Key Considerations for Scoping
of Reinstrumentation Projects
Hyonsook Kang
Industry Consultant
Retired from Shell – PM/EM
December 13, 2016
Copyright © Yokogawa Corporation of America
2
 Participant audio is muted.
 If your computer audio is not working, please
join us using the teleconference number.
Call-in toll-free number (US/Canada): 1-877-
668-4490
Call-in toll number (US/Canada): 1-408-792-
6300
Access code: 712 177 451
Event Logistics
Copyright © Yokogawa Corporation of America
3
 Questions will be taken through the Q&A window.
 Click on ‘Chat’ in the upper right corner of your screen.
Please send your questions to host. Questions will be
answered at the end of the presentation or via e-mail
shortly after.
Event Logistics
Copyright © Yokogawa Corporation of America
4
 Shortly after the event, you will receive an email
containing a link to the recording, slide download, and
access to all resources.
 As you exit the webinar, you will have the option to
participate in a short survey. Your feedback is very
important to us, so please take a minute to complete.
Event Logistics
Copyright © Yokogawa Corporation of America
5
 Host: Josh Perry
Marketing Manager
Josh.perry@us.yokogawa.com
 Presenter:
Hyonsook Kang
Hyonsook.Kang@us.yokogawa.com
Host & Presenters
Copyright © Yokogawa Corporation of America
6
Key Considerations for Scoping
of Reinstrumentation Projects
Hyonsook Kang
Industry Consultant
Retired from Shell – PM/EM
December 13, 2016
Modernize or Maintain?
• Are the right people involved – business, projects,
plant?
• Is the cost of maintaining the old system worth
spending? What is the total cost of ownership?
• How many more years can the existing system
last? Can the capability and productivity of the old
system be improved?
• Is it safe to operate?
• How much will it cost to migrate the system?
• What are the benefits and value added features of
the new system?
• Downtime for migration and disruptions to operation
and maintenance?
• How will future regulations influence operations in
the future?
Top 3 Drivers for Reinstrumentation Projects
• Obsolescence
– DCS
– SIS
– Operator Stations
– Field Instrumentation & Wiring
• Safety, Industry Regulations &
Compliance
– SIS Regulation
– Environmental Compliance Monitoring
• Operational Excellence
– Risk of Aging Workforce
– Advanced Process Control
– Cyber Security
Obsolescence – Automation Component Lifecycle
9
Safety, Industry Regulations/ Compliance
• SIS regulations – IEC 61511 becoming more
stringent. Different parts of the world not
allowing the grandfathering of the existing
systems (separation of BPCS & SIS)
• Environmental Compliance Monitoring
• Modular Process Automation – Operational
safety.
!
Careful consideration of how a possible accident
could affect the Owner’s Company in terms of
workforce safety, equipment damage and loss of
reputation
Average Dollar Loss per Major Incident by Cause in $MM
11
Challenges for Operational Excellence
Risk of Aging Workforce – losing senior operators due to
retirement. How to fill the gap with increase automation and
modular procedure automation
Advanced Process Control – increase throughput in plant
for more effective use of capital. Average increase of 4-10%
depending on the unit
Cyber Security – as moving towards a “connected
enterprise”, moving operations to the shore during
emergencies (for offshore), how to protect the networks from
these hackers and malware infections.
People over Age 65
13
Typical APC Costs & Benefits
14
Cyber Security
• Industrial plants are moving toward the “connected”
enterprise and enjoying the merits of connection to
information systems
• The control systems installed 10-20 years ago may have
obsolete security measures due to long term operation and
sophisticated new attacking techniques
15
6 Steps to Successful Reinstrumentation
Field Survey
Implementation of Best Practices and Recommendations
18
System Architecture
Project Scope Identification
• Identify the big
pieces
• Explore all the
opportunities and do
a proper risk analysis
• Maintain a vision of
what constitutes
success
Reuse of Existing Infrastructure
years
Copyright © Yokogawa Corporation of America
22
Obsolescence Dilemma
System & Security Requirements
Cyber Security Operations & Maintenance
24
APC
• Increase overall control stability and throughput
Operator Effectiveness
Control Room Upgrade
• Well designed control room will create
synergy and flow in the control rooms.
Human centered design philosophy
prioritizes safety, health, and comfort.
• Central Control Room Philosophy – increase
in operator effectiveness and breadth of
operator control and improve
communications.
27
Modular Procedural Automation
• Automate Procedures to help mitigate risks
of aging workforce for typical manual
operations.
28
Benefits of Operator Training System
29
Human Machine Interface Benefits
30
Time shortening of
monitoring cycle
Time shortening of
malfunction detection
Prevention of mistaken
judgment or
maloperation
Reduction of operators’
eyestrain or workload
Inheritance of operation
skills
Copyright © Yokogawa Corporation of America
31
Alarm Management
DCS/SIS Scope
Copyright © Yokogawa Corporation of America
33
Different Upgrade Scenarios
 Step by Step Upgrade: component base upgrade
unlike a full upgrade. For example, HMI is upgraded
without stopping the controllers, or upgrade of
controllers in an area of the unit without stopping other
controllers.
 Competitor System Upgrade: Yokogawa has developed
a comprehensive system migration strategy to address
competitor systems including Honeywell, ABB,
Emerson, Invensys, Siemans, etc, utilizing special
marshalling panels and adapter cables to connect
terminal panels of existing legacy systems and
database conversion tools.
Different Upgrade Scenarios
34
• Field Instrument
Replacement:
intelligent field
instruments and
process analyzers
accumulate diverse
field information
including process
values and
diagnostics.
Questions
??
Copyright © Yokogawa Corporation of America
36
Additional Resources
36
 Download our
Re-Instrumentation eBook to
Learn More on This Topic

More Related Content

PPTX
Understanding Transmitter Seals Webinar
PDF
Identifying and Overcoming Noise in Data Acquisition
PDF
Final optical wavelength measurement webinar 1 25-17 final 1
PDF
Field Pressure Calibration and Equipment Maintenance
PDF
The top 3 reasons to consider tdls
PDF
IIoT Digital Transformation for Plant Equipment Monitoring
PDF
Identifying & correcting poor power factor
PDF
Functional Safety (SIL) in the Subsea and Drilling Industry
Understanding Transmitter Seals Webinar
Identifying and Overcoming Noise in Data Acquisition
Final optical wavelength measurement webinar 1 25-17 final 1
Field Pressure Calibration and Equipment Maintenance
The top 3 reasons to consider tdls
IIoT Digital Transformation for Plant Equipment Monitoring
Identifying & correcting poor power factor
Functional Safety (SIL) in the Subsea and Drilling Industry

What's hot (20)

PPTX
SIS “Final Element” Diagnostics Including The SOV, Using A Digital Valve Cont...
PDF
35958867 safety-instrumented-systems
PDF
AlLERT Life Cycle Sustainment.
PPTX
Roman Nemish. Global IoT Technologies, Most Common Use Cases and Success Stra...
PDF
Ischia ATEX Inspection - Paperless Efficiency Company Brochure
PPTX
Flow Data Acquisition Presentation
PDF
Using Wireless Measurements in Control Applications
PDF
Process Analyzer Sampling Systems Simplified
PPTX
Sil presentation
PPTX
Part 5 of 6 - Implementation Phase - Safety Lifecycle Seminar - Emerson Excha...
PDF
SIL in de praktjk (functional Safety)
PPTX
Securing your supply chain from counterfeit parts through real time electroni...
PDF
Leveraging Cross-Operational Test Data for Manufacturing Yield and DPPM/RMA I...
PDF
LumaSense Thermal Imaging Infographic
PPT
Introduction to Functional Safety and SIL Certification
PDF
Factory Test Systems
PPT
THUM'S UP! : Wireless Troubleshooting of Intermittent Upsets
DOC
Controlling interests editors
PPTX
Embedded Systems, Asset or Security Threat? (6 May 2014, (ICS)2 Secure Rotter...
SIS “Final Element” Diagnostics Including The SOV, Using A Digital Valve Cont...
35958867 safety-instrumented-systems
AlLERT Life Cycle Sustainment.
Roman Nemish. Global IoT Technologies, Most Common Use Cases and Success Stra...
Ischia ATEX Inspection - Paperless Efficiency Company Brochure
Flow Data Acquisition Presentation
Using Wireless Measurements in Control Applications
Process Analyzer Sampling Systems Simplified
Sil presentation
Part 5 of 6 - Implementation Phase - Safety Lifecycle Seminar - Emerson Excha...
SIL in de praktjk (functional Safety)
Securing your supply chain from counterfeit parts through real time electroni...
Leveraging Cross-Operational Test Data for Manufacturing Yield and DPPM/RMA I...
LumaSense Thermal Imaging Infographic
Introduction to Functional Safety and SIL Certification
Factory Test Systems
THUM'S UP! : Wireless Troubleshooting of Intermittent Upsets
Controlling interests editors
Embedded Systems, Asset or Security Threat? (6 May 2014, (ICS)2 Secure Rotter...
Ad

Viewers also liked (18)

PPTX
Changing Best Practices in Flue Gas Analysis
PPTX
DOCX
Solid State Devices
PDF
Differential pressure control australia case study
DOC
تحديات المستقبل
PDF
Dwyer's Manometer Checklist
PPTX
Electronic marshalling vs remote io
PPTX
Scale exfoliation-in-cc-molds-sms-millcraft
PPTX
Condensation Issues in Instrumentation Enclosures and How to Prevent Them
PPTX
Condensate return-systems-chemtreat
PDF
Condensate Collection By Dk Singhal
PPTX
Electromagnetic Flowmeters
PPTX
Thermowells & Accessories
PDF
Optimizing the Steam Generation Cycle and Condensate Recovery Process
PDF
Damper Actuators
PDF
01 21-2015 basic deaerator science revealed final Desareador de oxigeno.
PDF
Cb gf web in aug 2016, controls r2 8.23.16 final
Changing Best Practices in Flue Gas Analysis
Solid State Devices
Differential pressure control australia case study
تحديات المستقبل
Dwyer's Manometer Checklist
Electronic marshalling vs remote io
Scale exfoliation-in-cc-molds-sms-millcraft
Condensation Issues in Instrumentation Enclosures and How to Prevent Them
Condensate return-systems-chemtreat
Condensate Collection By Dk Singhal
Electromagnetic Flowmeters
Thermowells & Accessories
Optimizing the Steam Generation Cycle and Condensate Recovery Process
Damper Actuators
01 21-2015 basic deaerator science revealed final Desareador de oxigeno.
Cb gf web in aug 2016, controls r2 8.23.16 final
Ad

Similar to Key Considerations for Scoping Reinstrumentation Projects (20)

PDF
Fluke Connect Condition Based Maintenance
PPT
Powersoft19 Overview - 2013
PPTX
Stork Presentation on Migration (Willem Hazenberg)
PDF
SCADA and Control Systems Security Summit
DOCX
Text-DISA_Review_Questions.docx
DOCX
Text-DISA_Review_Questions.docx
PDF
Apac 2015 minimizing integrity failure r02
PDF
Apac 2015 minimizing integrity failure r02
PPTX
Arizona State University Test Lecture
PPTX
Sunil David Presentation on Traceability-automation expo 22.pptx
PPTX
Unit v11 proactive maintenance analysis
PPTX
HA & DR System Design - Concepts and Solution
PDF
Process Safety Awareness | PSM | Gaurav Singh Rajput
PPTX
CA Mainframe Resource Intelligence
PPTX
PDF
Reliability Levels of Subsea Production Systems During Operations
PPTX
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
PPT
Richard Crisp -- predictable development for the IoT
PPTX
Unit 1 - Session 1.pptx
Fluke Connect Condition Based Maintenance
Powersoft19 Overview - 2013
Stork Presentation on Migration (Willem Hazenberg)
SCADA and Control Systems Security Summit
Text-DISA_Review_Questions.docx
Text-DISA_Review_Questions.docx
Apac 2015 minimizing integrity failure r02
Apac 2015 minimizing integrity failure r02
Arizona State University Test Lecture
Sunil David Presentation on Traceability-automation expo 22.pptx
Unit v11 proactive maintenance analysis
HA & DR System Design - Concepts and Solution
Process Safety Awareness | PSM | Gaurav Singh Rajput
CA Mainframe Resource Intelligence
Reliability Levels of Subsea Production Systems During Operations
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Richard Crisp -- predictable development for the IoT
Unit 1 - Session 1.pptx

More from Yokogawa1 (20)

PDF
Data, Data, Everywhere...GA10 Brings It All Together
PDF
202102 attaining proficiency in industrial pressure measurement r7
PDF
Chromatography Basics 2021
PDF
An Economic X-ray of Digital Transformation
PDF
Using A Unique, Next Generation APC Solution To Address Common Problems In Th...
PDF
Open Process Automation: Status of the O-PAS™ Standard, Conformance Certifica...
PDF
The Value-driven Approach to Digitalizing Assets and their Supply Chains
PDF
The Role And Evolution Of Advanced Analytics In The Process Industries
PDF
The Digital Twin For Production Optimization
PDF
Multi-Site Optimization To Drive Value Creation In Chevron
PDF
Keeping PACE with Advanced Process Control
PDF
Yokogawa’s DX and Smart Manufacturing Vision for Building our Future
PDF
Business Model Disruption - The Step-wise Transition to Remote Operations
PDF
A New Digital Maintenance Platform in a Large Petrochemical Facility to Ident...
PDF
Shift team effectiveness: Don't bother if you can't change "shop floor" shift...
PDF
Adversity Drives Innovation and Enterprise Resilience to Best Leverage a Hist...
PDF
Improved Upstream Production Efficiency with Remote Optimization Centers, Fie...
PDF
Transforming Decision Making in Scheduling of Terminal Operations
PDF
Contributing to the Development and Application of Cybersecurity Standards
PDF
Asia NOC Bridges Business-wide Performance Objectives and KPIs through an Adv...
Data, Data, Everywhere...GA10 Brings It All Together
202102 attaining proficiency in industrial pressure measurement r7
Chromatography Basics 2021
An Economic X-ray of Digital Transformation
Using A Unique, Next Generation APC Solution To Address Common Problems In Th...
Open Process Automation: Status of the O-PAS™ Standard, Conformance Certifica...
The Value-driven Approach to Digitalizing Assets and their Supply Chains
The Role And Evolution Of Advanced Analytics In The Process Industries
The Digital Twin For Production Optimization
Multi-Site Optimization To Drive Value Creation In Chevron
Keeping PACE with Advanced Process Control
Yokogawa’s DX and Smart Manufacturing Vision for Building our Future
Business Model Disruption - The Step-wise Transition to Remote Operations
A New Digital Maintenance Platform in a Large Petrochemical Facility to Ident...
Shift team effectiveness: Don't bother if you can't change "shop floor" shift...
Adversity Drives Innovation and Enterprise Resilience to Best Leverage a Hist...
Improved Upstream Production Efficiency with Remote Optimization Centers, Fie...
Transforming Decision Making in Scheduling of Terminal Operations
Contributing to the Development and Application of Cybersecurity Standards
Asia NOC Bridges Business-wide Performance Objectives and KPIs through an Adv...

Recently uploaded (20)

PPTX
CYBER-CRIMES AND SECURITY A guide to understanding
PPTX
UNIT 4 Total Quality Management .pptx
PDF
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
PPTX
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
PDF
composite construction of structures.pdf
PDF
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
PDF
Model Code of Practice - Construction Work - 21102022 .pdf
PPTX
Foundation to blockchain - A guide to Blockchain Tech
PPTX
OOP with Java - Java Introduction (Basics)
PPTX
UNIT-1 - COAL BASED THERMAL POWER PLANTS
DOCX
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
PDF
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
PDF
Operating System & Kernel Study Guide-1 - converted.pdf
PDF
737-MAX_SRG.pdf student reference guides
PPTX
Sustainable Sites - Green Building Construction
PDF
III.4.1.2_The_Space_Environment.p pdffdf
PDF
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
PPTX
bas. eng. economics group 4 presentation 1.pptx
PPTX
Fundamentals of safety and accident prevention -final (1).pptx
PPTX
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
CYBER-CRIMES AND SECURITY A guide to understanding
UNIT 4 Total Quality Management .pptx
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
composite construction of structures.pdf
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
Model Code of Practice - Construction Work - 21102022 .pdf
Foundation to blockchain - A guide to Blockchain Tech
OOP with Java - Java Introduction (Basics)
UNIT-1 - COAL BASED THERMAL POWER PLANTS
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
Operating System & Kernel Study Guide-1 - converted.pdf
737-MAX_SRG.pdf student reference guides
Sustainable Sites - Green Building Construction
III.4.1.2_The_Space_Environment.p pdffdf
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
bas. eng. economics group 4 presentation 1.pptx
Fundamentals of safety and accident prevention -final (1).pptx
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx

Key Considerations for Scoping Reinstrumentation Projects

  • 1. Copyright © Yokogawa Corporation of America 1 Key Considerations for Scoping of Reinstrumentation Projects Hyonsook Kang Industry Consultant Retired from Shell – PM/EM December 13, 2016
  • 2. Copyright © Yokogawa Corporation of America 2  Participant audio is muted.  If your computer audio is not working, please join us using the teleconference number. Call-in toll-free number (US/Canada): 1-877- 668-4490 Call-in toll number (US/Canada): 1-408-792- 6300 Access code: 712 177 451 Event Logistics
  • 3. Copyright © Yokogawa Corporation of America 3  Questions will be taken through the Q&A window.  Click on ‘Chat’ in the upper right corner of your screen. Please send your questions to host. Questions will be answered at the end of the presentation or via e-mail shortly after. Event Logistics
  • 4. Copyright © Yokogawa Corporation of America 4  Shortly after the event, you will receive an email containing a link to the recording, slide download, and access to all resources.  As you exit the webinar, you will have the option to participate in a short survey. Your feedback is very important to us, so please take a minute to complete. Event Logistics
  • 5. Copyright © Yokogawa Corporation of America 5  Host: Josh Perry Marketing Manager Josh.perry@us.yokogawa.com  Presenter: Hyonsook Kang Hyonsook.Kang@us.yokogawa.com Host & Presenters
  • 6. Copyright © Yokogawa Corporation of America 6 Key Considerations for Scoping of Reinstrumentation Projects Hyonsook Kang Industry Consultant Retired from Shell – PM/EM December 13, 2016
  • 7. Modernize or Maintain? • Are the right people involved – business, projects, plant? • Is the cost of maintaining the old system worth spending? What is the total cost of ownership? • How many more years can the existing system last? Can the capability and productivity of the old system be improved? • Is it safe to operate? • How much will it cost to migrate the system? • What are the benefits and value added features of the new system? • Downtime for migration and disruptions to operation and maintenance? • How will future regulations influence operations in the future?
  • 8. Top 3 Drivers for Reinstrumentation Projects • Obsolescence – DCS – SIS – Operator Stations – Field Instrumentation & Wiring • Safety, Industry Regulations & Compliance – SIS Regulation – Environmental Compliance Monitoring • Operational Excellence – Risk of Aging Workforce – Advanced Process Control – Cyber Security
  • 9. Obsolescence – Automation Component Lifecycle 9
  • 10. Safety, Industry Regulations/ Compliance • SIS regulations – IEC 61511 becoming more stringent. Different parts of the world not allowing the grandfathering of the existing systems (separation of BPCS & SIS) • Environmental Compliance Monitoring • Modular Process Automation – Operational safety. ! Careful consideration of how a possible accident could affect the Owner’s Company in terms of workforce safety, equipment damage and loss of reputation
  • 11. Average Dollar Loss per Major Incident by Cause in $MM 11
  • 12. Challenges for Operational Excellence Risk of Aging Workforce – losing senior operators due to retirement. How to fill the gap with increase automation and modular procedure automation Advanced Process Control – increase throughput in plant for more effective use of capital. Average increase of 4-10% depending on the unit Cyber Security – as moving towards a “connected enterprise”, moving operations to the shore during emergencies (for offshore), how to protect the networks from these hackers and malware infections.
  • 14. Typical APC Costs & Benefits 14
  • 15. Cyber Security • Industrial plants are moving toward the “connected” enterprise and enjoying the merits of connection to information systems • The control systems installed 10-20 years ago may have obsolete security measures due to long term operation and sophisticated new attacking techniques 15
  • 16. 6 Steps to Successful Reinstrumentation
  • 18. Implementation of Best Practices and Recommendations 18
  • 20. Project Scope Identification • Identify the big pieces • Explore all the opportunities and do a proper risk analysis • Maintain a vision of what constitutes success
  • 21. Reuse of Existing Infrastructure years
  • 22. Copyright © Yokogawa Corporation of America 22 Obsolescence Dilemma
  • 23. System & Security Requirements
  • 24. Cyber Security Operations & Maintenance 24
  • 25. APC • Increase overall control stability and throughput
  • 27. Control Room Upgrade • Well designed control room will create synergy and flow in the control rooms. Human centered design philosophy prioritizes safety, health, and comfort. • Central Control Room Philosophy – increase in operator effectiveness and breadth of operator control and improve communications. 27
  • 28. Modular Procedural Automation • Automate Procedures to help mitigate risks of aging workforce for typical manual operations. 28
  • 29. Benefits of Operator Training System 29
  • 30. Human Machine Interface Benefits 30 Time shortening of monitoring cycle Time shortening of malfunction detection Prevention of mistaken judgment or maloperation Reduction of operators’ eyestrain or workload Inheritance of operation skills
  • 31. Copyright © Yokogawa Corporation of America 31 Alarm Management
  • 33. Copyright © Yokogawa Corporation of America 33 Different Upgrade Scenarios  Step by Step Upgrade: component base upgrade unlike a full upgrade. For example, HMI is upgraded without stopping the controllers, or upgrade of controllers in an area of the unit without stopping other controllers.  Competitor System Upgrade: Yokogawa has developed a comprehensive system migration strategy to address competitor systems including Honeywell, ABB, Emerson, Invensys, Siemans, etc, utilizing special marshalling panels and adapter cables to connect terminal panels of existing legacy systems and database conversion tools.
  • 34. Different Upgrade Scenarios 34 • Field Instrument Replacement: intelligent field instruments and process analyzers accumulate diverse field information including process values and diagnostics.
  • 36. Copyright © Yokogawa Corporation of America 36 Additional Resources 36  Download our Re-Instrumentation eBook to Learn More on This Topic