IS5540- Project Management and   Quality Assurance   Project Management for global banking projects Prof. Y.B. Yeung 2/4/13 November 2009
Learning objectives Review examples of global IT projects of a major international bank Understand the challenges and experience gained from these IT project examples Understand the critical success factors of managing global IT projects
Global banking IT projects Definition IT projects that have users in multiple countries around the world(user focus) IT projects that are developed in multiple software centres in multiple countries(development focus) Many international companies have projects that fit both the above categories Requires advanced project management skills
Global banking environment International bank group operating in many countries Customers need to access their bank anywhere they travel Common brand and products worldwide Support services sourced from different countries(IT, call centres, data entry) Need to face different regulators and government
Study of a major global bank Fact sheets Two global IT projects Experience gained Critical success factors for managing global IT projects
Organisation of a global commercial bank
HSBC  fact sheet (1) One of the largest banking and financial service organisation in the world Asset = USD2,421 billion as of end June, 2009 Profit = USD3.7b for first half 2009 Number of offices worldwide = 8500 Total staff = 295,610 Number of customers = >100m(25m on Internet banking)
HSBC  Fact sheet (2) Established in 1865 in Hong Kong Head office in London Operations in Europe, Asia Pacific, Americas, Middle East & Africa
Asia Pacific region operations HSBC Asia Pacific Head office in Hong Kong Branches in 20 countries HK, China, India, Indonesia, Taiwan Philippines, Thailand, Malaysia, Singapore Brunei, Australia, New Zealand, Macau Pakistan, Bangladesh, Sri Lanka, Japan Vietnam, Korea, Kazakhstan
System connectivity branches branches Global Data network Software coe Software support Regional data  centres Global servicing centres
Example of global IT projects HUB(universal banking system) Central core team, regional customisation, used in multiple countries Internet banking Multiple development teams, used in multiple countries Group project strategy Develop once, use in as many places as possible
EXAMPLE 2 HUB PROJECT
HUB project H SBC  U niversal  B anking project ( HUB ) Software that supports branch banking in various countries Initial design is for small and medium size countries (eg. Thailand) Functionally rich (deposits, loans, time deposits, payments, trade finance, securities, credit cards) Now enhanced to handle large countries (eg. Canada, India)
Technology used by HUB IBM mid range computer – iSeries(formerly called AS400) Software in-house developed Use RPG (report program generator) language Front end – intelligent terminal software developed in-house using Unisys technology Development started in 1984 and took four years to complete First global project for the bank
Challenges faced by the project team Technology is new and evolving(S/34 to S/36 to S/38 to AS400) Technology not as robust as mainframe Needs rich functionality to cater for all aspects of branch banking First Group project – develop once and use many; implies building one software that cater for the needs of multiple countries  Difficult to gather requirements
Where is HUB today Probably one of the best branch banking software in the world (in-house or package) Implemented in many countries (all of Asia, Canada, Europe).  Large sites (HK, UK, USA) use selected modules from HUB Vancouver development centre is HUB COE Local support provided by regional team A major rewrite project has started to modernise HUB
Experience gained Set up a Group HUB user coordination department to control scope and user liaison Staffed by bankers and not IT staff Have clearly defined roles Core software developed in Hong Kong Sites allowed to make local changes Have to retrofit periodically back to core
Experience gained(2) PPCR procedure(program problem change request) Change control request vetted by HUB coordinators before passed to IT for evaluation Close partnership with IBM to improve the robustness of AS400(logical partitions, multiple processors, speed improvements) Strong project manager crucial to success of project
EXAMPLE 2 INTERNET BANKING PROJECT
Internet banking project PIB(personal internet banking)  BIB(business internal banking) Software history Base software purchased from IBM(from Integrion project) basic functionality Mainframe based engine for message routing to underlining applications Server(RS6000) software for message handling, encryption/decryption
Internet banking project(2) Components developed in-house All the customer facing screens – each country/bank group member is different Chinese support Hong Kong will not go live without Securities Trading Later addition – All corporate banking functions, including imports and exports
Internet banking connectivity Internet FIREWALL FIREWALL Mainframe TDM SAV CUA TD CARD LOAN SEC WEB SERVERS INTERNET BANKING SERVERS APPLICATIONS
Characteristics of project Core engine controlled by New York team Each country has variations on Web page (language, local content) Functionality (products, local interfaces) Regional team has to develop local functions Parallel development & implementation required Global and regional project management office
Hong Kong site – English and Chinese
Korean site – Korean and English
India – Unique NRI(non resident service)
Internet banking project today Rollout worldwide Hong Kong has over 1 million registered customers using internet banking Fast growing and popular channel High customer satisfaction The Hong Kong system has won many rewards from trade magazines
Experience gained Constant feedback required for Customer Experience Non IT support structure(eg. Call centre) also crucial to success Difficult to balance  Ease of use  vs.  Risk IT security is a constant threat but no security incidents caused by weak IT defense since launch Regulators/media watch like a hawk
How to manage global projects effectively Stick to project management principles Secure support from senior management  Have clear roles and responsibilities Good project planning Setup multi-site monitoring procedures Avoid scope creep Have common goals for all staff to overcome geographical and culture barriers Communicate, communicate, communicate
Stick to project management principles The basics do not change Variations for global projects are in: Cost Geography Multiple teams of IT and users Politics and turf war Complexity of managing change How many balls can you keep in the air?
Support from senior management Essential for: Funding – global projects are expensive. IT strategy support – core engine plus regional customisation; mainframe hardware at regional data centres plus servers(AIX and unix) User commitment – IT cannot do it alone and users pay for the project at the end
Clear roles and responsibilities New York team – hsbc.com Custody of core software; interface with IBM Regional teams User department – content; presentation; user acceptance test User coordinator department – control the rollout schedule and user liaison with all countries IT department – all technical development, testing and implementation
Clear roles and responsibilities(2) Business departments have to allocate resources Work with graphic design companies on web page design and navigation Work with IT on how to construct the web pages Prototype test with selected real life customers User acceptance test
Good project planning Plans have to be prepared at various levels Group; region; country Seek input from all stakeholders Marketing department will also provide input as to market segmentation in rolling out the product IT department has to input on hardware procurement, testing time slots, etc.
Setup multi-site monitoring procedures Steering Committee at group & regional level All stakeholders participate(IT and business, computer audit) High level progress reporting, issues Project manager has to work at the detailed level by communicating with local and remote teams Periodic progress reports Action quickly; escalate if necessary
Avoid scope creep Absolutely essential especially for multi-site projects Have a tight change control process on the scope One small change may have significant impact to the core infrastructure and other sites Project manager needs strong control on scope Work with the sponsor and users
Have common goals Differences in culture, geographies and processes must be overcome Solution: Built into award system Communicate often through intranet, working group meetings Form virtual teams Have escalation process in case of impasse
Communicate, communicate, communicate Share all information using intranet, newsletters, team meetings Encourage synergy with other group members in other countries Have escalation procedure in case of a communication block or tough issues
Summary The basic principles of project management do not change for global projects Complexity on scale, countries, people and politics The project manager plays a key role in the success of the project
Reference Hsbc.com website All HSBC information courtesy of HSBC Group

More Related Content

PPTX
Dell inc
DOC
Andrew Chalmers CV
DOC
JohnRobert_Castaneda_Resume_2016v2
DOC
DOC
Emery Rahrs Resume
PPTX
System Level Requirements Gathering
DOC
CV Resume Nazim KESER English Manager Director
Dell inc
Andrew Chalmers CV
JohnRobert_Castaneda_Resume_2016v2
Emery Rahrs Resume
System Level Requirements Gathering
CV Resume Nazim KESER English Manager Director

What's hot (20)

PDF
Resume-Jasim Ali
DOC
KTetreault IT
PPTX
Leah_Jones-Rodriguez_Final_Presentation
DOC
peggyHolland
DOCX
AllanMark_Dayan_CV
DOC
DOC
LuluResume-2015
DOC
Donald L James Jr
DOC
John_Rehmert
DOC
Elliott Robbins' Resume
DOC
Resume For Michael Ruffin
PDF
Adam Mickiewicz cv english version
DOC
Howard Holben - Resume
DOC
Narayanan Doraiswamy Resume
PDF
ToddCohen1016Resume
DOCX
Resume-Prabhat
DOC
ResumeGoogleNDO
PPT
PaperCut-MF Education Features
PPTX
Priyanka_Kanani_Fall_2015_Internship_Poster
PDF
John_Rehmert
Resume-Jasim Ali
KTetreault IT
Leah_Jones-Rodriguez_Final_Presentation
peggyHolland
AllanMark_Dayan_CV
LuluResume-2015
Donald L James Jr
John_Rehmert
Elliott Robbins' Resume
Resume For Michael Ruffin
Adam Mickiewicz cv english version
Howard Holben - Resume
Narayanan Doraiswamy Resume
ToddCohen1016Resume
Resume-Prabhat
ResumeGoogleNDO
PaperCut-MF Education Features
Priyanka_Kanani_Fall_2015_Internship_Poster
John_Rehmert
Ad

Viewers also liked (9)

PPT
Mobile banking project
PPTX
Voice based banking system
PDF
RISK AND RETURN ANALYSIS OF EQUITY SHARES IN BANKING
DOCX
comparative Analysis of mutual fund
DOC
SYNOPSIS ON BANK MANAGEMENT SYSTEM
PPTX
It portfolio management case study presentation
PDF
Project on Mutual Funds
PPT
Bank Management System
PPT
java Project report online banking system
Mobile banking project
Voice based banking system
RISK AND RETURN ANALYSIS OF EQUITY SHARES IN BANKING
comparative Analysis of mutual fund
SYNOPSIS ON BANK MANAGEMENT SYSTEM
It portfolio management case study presentation
Project on Mutual Funds
Bank Management System
java Project report online banking system
Ad

Similar to L10 pm for global banking projects (20)

PDF
Amit Chaubey
DOC
Yogesh Keshaowar_Profile
PDF
OSGi Community Event 2010 - Its Not About Technology Anymore (including a Cas...
DOCX
Rajkumar_webMethods_5.3Yrs_exp.doc
DOCX
Resume of Deependu Sarkar_Refined
DOC
Resume_Asish
DOC
Arvind Pal_Resume
DOC
.Net 7.1 years Vijay_Thakare
ODT
Anitha_Resume_BigData
DOCX
KK IT PM v5.0
PPTX
Techniques for Developing Systems in IT Management System
DOC
MohamedSalah-Resume
PPTX
SE&PM-MODULE-1 2.pptx Software engineering
PDF
Dave Wilson resume 021114
DOCX
Arun Kumar M Chandrasekar Resume
PPT
Corporate presentation2 aug 2006 (for offshore)
DOC
Puvvati_Resume
DOCX
Dhiraj_Kalra
DOC
Resume of Praveen
DOC
Venugopal - BO Resume
Amit Chaubey
Yogesh Keshaowar_Profile
OSGi Community Event 2010 - Its Not About Technology Anymore (including a Cas...
Rajkumar_webMethods_5.3Yrs_exp.doc
Resume of Deependu Sarkar_Refined
Resume_Asish
Arvind Pal_Resume
.Net 7.1 years Vijay_Thakare
Anitha_Resume_BigData
KK IT PM v5.0
Techniques for Developing Systems in IT Management System
MohamedSalah-Resume
SE&PM-MODULE-1 2.pptx Software engineering
Dave Wilson resume 021114
Arun Kumar M Chandrasekar Resume
Corporate presentation2 aug 2006 (for offshore)
Puvvati_Resume
Dhiraj_Kalra
Resume of Praveen
Venugopal - BO Resume

More from Asa Chan (12)

PPT
L02 pm & it context
PPT
L03 integration management
PDF
Project cartoon how projects really work
PPT
L05 time management
PPT
L06 cost management
PPT
L06 cost management (additional info on evm)
PPT
L08 csf of pm in banking
PPT
L07 quality management
PPT
L07 quality management (additional information on quality requirements)
PPT
Risk video
PPT
Is5540 course review
PPT
L01 introduction to pm
L02 pm & it context
L03 integration management
Project cartoon how projects really work
L05 time management
L06 cost management
L06 cost management (additional info on evm)
L08 csf of pm in banking
L07 quality management
L07 quality management (additional information on quality requirements)
Risk video
Is5540 course review
L01 introduction to pm

L10 pm for global banking projects

  • 1. IS5540- Project Management and Quality Assurance Project Management for global banking projects Prof. Y.B. Yeung 2/4/13 November 2009
  • 2. Learning objectives Review examples of global IT projects of a major international bank Understand the challenges and experience gained from these IT project examples Understand the critical success factors of managing global IT projects
  • 3. Global banking IT projects Definition IT projects that have users in multiple countries around the world(user focus) IT projects that are developed in multiple software centres in multiple countries(development focus) Many international companies have projects that fit both the above categories Requires advanced project management skills
  • 4. Global banking environment International bank group operating in many countries Customers need to access their bank anywhere they travel Common brand and products worldwide Support services sourced from different countries(IT, call centres, data entry) Need to face different regulators and government
  • 5. Study of a major global bank Fact sheets Two global IT projects Experience gained Critical success factors for managing global IT projects
  • 6. Organisation of a global commercial bank
  • 7. HSBC fact sheet (1) One of the largest banking and financial service organisation in the world Asset = USD2,421 billion as of end June, 2009 Profit = USD3.7b for first half 2009 Number of offices worldwide = 8500 Total staff = 295,610 Number of customers = >100m(25m on Internet banking)
  • 8. HSBC Fact sheet (2) Established in 1865 in Hong Kong Head office in London Operations in Europe, Asia Pacific, Americas, Middle East & Africa
  • 9. Asia Pacific region operations HSBC Asia Pacific Head office in Hong Kong Branches in 20 countries HK, China, India, Indonesia, Taiwan Philippines, Thailand, Malaysia, Singapore Brunei, Australia, New Zealand, Macau Pakistan, Bangladesh, Sri Lanka, Japan Vietnam, Korea, Kazakhstan
  • 10. System connectivity branches branches Global Data network Software coe Software support Regional data centres Global servicing centres
  • 11. Example of global IT projects HUB(universal banking system) Central core team, regional customisation, used in multiple countries Internet banking Multiple development teams, used in multiple countries Group project strategy Develop once, use in as many places as possible
  • 12. EXAMPLE 2 HUB PROJECT
  • 13. HUB project H SBC U niversal B anking project ( HUB ) Software that supports branch banking in various countries Initial design is for small and medium size countries (eg. Thailand) Functionally rich (deposits, loans, time deposits, payments, trade finance, securities, credit cards) Now enhanced to handle large countries (eg. Canada, India)
  • 14. Technology used by HUB IBM mid range computer – iSeries(formerly called AS400) Software in-house developed Use RPG (report program generator) language Front end – intelligent terminal software developed in-house using Unisys technology Development started in 1984 and took four years to complete First global project for the bank
  • 15. Challenges faced by the project team Technology is new and evolving(S/34 to S/36 to S/38 to AS400) Technology not as robust as mainframe Needs rich functionality to cater for all aspects of branch banking First Group project – develop once and use many; implies building one software that cater for the needs of multiple countries Difficult to gather requirements
  • 16. Where is HUB today Probably one of the best branch banking software in the world (in-house or package) Implemented in many countries (all of Asia, Canada, Europe). Large sites (HK, UK, USA) use selected modules from HUB Vancouver development centre is HUB COE Local support provided by regional team A major rewrite project has started to modernise HUB
  • 17. Experience gained Set up a Group HUB user coordination department to control scope and user liaison Staffed by bankers and not IT staff Have clearly defined roles Core software developed in Hong Kong Sites allowed to make local changes Have to retrofit periodically back to core
  • 18. Experience gained(2) PPCR procedure(program problem change request) Change control request vetted by HUB coordinators before passed to IT for evaluation Close partnership with IBM to improve the robustness of AS400(logical partitions, multiple processors, speed improvements) Strong project manager crucial to success of project
  • 19. EXAMPLE 2 INTERNET BANKING PROJECT
  • 20. Internet banking project PIB(personal internet banking) BIB(business internal banking) Software history Base software purchased from IBM(from Integrion project) basic functionality Mainframe based engine for message routing to underlining applications Server(RS6000) software for message handling, encryption/decryption
  • 21. Internet banking project(2) Components developed in-house All the customer facing screens – each country/bank group member is different Chinese support Hong Kong will not go live without Securities Trading Later addition – All corporate banking functions, including imports and exports
  • 22. Internet banking connectivity Internet FIREWALL FIREWALL Mainframe TDM SAV CUA TD CARD LOAN SEC WEB SERVERS INTERNET BANKING SERVERS APPLICATIONS
  • 23. Characteristics of project Core engine controlled by New York team Each country has variations on Web page (language, local content) Functionality (products, local interfaces) Regional team has to develop local functions Parallel development & implementation required Global and regional project management office
  • 24. Hong Kong site – English and Chinese
  • 25. Korean site – Korean and English
  • 26. India – Unique NRI(non resident service)
  • 27. Internet banking project today Rollout worldwide Hong Kong has over 1 million registered customers using internet banking Fast growing and popular channel High customer satisfaction The Hong Kong system has won many rewards from trade magazines
  • 28. Experience gained Constant feedback required for Customer Experience Non IT support structure(eg. Call centre) also crucial to success Difficult to balance Ease of use vs. Risk IT security is a constant threat but no security incidents caused by weak IT defense since launch Regulators/media watch like a hawk
  • 29. How to manage global projects effectively Stick to project management principles Secure support from senior management Have clear roles and responsibilities Good project planning Setup multi-site monitoring procedures Avoid scope creep Have common goals for all staff to overcome geographical and culture barriers Communicate, communicate, communicate
  • 30. Stick to project management principles The basics do not change Variations for global projects are in: Cost Geography Multiple teams of IT and users Politics and turf war Complexity of managing change How many balls can you keep in the air?
  • 31. Support from senior management Essential for: Funding – global projects are expensive. IT strategy support – core engine plus regional customisation; mainframe hardware at regional data centres plus servers(AIX and unix) User commitment – IT cannot do it alone and users pay for the project at the end
  • 32. Clear roles and responsibilities New York team – hsbc.com Custody of core software; interface with IBM Regional teams User department – content; presentation; user acceptance test User coordinator department – control the rollout schedule and user liaison with all countries IT department – all technical development, testing and implementation
  • 33. Clear roles and responsibilities(2) Business departments have to allocate resources Work with graphic design companies on web page design and navigation Work with IT on how to construct the web pages Prototype test with selected real life customers User acceptance test
  • 34. Good project planning Plans have to be prepared at various levels Group; region; country Seek input from all stakeholders Marketing department will also provide input as to market segmentation in rolling out the product IT department has to input on hardware procurement, testing time slots, etc.
  • 35. Setup multi-site monitoring procedures Steering Committee at group & regional level All stakeholders participate(IT and business, computer audit) High level progress reporting, issues Project manager has to work at the detailed level by communicating with local and remote teams Periodic progress reports Action quickly; escalate if necessary
  • 36. Avoid scope creep Absolutely essential especially for multi-site projects Have a tight change control process on the scope One small change may have significant impact to the core infrastructure and other sites Project manager needs strong control on scope Work with the sponsor and users
  • 37. Have common goals Differences in culture, geographies and processes must be overcome Solution: Built into award system Communicate often through intranet, working group meetings Form virtual teams Have escalation process in case of impasse
  • 38. Communicate, communicate, communicate Share all information using intranet, newsletters, team meetings Encourage synergy with other group members in other countries Have escalation procedure in case of a communication block or tough issues
  • 39. Summary The basic principles of project management do not change for global projects Complexity on scale, countries, people and politics The project manager plays a key role in the success of the project
  • 40. Reference Hsbc.com website All HSBC information courtesy of HSBC Group