Dimitris Raftopoulos
Strategic Leadership Unit
Projects’ Action Plan
 Implementation Methodology – PMI Project Life Cycle
 WP1 - Project Management | Lead: 3LRI
 WP2 - Defining Ageing and Employment Trends in EU |
Lead: University of Social Sciences
 WP3 - Developing Business Concepts for Age Management
& Investment in the HR sector | Lead: UoS
 WP4 - Pilot Projects | Lead: FU-Uppsala
 WP5 - Quality Assurance | Lead: 3LRI
 WP6 - Awareness raising activities | Lead: Documenta
 WP7 - Dissemination of Results | Lead: 3LRI
 WP8 - Mainstreaming and results exploitation | Lead: 3LRI
2
Presentation of PPs and their activity
 3L Research Institute, Greece
 University of Strathclyde, UK
 Folkuniversitetet, Sweden
 University of Social Sciences, Poland
 Documenta, Spain
3
Day 1 - Outline
4
 Presentation of WP.1 Project Management
 Status Update
 Presentation of WP.2 defining ageing & employment trends
 Strategy plan (report) and Exchange information & knowhow (report)
 Presentation of WP.5 Quality Assurance
 Methodological guide for WP.3
 Evaluation of the project
 Presentation of WP.6 Awareness raising activities
 Workshops for the age management concept benefits, Sensitising
entrepreneurs,
 Seminars addressing HR managers, Sensitising the aged workforce
 Presentation of WP.7 Dissemination of results
 Website, brochures, flyer, poster, eNewsletters, press campaign,
Dissemination Conference
Work Packages Analysis WP.1-2
Work Package / Deliverables
Type
Number Title
WP1 Project Management
1.1 Consortium Agreement Other
1.2 Web-based system Service/Product
1.3 Project Partners Meetings Event
1.4 Progress Reports Report
WP2 Defining Ageing and Employment Trends in EU
2.1 Analysing the demographic trends Report
2.2 Analysis of the aged workforce employability Report
2.3 Survey on the aged employed / unemployed workforce Report
2.4 Strategy plan to meet future demographic needs Report
2.5 Exchange information and know-how Report
6
WP.1-Act.1.2
1.2 Web-based system
 Link: http://management.lllprojects.eu/feng/#
 Logins sent to all partners’ personnel
 Instructions .doc file regarding the use of the web-
system was sent as well
 Accessible through the website at the Members Area,
top right
Each responsible manager is to delegate activities to their
personnel participating
7
WP.1-Act.1.3
Activity 1.3: PPs’ meetings
 Done
 Kick-off meeting - Athens: 13-14/12/2011
 2nd meeting - Sweden: 28-29/06/2012
 Remaining
 3rd meeting - Spain: 29-30/11/2012
 4th meeting - Poland: May XX-XX/05/2013
 5th meeting - UK: December XX-XX/12/2013
 Closing meeting - Brussels: September XX-XX/09/2014
8
WP.1-Act.1.4
Activity 1.4: Progress Reports
 1st period: Oct.11 – Mar.12
 2nd period: Apr.12-Sep.12
 Financial excel files through individual Dropbox folders
 Problem? PPs Feedback!!!
 Every six (6) Month Financial & Progress Report
 FolkUniversitetet
 UoS
 Documenta
 University of Management
9
List of Indicators
10
WP.2-Act.2.4-2.5
11
Activity 2.4: Strategy plan to meet future demographic needs
 The current strategy plan will be examined and worked in combination with the analysis of
demographic trends, in order to see how companies could meet the future demographic. The
focal point will be how to increase the positive aspects of ageing workforce, while decreasing
the negative ones. That plan will define the steps needed to be followed and will be used as the
basis on which the workshops will be conducted as well as the pilot actions. The analytical
content of the report will be decided by the Consortium, setting up the methodology for
conducting the research as well as quantitative and qualitative standards.
 Responsible PP: UoS
 Duration: M9, 1 month
Activity 2.5: Exchange information & know-how
 The report will support the exchange of information and Know-How on
building upon innovative processes in the sector of age management
towards developing and testing alternative working conditions in
enterprises. This will be based on the findings of the reports already
conducted in the specific work package.
 Duration: M10, 1 month
 Responsible PP: Documenta
Coffee Break
12
Work Packages Analysis WP.5-6
WP5 Quality Assurance
5.1
Methodological Guide for WP “Defining Ageing and Employment
Trends in EU”
Report
5.2
Methodological Guide for WP “Developing Business Concepts for
Age Management & Investment in the HR sector”
Report
5.3 Methodological Guide for Pilot Projects implementation Report
5.4
Methodological Guide for Awareness raising, Dissemination and
Exploitation of results activities
Report
5.5 Evaluation of the results of the project Report
WP6 Awareness raising activities
6.1 Workshops for the age management concept benefits Event
6.2 Sensitising entrepreneurs Event
6.3 Seminars addressing HR managers Event
6.4 Sensitising the aged workforce Event
13
WP.5-Act.5.2
14
 5.2: Methodological Guide for WP “Developing Business Concepts for
Age Management & Investment in the HR sector”
 Status Update by University of Strathclyde
 Responsible PP: UoS
WP.5-Act.5.4
15
 5.5: Evaluation of the results of the project
 Interim internal evaluation -> online questionnaire filled by PPs only (excluding PC)
 Status Update
 Final external evaluation -> external expert TBC for all PPs (including PC)
 Responsible PP: SWSPIZ
Lunch
16
WP.6-Act.6.1
Activity 6.1: Awareness raising activities
 Update by UoS on their workshop
 Discussion on the following four (4) workshops (one per country) that will involve local
public and private actors, enterprises employees, customers, suppliers, employers and the
community and will discuss as well as examine the benefits enterprises could have from the
proposed strategies. Proposal to PPs.
 These workshops will last half a day and will be organised by each partner in each
participating country, adapting the content to their language, their specific working
conditions, labour market needs and specificities of the attendants.
 Duration: M10-M12, 3 months
 Budget: 29.706,00€
17
WP.6-Act.6.2-6.3
18
Activity 6.2: Sensitising entrepreneurs
 Project partners will visit each other’s area and will visit businesses that operate with aged work force and have
successful results, for exchanging experience. PPs will discuss with the personnel and owners, gaining valuable experience
and know–how that they could bring back to their organizations as well as countries. Local business people will be part
as well of the study tours.
 These study tours (5 in total, one per country), will last one day and will take place together with the project meetings, in
order to save time and money from travelling.
 Duration: M2, M9, M15, M21, M27, 5 months
 Budget: 2.500,00€ (included in 6.1)
Activity 6.3: Seminars addressing HR managers
 There will be organized 5 seminars, one in each different participating country, addressing to Human Resources
Managers for implementing decisions on staff recruitment, retention and redundancy in view of the formulated Age
Management Concepts. The proposed issues will be deriving from the reports already elaborated in the context of the
project.
 Catch a minimum of 20 participants per seminar.
 These seminars will last half a day and will be organised by each partner in each participating country, adapting the
content to their language, their specific labour market needs and conditions and specificities of the attendants.
 Duration: M18-M22, 5 months
 Budget: 1.700,00€ (included in 6.1)
WP.6-Act.6.4
19
Activity 6.4: Sensitising the aged workforce
 In parallel with the seminars organized focusing in HR managers, another 5 will be
organized, addressing to aged workforce and Unemployed aged 50+, with special focus
on sensitive social groups. It will explain the strengths they have as well as the skills that
they need to gain, in order to remain competitive in the labour market they operate and
even in the EU market.
 Catch a minimum of 20 participants per seminar
 These seminars will last half a day and will be organised by each partner in each
participating country, adapting the content to their language, their specific labour market
needs and conditions and specificities of the attendants.
 Duration: M18-M22, 5 months
 Budget: 1.700,00 € (included in 6.1)
Work Packages Analysis WP.7-8
WP7 Dissemination of Results
7.1 Developing a website Service/Product
7.2 Publicity campaign – Information and sensitisation brochures Other
7.3 Publicity campaign – Dissemination of events Other
7.4 Publicity campaign – Electronic Newsletters Other
7.5 Press campaign Other
7.6 Dissemination conference Event
WP8 Mainstreaming and results exploitation
8.1 Mainstreaming and results exploitation action plan Report
8.2 Developing a business manual Report
8.3 Policies assessment Report
20
WP.7-Act.7.1
21
Activity 7.1: Developing a website
 Presentation of the website.
 The website is available in all partners’ language and will be continuously updated by all
partners.
 Duration: M3, 1 month
 Budget: 29.501,00€
http://like.lllprojects.eu/
Act.7.1: “website structure”
22
Structure
 Home
 Project overview
 Rationale
 EU added value
 Project objectives
 Deliverables
 Expected results & outcomes
 Project Meetings
 Project Calendar
 Media library
 Project Partners
 Documentation Center
 + Forum
 Online Questionnaire
 + Sitemap
WP.7-Act.7.2
23
Activity 7.2: Publicity campaign – Information and Sensitisation
brochures
Four brochures of 4pages will be produced, in the following languages: EN, ES, EL,
SE, PL
 one presenting the project
 one sensitising the aged workforce
 one sensitizing enterprises and
 one presenting the project results
 The Lead Partner of the Work Package will create a common layout (with the approbation
of all partners), including a project logo, to be used in all brochures and overall material,
and a common text, but each partner will adapt the text to local conditions, needs and
specificities
 Proposal for change in the development of the 2nd brochure
 Each brochure (A5) will be printed in 1000 items per country
 Duration: M3, M7, M33, 3 months
 Budget: 11.300,00€
WP.7-Act.7.3-7.4
24
Activity 7.3: Publicity campaign – Dissemination of events
 For each event organised (workshops, seminars, conference), each partner will produce and diffuse flyers and posters to
disseminate the event in order to ensure the largest possible participation.
 This means that 6 different flyers and 6 different posters will be produced in each language. Each flyer (A5) will be
printed in 200 items, each poster (A3) in 20 items.
 The Lead Partner of the Work Package will create a common layout (with the approbation of all partners), to be used in
for flyers and posters, and a common text, but each partner will adapt the text to local conditions, needs and
specificities.
 This dissemination will be done in an electronic way as well.
 Duration: M9, M17, M26, M28-29, 5 months
 Budget: 1.900,00€ (included in 7.1)
Activity 7.4: Publicity campaign – Electronic Newsletters
 6 newsletters on the employability of the aged workforce and presenting the project evolution and outputs during the
project lifetime will be sent electronically, which will be used to promote the main Project initiatives, to inform the
operators of interested sectors on the project implementation, the activity phases still in progress, the possibilities and
modalities of participation, to sensitize the population towards the thematic at the focus of the debate, to spread the
results obtained by the Project.
 The Lead Partner will have the overall coordination of the activity, but all partners will participate in the drafting of the
newsletter and in its dissemination to all relevant EU, national, regional and local actors, not only within the 5
participating countries but also in other European countries, to ensure the largest possible dissemination.
 Duration: M3, M9, M15, M21, M27, M33, 6 months
 Budget: (included in 7.1)
WP.7-Act.7.5
25
Activity 7.5: Press Campaign
 The project will be presented to local actors and local press by each partner during a
press-conference presenting the project and addressing specific issues relevant to the
project theme and the local conditions. Each partner will decide on when organising the
press-conference, in order to choose the most appropriate moment for a more effective
and positive event (e.g. before an important event).
 During the press-conferences, folders will be distributed to the journalists with information
about the project, the programme, the transnational actions and the local actions and
added value of the project.
 Regional press-releases will inform target groups about the project and the organised
events and will be issued after the press-conference and more often if possible.
 Project partners will launch a press and radio campaign trying to sensitise as many actors
and target groups as possible.
 Duration: M1-M36, 36 months
 Budget: 250,00 € (included in 7.1)
WP.7-Act.7.6
26
Activity 7.6: Dissemination Conference
 A dissemination conference of the project will be organized in Brussels to present the project results and
disseminate all project products and outputs and to open the ground to new collaborations and partnerships
for the continuity of the project activities. This conference will have as general objectives:
 To assure the largest information and raising awareness for the project by EU actors;
 To inform the public opinion on the role developed by local institutions, European Union and Project partners
in the realization of the Project;
 To inform about the project’s outputs and results, the impact of the Project’s interventions, the findings of it.
 To communicate about age management concept, training of the aged workers and business organization
issues
 The target groups (EU stakeholders, representatives of regions, lobbies, think tanks, representatives of
enterprises, unions of enterprises, unions of employees, policy makers, social partners, training and
education providers and agencies…) will be targeted by the partners through the promotion of the project
and through direct communication via the events organised, meetings, emails and phone calls in order to
catch a minimum of 80 participants.
 The conference will last half a day and will be organised by P1 in Brussels, for acceding EU decision-makers
and for ensuring an easy access to attendants from all over Europe. Each partner will participate in it and
bring about 10 national and local stakeholders in order to ensure transnationality to the event.
 Duration: M33, 1 month
 Budget: 37.800,00€
Dissemination & Valorisation
WP 6, Awareness raising activities
 As in most cases aged persons are unaware of the fact that they are being discriminated, special activities
aim at sensitizing both employers and aged workforce are planned to be implemented, such as workshops
on age management concept benefits, study tours for sensitising entrepreneurs, seminars for HR managers
and for aged workforce.
WP7, Dissemination of results
 Following a methodology to be defined by the consortium, a communication plan will accompany the project
all over its duration, that will include: a publicity campaign (website and discussion forum, brochures, flyers,
posters, electronic newsletters, electronic dissemination of outputs) for paper and electronic dissemination of
the project, a press campaign (press-conferences, press-releases, radio spots) and a Dissemination
Conference. The Discussion Forum will be used as a tool for transferring outputs at regional, national and
European level.
WP8, Mainstreaming and results exploitation
 This work package will last one year, to prepare the project for its exploitation even after the end of the
project life time. The mainstreaming of the project results and outputs is designed to limit early retirement
and encourage the recruitment and retention of older workers. A Mainstreaming Action Plan is planned
within the framework of the project in order to support the transfer of practices and methodologies
experimented to different systems. Furthermore, a Results Exploitation Action Plan will be delivered in order
to identify results to be utilised and transferred. The mainstreaming and exploitation strategy will be
multilevel (from local to European) and multi-actor oriented.
27
Time Table
28
Indicators
 Review of the indicators list
 Partners problems, feedback
 Guide of the partners about the next indicators period
 1st period: Oct.2011 – Marc.2011
 2nd period: Apr.2012 – Sep.2012
 3rd period: Oct.2012 – Marc.2013
29
Work Packages Analysis WP.3
WP3
Developing Business Concepts for Age Management &
Investment in the HR sector
3.1 Designing model for enterprises on age management Report
3.2 Guide for management optimisation performance Report
3.3 Development of measurable performance indicators Report
3.4 Analysis of older workforce work traits Report
3.5 Employment opportunities for older workers Report
30
WP.3-Act.3.1-3.2
Activity 3.1: Designing model for enterprises on age management
 Focus on the development of innovative business concepts related to age management processes.
To this end, a study will be conducted to design a model for enterprises on introducing age
management concepts, flexible working arrangements and succession management, using the
finding of the report already elaborated in WP2.
 Duration: M15, 1 month
 Budget: 13.627,00€
 The 40 pages report will be firstly available in English and in electronic version and then
translated in Greek, Spanish, Polish and Swedish
Activity 3.2: Guide for management optimisation performance
 The above guide will cross examine the management systems currently deployed in the
companies of the EU with those suggested in the first action of WP3 and will lead to the
development of a methodological guide which will point what actions need to be taken in order
to optimize the performance of management systems used in the EU market.
 Duration: M17, 1 month
 Budget: 2.674,00€
 The 40 pages report will be available in English
31
 Thank you for your attention
32

More Related Content

PDF
{LIKE} kick off PPT
PPT
Dialogos+ Project Presentation
PDF
H2020 Work Programme 2018-2020 for Future and Emerging Technologies (FET)
 
PPT
SoCool@Eu
 
PDF
10 management issues-20130221
PPTX
Ddd brugge demo mijn bibliotheek administratie 20141006
PDF
{LIKE} 3rd PM PPT
PPTX
Facebook in de klas llit
{LIKE} kick off PPT
Dialogos+ Project Presentation
H2020 Work Programme 2018-2020 for Future and Emerging Technologies (FET)
 
SoCool@Eu
 
10 management issues-20130221
Ddd brugge demo mijn bibliotheek administratie 20141006
{LIKE} 3rd PM PPT
Facebook in de klas llit

Similar to {LIKE} 2nd PM PPT (20)

PPTX
Transfer of Innovation project VOW+IPLM- The Value of Work for Individual Pos...
DOC
Project starting report iktimed 2 nov
PDF
MITKE Good Practice Aug 2010
PDF
SINERGIE's organisation profile
PPT
Emf project angels network 28_nov2011_bxl_mmib
PPTX
Ecovem project presentation ing 2021 03
PDF
The pm²-story-nicos.kourounakis.2017.share
PPTX
ECoVEM DL IEEE EdSoc Tunis UNED 2022 07 final.pptx
PPT
FUPOL Workpackage 7 - Large Scale Demonstrators
PDF
Talents up craig alan_20_05_2013
DOCX
MEET-BIS Vietnam TOR_ ES_2013
PPT
Go green wp2_valencia
PDF
Fostering solar technology in the Mediterranean area - Communication Plan
PPTX
Fostering Solar Technology in the Mediterranean Area (www.fosterinmed.eu)
PPTX
6th COBWEB Consortium Meeting
PDF
HoCare Interreg Europe project
PPTX
OECD/DAC - Results Community October 2018 Workshop - Results approaches for t...
PDF
Step4all guide 3 How to apply and how to manage successful European projects
PDF
ISO 140001 integration into SEAP plans
PPTX
#TCI2019 Clusters3 Final Conference - Interreg Europe: state of play
Transfer of Innovation project VOW+IPLM- The Value of Work for Individual Pos...
Project starting report iktimed 2 nov
MITKE Good Practice Aug 2010
SINERGIE's organisation profile
Emf project angels network 28_nov2011_bxl_mmib
Ecovem project presentation ing 2021 03
The pm²-story-nicos.kourounakis.2017.share
ECoVEM DL IEEE EdSoc Tunis UNED 2022 07 final.pptx
FUPOL Workpackage 7 - Large Scale Demonstrators
Talents up craig alan_20_05_2013
MEET-BIS Vietnam TOR_ ES_2013
Go green wp2_valencia
Fostering solar technology in the Mediterranean area - Communication Plan
Fostering Solar Technology in the Mediterranean Area (www.fosterinmed.eu)
6th COBWEB Consortium Meeting
HoCare Interreg Europe project
OECD/DAC - Results Community October 2018 Workshop - Results approaches for t...
Step4all guide 3 How to apply and how to manage successful European projects
ISO 140001 integration into SEAP plans
#TCI2019 Clusters3 Final Conference - Interreg Europe: state of play
Ad

Recently uploaded (20)

PPTX
TNA_Presentation-1-Final(SAVE)) (1).pptx
PDF
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
PDF
advance database management system book.pdf
PDF
Chinmaya Tiranga quiz Grand Finale.pdf
PPTX
Share_Module_2_Power_conflict_and_negotiation.pptx
PDF
Empowerment Technology for Senior High School Guide
PDF
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
PDF
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
PDF
Environmental Education MCQ BD2EE - Share Source.pdf
PDF
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 1)
PDF
What if we spent less time fighting change, and more time building what’s rig...
PDF
International_Financial_Reporting_Standa.pdf
PPTX
B.Sc. DS Unit 2 Software Engineering.pptx
PDF
Weekly quiz Compilation Jan -July 25.pdf
PPTX
Chinmaya Tiranga Azadi Quiz (Class 7-8 )
PDF
LDMMIA Reiki Yoga Finals Review Spring Summer
PDF
Complications of Minimal Access-Surgery.pdf
PDF
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
PDF
Trump Administration's workforce development strategy
PPTX
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
TNA_Presentation-1-Final(SAVE)) (1).pptx
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
advance database management system book.pdf
Chinmaya Tiranga quiz Grand Finale.pdf
Share_Module_2_Power_conflict_and_negotiation.pptx
Empowerment Technology for Senior High School Guide
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
Environmental Education MCQ BD2EE - Share Source.pdf
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 1)
What if we spent less time fighting change, and more time building what’s rig...
International_Financial_Reporting_Standa.pdf
B.Sc. DS Unit 2 Software Engineering.pptx
Weekly quiz Compilation Jan -July 25.pdf
Chinmaya Tiranga Azadi Quiz (Class 7-8 )
LDMMIA Reiki Yoga Finals Review Spring Summer
Complications of Minimal Access-Surgery.pdf
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
Trump Administration's workforce development strategy
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
Ad

{LIKE} 2nd PM PPT

  • 1. 517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP 28-29 June 2012| Stockholm - Sweden Dimitris Raftopoulos Strategic Leadership Unit
  • 2. Projects’ Action Plan  Implementation Methodology – PMI Project Life Cycle  WP1 - Project Management | Lead: 3LRI  WP2 - Defining Ageing and Employment Trends in EU | Lead: University of Social Sciences  WP3 - Developing Business Concepts for Age Management & Investment in the HR sector | Lead: UoS  WP4 - Pilot Projects | Lead: FU-Uppsala  WP5 - Quality Assurance | Lead: 3LRI  WP6 - Awareness raising activities | Lead: Documenta  WP7 - Dissemination of Results | Lead: 3LRI  WP8 - Mainstreaming and results exploitation | Lead: 3LRI 2
  • 3. Presentation of PPs and their activity  3L Research Institute, Greece  University of Strathclyde, UK  Folkuniversitetet, Sweden  University of Social Sciences, Poland  Documenta, Spain 3
  • 4. Day 1 - Outline 4  Presentation of WP.1 Project Management  Status Update  Presentation of WP.2 defining ageing & employment trends  Strategy plan (report) and Exchange information & knowhow (report)  Presentation of WP.5 Quality Assurance  Methodological guide for WP.3  Evaluation of the project  Presentation of WP.6 Awareness raising activities  Workshops for the age management concept benefits, Sensitising entrepreneurs,  Seminars addressing HR managers, Sensitising the aged workforce  Presentation of WP.7 Dissemination of results  Website, brochures, flyer, poster, eNewsletters, press campaign, Dissemination Conference
  • 5. Work Packages Analysis WP.1-2 Work Package / Deliverables Type Number Title WP1 Project Management 1.1 Consortium Agreement Other 1.2 Web-based system Service/Product 1.3 Project Partners Meetings Event 1.4 Progress Reports Report WP2 Defining Ageing and Employment Trends in EU 2.1 Analysing the demographic trends Report 2.2 Analysis of the aged workforce employability Report 2.3 Survey on the aged employed / unemployed workforce Report 2.4 Strategy plan to meet future demographic needs Report 2.5 Exchange information and know-how Report 6
  • 6. WP.1-Act.1.2 1.2 Web-based system  Link: http://management.lllprojects.eu/feng/#  Logins sent to all partners’ personnel  Instructions .doc file regarding the use of the web- system was sent as well  Accessible through the website at the Members Area, top right Each responsible manager is to delegate activities to their personnel participating 7
  • 7. WP.1-Act.1.3 Activity 1.3: PPs’ meetings  Done  Kick-off meeting - Athens: 13-14/12/2011  2nd meeting - Sweden: 28-29/06/2012  Remaining  3rd meeting - Spain: 29-30/11/2012  4th meeting - Poland: May XX-XX/05/2013  5th meeting - UK: December XX-XX/12/2013  Closing meeting - Brussels: September XX-XX/09/2014 8
  • 8. WP.1-Act.1.4 Activity 1.4: Progress Reports  1st period: Oct.11 – Mar.12  2nd period: Apr.12-Sep.12  Financial excel files through individual Dropbox folders  Problem? PPs Feedback!!!  Every six (6) Month Financial & Progress Report  FolkUniversitetet  UoS  Documenta  University of Management 9
  • 10. WP.2-Act.2.4-2.5 11 Activity 2.4: Strategy plan to meet future demographic needs  The current strategy plan will be examined and worked in combination with the analysis of demographic trends, in order to see how companies could meet the future demographic. The focal point will be how to increase the positive aspects of ageing workforce, while decreasing the negative ones. That plan will define the steps needed to be followed and will be used as the basis on which the workshops will be conducted as well as the pilot actions. The analytical content of the report will be decided by the Consortium, setting up the methodology for conducting the research as well as quantitative and qualitative standards.  Responsible PP: UoS  Duration: M9, 1 month Activity 2.5: Exchange information & know-how  The report will support the exchange of information and Know-How on building upon innovative processes in the sector of age management towards developing and testing alternative working conditions in enterprises. This will be based on the findings of the reports already conducted in the specific work package.  Duration: M10, 1 month  Responsible PP: Documenta
  • 12. Work Packages Analysis WP.5-6 WP5 Quality Assurance 5.1 Methodological Guide for WP “Defining Ageing and Employment Trends in EU” Report 5.2 Methodological Guide for WP “Developing Business Concepts for Age Management & Investment in the HR sector” Report 5.3 Methodological Guide for Pilot Projects implementation Report 5.4 Methodological Guide for Awareness raising, Dissemination and Exploitation of results activities Report 5.5 Evaluation of the results of the project Report WP6 Awareness raising activities 6.1 Workshops for the age management concept benefits Event 6.2 Sensitising entrepreneurs Event 6.3 Seminars addressing HR managers Event 6.4 Sensitising the aged workforce Event 13
  • 13. WP.5-Act.5.2 14  5.2: Methodological Guide for WP “Developing Business Concepts for Age Management & Investment in the HR sector”  Status Update by University of Strathclyde  Responsible PP: UoS
  • 14. WP.5-Act.5.4 15  5.5: Evaluation of the results of the project  Interim internal evaluation -> online questionnaire filled by PPs only (excluding PC)  Status Update  Final external evaluation -> external expert TBC for all PPs (including PC)  Responsible PP: SWSPIZ
  • 16. WP.6-Act.6.1 Activity 6.1: Awareness raising activities  Update by UoS on their workshop  Discussion on the following four (4) workshops (one per country) that will involve local public and private actors, enterprises employees, customers, suppliers, employers and the community and will discuss as well as examine the benefits enterprises could have from the proposed strategies. Proposal to PPs.  These workshops will last half a day and will be organised by each partner in each participating country, adapting the content to their language, their specific working conditions, labour market needs and specificities of the attendants.  Duration: M10-M12, 3 months  Budget: 29.706,00€ 17
  • 17. WP.6-Act.6.2-6.3 18 Activity 6.2: Sensitising entrepreneurs  Project partners will visit each other’s area and will visit businesses that operate with aged work force and have successful results, for exchanging experience. PPs will discuss with the personnel and owners, gaining valuable experience and know–how that they could bring back to their organizations as well as countries. Local business people will be part as well of the study tours.  These study tours (5 in total, one per country), will last one day and will take place together with the project meetings, in order to save time and money from travelling.  Duration: M2, M9, M15, M21, M27, 5 months  Budget: 2.500,00€ (included in 6.1) Activity 6.3: Seminars addressing HR managers  There will be organized 5 seminars, one in each different participating country, addressing to Human Resources Managers for implementing decisions on staff recruitment, retention and redundancy in view of the formulated Age Management Concepts. The proposed issues will be deriving from the reports already elaborated in the context of the project.  Catch a minimum of 20 participants per seminar.  These seminars will last half a day and will be organised by each partner in each participating country, adapting the content to their language, their specific labour market needs and conditions and specificities of the attendants.  Duration: M18-M22, 5 months  Budget: 1.700,00€ (included in 6.1)
  • 18. WP.6-Act.6.4 19 Activity 6.4: Sensitising the aged workforce  In parallel with the seminars organized focusing in HR managers, another 5 will be organized, addressing to aged workforce and Unemployed aged 50+, with special focus on sensitive social groups. It will explain the strengths they have as well as the skills that they need to gain, in order to remain competitive in the labour market they operate and even in the EU market.  Catch a minimum of 20 participants per seminar  These seminars will last half a day and will be organised by each partner in each participating country, adapting the content to their language, their specific labour market needs and conditions and specificities of the attendants.  Duration: M18-M22, 5 months  Budget: 1.700,00 € (included in 6.1)
  • 19. Work Packages Analysis WP.7-8 WP7 Dissemination of Results 7.1 Developing a website Service/Product 7.2 Publicity campaign – Information and sensitisation brochures Other 7.3 Publicity campaign – Dissemination of events Other 7.4 Publicity campaign – Electronic Newsletters Other 7.5 Press campaign Other 7.6 Dissemination conference Event WP8 Mainstreaming and results exploitation 8.1 Mainstreaming and results exploitation action plan Report 8.2 Developing a business manual Report 8.3 Policies assessment Report 20
  • 20. WP.7-Act.7.1 21 Activity 7.1: Developing a website  Presentation of the website.  The website is available in all partners’ language and will be continuously updated by all partners.  Duration: M3, 1 month  Budget: 29.501,00€ http://like.lllprojects.eu/
  • 21. Act.7.1: “website structure” 22 Structure  Home  Project overview  Rationale  EU added value  Project objectives  Deliverables  Expected results & outcomes  Project Meetings  Project Calendar  Media library  Project Partners  Documentation Center  + Forum  Online Questionnaire  + Sitemap
  • 22. WP.7-Act.7.2 23 Activity 7.2: Publicity campaign – Information and Sensitisation brochures Four brochures of 4pages will be produced, in the following languages: EN, ES, EL, SE, PL  one presenting the project  one sensitising the aged workforce  one sensitizing enterprises and  one presenting the project results  The Lead Partner of the Work Package will create a common layout (with the approbation of all partners), including a project logo, to be used in all brochures and overall material, and a common text, but each partner will adapt the text to local conditions, needs and specificities  Proposal for change in the development of the 2nd brochure  Each brochure (A5) will be printed in 1000 items per country  Duration: M3, M7, M33, 3 months  Budget: 11.300,00€
  • 23. WP.7-Act.7.3-7.4 24 Activity 7.3: Publicity campaign – Dissemination of events  For each event organised (workshops, seminars, conference), each partner will produce and diffuse flyers and posters to disseminate the event in order to ensure the largest possible participation.  This means that 6 different flyers and 6 different posters will be produced in each language. Each flyer (A5) will be printed in 200 items, each poster (A3) in 20 items.  The Lead Partner of the Work Package will create a common layout (with the approbation of all partners), to be used in for flyers and posters, and a common text, but each partner will adapt the text to local conditions, needs and specificities.  This dissemination will be done in an electronic way as well.  Duration: M9, M17, M26, M28-29, 5 months  Budget: 1.900,00€ (included in 7.1) Activity 7.4: Publicity campaign – Electronic Newsletters  6 newsletters on the employability of the aged workforce and presenting the project evolution and outputs during the project lifetime will be sent electronically, which will be used to promote the main Project initiatives, to inform the operators of interested sectors on the project implementation, the activity phases still in progress, the possibilities and modalities of participation, to sensitize the population towards the thematic at the focus of the debate, to spread the results obtained by the Project.  The Lead Partner will have the overall coordination of the activity, but all partners will participate in the drafting of the newsletter and in its dissemination to all relevant EU, national, regional and local actors, not only within the 5 participating countries but also in other European countries, to ensure the largest possible dissemination.  Duration: M3, M9, M15, M21, M27, M33, 6 months  Budget: (included in 7.1)
  • 24. WP.7-Act.7.5 25 Activity 7.5: Press Campaign  The project will be presented to local actors and local press by each partner during a press-conference presenting the project and addressing specific issues relevant to the project theme and the local conditions. Each partner will decide on when organising the press-conference, in order to choose the most appropriate moment for a more effective and positive event (e.g. before an important event).  During the press-conferences, folders will be distributed to the journalists with information about the project, the programme, the transnational actions and the local actions and added value of the project.  Regional press-releases will inform target groups about the project and the organised events and will be issued after the press-conference and more often if possible.  Project partners will launch a press and radio campaign trying to sensitise as many actors and target groups as possible.  Duration: M1-M36, 36 months  Budget: 250,00 € (included in 7.1)
  • 25. WP.7-Act.7.6 26 Activity 7.6: Dissemination Conference  A dissemination conference of the project will be organized in Brussels to present the project results and disseminate all project products and outputs and to open the ground to new collaborations and partnerships for the continuity of the project activities. This conference will have as general objectives:  To assure the largest information and raising awareness for the project by EU actors;  To inform the public opinion on the role developed by local institutions, European Union and Project partners in the realization of the Project;  To inform about the project’s outputs and results, the impact of the Project’s interventions, the findings of it.  To communicate about age management concept, training of the aged workers and business organization issues  The target groups (EU stakeholders, representatives of regions, lobbies, think tanks, representatives of enterprises, unions of enterprises, unions of employees, policy makers, social partners, training and education providers and agencies…) will be targeted by the partners through the promotion of the project and through direct communication via the events organised, meetings, emails and phone calls in order to catch a minimum of 80 participants.  The conference will last half a day and will be organised by P1 in Brussels, for acceding EU decision-makers and for ensuring an easy access to attendants from all over Europe. Each partner will participate in it and bring about 10 national and local stakeholders in order to ensure transnationality to the event.  Duration: M33, 1 month  Budget: 37.800,00€
  • 26. Dissemination & Valorisation WP 6, Awareness raising activities  As in most cases aged persons are unaware of the fact that they are being discriminated, special activities aim at sensitizing both employers and aged workforce are planned to be implemented, such as workshops on age management concept benefits, study tours for sensitising entrepreneurs, seminars for HR managers and for aged workforce. WP7, Dissemination of results  Following a methodology to be defined by the consortium, a communication plan will accompany the project all over its duration, that will include: a publicity campaign (website and discussion forum, brochures, flyers, posters, electronic newsletters, electronic dissemination of outputs) for paper and electronic dissemination of the project, a press campaign (press-conferences, press-releases, radio spots) and a Dissemination Conference. The Discussion Forum will be used as a tool for transferring outputs at regional, national and European level. WP8, Mainstreaming and results exploitation  This work package will last one year, to prepare the project for its exploitation even after the end of the project life time. The mainstreaming of the project results and outputs is designed to limit early retirement and encourage the recruitment and retention of older workers. A Mainstreaming Action Plan is planned within the framework of the project in order to support the transfer of practices and methodologies experimented to different systems. Furthermore, a Results Exploitation Action Plan will be delivered in order to identify results to be utilised and transferred. The mainstreaming and exploitation strategy will be multilevel (from local to European) and multi-actor oriented. 27
  • 28. Indicators  Review of the indicators list  Partners problems, feedback  Guide of the partners about the next indicators period  1st period: Oct.2011 – Marc.2011  2nd period: Apr.2012 – Sep.2012  3rd period: Oct.2012 – Marc.2013 29
  • 29. Work Packages Analysis WP.3 WP3 Developing Business Concepts for Age Management & Investment in the HR sector 3.1 Designing model for enterprises on age management Report 3.2 Guide for management optimisation performance Report 3.3 Development of measurable performance indicators Report 3.4 Analysis of older workforce work traits Report 3.5 Employment opportunities for older workers Report 30
  • 30. WP.3-Act.3.1-3.2 Activity 3.1: Designing model for enterprises on age management  Focus on the development of innovative business concepts related to age management processes. To this end, a study will be conducted to design a model for enterprises on introducing age management concepts, flexible working arrangements and succession management, using the finding of the report already elaborated in WP2.  Duration: M15, 1 month  Budget: 13.627,00€  The 40 pages report will be firstly available in English and in electronic version and then translated in Greek, Spanish, Polish and Swedish Activity 3.2: Guide for management optimisation performance  The above guide will cross examine the management systems currently deployed in the companies of the EU with those suggested in the first action of WP3 and will lead to the development of a methodological guide which will point what actions need to be taken in order to optimize the performance of management systems used in the EU market.  Duration: M17, 1 month  Budget: 2.674,00€  The 40 pages report will be available in English 31
  • 31.  Thank you for your attention 32