serve msc ccc crash course
Career Waypoint USER Guide 2013 June 4
USCG R&D Center’s Analysis of Standard Boat Asset Project Office (APO’s) Met...
Crane Safety in California
Process flow chart vibration data gather
AKKA Technologies Singapore Services
Dematic Parts Repair
Logistics transporter assessment
Automatic Guided Vehicle
Separation Standard
Airport Collaborative Decision Making
Maltman Wayne Resume Defence
Airport security 2013 steve batt
Ad

Similar to Ircap program (20)

PDF
SCFT-Training_v8.2-1
PDF
Shahzad Khan
PPTX
Condition monitoring
PPTX
AV Latency Measurement
DOCX
Wash machine test equipment
PDF
Civil Engineering Instrumentation for Infrastructure
PPT
Instrumentation for Condition Monitoring.ppt
PPTX
Kingdom of Saudi Aramco SWIM Orientation.pptx
PDF
Paint Magazine
PDF
Timothy Fenwick - Crankshaft Sensor Tester
PPTX
Trp reliability presentation 2
PDF
Preventive maintenance
PDF
2 g dt and mapinfo
PPT
Maintenance engineering- Unit- 3
PDF
E4136110r b en
PDF
digital avionics systems
PPTX
Case study of Adaptive Cruise Control
PPTX
Mobility testing overview and instructions
PDF
Development of PLC based Transdermal Patch Evaluation System
DOC
Issam_CV 08-10-015 (Trainer)
SCFT-Training_v8.2-1
Shahzad Khan
Condition monitoring
AV Latency Measurement
Wash machine test equipment
Civil Engineering Instrumentation for Infrastructure
Instrumentation for Condition Monitoring.ppt
Kingdom of Saudi Aramco SWIM Orientation.pptx
Paint Magazine
Timothy Fenwick - Crankshaft Sensor Tester
Trp reliability presentation 2
Preventive maintenance
2 g dt and mapinfo
Maintenance engineering- Unit- 3
E4136110r b en
digital avionics systems
Case study of Adaptive Cruise Control
Mobility testing overview and instructions
Development of PLC based Transdermal Patch Evaluation System
Issam_CV 08-10-015 (Trainer)
Ad

More from ydmisra (9)

PPTX
Marpol annex v from ist jan 2013
PPT
Lpg lng cargo_handling Merchant Shipping
PPT
Cargo lashing
PDF
Sop for export import for textile
PPTX
Nyk and weather routing
PPTX
Ships structure-safety
PPT
Bhr ship constructions
PPT
The indian-contract-act-1872
PPT
Evaluation of training
Marpol annex v from ist jan 2013
Lpg lng cargo_handling Merchant Shipping
Cargo lashing
Sop for export import for textile
Nyk and weather routing
Ships structure-safety
Bhr ship constructions
The indian-contract-act-1872
Evaluation of training

Recently uploaded (20)

PDF
TyAnn Osborn: A Visionary Leader Shaping Corporate Workforce Dynamics
PDF
SIMNET Inc – 2023’s Most Trusted IT Services & Solution Provider
PDF
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
PDF
Blood Collected straight from the donor into a blood bag and mixed with an an...
PPTX
Slide gioi thieu VietinBank Quy 2 - 2025
PPTX
3. HISTORICAL PERSPECTIVE UNIIT 3^..pptx
PDF
Outsourced Audit & Assurance in USA Why Globus Finanza is Your Trusted Choice
PDF
Solara Labs: Empowering Health through Innovative Nutraceutical Solutions
PDF
Family Law: The Role of Communication in Mediation (www.kiu.ac.ug)
PPTX
Sales & Distribution Management , LOGISTICS, Distribution, Sales Managers
PDF
IFRS Notes in your pocket for study all the time
PDF
Deliverable file - Regulatory guideline analysis.pdf
PDF
Cours de Système d'information about ERP.pdf
PDF
Solaris Resources Presentation - Corporate August 2025.pdf
PDF
Digital Marketing & E-commerce Certificate Glossary.pdf.................
PDF
Comments on Crystal Cloud and Energy Star.pdf
PPTX
Negotiation and Persuasion Skills: A Shrewd Person's Perspective
PDF
How to Get Business Funding for Small Business Fast
PDF
NewBase 12 August 2025 Energy News issue - 1812 by Khaled Al Awadi_compresse...
PDF
Daniels 2024 Inclusive, Sustainable Development
TyAnn Osborn: A Visionary Leader Shaping Corporate Workforce Dynamics
SIMNET Inc – 2023’s Most Trusted IT Services & Solution Provider
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
Blood Collected straight from the donor into a blood bag and mixed with an an...
Slide gioi thieu VietinBank Quy 2 - 2025
3. HISTORICAL PERSPECTIVE UNIIT 3^..pptx
Outsourced Audit & Assurance in USA Why Globus Finanza is Your Trusted Choice
Solara Labs: Empowering Health through Innovative Nutraceutical Solutions
Family Law: The Role of Communication in Mediation (www.kiu.ac.ug)
Sales & Distribution Management , LOGISTICS, Distribution, Sales Managers
IFRS Notes in your pocket for study all the time
Deliverable file - Regulatory guideline analysis.pdf
Cours de Système d'information about ERP.pdf
Solaris Resources Presentation - Corporate August 2025.pdf
Digital Marketing & E-commerce Certificate Glossary.pdf.................
Comments on Crystal Cloud and Energy Star.pdf
Negotiation and Persuasion Skills: A Shrewd Person's Perspective
How to Get Business Funding for Small Business Fast
NewBase 12 August 2025 Energy News issue - 1812 by Khaled Al Awadi_compresse...
Daniels 2024 Inclusive, Sustainable Development

Ircap program

  • 1. IR-CAP Condition Assessment Program An Indian Register of Shipping Program
  • 2. IR-CAP Service Independent assessment carried out at the request of ship owner. One or more aspects, viz. Ship’s Structure, Machinery & Cargo Systems can be assessed – as desired. The extent of survey is larger than that carried out at ESP or CAS survey and the Report is very detailed.
  • 3. IR-CAP Service Detailed documentary evidence is now available to all interested parties. Assessment is carried out on as-is-basis, considering all repairs & renewals that have been carried out during the CAP survey They can now judge the condition of vessel better & have better confidence on her ability to provide good service without any repairs in the near future. Insurers Ship Charters Cargo Shippers Terminal Operators
  • 4. Benefits to Ship Owner… The CAP survey also provides the ship owner, a basis to plan the maintenance that ensures continued asset utilization. The Ship owner can obtain better charters by demonstrating better quality of his ships.
  • 5. What is Special about IR-CAP ? IRS surveyors are required to examine and rate each such attribute, separately, for all components. Each “ System” is rated based on the ratings of various sub-systems/components. Specially designed software enables quick analysis and identifies the repairs that are required to secure the desired CAP Rating. Each component is rated considering all its relevant attributes, together.
  • 7. CAP Rating Process - Hull Local Strength Rating Longitudinal Strength Rating Total Hull Rating Satisfactory survey of Hull Fittings Anchor, Cable, Windlass, Rudder & Steering Gear, Weather-tightness, Shipside valvesTank Testing is a pre-requisite ! and
  • 8. Local Strength Rating Process Ship A Compartment Compartments in Cargo region + APT & FPT The Compartment Boundaries Structural Panels Plating + Secondary Stiffeners + Primary Girders Rating process starts at Panel Level
  • 10. Local Strength Rating Process Dry-dock External Examination Internal Examination Local Strength Rating of Each Panel Overall survey Close-up survey Thickness Measurements
  • 11. Attributes that are reported from External and Internal Examinations General condition Buckling, Indentations, Cracks These attributes are considered together with the Thickness Measurement to rate each panel Wastage Pitting, Localized thinning Coating condition Good, Fair or Poor Anode condition Good, Adequate, In-adequate
  • 12. Typical Job card for input from Surveyors Our software enables us to quickly prepare the required “Job-Cards” which are sent to the attending surveyors.
  • 13. Longitudinal Strength Rating The software enables quick assessment of the available Longitudinal Strength, at various sections in the cargo region Available Strength is then compared with that required at the location. Longitudinal Strength Rating for the Vessel = the poorest rating obtained.
  • 14. Longitudinal Strength Rating The software also helps evaluation of various repair options to improve the longitudinal strength, where required, in an optimum way.
  • 15. CAP Rating Machinery / Cargo Systems
  • 16. CAP Rating – Machinery / Cargo Systems Overall Survey Functional Test Predictive Test Audit of Maintenance Practices Machinery Rating Maintenance Rating Total Machinery Rating
  • 17. Overall Survey / Function Test Each machine is examined as per the items identified on the Job- cards Function test of each machinery is witnessed and it’s current capability assessed
  • 18. Overall Survey / Function Test Overall Survey •Examination of each machine component for any deterioration, corrosion, wear etc. •Verify the condition of instrumentation, and •Note presence of any leakages, etc.
  • 19. Overall Survey / Function Test Functional Testing • To verify that the intended function of the machinery is being performed satisfactorily • Verify the Operational Parameters / Measure the output and • Verify the functioning of safety devices
  • 20. Job Cards are prepared by grouping the machinery into well defined systems - Propulsion System etc. Machinery job cards Note the detailed list of components for each machinery unit, for which information is reported These job cards prepared by H.O. for each ship, and are filled up by the surveyor performing the survey
  • 21. Predictive Testing All machinery is subjected to predictive testing, as applicable, to ensure no hidden defects exist Depending on the machinery one or more of the following tests employed: •Vibration measurements •Used oil analysis •IR ( Insulation Resistance) Measurement
  • 22. Vibration Measurements : L – Left hand when facing the coupling flange R –Right hand when facing the coupling flange 1 – Machine end of mounting 2 – Crankshaft level 3 – Top end of frame A – Coupling end B -- Mid machine C – Free end of machine Locations for Reciprocating Machinery
  • 23. Measurements at : Motor Drive End Motor Free End Pump Drive End Pump Free End At each location: a = Axial readings x & y = Radial readings 90 deg apart in horizontal plane Locations for Rotating Machinery Vibration Measurements :
  • 24. Measured vibration levels are compared against acceptable levels and ratings assigned. Acceptable levels adopted are derived from ISO Std. 7919, and from our past experience. Vibration Measurements :
  • 25. Audit of Maintenance Practices The audit verifies that: Maintenance routines are as per manufacturer’s recommendations and good engineering practice Maintenance routines are carried out as per schedule and records maintained A good system of Inventory Control for spares and stores exists for maintenance activity
  • 26. In Summary… IR- CAP is a comprehensive scheme for assessment of Tankers The implementation of the scheme is also as disciplined Well Accepted by our clients as a Value Adding Service Another example of Quality Service from IRS