August, 2008 PRESENTATION IT PMO Charter Communication Document
Agenda IT Program Management Office –  Core Competencies IT Governance and the PMO PMO Pyramid, “hierarchy of needs” PMO Models available Planning Demand Management Project Management Methodology Communication Project Performance Metrics Status Reporting Administration
Our multi-layered governance structure will streamline decision making and improve transparency and control of IT Governance Level IT Steering Committee Doosan IT Council Design not completed Project Management and Delivery IT Mgmt Technical and  Business Committees 1 2 3 4 5 Governance Body Membership Objective IT Steering Committee  CEO, CFO, CIO,  BU presidents Govern DII IT strategy, funding allocation and investments  IT Leadership Team CIO and direct reports Govern day-to-day IT operations IT Project Portfolio  Committee PMO, Program Managers, Business Liaisons Govern the project portfolio  and project execution  Functional Process  Teams Enterprise Architects, Business Functional leads, system leads Govern enterprise architecture and standardization Change Control Board Infrastructure tower leads, system leads  Govern changes to the IT production environment
Program Management encompasses several components of IT Governance which are critical to a smooth running IT department * * * Areas that can be effectively managed by a Program Management Office
The success of a PMO requires success in base-level competencies before results from advanced competencies can be achieved. PMO Maturity exists in layers that are building blocks to the next level of maturity At the foundation, a PMO must be able to produce accurate status reports on projects. The next foundational element is developing people who can execute projects and understand the benefit that comes from repeatable, lean process methodologies. The aforementioned building blocks allow an organization to adopt processes and methodologies to improve project execution and likelihood of achieving promised business benefits.
The charter of the PMO is to be the “center of excellence” for program management which includes the following three areas… DII IT PMO Charter Planning Planning begins with the determination of what IT investments the business will pursue in the coming year. The PMO is required to orchestrate project demand through project funding The PMO helps plan during project execution by establishing methodologies and repeatable processes Communication Communications within the IT group include holding regular all-employee meetings, IT PMO meetings, and intra-program meetings. Communications beyond IT include monthly CC CIO team progress sharing and executive communications including the PMO dashboard and TSA elimination dashboard Administration Financial administration is a key component of tracking IT Investments. The PMO will handle PO requisitioning and invoice processing for all outside IT spend. The PMO will handle meeting planning and large event coordination as needed for the IT department.
Planning is the first PMO core competency. The PMO is responsible for coordinating the selection and funding of IT initiatives across all DII businesses: Search out all demand for new IT projects Initiate sessions with IT-Business review session to determine projects with greatest alignment to LRP Pull together final IT capital plans for each business, make adjustments to meet AOP stretch targets The PMO is responsible to work within IT to determine a standard project management methodology which enforces repeatable efficient processes Methodologies will be developed with grass-roots support to encourage adoption Build a culture of respect for project management as a discipline Organize training and certification programs for people involved with project management Work with IT Leadership team to build PM training into their teams development plans
Demand Management is the first step in selecting which projects will be funded IT Management Business Management Project Requests Business – IT Councils force-rank Projects for  Alignment to LRP objectives Final IT Project Portfolio and Capital Plan Achieved Frontline Workers LRP Filter AOP Filter IT Project Portfolio AOP Challenge Is applied and Further eliminates projects Project Ideas will outnumber the number that can be funded
The PMO will ensure that projects are executed in a disciplined and structured manner Initiate and transition project from concept stages into IT Project development  Develop initial business case and create project charter Identify and engage Project Stakeholders and Requirements Providers.  Develop and document Preliminary Project Plan, which covers plan for Define phase activities Conduct tollgate review Develop business requirements Develop systems requirements Develop high level architecture design Define deployment  strategy Initiate RFP / RFQ process Conduct make/buy/reuse analysis Refine business case Conduct tollgate review Migrate to new system Update site deployment materials and system documentation Transition to operations De-install legacy systems Conduct tollgate review Close project Project Management Methodology Construct Conduct Construct-phase kickoff Develop architecture design Develop detailed design Develop data migration strategy plan Develop test plans Complete system / site deployment plan Code and unit test Configure, integrate, and deliver system Setup QA environments Conduct tollgate review Conduct system testing Conduct data migration testing Conduct user acceptance testing  Conduct site readiness review Analyze defect and change requests Verify release readiness Conduct tollgate review Phase 1 Phase 2 Phase 3 Phase 4 Phase 5 G1 G2 G3 G4 CER Approval Charter Approval Go/No Go G5 Approve for Test Project Close-Out Deploy Plan Define Test
The Plan/Define deliverables build upon each other to culminate in the ultimate Plan/Define milestone – a completed and signed CER Business Requirements Document System Requirements Specification Technical Architecture Specification Comments CER G1 G2 The project charter sign-off is the official beginning of the project CER  (signed) Build/Buy Analysis RFP/RFQ If Necessary Plan/Define documentation serves as the “building blocks” for the CER  Plan/Define documentation forces project teams to “plan the project” The objective is to gain efficiency from a repeatable methodology, while allowing the project teams the flexibility to manage time and resources Project Plan Project  Charter  In order for a CER to be approved the Plan/Define documentation  must be completed  Fund/No Fund Decision
Communication is the second PMO core competency. The PMO’s core competency remains in reporting project and program status to the business The PMO dashboard and TSA Scoreboard for summarizing extensive project detail The PMO coordinates and facilitates meetings across stakeholder communities: All IT Employee Meeting Information Exchange with CC CIO team (Seoul) Ad-hoc updates to executive leadership The PMO team organizes and facilitates weekly, program-wide and IT-wide program status meetings in the areas of: ERP and DMS (Dealer Management Systems) IT Infrastructure and Facilities These meetings are the primary means of keeping communication alive across stakeholders within a certain IT discipline.
Throughout the project lifecycle we will track key project  metrics  - project milestone achievement, project cost, and quality of delivery Time Project Performance Metrics The Key milestones Estimated and actual time for completion Percent completion Weightings of milestones towards project completion Cost Estimated cost (and resources) for each project milestone Actual cost expended Invoiced cost Corrective actions for estimated cost over-runs Quality Description of key project related issues  The relative impact of key issues (high/med/low) The project risks and associated escalation actions
IT Status Reporting IT Dashboard IT Executive Summary Project Update Sheets – Timeline/Budget/Issues Project ID - Project Name % Complete CER Date Go-Live Date Next Milestone & Date Total Budget Budget Incurred Over Budget Issues Status Trend DII_ERP_001.2 Hybris frontend for Utility ESA: Phase 1 7.1% 30-Sep-08 31-Mar-09 CER - 9/30/08 $883,000 $30,833 N DII_ERP_002 DIITC Cloning Prep & Clean Up: Phase 1 100.0% 30-Apr-08 21-Jul-08 Phase 1 Complete $388,860 $281,030 N DII_ERP_013 Geith Cleanup 2.3% 1-Jan-09 1-Jul-09 Project Docs &  CER - 1/1/09 $1,500,000 $0 N *Identify Resources  *The development of Milestones TBD  DII_ERP_024 Replace dealer roster functionality - ESA 15.4% 30-Apr-08 31-Dec-08 User Mgmt Build - 8/6/08 $237,000 $0 N   DII_ERP_025 Global Retail Campaign Management 40.7% 25-Apr-08 31-Oct-08 Data Cleansing - 8/15/08 $314,000 $157,980 N   DII_IFR_012 Siebel Replatforming 99.8% 11-Apr-08 14-Jul-08 Close Siebel Contract w/ACS - 7/31/08 $189,039 $175,818 N  
Administration is the final PMO core competency. The PMO will serve as the administrative arm of the IT department due to its visibility across strategic programs and operations The PMO will provide the following administrative services to the IT department: CER processing and administration including creating “backup support” for capitalization Handle PO creation and invoice routing. This should be for Opex and Capex on all US Oracle-based ledgers Provide periodic budget vs. actual status reporting at a cost center level and per CER Produce financial metrics for the IT-wide dashboard IT Department administration Coordinate central administrative functions such as IT vacation and travel calendar Handle IT’s procurement card (US)

More Related Content

PDF
Business PMO & IT Pmo What Is The Difference
PDF
PMO - Delivering Business Results
DOC
Implementation of the pmo proposal
PPT
Pc 2011 Epmo Plan
PDF
PMO 101
PDF
PMO - Added value instead of administration
PPTX
ePMO Workshop - Ali Kaabi
Business PMO & IT Pmo What Is The Difference
PMO - Delivering Business Results
Implementation of the pmo proposal
Pc 2011 Epmo Plan
PMO 101
PMO - Added value instead of administration
ePMO Workshop - Ali Kaabi

What's hot (20)

PDF
PMO Frameworks
PPT
Setting up a pmo
PPTX
The PMO journey
PDF
Pmo
PPTX
How To Use PMO Intake Processes To Manage Your Project Portfolio
PPTX
Real example of PMO deployment
PDF
Setting up a Project Management Office (PMO)
PDF
PMO Handbook - How to Plan, Build, and Run a PMO
PPTX
Pmo Concept
PPT
The pmo strategy discipline execution value
PDF
Establishing an Effective PMO
PPSX
PMO - Strategic Model & Concepts Overview
PPTX
Project Management Office Roles Functions And Benefits
PDF
Having a PMO with agile flavor
PPTX
Pmo final 1
PPTX
PMO Kick-Off Presentation
PDF
PMO Charter Template
PPT
How to set up a project management office (PMO)
PDF
Setting up a new PMO - Arpin
PMO Frameworks
Setting up a pmo
The PMO journey
Pmo
How To Use PMO Intake Processes To Manage Your Project Portfolio
Real example of PMO deployment
Setting up a Project Management Office (PMO)
PMO Handbook - How to Plan, Build, and Run a PMO
Pmo Concept
The pmo strategy discipline execution value
Establishing an Effective PMO
PMO - Strategic Model & Concepts Overview
Project Management Office Roles Functions And Benefits
Having a PMO with agile flavor
Pmo final 1
PMO Kick-Off Presentation
PMO Charter Template
How to set up a project management office (PMO)
Setting up a new PMO - Arpin
Ad

Viewers also liked (20)

PPTX
PMO Mandate
PPT
Project management office value
PDF
IT Services Delivery - Program Management Office (PMO)
DOCX
Program charter
PDF
Bee serv pmi - belgium chapter
PPTX
Program Management Outsourcing: Challenges & Factors Contributing to Success
PDF
Governance in Ultra-Large-Scale Systems
PPT
Creating An EA Governance Organization
PPT
The Virtual PMO
DOC
Communications Management Plan
PDF
PMO View Interactive Dashboard
PDF
Effective Executive Status Reporting Webinar By KW3 Consulting
PPT
@CIOBRODY PMO Methodology Overview
PPT
PC 2012 PMO plan
PDF
PPTX
PMO (Project Management Office)
PPT
IT Governance Introduction
PPT
IT PMO (SAP) Success Story
PPTX
IT Governance Vs IT Management Presentation V0.1
PDF
What is Cobit
PMO Mandate
Project management office value
IT Services Delivery - Program Management Office (PMO)
Program charter
Bee serv pmi - belgium chapter
Program Management Outsourcing: Challenges & Factors Contributing to Success
Governance in Ultra-Large-Scale Systems
Creating An EA Governance Organization
The Virtual PMO
Communications Management Plan
PMO View Interactive Dashboard
Effective Executive Status Reporting Webinar By KW3 Consulting
@CIOBRODY PMO Methodology Overview
PC 2012 PMO plan
PMO (Project Management Office)
IT Governance Introduction
IT PMO (SAP) Success Story
IT Governance Vs IT Management Presentation V0.1
What is Cobit
Ad

Similar to IT PMO Charter (Linkedin) (20)

PPTX
The IT PMO - A Handbook for Federal Programs
PPTX
September 2010 Cgait Jeffco Creating And Managing A PMO
PDF
Discussion Paper PMO And Merger Projects
PPT
Project Management_c
PPTX
Mujeebur rahmansaher presentation
PDF
Project Management Methodology
PPT
Pmo Webinar Gerard Hill Adapted
PPT
The Powerof One+Pmo Overview
PPT
Project Management For Nonprofits
PDF
Considerations in Selecting and Protecting Your IT Investment
PDF
Program Office Background
PPT
Creating & Maturing a PMO
PPT
PMO Proposal For Global Sales Operations
PPT
Introduction To Project Management
PPT
L01 introduction to pm
DOC
JM_Shields_EXAMPLE_NCDPI_Resolvit_082412
PPT
Software Project Management (lecture 2)
PPT
Project management by hamidun
PDF
Strivent Service Offerings Differentiators Web 2 9
PPTX
Ims Primavera
The IT PMO - A Handbook for Federal Programs
September 2010 Cgait Jeffco Creating And Managing A PMO
Discussion Paper PMO And Merger Projects
Project Management_c
Mujeebur rahmansaher presentation
Project Management Methodology
Pmo Webinar Gerard Hill Adapted
The Powerof One+Pmo Overview
Project Management For Nonprofits
Considerations in Selecting and Protecting Your IT Investment
Program Office Background
Creating & Maturing a PMO
PMO Proposal For Global Sales Operations
Introduction To Project Management
L01 introduction to pm
JM_Shields_EXAMPLE_NCDPI_Resolvit_082412
Software Project Management (lecture 2)
Project management by hamidun
Strivent Service Offerings Differentiators Web 2 9
Ims Primavera

Recently uploaded (20)

PDF
Tortilla Mexican Grill 发射点犯得上发射点发生发射点犯得上发生
PPTX
chapter 2 entrepreneurship full lecture ppt
PDF
Second Hand Fashion Call to Action March 2025
PDF
income tax laws notes important pakistan
PDF
Consumer Behavior in the Digital Age (www.kiu.ac.ug)
PDF
Comments on Clouds that Assimilate Parts I&II.pdf
PDF
Highest-Paid CEO in 2025_ You Won’t Believe Who Tops the List.pdf
PDF
Business Communication for MBA Students.
PPTX
df0ee68f89e1a869be4bff9b80a7 business 79f0.pptx
PPTX
2 - Self & Personality 587689213yiuedhwejbmansbeakjrk
PPT
Retail Management and Retail Markets and Concepts
PDF
Vinod Bhatt - Most Inspiring Supply Chain Leader in India 2025.pdf
PDF
Robin Fischer: A Visionary Leader Making a Difference in Healthcare, One Day ...
DOCX
Handbook of Entrepreneurship- Chapter 5: Identifying business opportunity.docx
PPTX
CTG - Business Update 2Q2025 & 6M2025.pptx
PPTX
Transportation in Logistics management.pptx
PPTX
IITM - FINAL Option - 01 - 12.08.25.pptx
PPTX
Market and Demand Analysis.pptx for Management students
PPTX
Project Management_ SMART Projects Class.pptx
PPTX
TRAINNING, DEVELOPMENT AND APPRAISAL.pptx
Tortilla Mexican Grill 发射点犯得上发射点发生发射点犯得上发生
chapter 2 entrepreneurship full lecture ppt
Second Hand Fashion Call to Action March 2025
income tax laws notes important pakistan
Consumer Behavior in the Digital Age (www.kiu.ac.ug)
Comments on Clouds that Assimilate Parts I&II.pdf
Highest-Paid CEO in 2025_ You Won’t Believe Who Tops the List.pdf
Business Communication for MBA Students.
df0ee68f89e1a869be4bff9b80a7 business 79f0.pptx
2 - Self & Personality 587689213yiuedhwejbmansbeakjrk
Retail Management and Retail Markets and Concepts
Vinod Bhatt - Most Inspiring Supply Chain Leader in India 2025.pdf
Robin Fischer: A Visionary Leader Making a Difference in Healthcare, One Day ...
Handbook of Entrepreneurship- Chapter 5: Identifying business opportunity.docx
CTG - Business Update 2Q2025 & 6M2025.pptx
Transportation in Logistics management.pptx
IITM - FINAL Option - 01 - 12.08.25.pptx
Market and Demand Analysis.pptx for Management students
Project Management_ SMART Projects Class.pptx
TRAINNING, DEVELOPMENT AND APPRAISAL.pptx

IT PMO Charter (Linkedin)

  • 1. August, 2008 PRESENTATION IT PMO Charter Communication Document
  • 2. Agenda IT Program Management Office – Core Competencies IT Governance and the PMO PMO Pyramid, “hierarchy of needs” PMO Models available Planning Demand Management Project Management Methodology Communication Project Performance Metrics Status Reporting Administration
  • 3. Our multi-layered governance structure will streamline decision making and improve transparency and control of IT Governance Level IT Steering Committee Doosan IT Council Design not completed Project Management and Delivery IT Mgmt Technical and Business Committees 1 2 3 4 5 Governance Body Membership Objective IT Steering Committee CEO, CFO, CIO, BU presidents Govern DII IT strategy, funding allocation and investments IT Leadership Team CIO and direct reports Govern day-to-day IT operations IT Project Portfolio Committee PMO, Program Managers, Business Liaisons Govern the project portfolio and project execution Functional Process Teams Enterprise Architects, Business Functional leads, system leads Govern enterprise architecture and standardization Change Control Board Infrastructure tower leads, system leads Govern changes to the IT production environment
  • 4. Program Management encompasses several components of IT Governance which are critical to a smooth running IT department * * * Areas that can be effectively managed by a Program Management Office
  • 5. The success of a PMO requires success in base-level competencies before results from advanced competencies can be achieved. PMO Maturity exists in layers that are building blocks to the next level of maturity At the foundation, a PMO must be able to produce accurate status reports on projects. The next foundational element is developing people who can execute projects and understand the benefit that comes from repeatable, lean process methodologies. The aforementioned building blocks allow an organization to adopt processes and methodologies to improve project execution and likelihood of achieving promised business benefits.
  • 6. The charter of the PMO is to be the “center of excellence” for program management which includes the following three areas… DII IT PMO Charter Planning Planning begins with the determination of what IT investments the business will pursue in the coming year. The PMO is required to orchestrate project demand through project funding The PMO helps plan during project execution by establishing methodologies and repeatable processes Communication Communications within the IT group include holding regular all-employee meetings, IT PMO meetings, and intra-program meetings. Communications beyond IT include monthly CC CIO team progress sharing and executive communications including the PMO dashboard and TSA elimination dashboard Administration Financial administration is a key component of tracking IT Investments. The PMO will handle PO requisitioning and invoice processing for all outside IT spend. The PMO will handle meeting planning and large event coordination as needed for the IT department.
  • 7. Planning is the first PMO core competency. The PMO is responsible for coordinating the selection and funding of IT initiatives across all DII businesses: Search out all demand for new IT projects Initiate sessions with IT-Business review session to determine projects with greatest alignment to LRP Pull together final IT capital plans for each business, make adjustments to meet AOP stretch targets The PMO is responsible to work within IT to determine a standard project management methodology which enforces repeatable efficient processes Methodologies will be developed with grass-roots support to encourage adoption Build a culture of respect for project management as a discipline Organize training and certification programs for people involved with project management Work with IT Leadership team to build PM training into their teams development plans
  • 8. Demand Management is the first step in selecting which projects will be funded IT Management Business Management Project Requests Business – IT Councils force-rank Projects for Alignment to LRP objectives Final IT Project Portfolio and Capital Plan Achieved Frontline Workers LRP Filter AOP Filter IT Project Portfolio AOP Challenge Is applied and Further eliminates projects Project Ideas will outnumber the number that can be funded
  • 9. The PMO will ensure that projects are executed in a disciplined and structured manner Initiate and transition project from concept stages into IT Project development Develop initial business case and create project charter Identify and engage Project Stakeholders and Requirements Providers. Develop and document Preliminary Project Plan, which covers plan for Define phase activities Conduct tollgate review Develop business requirements Develop systems requirements Develop high level architecture design Define deployment strategy Initiate RFP / RFQ process Conduct make/buy/reuse analysis Refine business case Conduct tollgate review Migrate to new system Update site deployment materials and system documentation Transition to operations De-install legacy systems Conduct tollgate review Close project Project Management Methodology Construct Conduct Construct-phase kickoff Develop architecture design Develop detailed design Develop data migration strategy plan Develop test plans Complete system / site deployment plan Code and unit test Configure, integrate, and deliver system Setup QA environments Conduct tollgate review Conduct system testing Conduct data migration testing Conduct user acceptance testing Conduct site readiness review Analyze defect and change requests Verify release readiness Conduct tollgate review Phase 1 Phase 2 Phase 3 Phase 4 Phase 5 G1 G2 G3 G4 CER Approval Charter Approval Go/No Go G5 Approve for Test Project Close-Out Deploy Plan Define Test
  • 10. The Plan/Define deliverables build upon each other to culminate in the ultimate Plan/Define milestone – a completed and signed CER Business Requirements Document System Requirements Specification Technical Architecture Specification Comments CER G1 G2 The project charter sign-off is the official beginning of the project CER (signed) Build/Buy Analysis RFP/RFQ If Necessary Plan/Define documentation serves as the “building blocks” for the CER Plan/Define documentation forces project teams to “plan the project” The objective is to gain efficiency from a repeatable methodology, while allowing the project teams the flexibility to manage time and resources Project Plan Project Charter  In order for a CER to be approved the Plan/Define documentation must be completed Fund/No Fund Decision
  • 11. Communication is the second PMO core competency. The PMO’s core competency remains in reporting project and program status to the business The PMO dashboard and TSA Scoreboard for summarizing extensive project detail The PMO coordinates and facilitates meetings across stakeholder communities: All IT Employee Meeting Information Exchange with CC CIO team (Seoul) Ad-hoc updates to executive leadership The PMO team organizes and facilitates weekly, program-wide and IT-wide program status meetings in the areas of: ERP and DMS (Dealer Management Systems) IT Infrastructure and Facilities These meetings are the primary means of keeping communication alive across stakeholders within a certain IT discipline.
  • 12. Throughout the project lifecycle we will track key project metrics - project milestone achievement, project cost, and quality of delivery Time Project Performance Metrics The Key milestones Estimated and actual time for completion Percent completion Weightings of milestones towards project completion Cost Estimated cost (and resources) for each project milestone Actual cost expended Invoiced cost Corrective actions for estimated cost over-runs Quality Description of key project related issues The relative impact of key issues (high/med/low) The project risks and associated escalation actions
  • 13. IT Status Reporting IT Dashboard IT Executive Summary Project Update Sheets – Timeline/Budget/Issues Project ID - Project Name % Complete CER Date Go-Live Date Next Milestone & Date Total Budget Budget Incurred Over Budget Issues Status Trend DII_ERP_001.2 Hybris frontend for Utility ESA: Phase 1 7.1% 30-Sep-08 31-Mar-09 CER - 9/30/08 $883,000 $30,833 N DII_ERP_002 DIITC Cloning Prep & Clean Up: Phase 1 100.0% 30-Apr-08 21-Jul-08 Phase 1 Complete $388,860 $281,030 N DII_ERP_013 Geith Cleanup 2.3% 1-Jan-09 1-Jul-09 Project Docs & CER - 1/1/09 $1,500,000 $0 N *Identify Resources *The development of Milestones TBD DII_ERP_024 Replace dealer roster functionality - ESA 15.4% 30-Apr-08 31-Dec-08 User Mgmt Build - 8/6/08 $237,000 $0 N   DII_ERP_025 Global Retail Campaign Management 40.7% 25-Apr-08 31-Oct-08 Data Cleansing - 8/15/08 $314,000 $157,980 N   DII_IFR_012 Siebel Replatforming 99.8% 11-Apr-08 14-Jul-08 Close Siebel Contract w/ACS - 7/31/08 $189,039 $175,818 N  
  • 14. Administration is the final PMO core competency. The PMO will serve as the administrative arm of the IT department due to its visibility across strategic programs and operations The PMO will provide the following administrative services to the IT department: CER processing and administration including creating “backup support” for capitalization Handle PO creation and invoice routing. This should be for Opex and Capex on all US Oracle-based ledgers Provide periodic budget vs. actual status reporting at a cost center level and per CER Produce financial metrics for the IT-wide dashboard IT Department administration Coordinate central administrative functions such as IT vacation and travel calendar Handle IT’s procurement card (US)

Editor's Notes

  • #2: Booz Allen Hamilton Standard Colors Colors should be used in the color pairs whenever possible. Do not mix and match colors, use pairs together as shown. Black, White and Gray can be used with any of the other colors. Purple Pantone 2765 R 12 G 4 B 79 Green Pantone 357 R 15 G 67 B 24 Blue Pantone 2 88 R 11 G 31 B 101 Black Pantone Cool Gray 6 R 158 G 158 B 158 Red Pantone 485 R 252 G 5 B 14 Yellow Pantone 3965 R 232 G 244 B 4 Aqua Pantone 319 R 126 G 204 B 189 White