SlideShare a Scribd company logo
BUILDING SERVICES
STUDY ON FIRE SERVICES…
PRESENTED BY-

Aiman Naseem
Sundus Hussain
M.Raghib
Bilal Khan
Hamzah Meraj
CONTENTS
1. Introduction
2. Floor plans
3.Entrance
4.Corridors
5. Classrooms
6.Lift
7.Staircase
8. Basement
9. Fire Extinguishers & Refuge Area
10. Fire Alarm Control Panel
11. Illumination & Sign boards
12. Fire Hydrant Chamber & Fire Hose Reel
13. Fire Extractors
14.Water Tanks
15. Construction
16. Other fire Services
UNIVERSITY POLYTECHNIC

Approach- Main road- M.M.A Johar Road, JMI
Height of the building- 26m
Numbers of floors- 05
Occupancy per floor- 300-350 persons
FLOOR PLANS
I. Typical Floor Plan
II. Terrace Plan
III. Service Plan
Classrooms

Classrooms

Classrooms
FHC

FHC
Lift

Classrooms

FHC

Classrooms
Entrance/Exit
Fire Staircase

Corridor

TYPICAL FLOOR PLAN
17m

4.5m

2m
4m

9m
4.5m

2m

9m

Smoke detectors in
Classroom

Smoke detectors in
Lecture hall
BASEMENT
1.Basement floor plan
2.Services
Branch
Sprinkler pipe25mm dia

Main Sprinkler
pipe-65 mm dia

Ramp for
Exit

Smoke
Extractors

BASEMENT SERVICE PLAN

Fire Exit
14m

9m

1.5m

3m

3m

1.5m

9 Sprinklers are provided in
area of 9x9m

18 Sprinklers are provided
in an area of 14x8m
• Openable windows on external walls
are fitted with such locks that can be
opened by a fireman’s axe.
• Sprinklers are provided in the
basement.
• Mechanical extractors for smoke
venting system are provided.
• Fire Extinguishers provided & Signage
available.

• Fire Hose reel provided in the basement.
• Fire Alarm located on the service core
and at regular system.
Fire tank
Water tank

Lift

TERRACE PLAN
1.Lecture Hall
• 17x8m- 140students
• No of smoke detectors-8

2. Classroom
• 9mx9m for 70 students.
• No of smoke detecators-03
• Smoke Detectors are
provided on the ceiling.

• Exit signs on the doors are
pasted, but without
illumination.
• No fire extinguisher present
within the Hall.

•

Smoke Detectors
CORRIDORS
• 2500mm wide corridor
• Corridors are fitted with
Smoke Detectors But no
Sprinklers provided.
• Fire alarm is provided.
• ‘Panic button’ with breakable
glass is provided in the
corridors.
• Signage at regular interval
provided for exit.
LIFT
• No Fire Lift Provided.
• Lift floor area -2400mmx2100mm
• Has a loading capacity of 545kg(10
persons)
• Width of door.-1000mm
• Communication facilities are provided
in lift cars.

• A sign is been pasted and maintained on
the lift indicating that in case of fire
occupants shall use the stairs.
• Lifts are installed in a common
enclosures having individual lift
separated by walls
STAIRCASE
I. Normal Stairs
II. Fire Stairs
1. Normal Staircase
•

Width of the Stair-1500mm

•

Stair type- Circular & Winder

2.Fire Stairs

•

Width of Stair-2000mm

•
Fire Exit Signage provided near
to staircase.

•

Height of riser-150mm
Fire extinguishers
&
Refuge Area
• Type of fire extinguishers-ABC with ISI certification
mark.
• 2 extinguishers for every floor is been provided.

• 1 fire extinguisher each in lab, near to electrical
installation & generator room is been provided.
• Refuge area has been provided on the 4th Floor.
FIRE ALARM CONTROL
PANEL
• Fire control panel is provided on each
floor of the building.
• The panel receives information from
environmental sensors, such as heat
detectors or smoke detectors designed
to detect changes associated with fire.
• In fire condition, the fire alarm
control panel indicates where the fire
originated.
Illumination
&
Sign Boards
• No Emergency lights provided in
the staircase and corridor.
• Sign boards ‘Fire Exit’ over the Lift
and near to stairs are provided.
• Sign posted without illuminated sign
for, all exits and direction of travel
to each exit.
• No Fire plan for each floor showing
the locations of the stairways.
FIRE HYDRANT
CHAMBER(FHC)
&
FIRE HOSE REELS
• Chamber area- 0.7mx1.3m
• A hose reel, 30m long and fitted with
19mm diameter nozzle at the end of it.
• One Fire Hydrant Chamber on each
floor of the building is provided.
FIRE EXTRACTORS
& FIRE DAMPERS
• Fire Extractors provided only in the
basement area.
• Fire Dampers are located in return air
ducts.
• Fire Dampers in fire prevent the spread
of smoke inside the ducts.
• When a rise in temperature occurs,
the fire damper closes, usually
activated by a thermal element which
melts at higher temperatures.

FIRE DAMPERS
WATER TANKS
I.
II.

Fire tank.
Domestic water tank.
• Fire tank capacity- 25klts
• Area-16.9sqm
• Domestic water tank capacity- 20klts
• Area-15.3

Fire water supply Pipes

Domestic water supply Pipes
CONSTRUCTION
1.Comustibility
2.Material
1.Comustibility Properties
• All materials of constructions in load
bearing elements, stairways & corridors and
facades are non-combustible.
• The internal walls & staircase are of brick
& somewhere with reinforced concrete with
a minimum of 2h fire rating.
• Facade treatments is non combustible
because of the use of exposed brick.
2. MATERIALS
Flooring materials
•Terrazzo
•Marble
•Tiles
Materials for walls
•Tiles
•Cement plaster

Tiles as a flooring material

Terrazo as a flooring material
OTHER FIRE SERVICES
Facilities Which are necessary to be provided in case of fire which were not
present in our CASESTUDY.
1.Call box
2.Control Rooms
3.Materials (Non Combustible0
4.Denchers
1.CALL BOX
A callbox is a box containing a special-purpose direct
line telephone.
Call boxes should be
I. Located at each floor.
II. One or more should be provided on the floor.
III. Accessible within 22.5m.
IV. Call boxes shall be wired in a close circuit.
V. At a height of 1m from the floor level.
2.CONTROL ROOM
• There shall be a control room on the
entrance floor of the building with
communication system to all floors.
• Details of all floor plans along with the
detail of fire fighting equipment and
installations shall be maintained in the
control room.
3.Materials
Fire proofing material for walls
•Gypsum plaster
•Cementetious plaster
•Fibrous plaster
•Intumescent fire proofing
Fire proofing material for floors
•PCC
•Terrazo
•Tiles
4.DRENCHERS
• A drencher fire control system provides a
discharge of water over roofs, walls and
windows to prevent fire spreading from
or to adjacent buildings.

• Drencher systems provide the necessary
curtain of water for protection against
internal and external exposure to fire.
THANK YOU

More Related Content

PDF
Globus shopping mall
PPTX
Fire regulations for buildings
PDF
Fire Safety on High Raise Buildings
PPTX
Fire guidelines by nbc part 1
PPTX
Fire Safety and Building Materials
PPTX
Fire detection and alarm systems
PPTX
Provision for fire protection in high rise buildings
PDF
Safety and security for buildings
Globus shopping mall
Fire regulations for buildings
Fire Safety on High Raise Buildings
Fire guidelines by nbc part 1
Fire Safety and Building Materials
Fire detection and alarm systems
Provision for fire protection in high rise buildings
Safety and security for buildings

What's hot (20)

PPT
Mlr convention centre, bangloor.
PDF
building services- II Lighting
PPTX
Deisgn of Fire Escapes
PPTX
Auditorium design ppt
PPTX
Fire safety equipment in Birla Auditorum Jaipur
PDF
Achyut kanvinde
PPTX
Control room ( Advance Services )
PDF
Architectural acoustics
PDF
Fire Fighting and Solution for Globus Shopping Mall (bandra)
PPTX
Cept case study
PPTX
Acoustical materials
PPTX
Building Services
PDF
Green hospitals case study
PPTX
14. Area of Refuge
PPTX
Natural ventilation for Building Artitechture
PDF
Fire Fighting system
PDF
BUILDING SERVICES-II (ELECTRICAL)
PPTX
Library study on hospital
PPTX
Structure borne
Mlr convention centre, bangloor.
building services- II Lighting
Deisgn of Fire Escapes
Auditorium design ppt
Fire safety equipment in Birla Auditorum Jaipur
Achyut kanvinde
Control room ( Advance Services )
Architectural acoustics
Fire Fighting and Solution for Globus Shopping Mall (bandra)
Cept case study
Acoustical materials
Building Services
Green hospitals case study
14. Area of Refuge
Natural ventilation for Building Artitechture
Fire Fighting system
BUILDING SERVICES-II (ELECTRICAL)
Library study on hospital
Structure borne
Ad

Viewers also liked (20)

PDF
BUILDING SERVICES REPORT
PPTX
Gypsum and rubber use in building construction
PPTX
Fixed Ladder - Roof Ladder - Cage Ladder Slide Show
PPTX
PPTX
Case study: Presentation Slides
PPTX
Sustainable housing guidelines
PPTX
Fire protection by K R THANKI
PPT
High-Rise Firefighting
PDF
Fire safety-in-high-rise-apartment-buildings
PPTX
Plastic use as building material ppt
PPTX
Shopping mall case study
PPT
Fire protection systems
PPTX
HOTEL CASESTUDY - HYATT REGENCY, PUNE
PPSX
Case study - Hotel Silicrest
PDF
Basics of Fire fighting
PPT
Fire safety in the Workplace
PPT
Fire prevention.ppt
PPTX
Fire Protection Systems Unit-I
PDF
How to Make Awesome SlideShares: Tips & Tricks
BUILDING SERVICES REPORT
Gypsum and rubber use in building construction
Fixed Ladder - Roof Ladder - Cage Ladder Slide Show
Case study: Presentation Slides
Sustainable housing guidelines
Fire protection by K R THANKI
High-Rise Firefighting
Fire safety-in-high-rise-apartment-buildings
Plastic use as building material ppt
Shopping mall case study
Fire protection systems
HOTEL CASESTUDY - HYATT REGENCY, PUNE
Case study - Hotel Silicrest
Basics of Fire fighting
Fire safety in the Workplace
Fire prevention.ppt
Fire Protection Systems Unit-I
How to Make Awesome SlideShares: Tips & Tricks
Ad

Similar to jamia polytechnique delhi (20)

PPT
FireSafetyMeasuresforSchools.ppt
PPTX
FIRE SAFETY - Anoushka Aggarwal
PPTX
BUILDING SERVICE GROUP ASSIGNMENT
PDF
Unit iii (3.1)
PPTX
Means_of_Fire_Escape_with_Standards.pptx
PDF
Fire safety as per National Building Code-2016
PDF
469344131-FIRE-FIGTHING-CASE-STUDY-TALKATORA-STADIUM-pptx[1].pdf
PPTX
NBC NORMS FOR FIRE AND SAFETY IN ALL TYPE OF BUILDING
PPTX
1a Fire Protection PowerPoint Thailand.pptx
PPTX
Fire Hazard Commercial spaces
PPTX
Fire safety
PDF
Building services
PDF
B.service
 
PDF
The Trion Towers 1 Presentation Kit
PPTX
literature study high rise building 7 (1).pptx
PPTX
Fire safety in building
PPTX
commercial FIRE PPT DISSERTATION_Tarunendra_ (1).pptx
PPTX
FIRE NORMS AND INDIAN HABITAT CENTRE CASE STUDY
PDF
Mill 14-1-15 - Sheet - A108 - BUILDING REGULATIONS ...
FireSafetyMeasuresforSchools.ppt
FIRE SAFETY - Anoushka Aggarwal
BUILDING SERVICE GROUP ASSIGNMENT
Unit iii (3.1)
Means_of_Fire_Escape_with_Standards.pptx
Fire safety as per National Building Code-2016
469344131-FIRE-FIGTHING-CASE-STUDY-TALKATORA-STADIUM-pptx[1].pdf
NBC NORMS FOR FIRE AND SAFETY IN ALL TYPE OF BUILDING
1a Fire Protection PowerPoint Thailand.pptx
Fire Hazard Commercial spaces
Fire safety
Building services
B.service
 
The Trion Towers 1 Presentation Kit
literature study high rise building 7 (1).pptx
Fire safety in building
commercial FIRE PPT DISSERTATION_Tarunendra_ (1).pptx
FIRE NORMS AND INDIAN HABITAT CENTRE CASE STUDY
Mill 14-1-15 - Sheet - A108 - BUILDING REGULATIONS ...

More from Hamzah Meraj, Faculty of Architecture, Jamia Millia Islamia, New delhi (20)

PPTX
Housing Policies-BJP/UPA/STATE -Tushar bansal
PDF
PDF
National Policies and programs on Habitat- Lakshay mittal
PPTX
PPTX
housing decisions, policies and yojnas by BJP-Batul zainab
PDF
National Policies and programmes on habitat- Apoorva singh
Housing Policies-BJP/UPA/STATE -Tushar bansal
National Policies and programs on Habitat- Lakshay mittal
housing decisions, policies and yojnas by BJP-Batul zainab
National Policies and programmes on habitat- Apoorva singh

Recently uploaded (20)

PPTX
Introduction_to_Human_Anatomy_and_Physiology_for_B.Pharm.pptx
PDF
Basic Mud Logging Guide for educational purpose
PDF
ANTIBIOTICS.pptx.pdf………………… xxxxxxxxxxxxx
PPTX
Institutional Correction lecture only . . .
PDF
Origin of periodic table-Mendeleev’s Periodic-Modern Periodic table
PDF
RMMM.pdf make it easy to upload and study
PDF
2.FourierTransform-ShortQuestionswithAnswers.pdf
PDF
BÀI TẬP BỔ TRỢ 4 KỸ NĂNG TIẾNG ANH 9 GLOBAL SUCCESS - CẢ NĂM - BÁM SÁT FORM Đ...
PDF
STATICS OF THE RIGID BODIES Hibbelers.pdf
PDF
Module 4: Burden of Disease Tutorial Slides S2 2025
PDF
Abdominal Access Techniques with Prof. Dr. R K Mishra
PPTX
Pharmacology of Heart Failure /Pharmacotherapy of CHF
PDF
Physiotherapy_for_Respiratory_and_Cardiac_Problems WEBBER.pdf
PPTX
master seminar digital applications in india
PDF
01-Introduction-to-Information-Management.pdf
PPTX
PPT- ENG7_QUARTER1_LESSON1_WEEK1. IMAGERY -DESCRIPTIONS pptx.pptx
PPTX
Microbial diseases, their pathogenesis and prophylaxis
PPTX
Pharma ospi slides which help in ospi learning
PPTX
school management -TNTEU- B.Ed., Semester II Unit 1.pptx
PPTX
Final Presentation General Medicine 03-08-2024.pptx
Introduction_to_Human_Anatomy_and_Physiology_for_B.Pharm.pptx
Basic Mud Logging Guide for educational purpose
ANTIBIOTICS.pptx.pdf………………… xxxxxxxxxxxxx
Institutional Correction lecture only . . .
Origin of periodic table-Mendeleev’s Periodic-Modern Periodic table
RMMM.pdf make it easy to upload and study
2.FourierTransform-ShortQuestionswithAnswers.pdf
BÀI TẬP BỔ TRỢ 4 KỸ NĂNG TIẾNG ANH 9 GLOBAL SUCCESS - CẢ NĂM - BÁM SÁT FORM Đ...
STATICS OF THE RIGID BODIES Hibbelers.pdf
Module 4: Burden of Disease Tutorial Slides S2 2025
Abdominal Access Techniques with Prof. Dr. R K Mishra
Pharmacology of Heart Failure /Pharmacotherapy of CHF
Physiotherapy_for_Respiratory_and_Cardiac_Problems WEBBER.pdf
master seminar digital applications in india
01-Introduction-to-Information-Management.pdf
PPT- ENG7_QUARTER1_LESSON1_WEEK1. IMAGERY -DESCRIPTIONS pptx.pptx
Microbial diseases, their pathogenesis and prophylaxis
Pharma ospi slides which help in ospi learning
school management -TNTEU- B.Ed., Semester II Unit 1.pptx
Final Presentation General Medicine 03-08-2024.pptx

jamia polytechnique delhi

  • 1. BUILDING SERVICES STUDY ON FIRE SERVICES… PRESENTED BY- Aiman Naseem Sundus Hussain M.Raghib Bilal Khan Hamzah Meraj
  • 2. CONTENTS 1. Introduction 2. Floor plans 3.Entrance 4.Corridors 5. Classrooms 6.Lift 7.Staircase 8. Basement 9. Fire Extinguishers & Refuge Area 10. Fire Alarm Control Panel 11. Illumination & Sign boards 12. Fire Hydrant Chamber & Fire Hose Reel 13. Fire Extractors 14.Water Tanks 15. Construction 16. Other fire Services
  • 3. UNIVERSITY POLYTECHNIC Approach- Main road- M.M.A Johar Road, JMI Height of the building- 26m Numbers of floors- 05 Occupancy per floor- 300-350 persons
  • 4. FLOOR PLANS I. Typical Floor Plan II. Terrace Plan III. Service Plan
  • 8. Branch Sprinkler pipe25mm dia Main Sprinkler pipe-65 mm dia Ramp for Exit Smoke Extractors BASEMENT SERVICE PLAN Fire Exit
  • 9. 14m 9m 1.5m 3m 3m 1.5m 9 Sprinklers are provided in area of 9x9m 18 Sprinklers are provided in an area of 14x8m
  • 10. • Openable windows on external walls are fitted with such locks that can be opened by a fireman’s axe. • Sprinklers are provided in the basement. • Mechanical extractors for smoke venting system are provided.
  • 11. • Fire Extinguishers provided & Signage available. • Fire Hose reel provided in the basement. • Fire Alarm located on the service core and at regular system.
  • 13. 1.Lecture Hall • 17x8m- 140students • No of smoke detectors-8 2. Classroom • 9mx9m for 70 students. • No of smoke detecators-03 • Smoke Detectors are provided on the ceiling. • Exit signs on the doors are pasted, but without illumination. • No fire extinguisher present within the Hall. • Smoke Detectors
  • 14. CORRIDORS • 2500mm wide corridor • Corridors are fitted with Smoke Detectors But no Sprinklers provided. • Fire alarm is provided. • ‘Panic button’ with breakable glass is provided in the corridors. • Signage at regular interval provided for exit.
  • 15. LIFT • No Fire Lift Provided. • Lift floor area -2400mmx2100mm • Has a loading capacity of 545kg(10 persons) • Width of door.-1000mm • Communication facilities are provided in lift cars. • A sign is been pasted and maintained on the lift indicating that in case of fire occupants shall use the stairs. • Lifts are installed in a common enclosures having individual lift separated by walls
  • 17. 1. Normal Staircase • Width of the Stair-1500mm • Stair type- Circular & Winder 2.Fire Stairs • Width of Stair-2000mm • Fire Exit Signage provided near to staircase. • Height of riser-150mm
  • 19. • Type of fire extinguishers-ABC with ISI certification mark. • 2 extinguishers for every floor is been provided. • 1 fire extinguisher each in lab, near to electrical installation & generator room is been provided. • Refuge area has been provided on the 4th Floor.
  • 21. • Fire control panel is provided on each floor of the building. • The panel receives information from environmental sensors, such as heat detectors or smoke detectors designed to detect changes associated with fire. • In fire condition, the fire alarm control panel indicates where the fire originated.
  • 23. • No Emergency lights provided in the staircase and corridor. • Sign boards ‘Fire Exit’ over the Lift and near to stairs are provided. • Sign posted without illuminated sign for, all exits and direction of travel to each exit. • No Fire plan for each floor showing the locations of the stairways.
  • 25. • Chamber area- 0.7mx1.3m • A hose reel, 30m long and fitted with 19mm diameter nozzle at the end of it. • One Fire Hydrant Chamber on each floor of the building is provided.
  • 27. • Fire Extractors provided only in the basement area. • Fire Dampers are located in return air ducts. • Fire Dampers in fire prevent the spread of smoke inside the ducts. • When a rise in temperature occurs, the fire damper closes, usually activated by a thermal element which melts at higher temperatures. FIRE DAMPERS
  • 29. • Fire tank capacity- 25klts • Area-16.9sqm • Domestic water tank capacity- 20klts • Area-15.3 Fire water supply Pipes Domestic water supply Pipes
  • 31. 1.Comustibility Properties • All materials of constructions in load bearing elements, stairways & corridors and facades are non-combustible. • The internal walls & staircase are of brick & somewhere with reinforced concrete with a minimum of 2h fire rating. • Facade treatments is non combustible because of the use of exposed brick.
  • 32. 2. MATERIALS Flooring materials •Terrazzo •Marble •Tiles Materials for walls •Tiles •Cement plaster Tiles as a flooring material Terrazo as a flooring material
  • 33. OTHER FIRE SERVICES Facilities Which are necessary to be provided in case of fire which were not present in our CASESTUDY. 1.Call box 2.Control Rooms 3.Materials (Non Combustible0 4.Denchers
  • 34. 1.CALL BOX A callbox is a box containing a special-purpose direct line telephone. Call boxes should be I. Located at each floor. II. One or more should be provided on the floor. III. Accessible within 22.5m. IV. Call boxes shall be wired in a close circuit. V. At a height of 1m from the floor level.
  • 35. 2.CONTROL ROOM • There shall be a control room on the entrance floor of the building with communication system to all floors. • Details of all floor plans along with the detail of fire fighting equipment and installations shall be maintained in the control room.
  • 36. 3.Materials Fire proofing material for walls •Gypsum plaster •Cementetious plaster •Fibrous plaster •Intumescent fire proofing Fire proofing material for floors •PCC •Terrazo •Tiles
  • 37. 4.DRENCHERS • A drencher fire control system provides a discharge of water over roofs, walls and windows to prevent fire spreading from or to adjacent buildings. • Drencher systems provide the necessary curtain of water for protection against internal and external exposure to fire.