SlideShare a Scribd company logo
Performance Monitoring
and more …
IT-Power Services

© 2013 IT-PS
Monitoring of a virtualized Environment
Points of Interest
Challenges
Economically
Technically

Monitoring - Performance
Server
Storage
VIO Server
FC Switch
Client LPAR

Monitoring - Availability
2

IT-Power Services

22.11.2013

© 2013 IT-PS
Points of Interest
VIO Server:
NPIV
Physical Adapter
Virtual Adapter

FC Switch:
Port Utilization

SEA
Physical Adapter
Virtual Adapter

Error statistics

Configuration
Health
External Storage:
Front End / Back End
IO Rate
Data Rate
Transferred Data

Cache Hit Rate
Read / Write

System CPU

Client LPAR:
I/O Information
Response Time
Disk Utilization

LAN Utilization
Subsystem Utilization
CPU Utilization
Job Information

System Bus

Service Information

Utilization
3

IT-Power Services

22.11.2013

© 2013 IT-PS
Challenges - Economically
How utilized is my current investment ??
How many additional customers / systems can I move
to the existing Hardware ??
When will be the time for the next investment ??
Which investment will deliver the best price /
performance ratio ??

4

IT-Power Services

22.11.2013

© 2013 IT-PS
Challenges - Technically
Monitoring of all potential bottlenecks
Notification in the case of exceeding defined limits
Monitoring of the virtualization layer
Automated creation of Performance Graphs for
Management as well as Customers
Documentation of the Virtualization Layer
5

IT-Power Services

22.11.2013

© 2013 IT-PS
Monitoring (Performance)
Top-Down Approach
Layer 1 (Impact to all client LPARs):
Power Server utilization (e.g. LPAR2RRD)
Storage Utilization

Layer 2 (Impact to “some” Client LPARs):
VIOs Performance Utilization (FC, SEA)
FC Switch Port
Power Server Bus Utilization

Layer 3 (Impact to one Client LPAR):
Client LPAR Utilization
6

IT-Power Services

22.11.2013

© 2013 IT-PS
IT-PS Performance Monitor - Overview

7

IT-Power Services

22.11.2013

© 2013 IT-PS
IT-PS Performance Monitor – Error Log

8

IT-Power Services

22.11.2013

© 2013 IT-PS
Storage Utilization
Overview about the Storage Utilization:
Frontend IO/S und MB/s
Backend IO/S und MB/s
Virtual Disk IO/S und MB/s
Physical Disk IO/S und MB/s
CPU
Cache Usage

9

IT-Power Services

22.11.2013

© 2013 IT-PS
VIOs Utilization – Fiber Channel
Important is to recognize immediately which Client LPAR
is causing which part of the work load

Individual LPAR !!
10

IT-Power Services

22.11.2013

© 2013 IT-PS
VIOs Utilization –
Shared Ethernet Adapter
Important is to recognize
immediately which Client
LPAR is causing which
part of the work load

Individual connections!!
11

IT-Power Services

22.11.2013

© 2013 IT-PS
IOA Utilization – Client View
Shows the total FC Work Load produced by one client LPAR

12

IT-Power Services

22.11.2013

© 2013 IT-PS
FC Switch Port
Because of a Zoning n-Host Ports to 1 Storage Port
there might be a performance issue
Shortages at Metro
Mirror connections
have an immediate
impact to all mirrored
Client LPARs !!

13

IT-Power Services

22.11.2013

© 2013 IT-PS
Power Server Bus Utilization
Dependent on the used HW it is possible to monitor the
utilization of the System Bus (connection between
system unit and expansion drawers)
It is important to avoid in balances of the System Bus

14

IT-Power Services

22.11.2013

© 2013 IT-PS
Client LPAR Utilization
Analysis and graphical
presentation of all
Performance
information is possible

Requirements are highly dependent to the usage of each
system and might differ a lot between customers !!
15

IT-Power Services

22.11.2013

© 2013 IT-PS
Monitoring (Availability)
Monitoring the Availability of all Components
Producing a list of all Errors of the following components:
HMC
VIO Server
FC Switch

all Serviceable Events
all Error Log Entries
e.g. CRC, ENC, Trunk Error, BBC 0, …

Notification in the case of Events via E-Mail
Customizable based on the Severity
If required notification via SMS

16

IT-Power Services

22.11.2013

© 2013 IT-PS
Developed and maintained by …

IT-Power Services GmbH

E-Mail: office@it-ps.at
17

IT-Power Services

22.11.2013

© 2013 IT-PS

More Related Content

PPT
DCS and Fieldbus Software installation
PPTX
Automotive Interconnect Challenges
PDF
Drives and motors 2014
PPTX
Automotive Challenges Addressed by Standard and Non-Standard Based IP
PDF
Webinar Presentation- Typical Challenges Faced by Tier 1s in AUTOSAR Tooling
PDF
Keynote 4 cornelius_koetz_v04
PPTX
Autosar software component
PPTX
Understanding Flash Bootloader Software and Automotive ECU Reprogramming
DCS and Fieldbus Software installation
Automotive Interconnect Challenges
Drives and motors 2014
Automotive Challenges Addressed by Standard and Non-Standard Based IP
Webinar Presentation- Typical Challenges Faced by Tier 1s in AUTOSAR Tooling
Keynote 4 cornelius_koetz_v04
Autosar software component
Understanding Flash Bootloader Software and Automotive ECU Reprogramming

What's hot (20)

PDF
Obd leader u vci universal vehicle connection interface diagnostic scanner ne...
DOCX
Arm's new architecture for automotive and industrial control markets
PDF
Webinar presentation on AUTOSAR Multicore Systems
PPTX
Autosar MCAL (Microcontroller Abstraction Layer)
PDF
Conférence TechnoArk 2016 - 08 abb
PPTX
Can based collision aviodance system for automobiles
PDF
5 Things to Know about the Train Control System menTCS
PDF
Introduction to TTCN-3 and AUTOSAR Conformance Testing
PPTX
ECU: Electronic Control Units in Electric Two Wheeler
PDF
PopcornSAR Specialized in AUTOSAR_Company profile
PPTX
FAQs’ for Unit, Integration and Functional Testing Services
PPT
Practical Use & Understanding of Foundation FieldBus for Engineers & Technicians
PDF
What is field bus
PDF
5 Things to Know about Virtualization on Compact PCI Serial
PDF
EMEA Airheads- Aruba OS- Mobile First Platform– Aruba OS 8.0 introduction
PPTX
Take a Walk on the Wired Side
PPT
DCS FIELDBUS hse linking device
PDF
Smau Milano 2016 -Eaton
PPTX
Securing the LAN Best practices to secure the wired access network
PPT
introduction to DCS System 800x a topology
Obd leader u vci universal vehicle connection interface diagnostic scanner ne...
Arm's new architecture for automotive and industrial control markets
Webinar presentation on AUTOSAR Multicore Systems
Autosar MCAL (Microcontroller Abstraction Layer)
Conférence TechnoArk 2016 - 08 abb
Can based collision aviodance system for automobiles
5 Things to Know about the Train Control System menTCS
Introduction to TTCN-3 and AUTOSAR Conformance Testing
ECU: Electronic Control Units in Electric Two Wheeler
PopcornSAR Specialized in AUTOSAR_Company profile
FAQs’ for Unit, Integration and Functional Testing Services
Practical Use & Understanding of Foundation FieldBus for Engineers & Technicians
What is field bus
5 Things to Know about Virtualization on Compact PCI Serial
EMEA Airheads- Aruba OS- Mobile First Platform– Aruba OS 8.0 introduction
Take a Walk on the Wired Side
DCS FIELDBUS hse linking device
Smau Milano 2016 -Eaton
Securing the LAN Best practices to secure the wired access network
introduction to DCS System 800x a topology
Ad

Viewers also liked (20)

PDF
Autocad toan tap
PPT
Twitter Bots
PDF
smithfield food 2004 AR
PDF
International experience with GHG and FE standards
PDF
10 claves para un buen diseño Web
PDF
Presentación Corporativa Projar Group
PDF
Ecosistemes 1el-biòtop
PDF
El chavillo 9
PDF
Resolución 089 2015
PPTX
Miss Gay [autosaved]
PDF
Dusseiller on Hackteria - MAT seminar, UCSB
PDF
Vera Bradley
PDF
Planificacionygestiondeemprendimientos
PDF
11 pede guarenas-guatire
PDF
Alunoespanholv3baixa 130131135246-phpapp02
PPTX
Industrial training seminar ppt on asp.net
DOCX
Product & services of soneri bank
PPTX
Vitrinismo y Escaparatismo
PPT
Ríos principales de la República Dominicana
PPTX
UD7 - La Composición
Autocad toan tap
Twitter Bots
smithfield food 2004 AR
International experience with GHG and FE standards
10 claves para un buen diseño Web
Presentación Corporativa Projar Group
Ecosistemes 1el-biòtop
El chavillo 9
Resolución 089 2015
Miss Gay [autosaved]
Dusseiller on Hackteria - MAT seminar, UCSB
Vera Bradley
Planificacionygestiondeemprendimientos
11 pede guarenas-guatire
Alunoespanholv3baixa 130131135246-phpapp02
Industrial training seminar ppt on asp.net
Product & services of soneri bank
Vitrinismo y Escaparatismo
Ríos principales de la República Dominicana
UD7 - La Composición
Ad

Similar to IT-PS Performance Monitoring Solution (20)

PDF
Introducing Application Engineered Routing Powered by Segment Routing
PDF
Public Safety LTE Broadband - Service Assurance
PDF
Cisco IWAN – Intelligent Connectivity for Today’s Reality
PPTX
Cisco Prime infrastructure 3.0
PPTX
Application Visibility and Experience through Flexible Netflow
PPT
Monitor and manage everything Cisco using OpManager
PDF
PLNOG 7: Emil Gągała, Sławomir Janukowicz - carrier grade NAT
PDF
Assessing Network Readiness
PDF
Yokogawa & NextNine – Lessons Learned: Global Cybersecurity Management System...
PPTX
Spring Driven Industrial IoT Utilizing Edge, Fog, and Cloud Computing
PPTX
2014/09/02 Cisco UCS HPC @ ANL
PPTX
Power path viewer_technical_presentation
PPT
Edge Device Multi-unicasting for Video Streaming
PDF
Latency Considerations in LTE: Implications to Security Gateway
PDF
CLASS 2018 - Palestra de Julio Oliveira (Gerente de Tecnologia, Power Grids G...
PDF
LI Bank Network Infrastructure cursory review
PDF
Design and Deployment of Enterprise WLANs
PPT
NETWORKING, COMMUNICATION SYSTEMS AND SCADA
PPT
NETWORKING, COMMUNICATION SYSTEMS AND SCADA
PPT
CENTUM CS300 R3
Introducing Application Engineered Routing Powered by Segment Routing
Public Safety LTE Broadband - Service Assurance
Cisco IWAN – Intelligent Connectivity for Today’s Reality
Cisco Prime infrastructure 3.0
Application Visibility and Experience through Flexible Netflow
Monitor and manage everything Cisco using OpManager
PLNOG 7: Emil Gągała, Sławomir Janukowicz - carrier grade NAT
Assessing Network Readiness
Yokogawa & NextNine – Lessons Learned: Global Cybersecurity Management System...
Spring Driven Industrial IoT Utilizing Edge, Fog, and Cloud Computing
2014/09/02 Cisco UCS HPC @ ANL
Power path viewer_technical_presentation
Edge Device Multi-unicasting for Video Streaming
Latency Considerations in LTE: Implications to Security Gateway
CLASS 2018 - Palestra de Julio Oliveira (Gerente de Tecnologia, Power Grids G...
LI Bank Network Infrastructure cursory review
Design and Deployment of Enterprise WLANs
NETWORKING, COMMUNICATION SYSTEMS AND SCADA
NETWORKING, COMMUNICATION SYSTEMS AND SCADA
CENTUM CS300 R3

Recently uploaded (20)

PDF
A contest of sentiment analysis: k-nearest neighbor versus neural network
PPTX
cloud_computing_Infrastucture_as_cloud_p
PPTX
Tartificialntelligence_presentation.pptx
PDF
Profit Center Accounting in SAP S/4HANA, S4F28 Col11
PPTX
Group 1 Presentation -Planning and Decision Making .pptx
PDF
Getting started with AI Agents and Multi-Agent Systems
PDF
gpt5_lecture_notes_comprehensive_20250812015547.pdf
PDF
August Patch Tuesday
PDF
Univ-Connecticut-ChatGPT-Presentaion.pdf
PDF
Microsoft Solutions Partner Drive Digital Transformation with D365.pdf
PDF
DP Operators-handbook-extract for the Mautical Institute
PDF
NewMind AI Weekly Chronicles - August'25-Week II
PPTX
Final SEM Unit 1 for mit wpu at pune .pptx
PDF
Zenith AI: Advanced Artificial Intelligence
PDF
WOOl fibre morphology and structure.pdf for textiles
PPT
Module 1.ppt Iot fundamentals and Architecture
PDF
TrustArc Webinar - Click, Consent, Trust: Winning the Privacy Game
PPTX
MicrosoftCybserSecurityReferenceArchitecture-April-2025.pptx
PDF
Web App vs Mobile App What Should You Build First.pdf
PDF
Hindi spoken digit analysis for native and non-native speakers
A contest of sentiment analysis: k-nearest neighbor versus neural network
cloud_computing_Infrastucture_as_cloud_p
Tartificialntelligence_presentation.pptx
Profit Center Accounting in SAP S/4HANA, S4F28 Col11
Group 1 Presentation -Planning and Decision Making .pptx
Getting started with AI Agents and Multi-Agent Systems
gpt5_lecture_notes_comprehensive_20250812015547.pdf
August Patch Tuesday
Univ-Connecticut-ChatGPT-Presentaion.pdf
Microsoft Solutions Partner Drive Digital Transformation with D365.pdf
DP Operators-handbook-extract for the Mautical Institute
NewMind AI Weekly Chronicles - August'25-Week II
Final SEM Unit 1 for mit wpu at pune .pptx
Zenith AI: Advanced Artificial Intelligence
WOOl fibre morphology and structure.pdf for textiles
Module 1.ppt Iot fundamentals and Architecture
TrustArc Webinar - Click, Consent, Trust: Winning the Privacy Game
MicrosoftCybserSecurityReferenceArchitecture-April-2025.pptx
Web App vs Mobile App What Should You Build First.pdf
Hindi spoken digit analysis for native and non-native speakers

IT-PS Performance Monitoring Solution

  • 1. Performance Monitoring and more … IT-Power Services © 2013 IT-PS
  • 2. Monitoring of a virtualized Environment Points of Interest Challenges Economically Technically Monitoring - Performance Server Storage VIO Server FC Switch Client LPAR Monitoring - Availability 2 IT-Power Services 22.11.2013 © 2013 IT-PS
  • 3. Points of Interest VIO Server: NPIV Physical Adapter Virtual Adapter FC Switch: Port Utilization SEA Physical Adapter Virtual Adapter Error statistics Configuration Health External Storage: Front End / Back End IO Rate Data Rate Transferred Data Cache Hit Rate Read / Write System CPU Client LPAR: I/O Information Response Time Disk Utilization LAN Utilization Subsystem Utilization CPU Utilization Job Information System Bus Service Information Utilization 3 IT-Power Services 22.11.2013 © 2013 IT-PS
  • 4. Challenges - Economically How utilized is my current investment ?? How many additional customers / systems can I move to the existing Hardware ?? When will be the time for the next investment ?? Which investment will deliver the best price / performance ratio ?? 4 IT-Power Services 22.11.2013 © 2013 IT-PS
  • 5. Challenges - Technically Monitoring of all potential bottlenecks Notification in the case of exceeding defined limits Monitoring of the virtualization layer Automated creation of Performance Graphs for Management as well as Customers Documentation of the Virtualization Layer 5 IT-Power Services 22.11.2013 © 2013 IT-PS
  • 6. Monitoring (Performance) Top-Down Approach Layer 1 (Impact to all client LPARs): Power Server utilization (e.g. LPAR2RRD) Storage Utilization Layer 2 (Impact to “some” Client LPARs): VIOs Performance Utilization (FC, SEA) FC Switch Port Power Server Bus Utilization Layer 3 (Impact to one Client LPAR): Client LPAR Utilization 6 IT-Power Services 22.11.2013 © 2013 IT-PS
  • 7. IT-PS Performance Monitor - Overview 7 IT-Power Services 22.11.2013 © 2013 IT-PS
  • 8. IT-PS Performance Monitor – Error Log 8 IT-Power Services 22.11.2013 © 2013 IT-PS
  • 9. Storage Utilization Overview about the Storage Utilization: Frontend IO/S und MB/s Backend IO/S und MB/s Virtual Disk IO/S und MB/s Physical Disk IO/S und MB/s CPU Cache Usage 9 IT-Power Services 22.11.2013 © 2013 IT-PS
  • 10. VIOs Utilization – Fiber Channel Important is to recognize immediately which Client LPAR is causing which part of the work load Individual LPAR !! 10 IT-Power Services 22.11.2013 © 2013 IT-PS
  • 11. VIOs Utilization – Shared Ethernet Adapter Important is to recognize immediately which Client LPAR is causing which part of the work load Individual connections!! 11 IT-Power Services 22.11.2013 © 2013 IT-PS
  • 12. IOA Utilization – Client View Shows the total FC Work Load produced by one client LPAR 12 IT-Power Services 22.11.2013 © 2013 IT-PS
  • 13. FC Switch Port Because of a Zoning n-Host Ports to 1 Storage Port there might be a performance issue Shortages at Metro Mirror connections have an immediate impact to all mirrored Client LPARs !! 13 IT-Power Services 22.11.2013 © 2013 IT-PS
  • 14. Power Server Bus Utilization Dependent on the used HW it is possible to monitor the utilization of the System Bus (connection between system unit and expansion drawers) It is important to avoid in balances of the System Bus 14 IT-Power Services 22.11.2013 © 2013 IT-PS
  • 15. Client LPAR Utilization Analysis and graphical presentation of all Performance information is possible Requirements are highly dependent to the usage of each system and might differ a lot between customers !! 15 IT-Power Services 22.11.2013 © 2013 IT-PS
  • 16. Monitoring (Availability) Monitoring the Availability of all Components Producing a list of all Errors of the following components: HMC VIO Server FC Switch all Serviceable Events all Error Log Entries e.g. CRC, ENC, Trunk Error, BBC 0, … Notification in the case of Events via E-Mail Customizable based on the Severity If required notification via SMS 16 IT-Power Services 22.11.2013 © 2013 IT-PS
  • 17. Developed and maintained by … IT-Power Services GmbH E-Mail: office@it-ps.at 17 IT-Power Services 22.11.2013 © 2013 IT-PS