SlideShare a Scribd company logo
www.wgconsulting.com
Requirements Gathering:
The first step to project
success
Lecture 1
BSIT-6th
Copyright 2014, WG Consulting, LLC 2
Copyright 2014, WG Consulting, LLC 33/22/2016
 70% of organizations have suffered at least one project failure in the prior 12 months.
 50% of respondents also indicated that their project failed to consistently achieve
what they set out to achieve!
 Many organizations fail to measure benefits so they are unaware of their true status
in terms of benefits realization (success assessment).
Source: KPMG Study, Global IT Management Survey
Dec 2010
The Facts
Copyright 2014, WG Consulting, LLC 43/22/2016
 Interviews with 600 people closely involved in software development projects find that
even at the start of a project many people expect their projects to fail! (a survey)
 “Fuzzy business objectives, out-of-sync stakeholders, and excessive rework” mean that
75% of project participants lack confidence that their projects will succeed.
 78% of respondents reported that the “Business is usually or always out of sync with
project requirements” (a survey)
What are the statistics?
Copyright 2014, WG Consulting, LLC 53/22/2016
 Too many project managers either overlook the importance of requirements
management or fail to understand the difference between scope, requirements, and
expectations.
 Scope = draws boundary b/w what’s in and what’s out of the projecct.
 In fact, 60-80 percent of project failures can be attributed directly to poor requirements
gathering, analysis, and management.
G. Chandrashekar of the ProjectSmart blog wrote,
“Innumerable studies have shown that requirements gathering is the single most important
step…It’s far more expensive to fix a requirements error than a coding error. But somehow
everyone seems to believe that a requirements specification document is the easiest part to
produce…It can’t be further from the truth. No one ever built a good structure without the
right foundation. Make sure that you take time to gather the requirements fully and analyze
them in depth.”
What is the problem?
Copyright 2014, WG Consulting, LLC 63/22/2016
Why Projects Fail….
Copyright 2014, WG Consulting, LLC 73/22/2016
 The requirements gathering or the discovery phase is essential to the
success of any project.
 Many experienced project managers would agree that if the
requirements are identified correctly and early in the project cycle there
would be a significant reduction in the project budget.
 If an effort to save time and project dollars, requirements gathering is
often overlooked or is not allocated enough time or budget.
Why are requirements important?
Copyright 2014, WG Consulting, LLC 83/22/2016
Five key components of requirements gathering
1. Gathering requirements comes first, defining scope comes second.
It is fairly common in the project management world for people to use
the terms “requirements” and “scope” synonymously. But they are
different. “Requirements” define what is needed and “Scope” is how you
are going get there.
 “Requirements” are the demands, needs, and specifications for a
product as outlined by project stakeholders. The Deep Fried Brain
Blog defines requirements as what the customer needs.
 “Scope” is defined as the work that needs to be accomplished to
deliver a product, service, or result with the specified features and
functions.
Copyright 2014, WG Consulting, LLC 93/22/2016
Five key components of requirements gathering
2. There are two types of requirements: project requirements and
product requirements.
Project Requirements define how the work will be managed. Project
requirements focus on who, when, where, and how something gets
done.
Product Requirements include high level features or capabilities that the
business team has committed to delivering to a customer.
Project requirements must be defined first and then products evaluated
based on the best fit to these needs.
Copyright 2014, WG Consulting, LLC 103/22/2016
Five key components of requirements gathering
3. Make sure you adequately document all the requirements.
The requirements gathering process should be iterative and all discussions
documented and verified to make sure requirements were understood
correctly.
Requirements should be evaluated throughout the project to make sure
systems are not overly complicated, over designed and address the initial
needs defined at the beginning of the project.
Copyright 2014, WG Consulting, LLC 113/22/2016
Five key components of requirements gathering
4. Select the best methodology for the project.
The approach when developing a project must be determined for each
engagement based on the project team, the organization and the goals of
the project. In some cases, a hybrid of these methodologies is ideal.
A few examples of project methodology include:
RAD (Rapid Application Deployment) Spiral
• Used for less structured projects
• Projects are divided to smaller
initiatives
• Prototyping is used
Spiral
• Incremental build
• Additional functionality added later
• Prototyping used
Waterfall
• Tightly defined objectives
• Controlled process
• Major milestones with accountability
JAD (Joint Application Design)
• Involves the client or end user in the
design and development of an
application
• Collaborative workshops
• Requires dedicated resources
Scrum
• Flexible and collaborative
• General guidelines are set but
constantly reevaluated
• Inspect and reevaluate
Copyright 2014, WG Consulting, LLC 123/22/2016
Five key components of requirements gathering
5. Engage a diverse cross section of users
It is always important to engage a broad group of users. Requirements
gathering sessions are usually effective in involving groups of users.
The facilitator of these discussions is critical providing leading questions,
understand the business and be able to gather information effectively.
It is often difficult for participants to articulate their daily routines and
processes. The success of requirements gathering is contingent on the
ability to extract detailed and high level information and then create a
global picture of the needs of the organization.
Copyright 2014, WG Consulting, LLC 133/22/2016
Requirements: The first critical step
“A good beginning makes a good ending.”
(Read yourself)
 The requirements gathering process may not guarantee a successful project but
provides a foundation for project that can be managed to meet well defined
objectives.
 Requirement gathering sessions should be designed to define business
processes, owners, and reporting needs.
 Requirements sessions should set a proactive tone for the project. Many project
teams get into the mindset of being reactive is addressing issues. A clear, concise
requirements document will create the baseline to building scope, project plans,
risk mitigation plans.
 Requirements provide the stepping stone to deriving scope. There are times
where at the end of the requirements phase, scope cannot be clearly defined. It
is essential at this point that the project methodology is modified to perhaps
include a proof of concept or prototyping phase.
Copyright 2014, WG Consulting, LLC 143/22/2016
Requirements: The first critical step
 Our requirements sessions are designed to be interactive and not follow a script.
This environment allows users to learn from the other subject manager experts
in the sessions as well as create a baseline for strong communication.
 These sessions should include how communication will be delivered, the project
team and their roles on the project and tools that will be used to document such
as an issues log, requirements matrix, or weekly status reports.
 A clear set of defined goals and objectives, reviewed throughout the term of the
project is a essential to manage expectations and avoid project pitfalls.
Copyright 2014, WG Consulting, LLC 153/22/2016
In general, one of the biggest problems that globally/nationally dispersed teams face in
requirements gathering and systems analysis is communication.
Solution?
Copyright 2014, WG Consulting, LLC 163/22/2016
Why are we different (About WG Consulting)
1. We follow the research and study what works. Our professionals have
researched the results of project success and project failure. The WG team
utilizes world-class methodologies to deliver value-creating solutions
based on each client’s unique operating needs. Our team’s thorough
understanding of operational and regulatory risk is the key to competitive
results that mitigate such risks for our valued clients.
• Research = 4.5% world population is color blind
• 7-9 items view at a time (usability)
2. We adapt our approach to your needs. Best business practices have
their value, but these processes cannot be applied to all organizations.
 Project methodology and approach can only be determined based on an
understanding of users, business processes, resources, knowledge of the
software and the requirements of the project. (methodology)
Copyright 2014, WG Consulting, LLC 173/22/2016
Why are we different (about WG Consulting)
3. We have been there. Our team is comprised of professionals with at
least 15 years of industry and consulting experience. Our consultants
have been IT analysts, administrators, project managers, and IT
professionals that have broad industry experience.
• This experience provides you with an educated, agile team that can adapt
to the project methodology, culture and needs of your organization.
4. Communication. Our consultants focus on constant and effective
communication with the client in the form of documentation, weekly
meetings, demonstrations and training sessions.
• It can be done through software?
Copyright 2014, WG Consulting, LLC 183/22/2016
 What features could you add to the product that would better accommodate
end user needs for older people aging 65+?
– Voice command
– Many menus
– Large text
– Audio reminders
 In which software development process model would requirements and
design be two completely separate phases?
– RAD
– Spiral
– V-model
– Waterfall
Quiz
Copyright 2014, WG Consulting, LLC 193/22/2016
 Requirements: A restaurant manager wants to develop an
in house software. Goal is that customers can place order
directly to the kitchen and kitchen can view it. Moreover
customers can change orders and pay the bills.
 There should be kids page for games and easy for kids to
make an order themselves.
• Quiet simple case 
• Explore more development models in slide no. 11
• In slide no. 12 what does involving means?
• In slide no. 16 explore Agile Methodology
• How communication among team can be done through software?
• Slide no. 18 contact related person to ask at least one question and paste also
on question.computingcage.com (always)
Restaurant Scenario

More Related Content

PPTX
Assessing Technology Landscape
PPT
Enterprise Application Integration
PDF
EAI example
PPT
Enterprise Application Integration
PDF
Meeting Mobile and BYOD Security Challenges
DOCX
Enterprise Application integration (middleware) concepts
PPT
Kendall sad8e ch01
 
PDF
ICTA Technology Meetup 01 - Enterprise Application Integration
Assessing Technology Landscape
Enterprise Application Integration
EAI example
Enterprise Application Integration
Meeting Mobile and BYOD Security Challenges
Enterprise Application integration (middleware) concepts
Kendall sad8e ch01
 
ICTA Technology Meetup 01 - Enterprise Application Integration

What's hot (20)

PPT
Enterprise application integration
PDF
End User Development - Governance and Risk Management
PPTX
Mba ii u v enterprise application integration
PDF
End-user computing is not a trend, it's a transformational shift
PDF
Employing Enterprise Application Integration (EAI)
PPTX
Introduction to Integration Technologies
PDF
Enterprise Application Integration
PPTX
User Profiling and Technology
PPT
smILLe Emtacl10 presentation
PDF
Application integration
PPTX
Techniques for Developing Systems in IT Management System
PPTX
Web engineering
PDF
Web engineering- Web Application Architecture
PPTX
Distributed systems-analysis-and-design
PPTX
EA - Enterprise Integration Introduction
PPT
Ch08-Architecture Design
PPTX
Technical Comptency_ppt
PPT
Infrastructure Strategy Plan
PPT
Middleware 2002
Enterprise application integration
End User Development - Governance and Risk Management
Mba ii u v enterprise application integration
End-user computing is not a trend, it's a transformational shift
Employing Enterprise Application Integration (EAI)
Introduction to Integration Technologies
Enterprise Application Integration
User Profiling and Technology
smILLe Emtacl10 presentation
Application integration
Techniques for Developing Systems in IT Management System
Web engineering
Web engineering- Web Application Architecture
Distributed systems-analysis-and-design
EA - Enterprise Integration Introduction
Ch08-Architecture Design
Technical Comptency_ppt
Infrastructure Strategy Plan
Middleware 2002
Ad

Viewers also liked (10)

PPTX
system level requirements gathering and analysis
PPT
Classical Encryption Techniques
PPT
Activites and Time Planning
PPTX
Requirements Gathering for Project Management Success
PPTX
Ruby on Rails Session 02 - UX Design
PDF
Events2016:2:9
PDF
Patrimoine virtuel et enseignement de l'histoire
DOCX
Pollo guisado
DOCX
Republica bolivariana de venezuela constitucional
PDF
Propiedad intelectual en colombia
system level requirements gathering and analysis
Classical Encryption Techniques
Activites and Time Planning
Requirements Gathering for Project Management Success
Ruby on Rails Session 02 - UX Design
Events2016:2:9
Patrimoine virtuel et enseignement de l'histoire
Pollo guisado
Republica bolivariana de venezuela constitucional
Propiedad intelectual en colombia
Ad

Similar to System Level Requirements Gathering (20)

PPTX
SRE Lect (week 1).pptx
PPTX
Project Formulation and Management - Project Scope Management
PDF
ICONUK - Requirements Gathering "...or the secret art of mind reading"
PPTX
Business requirements gathering and analysis
PPTX
Project Management for IT-related Projects (Logitrain)
PPTX
Project Management System Architecture for Today
PDF
Jim.cassidy
PDF
Project scope management
PPTX
SE_MODULE 2_Complete.pptx about se n pm.
PPTX
Projects2016_Franks_Top10ReasonsProjectsFail
PDF
2.requirements management
PDF
Topic 7 - Project Scope Management.pdf
PPTX
ITPM ch5 project scope management notes<
PPT
SW Development Methodologies
PPTX
Project Management
PDF
2. project scope management
PPT
Spm unit 1
PPTX
Hospital Information Systems(HIS) in India
DOCX
1 2Service Request SR-rm-022 - Part 1.docx
PDF
PMP PMBok 5th ch 5 scope management
SRE Lect (week 1).pptx
Project Formulation and Management - Project Scope Management
ICONUK - Requirements Gathering "...or the secret art of mind reading"
Business requirements gathering and analysis
Project Management for IT-related Projects (Logitrain)
Project Management System Architecture for Today
Jim.cassidy
Project scope management
SE_MODULE 2_Complete.pptx about se n pm.
Projects2016_Franks_Top10ReasonsProjectsFail
2.requirements management
Topic 7 - Project Scope Management.pdf
ITPM ch5 project scope management notes<
SW Development Methodologies
Project Management
2. project scope management
Spm unit 1
Hospital Information Systems(HIS) in India
1 2Service Request SR-rm-022 - Part 1.docx
PMP PMBok 5th ch 5 scope management

More from Computing Cage (11)

PPT
Software Project Management chapter-1
PPT
Overview of tcp ip
PPT
Introduction to Object Oriented Design
PPTX
Introduction to Network Security
PPTX
Software Testing & Debugging
PPT
Sample slides 2
PPT
Sample slides 1
PPT
System Integration & Build Management
PPT
Software Architecture
PPTX
Search Engine Optimization
PPTX
A Star Search
Software Project Management chapter-1
Overview of tcp ip
Introduction to Object Oriented Design
Introduction to Network Security
Software Testing & Debugging
Sample slides 2
Sample slides 1
System Integration & Build Management
Software Architecture
Search Engine Optimization
A Star Search

Recently uploaded (20)

PDF
Trump Administration's workforce development strategy
PPTX
IMMUNITY IMMUNITY refers to protection against infection, and the immune syst...
PPTX
GDM (1) (1).pptx small presentation for students
PPTX
Final Presentation General Medicine 03-08-2024.pptx
PDF
Complications of Minimal Access Surgery at WLH
PDF
O5-L3 Freight Transport Ops (International) V1.pdf
PDF
A systematic review of self-coping strategies used by university students to ...
PPTX
Cell Structure & Organelles in detailed.
PPTX
Pharma ospi slides which help in ospi learning
PDF
STATICS OF THE RIGID BODIES Hibbelers.pdf
PPTX
Orientation - ARALprogram of Deped to the Parents.pptx
PDF
GENETICS IN BIOLOGY IN SECONDARY LEVEL FORM 3
PDF
Chinmaya Tiranga quiz Grand Finale.pdf
PDF
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
PPTX
human mycosis Human fungal infections are called human mycosis..pptx
PPTX
1st Inaugural Professorial Lecture held on 19th February 2020 (Governance and...
PDF
VCE English Exam - Section C Student Revision Booklet
PDF
grade 11-chemistry_fetena_net_5883.pdf teacher guide for all student
PDF
Microbial disease of the cardiovascular and lymphatic systems
PPTX
Tissue processing ( HISTOPATHOLOGICAL TECHNIQUE
Trump Administration's workforce development strategy
IMMUNITY IMMUNITY refers to protection against infection, and the immune syst...
GDM (1) (1).pptx small presentation for students
Final Presentation General Medicine 03-08-2024.pptx
Complications of Minimal Access Surgery at WLH
O5-L3 Freight Transport Ops (International) V1.pdf
A systematic review of self-coping strategies used by university students to ...
Cell Structure & Organelles in detailed.
Pharma ospi slides which help in ospi learning
STATICS OF THE RIGID BODIES Hibbelers.pdf
Orientation - ARALprogram of Deped to the Parents.pptx
GENETICS IN BIOLOGY IN SECONDARY LEVEL FORM 3
Chinmaya Tiranga quiz Grand Finale.pdf
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
human mycosis Human fungal infections are called human mycosis..pptx
1st Inaugural Professorial Lecture held on 19th February 2020 (Governance and...
VCE English Exam - Section C Student Revision Booklet
grade 11-chemistry_fetena_net_5883.pdf teacher guide for all student
Microbial disease of the cardiovascular and lymphatic systems
Tissue processing ( HISTOPATHOLOGICAL TECHNIQUE

System Level Requirements Gathering

  • 1. www.wgconsulting.com Requirements Gathering: The first step to project success Lecture 1 BSIT-6th
  • 2. Copyright 2014, WG Consulting, LLC 2
  • 3. Copyright 2014, WG Consulting, LLC 33/22/2016  70% of organizations have suffered at least one project failure in the prior 12 months.  50% of respondents also indicated that their project failed to consistently achieve what they set out to achieve!  Many organizations fail to measure benefits so they are unaware of their true status in terms of benefits realization (success assessment). Source: KPMG Study, Global IT Management Survey Dec 2010 The Facts
  • 4. Copyright 2014, WG Consulting, LLC 43/22/2016  Interviews with 600 people closely involved in software development projects find that even at the start of a project many people expect their projects to fail! (a survey)  “Fuzzy business objectives, out-of-sync stakeholders, and excessive rework” mean that 75% of project participants lack confidence that their projects will succeed.  78% of respondents reported that the “Business is usually or always out of sync with project requirements” (a survey) What are the statistics?
  • 5. Copyright 2014, WG Consulting, LLC 53/22/2016  Too many project managers either overlook the importance of requirements management or fail to understand the difference between scope, requirements, and expectations.  Scope = draws boundary b/w what’s in and what’s out of the projecct.  In fact, 60-80 percent of project failures can be attributed directly to poor requirements gathering, analysis, and management. G. Chandrashekar of the ProjectSmart blog wrote, “Innumerable studies have shown that requirements gathering is the single most important step…It’s far more expensive to fix a requirements error than a coding error. But somehow everyone seems to believe that a requirements specification document is the easiest part to produce…It can’t be further from the truth. No one ever built a good structure without the right foundation. Make sure that you take time to gather the requirements fully and analyze them in depth.” What is the problem?
  • 6. Copyright 2014, WG Consulting, LLC 63/22/2016 Why Projects Fail….
  • 7. Copyright 2014, WG Consulting, LLC 73/22/2016  The requirements gathering or the discovery phase is essential to the success of any project.  Many experienced project managers would agree that if the requirements are identified correctly and early in the project cycle there would be a significant reduction in the project budget.  If an effort to save time and project dollars, requirements gathering is often overlooked or is not allocated enough time or budget. Why are requirements important?
  • 8. Copyright 2014, WG Consulting, LLC 83/22/2016 Five key components of requirements gathering 1. Gathering requirements comes first, defining scope comes second. It is fairly common in the project management world for people to use the terms “requirements” and “scope” synonymously. But they are different. “Requirements” define what is needed and “Scope” is how you are going get there.  “Requirements” are the demands, needs, and specifications for a product as outlined by project stakeholders. The Deep Fried Brain Blog defines requirements as what the customer needs.  “Scope” is defined as the work that needs to be accomplished to deliver a product, service, or result with the specified features and functions.
  • 9. Copyright 2014, WG Consulting, LLC 93/22/2016 Five key components of requirements gathering 2. There are two types of requirements: project requirements and product requirements. Project Requirements define how the work will be managed. Project requirements focus on who, when, where, and how something gets done. Product Requirements include high level features or capabilities that the business team has committed to delivering to a customer. Project requirements must be defined first and then products evaluated based on the best fit to these needs.
  • 10. Copyright 2014, WG Consulting, LLC 103/22/2016 Five key components of requirements gathering 3. Make sure you adequately document all the requirements. The requirements gathering process should be iterative and all discussions documented and verified to make sure requirements were understood correctly. Requirements should be evaluated throughout the project to make sure systems are not overly complicated, over designed and address the initial needs defined at the beginning of the project.
  • 11. Copyright 2014, WG Consulting, LLC 113/22/2016 Five key components of requirements gathering 4. Select the best methodology for the project. The approach when developing a project must be determined for each engagement based on the project team, the organization and the goals of the project. In some cases, a hybrid of these methodologies is ideal. A few examples of project methodology include: RAD (Rapid Application Deployment) Spiral • Used for less structured projects • Projects are divided to smaller initiatives • Prototyping is used Spiral • Incremental build • Additional functionality added later • Prototyping used Waterfall • Tightly defined objectives • Controlled process • Major milestones with accountability JAD (Joint Application Design) • Involves the client or end user in the design and development of an application • Collaborative workshops • Requires dedicated resources Scrum • Flexible and collaborative • General guidelines are set but constantly reevaluated • Inspect and reevaluate
  • 12. Copyright 2014, WG Consulting, LLC 123/22/2016 Five key components of requirements gathering 5. Engage a diverse cross section of users It is always important to engage a broad group of users. Requirements gathering sessions are usually effective in involving groups of users. The facilitator of these discussions is critical providing leading questions, understand the business and be able to gather information effectively. It is often difficult for participants to articulate their daily routines and processes. The success of requirements gathering is contingent on the ability to extract detailed and high level information and then create a global picture of the needs of the organization.
  • 13. Copyright 2014, WG Consulting, LLC 133/22/2016 Requirements: The first critical step “A good beginning makes a good ending.” (Read yourself)  The requirements gathering process may not guarantee a successful project but provides a foundation for project that can be managed to meet well defined objectives.  Requirement gathering sessions should be designed to define business processes, owners, and reporting needs.  Requirements sessions should set a proactive tone for the project. Many project teams get into the mindset of being reactive is addressing issues. A clear, concise requirements document will create the baseline to building scope, project plans, risk mitigation plans.  Requirements provide the stepping stone to deriving scope. There are times where at the end of the requirements phase, scope cannot be clearly defined. It is essential at this point that the project methodology is modified to perhaps include a proof of concept or prototyping phase.
  • 14. Copyright 2014, WG Consulting, LLC 143/22/2016 Requirements: The first critical step  Our requirements sessions are designed to be interactive and not follow a script. This environment allows users to learn from the other subject manager experts in the sessions as well as create a baseline for strong communication.  These sessions should include how communication will be delivered, the project team and their roles on the project and tools that will be used to document such as an issues log, requirements matrix, or weekly status reports.  A clear set of defined goals and objectives, reviewed throughout the term of the project is a essential to manage expectations and avoid project pitfalls.
  • 15. Copyright 2014, WG Consulting, LLC 153/22/2016 In general, one of the biggest problems that globally/nationally dispersed teams face in requirements gathering and systems analysis is communication. Solution?
  • 16. Copyright 2014, WG Consulting, LLC 163/22/2016 Why are we different (About WG Consulting) 1. We follow the research and study what works. Our professionals have researched the results of project success and project failure. The WG team utilizes world-class methodologies to deliver value-creating solutions based on each client’s unique operating needs. Our team’s thorough understanding of operational and regulatory risk is the key to competitive results that mitigate such risks for our valued clients. • Research = 4.5% world population is color blind • 7-9 items view at a time (usability) 2. We adapt our approach to your needs. Best business practices have their value, but these processes cannot be applied to all organizations.  Project methodology and approach can only be determined based on an understanding of users, business processes, resources, knowledge of the software and the requirements of the project. (methodology)
  • 17. Copyright 2014, WG Consulting, LLC 173/22/2016 Why are we different (about WG Consulting) 3. We have been there. Our team is comprised of professionals with at least 15 years of industry and consulting experience. Our consultants have been IT analysts, administrators, project managers, and IT professionals that have broad industry experience. • This experience provides you with an educated, agile team that can adapt to the project methodology, culture and needs of your organization. 4. Communication. Our consultants focus on constant and effective communication with the client in the form of documentation, weekly meetings, demonstrations and training sessions. • It can be done through software?
  • 18. Copyright 2014, WG Consulting, LLC 183/22/2016  What features could you add to the product that would better accommodate end user needs for older people aging 65+? – Voice command – Many menus – Large text – Audio reminders  In which software development process model would requirements and design be two completely separate phases? – RAD – Spiral – V-model – Waterfall Quiz
  • 19. Copyright 2014, WG Consulting, LLC 193/22/2016  Requirements: A restaurant manager wants to develop an in house software. Goal is that customers can place order directly to the kitchen and kitchen can view it. Moreover customers can change orders and pay the bills.  There should be kids page for games and easy for kids to make an order themselves. • Quiet simple case  • Explore more development models in slide no. 11 • In slide no. 12 what does involving means? • In slide no. 16 explore Agile Methodology • How communication among team can be done through software? • Slide no. 18 contact related person to ask at least one question and paste also on question.computingcage.com (always) Restaurant Scenario