History of LEAN Manufacturing*

     Taiichi Ohno is regarded as the founder of the Toyota Production System (TPS) which was
      developed from 1950 following an excursion to the Rouge Ford plant in the US by Eiji Toyoda,
      a young engineer who reported his findings on the Ford system back to Ohno.

     In the English translation of his book ‘TPS – beyond large scale production’ Ohno (1988)
      describes how TPS evolved out of need, as the market place in post war Japan required small
      quantities of cars to be produced in many varieties. This was very different to the Ford
      principle of mass-producing the same Automobiles in large production runs.

     Womack, Jones and Roos (1990) coined the phrase ‘Lean Manufacturing’ to describe TPS
      when they printed the results of a five-year study into the automotive industry in the book
      ‘The Machine That Changed The World’. This gives a pretty good insight into The History Of
      Lean Manufacturing

     Even with the massive amount of research that has taken place into the Toyota Production
      System, fifty one years after it was born, Slack et al (2001, p481) still refer to Lean
      Manufacturing as a ‘radical departure from traditional operations practice’.

     Ohno (1998) describes the most important objective of the TPS as increasing production
      efficiency through consistently and thoroughly eliminating waste.

*Source: www.beyondlean.com
Apply the Rules and Principles
What is Waste?




 *Womack et al (2003) define waste as any activity that consumes resource but adds
 no value as specified by the customer.
What is Value Add?

 1. Must be an activity the customer is
    willing to pay for
 2. Must change the product
 3. Must be done right the first time.

 ALL THREE MUST BE MET
Value-added Example

             Football Game
  Elapsed Time           = 180 minutes
  Regulation Time         = 60 minutes
  Penalties               = 6 minutes
  Active Playing Time     = 18 minutes
              Value-Added= 10%
Waste Elimination
 How much would you guess you spend on waste?
Definitions of Japanese terms
     Poka-Yoke - A mistake proofing device or procedure to prevent a defect
      during order-taking or manufacture.
     5 Whys - practice of asking "why" five times
     Kanbans - a communication tool in the "just-in-time" production and
      inventory control system which authorizes production or movement
     5S
        Sort - To clearly distinguish the needed from the unneeded.
        Straighten – Keeping needed items in the correct place to allow for
           easy and immediate retrieval (Configure)
        Shine - Keeping the workplace swept and clean (Clean & Check)
        Standardize – Consistency applying methods in a uniform and
           disciplined manner (Conformity)
        Sustain - making a habit of maintaining established procedures
           (Custom & Practice)
        OR seiri, seiton, seison, seiketsu, shitsuke.
Kaizen Event
   Rapid improvement process utilizing a
   cross-functional group of employees,
   working as a team, to meet targets in a
   results-oriented focus on a pre-determined
   project area
     Focused scope
     Detailed assessment of current process
     Quick implementation of high leverage
      improvements
Kaizen Workshops are not…

        ADDING                           WORKING
       RESOURCES                         LONGER
         TO THE                           HOURS
        PROCESS

                                                   WORKING
                               RUSHING              HARDER
                                 THE
                               PROCESS



Source: Lean Learning Center
Kaizen Workshop Process
Plan &                    Teach Lean                                                      Ensure
Prepare                   & Kaizen                                                        Follow-up

                                                       5.Identify
                                                                    6. Plan and
              2. Form Team    3. Analyze   4. Define      Root                    7. Refine &   8. Measure
 1. Identify                                                          Test                                     9. Share
                 and            Current      Ideal      Causes &                    Implement     Progress &
  Opportunity                                                        Proposed                                    Results
              Scope Project      State      State       Propose                    Solutions     Hold Gains
                                                                     Solutions
                                                        Solutions




Planning                                   Event/Workshop                                       Follow-up




          Process Steps                       Sponsor Reviews

                       Critical Facilitation Activities
Trane TA Kaizen Event
   Improve the “Days to Fill” a Position
     Current Average “Days to Fill” = 92 Days
     Goal Average “Days to Fill” = 60 Days
        This is the industry standard
        Trane takes an average of 32 days longer
         than the industry standard
Hiring Process (Current State)

    Operation Steps (Blue)           =
     11.6 hrs
    Waiting Steps (Pink)    = 225.5 hrs
    Perfect World (Find Candidate on 1st
     Try)
       Value Added % = 5.1%
    Best Case (Find Candidate in 3 Days)
       Value Added % = 4.8%
    Current State (It takes much longer)
       Value Added % Drops Rapidly
Hiring State (Ideal)
    Minimum of 6 months headcount forecast
    Above Median to Market Leader in Compensation
       Currently Trane is in the 50th percentile of the Durable Goods Market
    14 Days to Fill Job
       Currently average 92 days to fill job
    Verbal Offer Extended at Face-To-Face Interview
    95% Offer Rate Per Face-To-Face Interview
       Current rate = 33%
    95% Offer Acceptance Rate
       Current rate = 90%
    Recruit from Pool (People Waiting to Work for Trane)
    25% Entry Level Positions
       Current percentage = 0.03%
    100% Reduction in Unqualified Resumes Reviewed
    Clear, Concise, Enticing Job Descriptions
Current – Ideal State Gap Analysis
    Minimum of 6 months headcount forecast
       Turnover not accurately predicted
       True involvement between HR and Managers
       Current AOP Process for Headcount
       Current employment market
    Above Median to Market Leader in Compensation
       Compensation based on median market values
       Target candidates are employed with competitors
       Job jumpers because of compensation
    14 Days to Fill Job
       Reduced pool of candidates
       Communication Delays
       Hiring manager doesn’t have dedicated time to
          interview
       Current panel structure complicates scheduling
Current – Ideal State Gap Analysis

    Verbal Offer Extended at Face-To-Face Interview
         Cultural mind block
         Current interview process methodology
     95% Offer Rate Per Face-To-Face Interview
         Interview technique not sufficient
         Phone interview filtering
         Candidate specs changed in middle of process
     95% Offer Acceptance Rate
         Candidate understanding of job and Trane
         Geographical realization
         Candidates receiving other offers before one
          from Trane
         Housing market, relocation
         Talent Acquisition setting salary expectations at
          the end of the process not the beginning
Current – Ideal State Gap Analysis
    Recruit from Pool (People Waiting to Work for Trane)
       JIT forecasting
       Lack of leadership development program
       Candidate branding
     25% Entry Level Positions
       Leadership culture commitment
       Lack of leadership development program
       Headcount vs. $
       Lack of college recruiting resources
     100% Reduction in Unqualified Resumes Reviewed
       Clear job descriptions / qualifications
       Pre-screening tool
     Clear, Concise, Enticing Job Descriptions
       Job code database
       Job description database
Information Discovered
  2007 Turnover Rate = 24%
     The cost of replacing someone (recruiting, relocation, and
       training) is not accounted for well in the AOP
     Need to have a report to understand the turnover rate
       better in order improve the AOP process
  Lead time in hiring process is reduced just by the hiring manager
   making the hiring process a high priority
     High Priority Managers Time To Fill = 37 Days
     Low Priority Managers Time To Fill = 223 Days
  Job Code Database cleanup is on hold right now
Standard Work for Hiring Process

    Created standard work for the
     hiring process
    Implement required timing for:
       Reviewing resumes
       Feedback from phone
          interviews
       Feedback from face-to-face
          interviews
    Condensed forms for job
     requisition, job description, and
     position questionnaire into one
     form
    HM ANDON Cord - The signal for
     immediate help to prevent line stop
     (waiting time).
    RIM Meeting
Future Needs Identified
    Company Career Site – Enhanced
    Leadership Development Program for entry level candidates.
    Circulate final version of standard work to get buy-in
    Educate appropriate people on standard work for the hiring
     process.
    Educate appropriate people on pre-screening questions in
     ATS. Allows people that did not pass the pre-screening
     questions to be highlighted with a ‘KO’.
    Make the turnover rate report meaningful so it can be used
     for AOP.
    Develop ‘New Employee – Position Requirement’ template
     with drop down lists.
    Feasibility of Job Description Database.
    Feasibility of Candidate Recruitment Portal.
Communicate Results

       • Share results with team members, ad hoc
         team members, suppliers, etc.
       • Communicate results to organization using
         company newsletter, intranet, or e-mails
       • Build momentum and commitment for
         future Kaizen sessions
       • Communicate results to senior leadership
REFLECTION
  Reflect 30 days later on progress
  SO, Let’s Reflect……….
Contact Information
   Cathy Henesey
   Cathy.Henesey@trane.com
   903-581-9109 Work
   214-725-0710 Personal Cell
   Twitter name @cathyhenesey
   www.linkedin.com/in/cathyhenesey

More Related Content

PPT
Six Sigma Recruiting
PDF
Lean six sigma tools in the hiring process
PPT
Six Sigma in Recruitment Presentation
PDF
Lean Leadership - Part 3 of 3
PDF
Key HR Goals and Objectives 2013
PPTX
Analyze phase lean six sigma tollgate template
PPT
Value Stream Mapping Overview Update
PPT
Lean, Six Sigma, ToC using DMAIC project management
Six Sigma Recruiting
Lean six sigma tools in the hiring process
Six Sigma in Recruitment Presentation
Lean Leadership - Part 3 of 3
Key HR Goals and Objectives 2013
Analyze phase lean six sigma tollgate template
Value Stream Mapping Overview Update
Lean, Six Sigma, ToC using DMAIC project management

What's hot (20)

PPTX
Talent Acquisition KPI Scorecard
PDF
Recruiting the Lean Way - Value Stream Mapping
PPT
Hr manager kpi
PPTX
Lean six sigma green belt project improvement
PDF
Value Stream Mapping: What to Do Before You Dive In
PPTX
Workshops and presentations by Marek Piatkowski
PDF
SUCCESS STORY: Reducing Hiring Time From 10 Months to 36 Days
PDF
Value Stream Mapping in Office & Service Setttings
PDF
Lean Six Sigma project Caponera
PPTX
Connecting Kata with Hoshin Kanri and True North
PDF
Value Stream Mapping in Non-Manufacturing Environments
PDF
White Belt DMAIC Project Line G MTTR
PPT
Value stream mapping training
PPTX
Six Sigma Project- GB
PPTX
Gemba Walks: Frequently Asked Questions (FAQ)
PDF
The New Face of Quality in Office and Service Environments
PDF
Value stream mapping for non manufacturing environments
PPTX
value stream mapping
PDF
Daily Management Systems
PDF
Human Resource Planning Process PowerPoint Presentation Slides
Talent Acquisition KPI Scorecard
Recruiting the Lean Way - Value Stream Mapping
Hr manager kpi
Lean six sigma green belt project improvement
Value Stream Mapping: What to Do Before You Dive In
Workshops and presentations by Marek Piatkowski
SUCCESS STORY: Reducing Hiring Time From 10 Months to 36 Days
Value Stream Mapping in Office & Service Setttings
Lean Six Sigma project Caponera
Connecting Kata with Hoshin Kanri and True North
Value Stream Mapping in Non-Manufacturing Environments
White Belt DMAIC Project Line G MTTR
Value stream mapping training
Six Sigma Project- GB
Gemba Walks: Frequently Asked Questions (FAQ)
The New Face of Quality in Office and Service Environments
Value stream mapping for non manufacturing environments
value stream mapping
Daily Management Systems
Human Resource Planning Process PowerPoint Presentation Slides
Ad

Viewers also liked (20)

PDF
Intrapreneurship
PPT
Intrapreneurship
PDF
Intrapreneurship and Corporate Entrepreneurship Development
PDF
The Concept of Corporate Entrepreneurship - Intrapreneurship
PDF
Applying Design Thinking Principles in Product Management
PDF
Intro to User Journey Mapping for Building Better Websites - WordCamp Ottawa...
PDF
Managing Marketing Processes_Marketing Plan Assignment
PPT
Managing The Market Process 2
PDF
Step 2: Preliminary Market Mapping and Analysis
PDF
Design Thinking For Business Strategy
PDF
Value Stream Mapping in Office and Service
PDF
Customer journey mapping
PDF
Touchpoint Dashboard Journey Mapping Guide 2014
PDF
Value Stream Mapping: Case Studies
PDF
Mapping the customer experience: innovate using customer experience journey maps
PPTX
Value Stream Mapping (VSM)
PPT
Value Stream Mapping Workshop
PPT
Value Stream Mapping -The Concept
PPTX
Takt Time, Cycle Time & Line Balancing
PPTX
Value stream mapping ppt
Intrapreneurship
Intrapreneurship
Intrapreneurship and Corporate Entrepreneurship Development
The Concept of Corporate Entrepreneurship - Intrapreneurship
Applying Design Thinking Principles in Product Management
Intro to User Journey Mapping for Building Better Websites - WordCamp Ottawa...
Managing Marketing Processes_Marketing Plan Assignment
Managing The Market Process 2
Step 2: Preliminary Market Mapping and Analysis
Design Thinking For Business Strategy
Value Stream Mapping in Office and Service
Customer journey mapping
Touchpoint Dashboard Journey Mapping Guide 2014
Value Stream Mapping: Case Studies
Mapping the customer experience: innovate using customer experience journey maps
Value Stream Mapping (VSM)
Value Stream Mapping Workshop
Value Stream Mapping -The Concept
Takt Time, Cycle Time & Line Balancing
Value stream mapping ppt
Ad

Similar to Lean Methods In Recruiting (20)

PDF
Kaizen(Junu)
PDF
Campaigning for hr technology young-banket - pdf
PDF
Continuous Improvement using the Toyota Way
DOCX
Kaizen folder
PDF
Process improvement without technology investments?
PPT
Conducting Kaizen Events
PPTX
Recruitment in today's time
PPT
Measuring Quality of Hire
PPT
PPTX
Leveraging Lean Six Sigma to Sustain HR Operations
PPT
715230759-Kaizen-Training.pptkkkkkkkkkkkkkkkkkk
PPT
Kaizen: The Art of Continuous Improvement"
PPT
Five Step Methodology To Implement Bpr
PPT
Dimensions Of Change
DOCX
Chaplin School of Hospitality and Tourism ManagementInternship Lea.docx
PPTX
Lean Culture Introduction
PPTX
An RPO Case Study Transitioning Your Recruiting Organization
PPTX
DOES15 - Damon Edwards - DevOps Kaizen Practical Steps to Start & Sustain a T...
PPTX
DevOps Kaizen: Practical Steps to Start & Sustain a Transformation
PPT
Business process-reengineering
Kaizen(Junu)
Campaigning for hr technology young-banket - pdf
Continuous Improvement using the Toyota Way
Kaizen folder
Process improvement without technology investments?
Conducting Kaizen Events
Recruitment in today's time
Measuring Quality of Hire
Leveraging Lean Six Sigma to Sustain HR Operations
715230759-Kaizen-Training.pptkkkkkkkkkkkkkkkkkk
Kaizen: The Art of Continuous Improvement"
Five Step Methodology To Implement Bpr
Dimensions Of Change
Chaplin School of Hospitality and Tourism ManagementInternship Lea.docx
Lean Culture Introduction
An RPO Case Study Transitioning Your Recruiting Organization
DOES15 - Damon Edwards - DevOps Kaizen Practical Steps to Start & Sustain a T...
DevOps Kaizen: Practical Steps to Start & Sustain a Transformation
Business process-reengineering

Recently uploaded (20)

PPTX
Programs and apps: productivity, graphics, security and other tools
PPTX
Effective Security Operations Center (SOC) A Modern, Strategic, and Threat-In...
PDF
Advanced methodologies resolving dimensionality complications for autism neur...
PDF
Mobile App Security Testing_ A Comprehensive Guide.pdf
PPT
“AI and Expert System Decision Support & Business Intelligence Systems”
PPTX
ACSFv1EN-58255 AWS Academy Cloud Security Foundations.pptx
PPT
Teaching material agriculture food technology
PDF
Machine learning based COVID-19 study performance prediction
PDF
KodekX | Application Modernization Development
PDF
Building Integrated photovoltaic BIPV_UPV.pdf
PPTX
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
PDF
Empathic Computing: Creating Shared Understanding
PDF
NewMind AI Weekly Chronicles - August'25 Week I
PDF
TokAI - TikTok AI Agent : The First AI Application That Analyzes 10,000+ Vira...
PDF
Approach and Philosophy of On baking technology
PDF
cuic standard and advanced reporting.pdf
PDF
The Rise and Fall of 3GPP – Time for a Sabbatical?
PDF
Review of recent advances in non-invasive hemoglobin estimation
PDF
Peak of Data & AI Encore- AI for Metadata and Smarter Workflows
PDF
Diabetes mellitus diagnosis method based random forest with bat algorithm
Programs and apps: productivity, graphics, security and other tools
Effective Security Operations Center (SOC) A Modern, Strategic, and Threat-In...
Advanced methodologies resolving dimensionality complications for autism neur...
Mobile App Security Testing_ A Comprehensive Guide.pdf
“AI and Expert System Decision Support & Business Intelligence Systems”
ACSFv1EN-58255 AWS Academy Cloud Security Foundations.pptx
Teaching material agriculture food technology
Machine learning based COVID-19 study performance prediction
KodekX | Application Modernization Development
Building Integrated photovoltaic BIPV_UPV.pdf
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
Empathic Computing: Creating Shared Understanding
NewMind AI Weekly Chronicles - August'25 Week I
TokAI - TikTok AI Agent : The First AI Application That Analyzes 10,000+ Vira...
Approach and Philosophy of On baking technology
cuic standard and advanced reporting.pdf
The Rise and Fall of 3GPP – Time for a Sabbatical?
Review of recent advances in non-invasive hemoglobin estimation
Peak of Data & AI Encore- AI for Metadata and Smarter Workflows
Diabetes mellitus diagnosis method based random forest with bat algorithm

Lean Methods In Recruiting

  • 1. LEAN Recruiting Eliminating waste and improving process flow Cathy Henesey, SPHR Leader, Talent Acquisition Trane, a business of Ingersoll Rand
  • 2. History of LEAN Manufacturing*   Taiichi Ohno is regarded as the founder of the Toyota Production System (TPS) which was developed from 1950 following an excursion to the Rouge Ford plant in the US by Eiji Toyoda, a young engineer who reported his findings on the Ford system back to Ohno.   In the English translation of his book ‘TPS – beyond large scale production’ Ohno (1988) describes how TPS evolved out of need, as the market place in post war Japan required small quantities of cars to be produced in many varieties. This was very different to the Ford principle of mass-producing the same Automobiles in large production runs.   Womack, Jones and Roos (1990) coined the phrase ‘Lean Manufacturing’ to describe TPS when they printed the results of a five-year study into the automotive industry in the book ‘The Machine That Changed The World’. This gives a pretty good insight into The History Of Lean Manufacturing   Even with the massive amount of research that has taken place into the Toyota Production System, fifty one years after it was born, Slack et al (2001, p481) still refer to Lean Manufacturing as a ‘radical departure from traditional operations practice’.   Ohno (1998) describes the most important objective of the TPS as increasing production efficiency through consistently and thoroughly eliminating waste. *Source: www.beyondlean.com
  • 3. Apply the Rules and Principles
  • 4. What is Waste? *Womack et al (2003) define waste as any activity that consumes resource but adds no value as specified by the customer.
  • 5. What is Value Add? 1. Must be an activity the customer is willing to pay for 2. Must change the product 3. Must be done right the first time. ALL THREE MUST BE MET
  • 6. Value-added Example Football Game Elapsed Time = 180 minutes Regulation Time = 60 minutes Penalties = 6 minutes Active Playing Time = 18 minutes Value-Added= 10%
  • 7. Waste Elimination How much would you guess you spend on waste?
  • 8. Definitions of Japanese terms   Poka-Yoke - A mistake proofing device or procedure to prevent a defect during order-taking or manufacture.   5 Whys - practice of asking "why" five times   Kanbans - a communication tool in the "just-in-time" production and inventory control system which authorizes production or movement   5S   Sort - To clearly distinguish the needed from the unneeded.   Straighten – Keeping needed items in the correct place to allow for easy and immediate retrieval (Configure)   Shine - Keeping the workplace swept and clean (Clean & Check)   Standardize – Consistency applying methods in a uniform and disciplined manner (Conformity)   Sustain - making a habit of maintaining established procedures (Custom & Practice)   OR seiri, seiton, seison, seiketsu, shitsuke.
  • 9. Kaizen Event Rapid improvement process utilizing a cross-functional group of employees, working as a team, to meet targets in a results-oriented focus on a pre-determined project area   Focused scope   Detailed assessment of current process   Quick implementation of high leverage improvements
  • 10. Kaizen Workshops are not… ADDING WORKING RESOURCES LONGER TO THE HOURS PROCESS WORKING RUSHING HARDER THE PROCESS Source: Lean Learning Center
  • 11. Kaizen Workshop Process Plan & Teach Lean Ensure Prepare & Kaizen Follow-up 5.Identify 6. Plan and 2. Form Team 3. Analyze 4. Define Root 7. Refine & 8. Measure 1. Identify Test 9. Share and Current Ideal Causes & Implement Progress & Opportunity Proposed Results Scope Project State State Propose Solutions Hold Gains Solutions Solutions Planning Event/Workshop Follow-up Process Steps Sponsor Reviews Critical Facilitation Activities
  • 12. Trane TA Kaizen Event   Improve the “Days to Fill” a Position   Current Average “Days to Fill” = 92 Days   Goal Average “Days to Fill” = 60 Days   This is the industry standard   Trane takes an average of 32 days longer than the industry standard
  • 13. Hiring Process (Current State)   Operation Steps (Blue) = 11.6 hrs   Waiting Steps (Pink) = 225.5 hrs   Perfect World (Find Candidate on 1st Try)   Value Added % = 5.1%   Best Case (Find Candidate in 3 Days)   Value Added % = 4.8%   Current State (It takes much longer)   Value Added % Drops Rapidly
  • 14. Hiring State (Ideal)   Minimum of 6 months headcount forecast   Above Median to Market Leader in Compensation   Currently Trane is in the 50th percentile of the Durable Goods Market   14 Days to Fill Job   Currently average 92 days to fill job   Verbal Offer Extended at Face-To-Face Interview   95% Offer Rate Per Face-To-Face Interview   Current rate = 33%   95% Offer Acceptance Rate   Current rate = 90%   Recruit from Pool (People Waiting to Work for Trane)   25% Entry Level Positions   Current percentage = 0.03%   100% Reduction in Unqualified Resumes Reviewed   Clear, Concise, Enticing Job Descriptions
  • 15. Current – Ideal State Gap Analysis   Minimum of 6 months headcount forecast   Turnover not accurately predicted   True involvement between HR and Managers   Current AOP Process for Headcount   Current employment market   Above Median to Market Leader in Compensation   Compensation based on median market values   Target candidates are employed with competitors   Job jumpers because of compensation   14 Days to Fill Job   Reduced pool of candidates   Communication Delays   Hiring manager doesn’t have dedicated time to interview   Current panel structure complicates scheduling
  • 16. Current – Ideal State Gap Analysis   Verbal Offer Extended at Face-To-Face Interview   Cultural mind block   Current interview process methodology   95% Offer Rate Per Face-To-Face Interview   Interview technique not sufficient   Phone interview filtering   Candidate specs changed in middle of process   95% Offer Acceptance Rate   Candidate understanding of job and Trane   Geographical realization   Candidates receiving other offers before one from Trane   Housing market, relocation   Talent Acquisition setting salary expectations at the end of the process not the beginning
  • 17. Current – Ideal State Gap Analysis   Recruit from Pool (People Waiting to Work for Trane)   JIT forecasting   Lack of leadership development program   Candidate branding   25% Entry Level Positions   Leadership culture commitment   Lack of leadership development program   Headcount vs. $   Lack of college recruiting resources   100% Reduction in Unqualified Resumes Reviewed   Clear job descriptions / qualifications   Pre-screening tool   Clear, Concise, Enticing Job Descriptions   Job code database   Job description database
  • 18. Information Discovered   2007 Turnover Rate = 24%   The cost of replacing someone (recruiting, relocation, and training) is not accounted for well in the AOP   Need to have a report to understand the turnover rate better in order improve the AOP process   Lead time in hiring process is reduced just by the hiring manager making the hiring process a high priority   High Priority Managers Time To Fill = 37 Days   Low Priority Managers Time To Fill = 223 Days   Job Code Database cleanup is on hold right now
  • 19. Standard Work for Hiring Process   Created standard work for the hiring process   Implement required timing for:   Reviewing resumes   Feedback from phone interviews   Feedback from face-to-face interviews   Condensed forms for job requisition, job description, and position questionnaire into one form   HM ANDON Cord - The signal for immediate help to prevent line stop (waiting time).   RIM Meeting
  • 20. Future Needs Identified   Company Career Site – Enhanced   Leadership Development Program for entry level candidates.   Circulate final version of standard work to get buy-in   Educate appropriate people on standard work for the hiring process.   Educate appropriate people on pre-screening questions in ATS. Allows people that did not pass the pre-screening questions to be highlighted with a ‘KO’.   Make the turnover rate report meaningful so it can be used for AOP.   Develop ‘New Employee – Position Requirement’ template with drop down lists.   Feasibility of Job Description Database.   Feasibility of Candidate Recruitment Portal.
  • 21. Communicate Results • Share results with team members, ad hoc team members, suppliers, etc. • Communicate results to organization using company newsletter, intranet, or e-mails • Build momentum and commitment for future Kaizen sessions • Communicate results to senior leadership
  • 22. REFLECTION   Reflect 30 days later on progress   SO, Let’s Reflect……….
  • 23. Contact Information   Cathy Henesey   Cathy.Henesey@trane.com   903-581-9109 Work   214-725-0710 Personal Cell   Twitter name @cathyhenesey   www.linkedin.com/in/cathyhenesey