Spillway Design: An Overview
INTRODUCTION
• The object of spillway design, which involves two steps, is
– to provide a safe and adequate spillway structure for the lowest
combined cost of the spillway and the dam.
• The first step in the design involves determining the type and
overall size of the spillway structure to suit the anticipated
requirements and conditions of the site.
• A detailed hydraulic and structural design of the spillway
structure is the next step.
INTRODUCTION
• An evaluation of the basic data should be the first step in
the preparation of the design. This includes
– the topography and geology as well as
– flood hydrography,
– storage, and
– release requirements.
• The type, size, and elevation of the crest and whether it will be
controlled can also be tentatively decided.
• Several alternative arrangements might be possible and a
final layout could be created on the basis of economic
analysis.
ANALYSIS OF EXISTING STRUCTURES
• In the projects with concrete dams,
the spillways were mainly located
within the channel portion of the
river valley with any combinations of
L/Hand N.
• About 35% of spillways of concrete
dams are used in combination with
sluices and bottom outlets and the
use of chute spillways and tunnel
spillways makes up about 10% and
5% respectively.
ANALYSIS OF EXISTING STRUCTURES
• In the projects with earth-fill dams, gravity spillways
were used with L/H from 8 to 1700.
• In the narrow valleys, gravity spillways were used
when the power of the flow discharged was small.
• In the case of great flows, chute spillways were
preferred.
• On wide valleys, spillway tunnels gave way to
chute spillways, as the power of the flow
discharged was more than 5000 MW.
• Tunnel spillways make up about a quarter of all
flow-release structures of earth-fill dams.
VARIOUS ASPECTS INVOLVED IN A SPILLWAY
DESIGN
• The following aspects are involved in the design of
spillways:
– Hydrology
– Topography and geology
– Utility and operational aspects
– Constructional and structural aspects
Hydrology
• The hydrological aspects relevant to the spillway design are:
– Estimation of inflow design flood (IDF)
– Selection of spillway design flood
– Determination of spillway outflow discharge
– Determination of frequency of spillway use
• Estimation of inflow design flood for a given dam site is an exercise in
hydrology, therefore, procedures are fairly standardized.
regional
flood
formulae
envelope
curves
refined methods
involving statistical
analyses (flood frequency
series) and numerical
modeling of rainfall–runoff
relationships
Historica
l
Methods
Hydrology-Previous Vs Current Practice –Design Flood
Selection
• On the other hand, selection of the spillway design flood is a
function of social, moral, and economic, as well as
technological considerations.
• While the previous design flood–selection criteria considered
factors such as
– dam height,
– storage volume, and
– downstream development,
• Current practice is to select a design inflow flood on the
basis of the consequences of dam failure.
Hydrology
• The spillway outflow discharge corresponding to an inflow flood is
determined from the flood-routing analysis.
• At least
– a tentative design of the spillway
– Full Reservoir Level (FRL),
– crest level,
– number of spans, and
– an approximate discharge rating curve for the spillway
• The design of various elements of the spillway such as crest profile,
sidewalls, energy dissapator and downstream protection are all
based on spillway outflow discharge.
Hydrology-Frequency of Usage
• Ordinary river flows are usually stored in a reservoir, diverted
through head works, or released through outlets;
therefore, the spillway may not be required to function.
• At diversion dams, where storage space is limited and
diversion flows are relatively small compared to flood flows, a
spillway is used more frequently.
• When the flood flows are generally restricted to a small
duration and are flashy in nature, the spillways are
expected to operate more frequently.
Topography and Geology
• These considerations determine the type and location of a spillway as
follows:
1. Ogee spillway: Most commonly used as the integral overflow section of a concrete or a masonry
dam.
2. Chute spillway: Adopted in a site where a suitable foundation with moderate depth of
excavation is available, where topography of the site permits the use of a relatively short channel,
or where spillway
excavation can be used economically in the dam.
3. Side channel spillway: Suitable for earth or rock-fill dams in narrow canyons and for other
situations where direct overflow is not permissible.
4. Shaft spillway/Tunnel spillway: Used advantageously at dam sites in narrow canyons where
abutments rise steeply or where a diversion tunnel or conduit is available for use as the
downstream leg.
5. Siphon spillway: Used when there is a desire for an automatic operation without mechanical
parts and the discharge to be passed is small.
6. Free over-fall spillway: Suitable for arch dams
7. Duck bill spillway: Used when the waterway and foundation for the spillway are limited and a
curved crest-projection into the reservoir is possible.
Utility and Operational Aspects
From the standpoint of serviceability, spillways may be defined in three broad
classes as follows.
1. Service Spillways
Include any spillway that may be utilized without significant damage to the structure or downstream channel. As a
general rule, service spillways have paved
channels and suitable energy dissipators.
2. Limited Service and Additional Spillways
Include any spillway that may be utilized infrequently for operation of the reservoir without incurring excessive
damage. Some extraordinary maintenance at infrequent intervals would be acceptable in order to reduce initial
construction costs, but not to the extent of imposing significant limitations on the optimum utilization of the
reservoir’s controlled storage capacity under normal operating
conditions.
3. Emergency Spillways
Include any spillway, the use of which to be avoided as long as possible, used to prevent major damage to the
spillway structure or to downstream areas. Emergency spillways may involve partial control by so-called ‘‘Fuse Plugs’’
or ‘‘Flash Boards.’’
Utility and Operational Aspects
• Uncontrolled Crest
• Uncontrolled crests permit water to discharge whenever the reservoir
surface is higher than the crest.
• The height of the dam is determined from the maximum flood
required to be discharged and the necessary free board.
• Since the longest crest requires the least head, an economic balance
may be found between length and height of spillway if the
topography does not limit the length of the crest.
Utility and Operational Aspects
• Controlled Crest
• Gates may be used to control the reservoir water surface.
• The top of the gates is usually at the normal water-surface elevation of the
reservoir; to keep the maximum elevation constant, the gates are opened
sufficiently to pass the floods.
• While an uncontrolled crest requires a dam higher than a controlled crest, an
uncontrolled crest offers the following advantages:
– flood storage is always available, the necessity of gates and their maintenance is
eliminated, and the crest has a greater ability to pass the logs and other debris
without interference.
• An uncontrolled crest requires less discharge capacity than a controlled crest for
a given flood, since part of the flood is stored in order to acquire a head
necessary to pass the discharge.
Utility and Operational Aspects
• Spillways for Flood and Sediment Disposal
• While the prime objective of a spillway is disposal of floods, if designed specifically, it may
also serve for the disposal of sediment deposited in the reservoir.
• Mountainous streams with dependable flows and considerable heads favor selection of run-
off river plants.
– However, such streams carry large amount of sediment that could ultimately settle in the reservoir
and reduce its capacity.
• In such projects, spillways can be designed to serve the dual purpose of flood disposal and
sediment disposal to flush material deposited in the reservoir downstream, but these
requirements are often conflicting.
• While flood disposal warrants a larger spillway capacity with a wider waterway, sediment
disposal requires low level spillways or bottom outlets of large capacity placed deep below
the water surface. .
Constructional and Structural Aspects
• River valley projects with multiple purposes are usually phased over long periods of
time to suit the requirements of irrigation and power, financial allocations, and
progress of rehabilitation of the project-affected population.
• The construction of major dams and spillways involves large quantities of
excavation, earthwork, and concreting, and may be required to be constructed in
stages.
• The flood flows in the intervening periods, diverted over partly constructed spillways,
may set up undesirable flow conditions, thus resulting in damage to the adjacent
structures already constructed by then.
• Hydraulic model study is the best means to visualize these effects and to evolve
suitable designs.
Constructional and Structural Aspects
• The choice of earth- and rock-fill dams is often based on the availability of
material from the excavation for the spillways
• A detailed discussion on this is presented in the chapter ‘‘Unlined Rock
Spillways.’’
• Many future dams are likely to adopt the technology of roller-compacted
concrete. This method of construction is cost-effective, typically faster, and
causes minimum project disruption.
• This technique also facilitates the provision of stepped spillways since the rolling
in lifts of 30 to 60 cm favors the construction of a stepped surface as the height
increases.
• The stepped spillways ensure energy dissipation on the flow surface itself at
almost double that of an unstepped, smooth spillway.
ECONOMIC ANALYSIS
• The procedure for economic analysis has been illustrated by the USBR
(1960).
• Factors in EA Optimization may be:
– (1) the characteristics of the flood hydrograph;
– (2) the damages that would result if a flood occurred without the dam;
– (3) the damages that would result if such a flood occurred with the dam in
place;
– (4) the damages that would occur if the dam or spillway were breached;
– (5) the effects of various dam-spillway combinations on the probable increase
or decrease of damages above or below the dam;
– (6) the relative cost of increasing the spillway capacity; and
– (7) the use of outlet facilities to serve more than one function, such as control
of releases and control or passage of floods
Comparative costs: spillway-dam combinations. A:Minimum cost:
gated spillway, B: Minimum cost: ungated spillway (shown in
USBR, United States,1960)

More Related Content

PDF
Chapter 7 spillway and energy dissipators
PDF
Diversion Systems and Spillways (22 Nov 2013)
PDF
Flow diversion
PDF
Spillways
PDF
Chapter 5 drop sturcutures
PPTX
Lecture 1 free overfall and ogee
PDF
Canal drop notch type -design steps
PDF
4 spillways
Chapter 7 spillway and energy dissipators
Diversion Systems and Spillways (22 Nov 2013)
Flow diversion
Spillways
Chapter 5 drop sturcutures
Lecture 1 free overfall and ogee
Canal drop notch type -design steps
4 spillways

What's hot (20)

PPTX
energy dissipator in hydraulic structure
PDF
050218 chapter 7 spillways and energy dissipators
PPTX
Design of stilling basin and roughness devices
PDF
Hydraulic Design of Energy Dissipators for Culverts and Channels, 3rd Edition...
PPTX
Vertical canal fall
PDF
Hydraulic characteristics of flow and energy dissipation over stepped spillway
PDF
Ch 27 culverts
PPTX
Canal Regulation Work
PPT
ogee design
PPTX
Energy dissipators
PPTX
PDF
Culvertdesign
PPT
Ce154 lecture 3 reservoirs, spillways, & energy dissipators
PPTX
5.1 reservoir planning
PPTX
PPTX
Regulation Works
PPTX
Canal outlets and modules
PPTX
Energy dissipation - irrigation engineering
PPTX
Stream Gauging
energy dissipator in hydraulic structure
050218 chapter 7 spillways and energy dissipators
Design of stilling basin and roughness devices
Hydraulic Design of Energy Dissipators for Culverts and Channels, 3rd Edition...
Vertical canal fall
Hydraulic characteristics of flow and energy dissipation over stepped spillway
Ch 27 culverts
Canal Regulation Work
ogee design
Energy dissipators
Culvertdesign
Ce154 lecture 3 reservoirs, spillways, & energy dissipators
5.1 reservoir planning
Regulation Works
Canal outlets and modules
Energy dissipation - irrigation engineering
Stream Gauging
Ad

Similar to Lecture 0 design of spilways an overview (20)

PPTX
Lecture note on dam appurtenance introduction Lect 1.pptx
PDF
Design Principles that are involved in the Design of Flow over an Ogee Crest ...
PPTX
Spillways and Flood Control Works
PDF
spillway designs calculations and examples illustrating the working principle...
PDF
unit-3.pdf
PDF
SPILLWAYS.pdf
PPTX
Unit 3 spillway
PPT
4. Spillways.ppt
PPTX
Spillways description and design procedure
PPTX
Design and Application of Side Channel Spillways
PPTX
Spillway and its types
PPTX
"Exploring the Essential Functions and Design Considerations of Spillways in ...
PDF
4 Spillway, Sluices and crest gates and how to construct it
PPT
Spillway
PPTX
Spillways
PPT
Spillways2000 101110063804-phpapp02 - copy
PPTX
SPILLWAYS
PPT
Spillway
PPT
Spillways
PDF
Spillway 140901101155-phpapp02
Lecture note on dam appurtenance introduction Lect 1.pptx
Design Principles that are involved in the Design of Flow over an Ogee Crest ...
Spillways and Flood Control Works
spillway designs calculations and examples illustrating the working principle...
unit-3.pdf
SPILLWAYS.pdf
Unit 3 spillway
4. Spillways.ppt
Spillways description and design procedure
Design and Application of Side Channel Spillways
Spillway and its types
"Exploring the Essential Functions and Design Considerations of Spillways in ...
4 Spillway, Sluices and crest gates and how to construct it
Spillway
Spillways
Spillways2000 101110063804-phpapp02 - copy
SPILLWAYS
Spillway
Spillways
Spillway 140901101155-phpapp02
Ad

Recently uploaded (20)

PPT
Mechanical Engineering MATERIALS Selection
PPTX
Recipes for Real Time Voice AI WebRTC, SLMs and Open Source Software.pptx
PPTX
Welding lecture in detail for understanding
PPT
Project quality management in manufacturing
PPTX
bas. eng. economics group 4 presentation 1.pptx
PPTX
web development for engineering and engineering
PDF
Operating System & Kernel Study Guide-1 - converted.pdf
PPTX
CH1 Production IntroductoryConcepts.pptx
PDF
composite construction of structures.pdf
PPTX
Construction Project Organization Group 2.pptx
PDF
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
PPTX
Geodesy 1.pptx...............................................
PDF
Arduino robotics embedded978-1-4302-3184-4.pdf
PDF
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
PPTX
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
PPTX
KTU 2019 -S7-MCN 401 MODULE 2-VINAY.pptx
PPTX
OOP with Java - Java Introduction (Basics)
PPTX
UNIT 4 Total Quality Management .pptx
PDF
PRIZ Academy - 9 Windows Thinking Where to Invest Today to Win Tomorrow.pdf
PPTX
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
Mechanical Engineering MATERIALS Selection
Recipes for Real Time Voice AI WebRTC, SLMs and Open Source Software.pptx
Welding lecture in detail for understanding
Project quality management in manufacturing
bas. eng. economics group 4 presentation 1.pptx
web development for engineering and engineering
Operating System & Kernel Study Guide-1 - converted.pdf
CH1 Production IntroductoryConcepts.pptx
composite construction of structures.pdf
Construction Project Organization Group 2.pptx
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
Geodesy 1.pptx...............................................
Arduino robotics embedded978-1-4302-3184-4.pdf
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
KTU 2019 -S7-MCN 401 MODULE 2-VINAY.pptx
OOP with Java - Java Introduction (Basics)
UNIT 4 Total Quality Management .pptx
PRIZ Academy - 9 Windows Thinking Where to Invest Today to Win Tomorrow.pdf
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx

Lecture 0 design of spilways an overview

  • 1. Addis Ababa Science and Technology College of Architecture and Civil Engineering ADVANCED HYDRALUC STRUCURES CENG 6605 Fitsum Tesfaye (PhD)
  • 2. ADVANCED HYDRALUC STRUCURES CENG 6605 Spillway Design: An Overview
  • 3. INTRODUCTION • The object of spillway design, which involves two steps, is – to provide a safe and adequate spillway structure for the lowest combined cost of the spillway and the dam. • The first step in the design involves determining the type and overall size of the spillway structure to suit the anticipated requirements and conditions of the site. • A detailed hydraulic and structural design of the spillway structure is the next step.
  • 4. INTRODUCTION • An evaluation of the basic data should be the first step in the preparation of the design. This includes – the topography and geology as well as – flood hydrography, – storage, and – release requirements. • The type, size, and elevation of the crest and whether it will be controlled can also be tentatively decided. • Several alternative arrangements might be possible and a final layout could be created on the basis of economic analysis.
  • 5. ANALYSIS OF EXISTING STRUCTURES • In the projects with concrete dams, the spillways were mainly located within the channel portion of the river valley with any combinations of L/Hand N. • About 35% of spillways of concrete dams are used in combination with sluices and bottom outlets and the use of chute spillways and tunnel spillways makes up about 10% and 5% respectively.
  • 6. ANALYSIS OF EXISTING STRUCTURES • In the projects with earth-fill dams, gravity spillways were used with L/H from 8 to 1700. • In the narrow valleys, gravity spillways were used when the power of the flow discharged was small. • In the case of great flows, chute spillways were preferred. • On wide valleys, spillway tunnels gave way to chute spillways, as the power of the flow discharged was more than 5000 MW. • Tunnel spillways make up about a quarter of all flow-release structures of earth-fill dams.
  • 7. VARIOUS ASPECTS INVOLVED IN A SPILLWAY DESIGN • The following aspects are involved in the design of spillways: – Hydrology – Topography and geology – Utility and operational aspects – Constructional and structural aspects
  • 8. Hydrology • The hydrological aspects relevant to the spillway design are: – Estimation of inflow design flood (IDF) – Selection of spillway design flood – Determination of spillway outflow discharge – Determination of frequency of spillway use • Estimation of inflow design flood for a given dam site is an exercise in hydrology, therefore, procedures are fairly standardized. regional flood formulae envelope curves refined methods involving statistical analyses (flood frequency series) and numerical modeling of rainfall–runoff relationships Historica l Methods
  • 9. Hydrology-Previous Vs Current Practice –Design Flood Selection • On the other hand, selection of the spillway design flood is a function of social, moral, and economic, as well as technological considerations. • While the previous design flood–selection criteria considered factors such as – dam height, – storage volume, and – downstream development, • Current practice is to select a design inflow flood on the basis of the consequences of dam failure.
  • 10. Hydrology • The spillway outflow discharge corresponding to an inflow flood is determined from the flood-routing analysis. • At least – a tentative design of the spillway – Full Reservoir Level (FRL), – crest level, – number of spans, and – an approximate discharge rating curve for the spillway • The design of various elements of the spillway such as crest profile, sidewalls, energy dissapator and downstream protection are all based on spillway outflow discharge.
  • 11. Hydrology-Frequency of Usage • Ordinary river flows are usually stored in a reservoir, diverted through head works, or released through outlets; therefore, the spillway may not be required to function. • At diversion dams, where storage space is limited and diversion flows are relatively small compared to flood flows, a spillway is used more frequently. • When the flood flows are generally restricted to a small duration and are flashy in nature, the spillways are expected to operate more frequently.
  • 12. Topography and Geology • These considerations determine the type and location of a spillway as follows: 1. Ogee spillway: Most commonly used as the integral overflow section of a concrete or a masonry dam. 2. Chute spillway: Adopted in a site where a suitable foundation with moderate depth of excavation is available, where topography of the site permits the use of a relatively short channel, or where spillway excavation can be used economically in the dam. 3. Side channel spillway: Suitable for earth or rock-fill dams in narrow canyons and for other situations where direct overflow is not permissible. 4. Shaft spillway/Tunnel spillway: Used advantageously at dam sites in narrow canyons where abutments rise steeply or where a diversion tunnel or conduit is available for use as the downstream leg. 5. Siphon spillway: Used when there is a desire for an automatic operation without mechanical parts and the discharge to be passed is small. 6. Free over-fall spillway: Suitable for arch dams 7. Duck bill spillway: Used when the waterway and foundation for the spillway are limited and a curved crest-projection into the reservoir is possible.
  • 13. Utility and Operational Aspects From the standpoint of serviceability, spillways may be defined in three broad classes as follows. 1. Service Spillways Include any spillway that may be utilized without significant damage to the structure or downstream channel. As a general rule, service spillways have paved channels and suitable energy dissipators. 2. Limited Service and Additional Spillways Include any spillway that may be utilized infrequently for operation of the reservoir without incurring excessive damage. Some extraordinary maintenance at infrequent intervals would be acceptable in order to reduce initial construction costs, but not to the extent of imposing significant limitations on the optimum utilization of the reservoir’s controlled storage capacity under normal operating conditions. 3. Emergency Spillways Include any spillway, the use of which to be avoided as long as possible, used to prevent major damage to the spillway structure or to downstream areas. Emergency spillways may involve partial control by so-called ‘‘Fuse Plugs’’ or ‘‘Flash Boards.’’
  • 14. Utility and Operational Aspects • Uncontrolled Crest • Uncontrolled crests permit water to discharge whenever the reservoir surface is higher than the crest. • The height of the dam is determined from the maximum flood required to be discharged and the necessary free board. • Since the longest crest requires the least head, an economic balance may be found between length and height of spillway if the topography does not limit the length of the crest.
  • 15. Utility and Operational Aspects • Controlled Crest • Gates may be used to control the reservoir water surface. • The top of the gates is usually at the normal water-surface elevation of the reservoir; to keep the maximum elevation constant, the gates are opened sufficiently to pass the floods. • While an uncontrolled crest requires a dam higher than a controlled crest, an uncontrolled crest offers the following advantages: – flood storage is always available, the necessity of gates and their maintenance is eliminated, and the crest has a greater ability to pass the logs and other debris without interference. • An uncontrolled crest requires less discharge capacity than a controlled crest for a given flood, since part of the flood is stored in order to acquire a head necessary to pass the discharge.
  • 16. Utility and Operational Aspects • Spillways for Flood and Sediment Disposal • While the prime objective of a spillway is disposal of floods, if designed specifically, it may also serve for the disposal of sediment deposited in the reservoir. • Mountainous streams with dependable flows and considerable heads favor selection of run- off river plants. – However, such streams carry large amount of sediment that could ultimately settle in the reservoir and reduce its capacity. • In such projects, spillways can be designed to serve the dual purpose of flood disposal and sediment disposal to flush material deposited in the reservoir downstream, but these requirements are often conflicting. • While flood disposal warrants a larger spillway capacity with a wider waterway, sediment disposal requires low level spillways or bottom outlets of large capacity placed deep below the water surface. .
  • 17. Constructional and Structural Aspects • River valley projects with multiple purposes are usually phased over long periods of time to suit the requirements of irrigation and power, financial allocations, and progress of rehabilitation of the project-affected population. • The construction of major dams and spillways involves large quantities of excavation, earthwork, and concreting, and may be required to be constructed in stages. • The flood flows in the intervening periods, diverted over partly constructed spillways, may set up undesirable flow conditions, thus resulting in damage to the adjacent structures already constructed by then. • Hydraulic model study is the best means to visualize these effects and to evolve suitable designs.
  • 18. Constructional and Structural Aspects • The choice of earth- and rock-fill dams is often based on the availability of material from the excavation for the spillways • A detailed discussion on this is presented in the chapter ‘‘Unlined Rock Spillways.’’ • Many future dams are likely to adopt the technology of roller-compacted concrete. This method of construction is cost-effective, typically faster, and causes minimum project disruption. • This technique also facilitates the provision of stepped spillways since the rolling in lifts of 30 to 60 cm favors the construction of a stepped surface as the height increases. • The stepped spillways ensure energy dissipation on the flow surface itself at almost double that of an unstepped, smooth spillway.
  • 19. ECONOMIC ANALYSIS • The procedure for economic analysis has been illustrated by the USBR (1960). • Factors in EA Optimization may be: – (1) the characteristics of the flood hydrograph; – (2) the damages that would result if a flood occurred without the dam; – (3) the damages that would result if such a flood occurred with the dam in place; – (4) the damages that would occur if the dam or spillway were breached; – (5) the effects of various dam-spillway combinations on the probable increase or decrease of damages above or below the dam; – (6) the relative cost of increasing the spillway capacity; and – (7) the use of outlet facilities to serve more than one function, such as control of releases and control or passage of floods
  • 20. Comparative costs: spillway-dam combinations. A:Minimum cost: gated spillway, B: Minimum cost: ungated spillway (shown in USBR, United States,1960)

Editor's Notes

  • #5: However, considering analyses of existing spillways could be useful in understanding trends towards the types of spillways for a given set of conditions.
  • #6: It would be of interest to analyze existing structures to see if there was a trend for adopting a particular type of spillway in a given set of condition. Here, L and H are the length and height of the dam crest respectively, and N is the power of the flow from the spillway given by 0.0098 Q*Hb, MW, where Q (cumec) is the discharge and Hb (m)—the difference between the upstream water level and natural river bed. Semenkov (1979) analyzed more than 400 projects in terms of parameters L/Hand N for the three main types of spillways: gravity spillways, chute spillways, and tunnel spillways for concrete and earth-fill dams.
  • #7: Here, L and H are the length and height of the dam crest respectively, and N is the power of the flow from the spillway given by 0.0098 Q*Hb, MW, where Q (cumec) is the discharge and Hb (m)—the difference between the upstream water level and natural river bed.
  • #9: (such as Inglis, Dickens, etc.) The earlier approaches of regional flood formulae and envelope curves have now been replaced with refined methods involving statistical analyses (flood frequency series) and numerical modeling of rainfall–runoff relationships.
  • #10: This is one of the most debated issues of spillway design and different countries have their own standards or procedures for selecting spillway design flood.
  • #11: necessary for a flood routing analysis.
  • #12: The frequency of spillway usage is determined by the run-off characteristics of the drainage area and the flood storage capacity available in the reservoir. When the flood flows are generally restricted to a small duration and are flashy in nature, the spillways are expected to operate more frequently. The design philosophy for such spillways favors a more elaborate and fail-safe design.
  • #13: Topography and geology, with selected subsurface explorations, have greater influence on the location and type of spillway than any other factors. The class and amount of excavation, possibility of seepage and piping, value of excavated material for other purposes, possibility of scour and subsequent need for lining, location of faults, type of foundation, and bearing pressures allowed are some of the items considered.
  • #14: The overall advantages and disadvantages of service, additional, and emergency spillways should be considered in the planning and design of a reservoir project. Besides the aforementioned, the spillways can be classified according to the control structure, namely controlled or gated crest and uncontrolled or ungated crest.
  • #16: An uncontrolled crest also becomes necessary for some dams located in distant valleys or where, for some reason, spillways are not accessible during floods. A completely controlled crest immediately passes all incoming floodwater if the flood starts when the reservoir is at maximum stage, but it also offers a means of draining the water level in anticipation of floods or allowing induced surcharge at the time of floods. A choice between a controlled and an uncontrolled spillway would require consideration of the above aspects.
  • #18: It would therefore be necessary to plan the construction schedule, as well as spillway features, in such a way that the temporary passages of flow do not cause undesirable flow conditions.
  • #19: The choice of earth- and rock-fill dams is often based on the availability of material from the excavation for the spillways. In such situations, unlined rock spillways and unlined cascade spillways may be preferred over chute and side channel spillways. The theory and case studies on stepped spillways are discussed in the chapter, ‘‘Stepped Spillways.
  • #20: The procedure for economic analysis has been illustrated by the USBR (1960). The analysis seeks to identify an optimum combined cost of the dam-spillway combination. In determining the best combination of storage and spillway capacity to accommodate the selected design flood, all pertinent factors of hydrology, hydraulics, design cost, and probable damage should be considered.