New ERP solution for Northland –
Implementation of IFS Applications

Patrick Harlin, IT-manager
Northland Resources
Östen Westman, Project manager
Novacura
Agenda





Northland Resources – short background
Goals for new solution
Implementation of IFS Applications
Experiences and lessons learned
Northland Resources – A new company
in rapid change
 Canadian idea that transformed a wet bog
to a mine within 24 months
 Total investment approx. 1.2 billion USD
 From 70 till 250 employees in 12 months
(Long term number will be 400-500 employees)
Europe’s new iron ore producer
From a wet bog to a mine
Från blöt myr till gruva
…..och november 2011

7

11

11
Logistiken
9

27
Kaunisvaara Projektöversikt
inkluderande Pellivuoma

10

27
Logistics
First delivery

25 feb 2013

12

17
13
Effects of rapid buildup

Rapid buildup of organization and construction at the same time
Company lifecycle phases and IT

”Loop of systems acquisitions”

No history = Unclear requirements definition and no
history considerations
Reasons for the late ”heart change” =
change of business solution
 Transformation from ”Project” to ”Operation”
 Both organization and operation needed a new
focus
 IFS Applications offered the flexibility needed for
the start up of the operations

 Usability
 Different types of clients, access to information,
role based interfaces

 ”Total Cost of Ownership” – TCO
 Aprox. 1 million USD lower TCO over 5 years
Timeline – new solution


SAP implemented in 2010 to replace old finance solution:




Northland selected future maintenance solution during Q4 2011




Solution included Finance and Purchase
Scope included Equipment, Preventive Maintenance, Work Order and Inventory and
IFS Applications,8 was selected

In Q2 2012 - Northlands management initiated a process review


The goal was to synchronize Northland needs and address existing issues:
 High level definition of Northland system map
 Transition from “project” to “operation”
 Implement common and cross-functional processes for critical areas such as:



Purchase Requisition – Purchase Order – Invoice – Payment
Fault Report – Prepare Work Order – Execute Work Order – Report Work Order

 Create a foundation for future development




A Total Cost of Ownership analysis between current solution compared with
a new solution from IFS was executed:




Processes & Business analysis

Over a 5 year period Northland would lower the cost with more than 1 Million USD
using a an IFS Applications based solution compared with an integrated solution
between SAP and IFS Applications

Investment approved by board and agreement signed by the end of June
2012 and the project was initiated immediately with technical installations
System overview Northland
Production process
Mining

Contract

Enrichment

Process and
control system

Distribution
Logistics

Business Performance

Finance

Purchase

Inventory

Project
Document
SHEQ

HR

Maintenance

Invoicing
Goals for the project
 Common business solution for Northland
 Common processes for all companies in the Northland group
 Finance – Purchase – Inventory – Maintenance – Project

 Long term integration with critical solutions (future needs)
 SURPAC/CAT Minestar – Mine planning
 ABB 800xa – Crusher and enrichment
 Currently on-going

 Savage – Logistics
 Intelex – health, Environment and Safety
 Trix – Technical Document Management

 Support for mobile devices
 Touch applications and bar code readers
 On-going

 Development of long term strategy for the new solution
 When the project started many of the critical roles and resources where
not hired yet
High level project plan - 2012



Agreement signed
Installation




Pre-study Finance




Suppliers, equipment objects, parts
etc.
Test

In each area and cross functional

Training based on work instructions





Migration

Final solution tests




WS & configurations

Configuration of processes and
creation of work instructions

Migration of data to IFS




Pre-study
Finance

Planning the switch from SAP to
IFS

Workshops and configuration of
solution




Inst

Databases TEST and PROD

Train.

Northland key users

Go-live – Monday December 3rd
Go-live support


Adjustments of configurations
Go-live support

Jun

Jul

Aug

Sep Oct

Nov

Dec

Jan
How did Northland do it? –
Resources, time and cost
 Project organization
 IFS (4 persons)





Project Manager/Inventory/Purchase
Finance
Project
Technical

 Northland (7 persons)







Solution management/Project Manager/Maintenance (external)
Finance (2 persons)
Purchase (1 person)
Inventory (1 person)
Maintenance (1 person)
Project (1 person)

 Implementation
 July 2012 – January 2013

 Total cost external consulting resources (excluding travel cost)
 2,5 milj SEK = approx. 385 000 USD
Results
 160 users active in new solution
 15 users in old solution

 New finance solution
 Tough timing of the ”heart surgery”

 New integrated purchase process including scanning and
interpretation of invoices
 Focus on operations

 New maintenance solution
 Focus on asset life cycle

 New inventory solution
 Control from day 1

 Integration to QlikView updated
 New budget process and follow up for 2013
What does it look like?






8 companies
63 projects
>1000 equipment objects and parts
Full event history for production
Thank you for your attention!

www

www.northland.eu

30

More Related Content

PDF
Suresh Madhu_Resume
PPSX
PTC Windchill ESI 9.x Architecture
PDF
Racing for the Flexibility Integrating Aras into the IT Landscape
PPTX
SAP Teamcenter by Siemens Partnership
DOC
CV_Vadivu
PDF
Product Line Engineering Meets PLM
PPTX
Integration
 
PDF
Pratibha Chaudhary 6 years Exp SAP ABAP
Suresh Madhu_Resume
PTC Windchill ESI 9.x Architecture
Racing for the Flexibility Integrating Aras into the IT Landscape
SAP Teamcenter by Siemens Partnership
CV_Vadivu
Product Line Engineering Meets PLM
Integration
 
Pratibha Chaudhary 6 years Exp SAP ABAP

What's hot (19)

PPTX
COLLABORATE 18 Presentation: Success Story- Cloud Product Information Managem...
PDF
OBIA with ERP Upgrade-Leverage Packaged Analytics when Upgrading!
PDF
MSCE Presentation 2018 | Oracle Modern Supply Chain Experience 2018
PDF
ARIS - Empower Anyone, Anytime, Anywhere to Connect and Collaborate - Stephan...
PDF
Business Driven IT Design
PDF
Apama, Terracotta, webMethods Upgrade: Avoiding Common Pitfalls
PDF
Mission Ready PLM
PDF
Why sap by design is a top class solution ?
PDF
In-Memory Data Management Goes Mainstream - OpenSlava 2015
PPTX
Crm siebel
PDF
The Future of Customer Centricity
PDF
Three Approaches to Integration that Deliver Greater PLM Value
PPTX
Oracle projects integration
PDF
Integration of Manufacturing Execution Systems - Harsh Infotech Case Studies
PDF
smartbol-brochure-PRINT-new
PDF
Marc Steegmans - Customer story Bewel
PDF
DPA+RPA Meetup 2020 02-26
PDF
Siebel CRM Strategy and Roadmap
PDF
S3 infotech erp
COLLABORATE 18 Presentation: Success Story- Cloud Product Information Managem...
OBIA with ERP Upgrade-Leverage Packaged Analytics when Upgrading!
MSCE Presentation 2018 | Oracle Modern Supply Chain Experience 2018
ARIS - Empower Anyone, Anytime, Anywhere to Connect and Collaborate - Stephan...
Business Driven IT Design
Apama, Terracotta, webMethods Upgrade: Avoiding Common Pitfalls
Mission Ready PLM
Why sap by design is a top class solution ?
In-Memory Data Management Goes Mainstream - OpenSlava 2015
Crm siebel
The Future of Customer Centricity
Three Approaches to Integration that Deliver Greater PLM Value
Oracle projects integration
Integration of Manufacturing Execution Systems - Harsh Infotech Case Studies
smartbol-brochure-PRINT-new
Marc Steegmans - Customer story Bewel
DPA+RPA Meetup 2020 02-26
Siebel CRM Strategy and Roadmap
S3 infotech erp
Ad

Viewers also liked (20)

PDF
IFS Manufacturing customer´s experience of using IFS Applications
 
PDF
IFS Project-Based Solutions - share the solution, share the benefit
 
PDF
Industrial manufacturing and IFS Applications 8: customer case
 
PDF
New look new benefits - upgrading to IFS Applications 8
 
PPTX
IFS SOUTH ASIA COMPANY_INTRODUCTION- NOV 2015
PDF
4shared.com Website Tutorial
PPTX
About IFS Applications
PDF
IFS Applications - keeping business agile
PPT
Selling Approaches Athena Info Consulting
PDF
The Timing And Predictors Of The Early Termination Of Breastfeeding
PPT
Today
PPTX
Forever flowing 3.1
PPTX
Forever flowing 3.2
PPT
5.Maila Arrateko Andra Mari
PPT
космически туризъм
PPT
офисные здания
PPT
Europe 2020
PPSX
SA & Cape Town responsible tourism journey june 2012
PDF
My Last Resume 2014
PPT
28. The Product Life Cycle
IFS Manufacturing customer´s experience of using IFS Applications
 
IFS Project-Based Solutions - share the solution, share the benefit
 
Industrial manufacturing and IFS Applications 8: customer case
 
New look new benefits - upgrading to IFS Applications 8
 
IFS SOUTH ASIA COMPANY_INTRODUCTION- NOV 2015
4shared.com Website Tutorial
About IFS Applications
IFS Applications - keeping business agile
Selling Approaches Athena Info Consulting
The Timing And Predictors Of The Early Termination Of Breastfeeding
Today
Forever flowing 3.1
Forever flowing 3.2
5.Maila Arrateko Andra Mari
космически туризъм
офисные здания
Europe 2020
SA & Cape Town responsible tourism journey june 2012
My Last Resume 2014
28. The Product Life Cycle
Ad

Similar to Lesson learned from 90-days IFS implementation in mining start-up (20)

PPTX
Successful Workflow Systems Projects - Dan Buckhout
PDF
Preparing for growt: How Odfjell Drilling is benefiting from running IFS App...
 
PDF
JF Burguet - ERP Experiences
PPTX
GXC Advisory Board Business Windows 7 Accelerated Migration September2012
PPTX
Managing, Measuring & Benchmarking Offshore Application Development
PDF
Service & assets news and solutions
 
PDF
Baird Miller, DOL: IT Portfolio Management in State Government
 
PPTX
Application Management Service Offerings
PPTX
Application Management Services
PPTX
Application Management Services
PDF
Agile adoption tales from the coalface
PDF
Flexible Product Development
PDF
Session 3 - Reengineering the Finance Organization
PPTX
Mark Aikman, CIO at The North Group - Leading a Complex Bespoke System Transf...
PDF
A case of Fusion Middleware - iLOUG 2013
PPT
Risk managementforsponsors barnes
PPTX
Mark Aikman, IT Director at The North Group - Leading a Complex Bespoke Syste...
PDF
TechOut Solutions, LLC - A Short Introduction to Our Services and Processes
PPTX
AgileIndy Keynote 2017
PPT
ERP project mgt approach
Successful Workflow Systems Projects - Dan Buckhout
Preparing for growt: How Odfjell Drilling is benefiting from running IFS App...
 
JF Burguet - ERP Experiences
GXC Advisory Board Business Windows 7 Accelerated Migration September2012
Managing, Measuring & Benchmarking Offshore Application Development
Service & assets news and solutions
 
Baird Miller, DOL: IT Portfolio Management in State Government
 
Application Management Service Offerings
Application Management Services
Application Management Services
Agile adoption tales from the coalface
Flexible Product Development
Session 3 - Reengineering the Finance Organization
Mark Aikman, CIO at The North Group - Leading a Complex Bespoke System Transf...
A case of Fusion Middleware - iLOUG 2013
Risk managementforsponsors barnes
Mark Aikman, IT Director at The North Group - Leading a Complex Bespoke Syste...
TechOut Solutions, LLC - A Short Introduction to Our Services and Processes
AgileIndy Keynote 2017
ERP project mgt approach

More from IFS (20)

PDF
Food and Beverage solution map New
 
PDF
Retail solution map
 
PPTX
Offshore Operations & Marine Services
 
PPTX
British GT Racing
 
PDF
Shipbuilding
 
PDF
IFS EAM Solution Map pdf
 
PDF
IFS Process Manufacturing – F&B Solution Map pdf
 
PDF
IFS Process Manufacturing – Chemicals Solution Map pdf
 
PDF
IFS High Tech Solution Map pdf
 
PDF
IFS Energy & Utilities Solution Map
 
PDF
IFS Construction & Contracting Solution Map
 
PDF
IFS Metrix Service Management: An Overview
 
PDF
Compliance-the 3rd variable
 
PDF
Customer case: The retail industry working with IFS
 
PDF
Customer case: Health & Safety
 
PDF
Troubleshooter´s Top 5: Real-world performance tuning of IFS Applications
 
PDF
Success story: Quality Assurance real customer case
 
PDF
Success story: IFS CRM helped Damen Shipyards realize its vision
 
PDF
Mobile Work Order solutions for high-performance service & maintenance
 
PDF
Success story: Warehouse efficiency - out of the box!
 
Food and Beverage solution map New
 
Retail solution map
 
Offshore Operations & Marine Services
 
British GT Racing
 
Shipbuilding
 
IFS EAM Solution Map pdf
 
IFS Process Manufacturing – F&B Solution Map pdf
 
IFS Process Manufacturing – Chemicals Solution Map pdf
 
IFS High Tech Solution Map pdf
 
IFS Energy & Utilities Solution Map
 
IFS Construction & Contracting Solution Map
 
IFS Metrix Service Management: An Overview
 
Compliance-the 3rd variable
 
Customer case: The retail industry working with IFS
 
Customer case: Health & Safety
 
Troubleshooter´s Top 5: Real-world performance tuning of IFS Applications
 
Success story: Quality Assurance real customer case
 
Success story: IFS CRM helped Damen Shipyards realize its vision
 
Mobile Work Order solutions for high-performance service & maintenance
 
Success story: Warehouse efficiency - out of the box!
 

Recently uploaded (20)

PDF
Blue Purple Modern Animated Computer Science Presentation.pdf.pdf
PDF
Chapter 3 Spatial Domain Image Processing.pdf
PDF
Network Security Unit 5.pdf for BCA BBA.
PPTX
Digital-Transformation-Roadmap-for-Companies.pptx
PDF
Optimiser vos workloads AI/ML sur Amazon EC2 et AWS Graviton
PDF
Architecting across the Boundaries of two Complex Domains - Healthcare & Tech...
PPTX
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
PDF
Spectral efficient network and resource selection model in 5G networks
PPT
“AI and Expert System Decision Support & Business Intelligence Systems”
PPTX
Effective Security Operations Center (SOC) A Modern, Strategic, and Threat-In...
PDF
Agricultural_Statistics_at_a_Glance_2022_0.pdf
PDF
TokAI - TikTok AI Agent : The First AI Application That Analyzes 10,000+ Vira...
PPTX
MYSQL Presentation for SQL database connectivity
PPTX
Big Data Technologies - Introduction.pptx
PDF
Dropbox Q2 2025 Financial Results & Investor Presentation
PDF
The Rise and Fall of 3GPP – Time for a Sabbatical?
PDF
Peak of Data & AI Encore- AI for Metadata and Smarter Workflows
PDF
cuic standard and advanced reporting.pdf
PDF
Build a system with the filesystem maintained by OSTree @ COSCUP 2025
PDF
Building Integrated photovoltaic BIPV_UPV.pdf
Blue Purple Modern Animated Computer Science Presentation.pdf.pdf
Chapter 3 Spatial Domain Image Processing.pdf
Network Security Unit 5.pdf for BCA BBA.
Digital-Transformation-Roadmap-for-Companies.pptx
Optimiser vos workloads AI/ML sur Amazon EC2 et AWS Graviton
Architecting across the Boundaries of two Complex Domains - Healthcare & Tech...
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
Spectral efficient network and resource selection model in 5G networks
“AI and Expert System Decision Support & Business Intelligence Systems”
Effective Security Operations Center (SOC) A Modern, Strategic, and Threat-In...
Agricultural_Statistics_at_a_Glance_2022_0.pdf
TokAI - TikTok AI Agent : The First AI Application That Analyzes 10,000+ Vira...
MYSQL Presentation for SQL database connectivity
Big Data Technologies - Introduction.pptx
Dropbox Q2 2025 Financial Results & Investor Presentation
The Rise and Fall of 3GPP – Time for a Sabbatical?
Peak of Data & AI Encore- AI for Metadata and Smarter Workflows
cuic standard and advanced reporting.pdf
Build a system with the filesystem maintained by OSTree @ COSCUP 2025
Building Integrated photovoltaic BIPV_UPV.pdf

Lesson learned from 90-days IFS implementation in mining start-up

  • 1. New ERP solution for Northland – Implementation of IFS Applications Patrick Harlin, IT-manager Northland Resources Östen Westman, Project manager Novacura
  • 2. Agenda     Northland Resources – short background Goals for new solution Implementation of IFS Applications Experiences and lessons learned
  • 3. Northland Resources – A new company in rapid change  Canadian idea that transformed a wet bog to a mine within 24 months  Total investment approx. 1.2 billion USD  From 70 till 250 employees in 12 months (Long term number will be 400-500 employees)
  • 4. Europe’s new iron ore producer
  • 5. From a wet bog to a mine
  • 6. Från blöt myr till gruva
  • 12. First delivery 25 feb 2013 12 17
  • 13. 13
  • 14. Effects of rapid buildup Rapid buildup of organization and construction at the same time
  • 15. Company lifecycle phases and IT ”Loop of systems acquisitions” No history = Unclear requirements definition and no history considerations
  • 16. Reasons for the late ”heart change” = change of business solution  Transformation from ”Project” to ”Operation”  Both organization and operation needed a new focus  IFS Applications offered the flexibility needed for the start up of the operations  Usability  Different types of clients, access to information, role based interfaces  ”Total Cost of Ownership” – TCO  Aprox. 1 million USD lower TCO over 5 years
  • 17. Timeline – new solution  SAP implemented in 2010 to replace old finance solution:   Northland selected future maintenance solution during Q4 2011   Solution included Finance and Purchase Scope included Equipment, Preventive Maintenance, Work Order and Inventory and IFS Applications,8 was selected In Q2 2012 - Northlands management initiated a process review  The goal was to synchronize Northland needs and address existing issues:  High level definition of Northland system map  Transition from “project” to “operation”  Implement common and cross-functional processes for critical areas such as:   Purchase Requisition – Purchase Order – Invoice – Payment Fault Report – Prepare Work Order – Execute Work Order – Report Work Order  Create a foundation for future development   A Total Cost of Ownership analysis between current solution compared with a new solution from IFS was executed:   Processes & Business analysis Over a 5 year period Northland would lower the cost with more than 1 Million USD using a an IFS Applications based solution compared with an integrated solution between SAP and IFS Applications Investment approved by board and agreement signed by the end of June 2012 and the project was initiated immediately with technical installations
  • 18. System overview Northland Production process Mining Contract Enrichment Process and control system Distribution Logistics Business Performance Finance Purchase Inventory Project Document SHEQ HR Maintenance Invoicing
  • 19. Goals for the project  Common business solution for Northland  Common processes for all companies in the Northland group  Finance – Purchase – Inventory – Maintenance – Project  Long term integration with critical solutions (future needs)  SURPAC/CAT Minestar – Mine planning  ABB 800xa – Crusher and enrichment  Currently on-going  Savage – Logistics  Intelex – health, Environment and Safety  Trix – Technical Document Management  Support for mobile devices  Touch applications and bar code readers  On-going  Development of long term strategy for the new solution  When the project started many of the critical roles and resources where not hired yet
  • 20. High level project plan - 2012   Agreement signed Installation   Pre-study Finance   Suppliers, equipment objects, parts etc. Test In each area and cross functional Training based on work instructions    Migration Final solution tests   WS & configurations Configuration of processes and creation of work instructions Migration of data to IFS   Pre-study Finance Planning the switch from SAP to IFS Workshops and configuration of solution   Inst Databases TEST and PROD Train. Northland key users Go-live – Monday December 3rd Go-live support  Adjustments of configurations Go-live support Jun Jul Aug Sep Oct Nov Dec Jan
  • 21. How did Northland do it? – Resources, time and cost  Project organization  IFS (4 persons)     Project Manager/Inventory/Purchase Finance Project Technical  Northland (7 persons)       Solution management/Project Manager/Maintenance (external) Finance (2 persons) Purchase (1 person) Inventory (1 person) Maintenance (1 person) Project (1 person)  Implementation  July 2012 – January 2013  Total cost external consulting resources (excluding travel cost)  2,5 milj SEK = approx. 385 000 USD
  • 22. Results  160 users active in new solution  15 users in old solution  New finance solution  Tough timing of the ”heart surgery”  New integrated purchase process including scanning and interpretation of invoices  Focus on operations  New maintenance solution  Focus on asset life cycle  New inventory solution  Control from day 1  Integration to QlikView updated  New budget process and follow up for 2013
  • 23. What does it look like?     8 companies 63 projects >1000 equipment objects and parts Full event history for production
  • 24. Thank you for your attention! www www.northland.eu 30