Limits for tasks
• set Work in Progress (WiP) limits in the team
• WiP are individually for the producer, pair, team
• WiP can be adapted any times in the team
Limits for queues
• queues should be as small as possible
• necessity: variability can be restricted and the
workflow are maintained
Buffer and bottlenecks
• buffer should be as small as possible
• buffer and queues increase the whole WIP limit
• buffer > WiP > lead time
Size of the input queue
• the size of the input queue is given by the
prioritization meeting
• input queue should be refilling as fast as possible
• idle time is to avoid
Unlimited sections
• theory of constraints „Drum Buffer Rope“ allows
partly no WiP
• Kanban provides WiP per column, but
sometimes with exceptions (e.g. queue column)
Do not put pressure on team
• small WiP limits causes pressure on the team
- results is that the project stops
• use idle times for optimization
• J-curve effect
Mistake: not set WiP limit
• if WiP limit is set identify process errors
• without WiP limits -
result: no continuous improvement for the
process and team
Allocation of capacity
• define WiP limit for the whole Kanban board
• define WiP limits for the service level agreements
• define capacities for each service level agreement
Conclusion
• define WiP limits per board, column, person
• individually adaption of the WiP
• use positive tension of the WiP limits

More Related Content

PPTX
Kanban - Classes of Service
PPTX
Kanban - Class of Service (To Manage Incidents in a DevOps Team)
PPTX
Kanban – Visualizing the value chain
PPTX
Kanban - Establish a Delivery Rhythm
PPTX
Working with Kanban
PPTX
Webinar: Kanban or Scrum – Is Scrum for developers and Kanban for IT support?
PPTX
Kanban
PPTX
Kanban 101
Kanban - Classes of Service
Kanban - Class of Service (To Manage Incidents in a DevOps Team)
Kanban – Visualizing the value chain
Kanban - Establish a Delivery Rhythm
Working with Kanban
Webinar: Kanban or Scrum – Is Scrum for developers and Kanban for IT support?
Kanban
Kanban 101

What's hot (20)

PPTX
Cross-department Kanban Systems - 3 dimensions of scaling #llkd15
PPT
Implementing kanban for services team
PPTX
Kanban
PPTX
Kanban software development
ODP
Kanban Board Examples
PDF
Introduction to Kanban boards
PPTX
Kanban - Set a pace for the input
PPTX
Agile scrum foundation tutorial.pptx
PPTX
Kanban - A recipe for success
PPTX
Leading IT Service Management from Scrum to Kanban
PDF
What the heck is Kanban? - CodeMash 2014
PDF
Testing Web Services - CodeMash 2014
PPTX
Kanban in sw development
PDF
Lean Kanban India 2018 | WIP decides Lead Time, Delivery Rate and Flow Effic...
PPT
XP2010 - From Scrum To Kanban In 10 Easy Steps!
PDF
An Introduction to Kanban
PPTX
Using Processes and Timers for Long-Running Asynchronous Tasks
PPTX
Why Pipelines Matter
KEY
Express lane video 8 results
PDF
Continuous delivery, a plugin for Kanban LKFR14
Cross-department Kanban Systems - 3 dimensions of scaling #llkd15
Implementing kanban for services team
Kanban
Kanban software development
Kanban Board Examples
Introduction to Kanban boards
Kanban - Set a pace for the input
Agile scrum foundation tutorial.pptx
Kanban - A recipe for success
Leading IT Service Management from Scrum to Kanban
What the heck is Kanban? - CodeMash 2014
Testing Web Services - CodeMash 2014
Kanban in sw development
Lean Kanban India 2018 | WIP decides Lead Time, Delivery Rate and Flow Effic...
XP2010 - From Scrum To Kanban In 10 Easy Steps!
An Introduction to Kanban
Using Processes and Timers for Long-Running Asynchronous Tasks
Why Pipelines Matter
Express lane video 8 results
Continuous delivery, a plugin for Kanban LKFR14
Ad

Viewers also liked (6)

PPTX
Why do we need WiP?
PDF
Lean Day Azienda Ospedaliera Senese (1^ Edizione)
PPTX
Why Limit WIP?
PPS
Case Study Sri Lanka Lean Wip Reduction
PDF
Limit your WIP! Why and how?
PPTX
Reduce WIP and Deliver Often: Kanban Recipe for Success Steps 2 and 3
Why do we need WiP?
Lean Day Azienda Ospedaliera Senese (1^ Edizione)
Why Limit WIP?
Case Study Sri Lanka Lean Wip Reduction
Limit your WIP! Why and how?
Reduce WIP and Deliver Often: Kanban Recipe for Success Steps 2 and 3
Ad

Similar to Kanban - Set Work in Progress Limits (20)

PPTX
EngManagement-Lecture 9.pptx
PPTX
CIM 15ME62 Module-3
PPTX
Kanban implementation introduction for beginner
PPT
Understand regression testing
PDF
11 Lean Value Stream Mapppppppppppppppppppppppp.pdf
PPT
Process Selection and Facility layout.ppt
PDF
Pipelining
PPT
Mba ii pmom_unit-1.4 process design, analysis & selection a
PPTX
21 Experiments to Increase Throughput
PDF
Andrew rusling 21 experiments to increase velocity
PPTX
21 experiments to increase velocity
PPTX
Olio ie training for all stuff
PPTX
7_production-activity-control.pptx
PPTX
Progress OE performance management
PPTX
Progress Openedge performance management
PPTX
Toyota production system
PPT
BID Final Presentation Creastmead V2.6 crews
PDF
Lean - PPT (Lean manufacturing and six sigma)
PPTX
Equipment Availability Analysis
PPTX
performance evaluation of parallel processors.pptx
EngManagement-Lecture 9.pptx
CIM 15ME62 Module-3
Kanban implementation introduction for beginner
Understand regression testing
11 Lean Value Stream Mapppppppppppppppppppppppp.pdf
Process Selection and Facility layout.ppt
Pipelining
Mba ii pmom_unit-1.4 process design, analysis & selection a
21 Experiments to Increase Throughput
Andrew rusling 21 experiments to increase velocity
21 experiments to increase velocity
Olio ie training for all stuff
7_production-activity-control.pptx
Progress OE performance management
Progress Openedge performance management
Toyota production system
BID Final Presentation Creastmead V2.6 crews
Lean - PPT (Lean manufacturing and six sigma)
Equipment Availability Analysis
performance evaluation of parallel processors.pptx

More from Avarteq (15)

PPTX
Kanban - How to coordinate with Kanban
PPTX
Kanban: Kaizen - Culture of continuous improvement
PPTX
Kanban - Extreme improvements in five quarters
PPTX
The Kanban method
PPTX
Kanban: The Dilemma of an Agile Manager
PDF
Ruby Grundlagen
KEY
Opscode Chef - Grundlagen
KEY
Einführung in Opscode Chef - Voraussetzungen
KEY
RabbitMQ mit (J)Ruby
KEY
JRuby
PDF
Enterprise rails hosting 3 ways to scale - 2011-10
KEY
Julian Fischer Ruby On Rails
KEY
Mehrserver Lösungen
KEY
Enterprise Hosting
KEY
Evolutionary Algorithms In Ruby
Kanban - How to coordinate with Kanban
Kanban: Kaizen - Culture of continuous improvement
Kanban - Extreme improvements in five quarters
The Kanban method
Kanban: The Dilemma of an Agile Manager
Ruby Grundlagen
Opscode Chef - Grundlagen
Einführung in Opscode Chef - Voraussetzungen
RabbitMQ mit (J)Ruby
JRuby
Enterprise rails hosting 3 ways to scale - 2011-10
Julian Fischer Ruby On Rails
Mehrserver Lösungen
Enterprise Hosting
Evolutionary Algorithms In Ruby

Recently uploaded (20)

PDF
TED Talk on how to make TED Talk slides.pdf
PDF
Maintaining a Quality Culture - Performance Metrics, Best Practices and QMS E...
PPTX
Project Management Methods PERT-and-CPM.pptx
PPTX
Chapter-3.pptx project life cycle presentation
PPTX
Course Overview of the Course Titled.pptx
PDF
Leveraging Intangible Assets Through Campus Entrepreneurship and Tech Transfer
PDF
The Plan: Save the Palestinian Nation Now
PPTX
Organisational behaviour_ managerial applications of perception
PDF
Certified Information Systems Security Professional (CISSP) Specialization Ce...
PPTX
Human Resource Management | Introduction,Meaning and Definition
PPTX
BASIC H2S TRAINING for oil and gas industries
PPTX
The Sustainable Site: Boosting Productivity in Construction – Pipe Dream or P...
PPTX
Chapter One an overview of political economy
PDF
How to Present a Project Proposal to Stakeholders for Approval?
PDF
Case study -Uber strategic plan and management
PPT
Introduction to Operations And Supply Management
PPTX
Testing center of excellence how to, why required
PPTX
_ISO_Presentation_ISO 9001 and 45001.pptx
PPTX
2. CYCLE OF FUNCTIONING RIFLE -PP Presentation..pptx
PPTX
power of team work; how to develop team work
TED Talk on how to make TED Talk slides.pdf
Maintaining a Quality Culture - Performance Metrics, Best Practices and QMS E...
Project Management Methods PERT-and-CPM.pptx
Chapter-3.pptx project life cycle presentation
Course Overview of the Course Titled.pptx
Leveraging Intangible Assets Through Campus Entrepreneurship and Tech Transfer
The Plan: Save the Palestinian Nation Now
Organisational behaviour_ managerial applications of perception
Certified Information Systems Security Professional (CISSP) Specialization Ce...
Human Resource Management | Introduction,Meaning and Definition
BASIC H2S TRAINING for oil and gas industries
The Sustainable Site: Boosting Productivity in Construction – Pipe Dream or P...
Chapter One an overview of political economy
How to Present a Project Proposal to Stakeholders for Approval?
Case study -Uber strategic plan and management
Introduction to Operations And Supply Management
Testing center of excellence how to, why required
_ISO_Presentation_ISO 9001 and 45001.pptx
2. CYCLE OF FUNCTIONING RIFLE -PP Presentation..pptx
power of team work; how to develop team work

Kanban - Set Work in Progress Limits

  • 1. Set Work In Progress Limits Kanban - Chapter 10
  • 2. Limits for tasks • set Work in Progress (WiP) limits in the team • WiP are individually for the producer, pair, team • WiP can be adapted any times in the team
  • 3. Limits for queues • queues should be as small as possible • necessity: variability can be restricted and the workflow are maintained
  • 4. Buffer and bottlenecks • buffer should be as small as possible • buffer and queues increase the whole WIP limit • buffer > WiP > lead time
  • 5. Size of the input queue • the size of the input queue is given by the prioritization meeting • input queue should be refilling as fast as possible • idle time is to avoid
  • 6. Unlimited sections • theory of constraints „Drum Buffer Rope“ allows partly no WiP • Kanban provides WiP per column, but sometimes with exceptions (e.g. queue column)
  • 7. Do not put pressure on team • small WiP limits causes pressure on the team - results is that the project stops • use idle times for optimization • J-curve effect
  • 8. Mistake: not set WiP limit • if WiP limit is set identify process errors • without WiP limits - result: no continuous improvement for the process and team
  • 9. Allocation of capacity • define WiP limit for the whole Kanban board • define WiP limits for the service level agreements • define capacities for each service level agreement
  • 10. Conclusion • define WiP limits per board, column, person • individually adaption of the WiP • use positive tension of the WiP limits