RIDHI SIDHI LIBRARY, JAIPUR
LIVE CASE STUDY
SUBMITTED BY:
AVI SHAH
GOBIND DAHIYA
MAYANK CHAUDHARY
NAMAN BHARGAVA
SIDDHARTH KRISHNA
By POORNIMA UNIVERSITY , Jaipur
Batch 2015-20
LOCATION AND ACCESSIBILITY
 ADDRESS- 33, GOPALPURA RAOD, GANGARAM NAGAR, MANGAL
VIHAR, KESHAV VIHAR, GOPALPURA MODE, JAIPUR.
 1.94 KM AWAY FROM NEW AATISH MARKET METRO STATION
TOWARDS SOUTH-WEST.
ABOUT THE LIBRARY
 TOTAL AREA – 1620 SQ. FT. (36’ X 45’)
 OPENING HOURS – 7:00 AM – 10:00 PM (MONDAY-SATURDAY)
7:00 AM – 1:00 PM (SUNDAY)
 CHARGES – FOR FULL DAY- 900/-
FOR HALF DAY- 600/-
 AVERAGE FOOTFALL – 90 PERSON PER DAY
 TOTAL CUBICLES – 75 OF SIZE ‘2 X 2 FT.’
 CENTRAL TABLE WITH SITTING FOR 12 PERSONS.
 8 CUBICLES OF SIZE ‘4 X 2 FT.’
 SITUATED IN THE BASEMENT WITH MAIN ENTRY FROM THE 24 M
WIDE ROAD.
 WI-FI SERVICES AVAILABLE.
PLAN
READING TABLE FOR 12
PERSONS
CUBICLES ARRANGED FOR
WORK
READING TABLE AND OFFICE WALL TO WALL SWITCH
PHOTOGRAPHS SHOWING INTERIOR OF LIBRARY
LOCALITIES NEAR THE SITE
MAIN ENTRY OF THE
LIBRARY
PARKING IN FRONT OF MAIN
ENTRY
BAKERY SHOP ADJACENT TO ROAD GOING TOWARDS
INFERENCES
 USERS HAD COMPLAINT ABOUT THE NATURAL LIGHTING AND
VENTILATION SINCE ITS IN THE BASEMENT. HENCE, WE CAN’T GIVE
A LIBRARY IN THE BASEMENT OF OUR BUILDING.
 A MINIMUM SPACE OF 4 FEET IS REQUIRED BETWEEN TWO
PARALLEL CABINS.
4”
 ENTRY IS GIVEN FROM THE MAIN ROAD SO THAT THERE IS A
DIRECT ACCESS TO THE LIBRARY FROM THE ROAD. IT
SHOWS THAT LIBRARY HAS TO BE VISIBLE TO USERS AND IT
SHOULD HAVE A DIRECT ACCESS.
SWITCH BOARDS AND PLUG POINTS ARE NOT PROVIDED TO EACH
TABLE AND INSTEAD, WALL TO WALL SWITCHE BOARDS ARE GIVEN
WHICH SOMETIMES ACTS AS A HURDLE FOR THE STUDENTS.
VENNESLA
LIBRARY
AND
CULTURE HOUSE
Architects - Helen & Hard
Location - Vennesla,
Norway
Category - Library
Area - 1938.0 m2
Project Year – 2011
The new library in
Vennesla comprises a
library, a café, meeting
places and administrative
areas, and links and
existing community
house and learning
centre together.
Existing buildings are
located either side of the
library, but natural light
floods in through
glazed facades that are
exposed at the front and
shaded behind timber
slats at the back.
 Chunky wooden ribs bend around the walls
and ceiling of this library in Norwayby Helen &
Hard Architects and integrate lighting,
bookshelves and seating.
 The whole library consists of 27 ribs made of
prefabricated glue-laminated timber elements
and CNC-cut plywood boards.
 The 27 ribs frame the outline of a double-
height hall, which spans the length of the
Vennesla Library and Cultural Centre and
includes a mezzanine.
 Glue-laminated timber beams and columns
provide the structure for each rib, while
air conditioning ducts are sandwiched behind
the lighting fixtures and plywood casing.
 In total, over 450m3 of gluelam wood have
been used for the construction alone.
Library case study
Library case study
Stairs lead down to a basement floor containing offices, classrooms and a local history
collection.
The library is a “low-energy” building, defined as class “A” in the Norwegian energy-
use definition system.
All ribs, inner and outer walls, elevator shaft, slabs, and partially roof, are made in
gluelam wood. All gluelam is exposed on one or both sides.
Library case study
Library case study
Library case study
MULTIMEDIA LIBRARY
AUNEAU
LITERATURE CASE
STUDY
LOCATION AND ACCESSIBILITY
 ADDRESS- 29 RUE DE LA RÉSISTANCE, 28700 AUNEAU, France
 110 m AWAY FROM THE NEAREST BUS STOP
S I T E P L A N
GROUND FLOOR
PLAN
1ST FLOOR
2ND FLOOR
BOTH NATURAL AND ARTIFICIAL WELL ARRANGED SEATING
PHOTOGRAPH SHOWING THE INTERIOR OF THE LIBRARY

More Related Content

PDF
PUBLIC LIBRARY CASE STUDY
PPTX
Public library
PDF
library architecture
PPTX
Presentation of Case Studies for Bookcafe
PPTX
Case study of library
PPT
Roman architecture
PPTX
Bms system
PUBLIC LIBRARY CASE STUDY
Public library
library architecture
Presentation of Case Studies for Bookcafe
Case study of library
Roman architecture
Bms system

What's hot (20)

PPTX
Library Standards
PDF
Case study on libraries
PPTX
Case study for University Library Design MTU
PDF
Seattle library, washington
PDF
Comperative Analysis of Exhibition Space
PPTX
Case study of surrey library
PPTX
NEHRU SCIENCE CENTER MUMBAI and Dr. Kallam anji reddy memorial
PPTX
Maya somaiya library
PPTX
Seattle public library
PPTX
TIANJIN BINHAI LIBRARY
PPTX
LIBRARY
PDF
site & case study
PDF
college campus Case study
PDF
Literature review and case study of corporate architecture
PDF
BRICK school of architecture, case study
PDF
Desktop study international (architectural college) 1
DOCX
Public Library ,Thesis dissertation.
PPTX
Casestudy on National Museum , New Delhi
PPTX
Forum mall banglore case study
PPTX
NGMA case study
Library Standards
Case study on libraries
Case study for University Library Design MTU
Seattle library, washington
Comperative Analysis of Exhibition Space
Case study of surrey library
NEHRU SCIENCE CENTER MUMBAI and Dr. Kallam anji reddy memorial
Maya somaiya library
Seattle public library
TIANJIN BINHAI LIBRARY
LIBRARY
site & case study
college campus Case study
Literature review and case study of corporate architecture
BRICK school of architecture, case study
Desktop study international (architectural college) 1
Public Library ,Thesis dissertation.
Casestudy on National Museum , New Delhi
Forum mall banglore case study
NGMA case study
Ad

Similar to Library case study (8)

PPTX
folk museum
PPTX
Beyond co-location local studies
PDF
architectural science about light of natural & artificial
PPTX
imperial_(1).pptx school desihn.........
PDF
BCI & Eurobib 2011 Library Projects Brochure
PDF
Future Library 2013 Unconference - Jakob Guillois Lærkes
PDF
Virasat - E - Khalsa memorial and heritage complex.
PDF
Architectural portfolio
folk museum
Beyond co-location local studies
architectural science about light of natural & artificial
imperial_(1).pptx school desihn.........
BCI & Eurobib 2011 Library Projects Brochure
Future Library 2013 Unconference - Jakob Guillois Lærkes
Virasat - E - Khalsa memorial and heritage complex.
Architectural portfolio
Ad

More from Siddiq Salim (18)

PPTX
LANDSCAPE STUDY - NEHRU PARK, JAIPUR
PPTX
Green building Manipal University
PDF
Multiplex case study
PDF
Co working office spaces
PPT
Huda city center, gurgaon
PPTX
Zostel case study
PPTX
Case Study : EXHIBITION AND CONVENTION CENTRE
PPTX
Vernacular Building : Therme Vals bath by Peter Zumthor
PPTX
JAIPUR HOTEL BYELAWS
PPTX
Vernacular Study : AKIL SAMI HOUSE ,by Ar.HASSAN FATHY
PPTX
Fire safety equipment in Birla Auditorum Jaipur
PPTX
STEEL DOORS AND WINDOW'S FITTINGS
PPTX
AR. Micheal Graves ppt
PPTX
PUNJAB ENERGY DEVELOPMENT AGENCY BUILDING , CHANDIGARH
PPTX
Building materials
PPTX
Cement
PPTX
PLASTIC
PPT
ANCIENT ROMAN ARCHITECTURE
LANDSCAPE STUDY - NEHRU PARK, JAIPUR
Green building Manipal University
Multiplex case study
Co working office spaces
Huda city center, gurgaon
Zostel case study
Case Study : EXHIBITION AND CONVENTION CENTRE
Vernacular Building : Therme Vals bath by Peter Zumthor
JAIPUR HOTEL BYELAWS
Vernacular Study : AKIL SAMI HOUSE ,by Ar.HASSAN FATHY
Fire safety equipment in Birla Auditorum Jaipur
STEEL DOORS AND WINDOW'S FITTINGS
AR. Micheal Graves ppt
PUNJAB ENERGY DEVELOPMENT AGENCY BUILDING , CHANDIGARH
Building materials
Cement
PLASTIC
ANCIENT ROMAN ARCHITECTURE

Recently uploaded (20)

PDF
ART & DESIGN HISTORY OF VEDIC CIVILISATION.pdf
PDF
Design Thinking - Module 1 - Introduction To Design Thinking - Dr. Rohan Dasg...
PDF
GSH-Vicky1-Complete-Plans on Housing.pdf
PPTX
Causes of Flooding by Slidesgo sdnl;asnjdl;asj.pptx
PPTX
timber basics in structure mechanics (dos)
PDF
Architecture Design Portfolio- VICTOR OKUTU
PDF
2025CategoryRanking of technology university
PPTX
2. Competency Based Interviewing - September'16.pptx
PPTX
Presentation.pptx anemia in pregnancy in
PPTX
22CDH01-V3-UNIT III-UX-UI for Immersive Design
PPTX
Evolution_of_Computing_Presentation (1).pptx
PPTX
UNIT III - GRAPHICS AND AUDIO FOR MOBILE
PDF
SOUND-NOTE-ARCHITECT-MOHIUDDIN AKHAND SMUCT
PDF
Pongal 2026 Sponsorship Presentation - Bhopal Tamil Sangam
PDF
Skskkxiixijsjsnwkwkaksixindndndjdjdjsjjssk
PPTX
Introduction to Building Information Modeling
PDF
321 LIBRARY DESIGN.pdf43354445t6556t5656
PDF
Chalkpiece Annual Report from 2019 To 2025
PPTX
EDP Competencies-types, process, explanation
PPTX
CLASS_11_BUSINESS_STUDIES_PPT_CHAPTER_1_Business_Trade_Commerce.pptx
ART & DESIGN HISTORY OF VEDIC CIVILISATION.pdf
Design Thinking - Module 1 - Introduction To Design Thinking - Dr. Rohan Dasg...
GSH-Vicky1-Complete-Plans on Housing.pdf
Causes of Flooding by Slidesgo sdnl;asnjdl;asj.pptx
timber basics in structure mechanics (dos)
Architecture Design Portfolio- VICTOR OKUTU
2025CategoryRanking of technology university
2. Competency Based Interviewing - September'16.pptx
Presentation.pptx anemia in pregnancy in
22CDH01-V3-UNIT III-UX-UI for Immersive Design
Evolution_of_Computing_Presentation (1).pptx
UNIT III - GRAPHICS AND AUDIO FOR MOBILE
SOUND-NOTE-ARCHITECT-MOHIUDDIN AKHAND SMUCT
Pongal 2026 Sponsorship Presentation - Bhopal Tamil Sangam
Skskkxiixijsjsnwkwkaksixindndndjdjdjsjjssk
Introduction to Building Information Modeling
321 LIBRARY DESIGN.pdf43354445t6556t5656
Chalkpiece Annual Report from 2019 To 2025
EDP Competencies-types, process, explanation
CLASS_11_BUSINESS_STUDIES_PPT_CHAPTER_1_Business_Trade_Commerce.pptx

Library case study

  • 1. RIDHI SIDHI LIBRARY, JAIPUR LIVE CASE STUDY SUBMITTED BY: AVI SHAH GOBIND DAHIYA MAYANK CHAUDHARY NAMAN BHARGAVA SIDDHARTH KRISHNA By POORNIMA UNIVERSITY , Jaipur Batch 2015-20
  • 2. LOCATION AND ACCESSIBILITY  ADDRESS- 33, GOPALPURA RAOD, GANGARAM NAGAR, MANGAL VIHAR, KESHAV VIHAR, GOPALPURA MODE, JAIPUR.  1.94 KM AWAY FROM NEW AATISH MARKET METRO STATION TOWARDS SOUTH-WEST.
  • 3. ABOUT THE LIBRARY  TOTAL AREA – 1620 SQ. FT. (36’ X 45’)  OPENING HOURS – 7:00 AM – 10:00 PM (MONDAY-SATURDAY) 7:00 AM – 1:00 PM (SUNDAY)  CHARGES – FOR FULL DAY- 900/- FOR HALF DAY- 600/-  AVERAGE FOOTFALL – 90 PERSON PER DAY  TOTAL CUBICLES – 75 OF SIZE ‘2 X 2 FT.’  CENTRAL TABLE WITH SITTING FOR 12 PERSONS.  8 CUBICLES OF SIZE ‘4 X 2 FT.’  SITUATED IN THE BASEMENT WITH MAIN ENTRY FROM THE 24 M WIDE ROAD.  WI-FI SERVICES AVAILABLE.
  • 5. READING TABLE FOR 12 PERSONS CUBICLES ARRANGED FOR WORK READING TABLE AND OFFICE WALL TO WALL SWITCH PHOTOGRAPHS SHOWING INTERIOR OF LIBRARY
  • 6. LOCALITIES NEAR THE SITE MAIN ENTRY OF THE LIBRARY PARKING IN FRONT OF MAIN ENTRY BAKERY SHOP ADJACENT TO ROAD GOING TOWARDS
  • 7. INFERENCES  USERS HAD COMPLAINT ABOUT THE NATURAL LIGHTING AND VENTILATION SINCE ITS IN THE BASEMENT. HENCE, WE CAN’T GIVE A LIBRARY IN THE BASEMENT OF OUR BUILDING.
  • 8.  A MINIMUM SPACE OF 4 FEET IS REQUIRED BETWEEN TWO PARALLEL CABINS. 4”
  • 9.  ENTRY IS GIVEN FROM THE MAIN ROAD SO THAT THERE IS A DIRECT ACCESS TO THE LIBRARY FROM THE ROAD. IT SHOWS THAT LIBRARY HAS TO BE VISIBLE TO USERS AND IT SHOULD HAVE A DIRECT ACCESS.
  • 10. SWITCH BOARDS AND PLUG POINTS ARE NOT PROVIDED TO EACH TABLE AND INSTEAD, WALL TO WALL SWITCHE BOARDS ARE GIVEN WHICH SOMETIMES ACTS AS A HURDLE FOR THE STUDENTS.
  • 12. Architects - Helen & Hard Location - Vennesla, Norway Category - Library Area - 1938.0 m2 Project Year – 2011
  • 13. The new library in Vennesla comprises a library, a café, meeting places and administrative areas, and links and existing community house and learning centre together. Existing buildings are located either side of the library, but natural light floods in through glazed facades that are exposed at the front and shaded behind timber slats at the back.
  • 14.  Chunky wooden ribs bend around the walls and ceiling of this library in Norwayby Helen & Hard Architects and integrate lighting, bookshelves and seating.  The whole library consists of 27 ribs made of prefabricated glue-laminated timber elements and CNC-cut plywood boards.  The 27 ribs frame the outline of a double- height hall, which spans the length of the Vennesla Library and Cultural Centre and includes a mezzanine.  Glue-laminated timber beams and columns provide the structure for each rib, while air conditioning ducts are sandwiched behind the lighting fixtures and plywood casing.  In total, over 450m3 of gluelam wood have been used for the construction alone.
  • 17. Stairs lead down to a basement floor containing offices, classrooms and a local history collection. The library is a “low-energy” building, defined as class “A” in the Norwegian energy- use definition system. All ribs, inner and outer walls, elevator shaft, slabs, and partially roof, are made in gluelam wood. All gluelam is exposed on one or both sides.
  • 22. LOCATION AND ACCESSIBILITY  ADDRESS- 29 RUE DE LA RÉSISTANCE, 28700 AUNEAU, France  110 m AWAY FROM THE NEAREST BUS STOP
  • 23. S I T E P L A N
  • 25. PLAN
  • 28. BOTH NATURAL AND ARTIFICIAL WELL ARRANGED SEATING PHOTOGRAPH SHOWING THE INTERIOR OF THE LIBRARY