Position Description of Employer
&Project
Duration Works Description
Document
controller for
EPC contractor
OTV Engineering Co.,
Ltd- Baoji
9KM&FJS Water
Treatment Plants
Rebuilding &Expansion
Project
08/2005-
02/2007
*Receiving , registering, updating
and filing all approved drawings
from engineering contractor and
distributing it respectively to
subcontractors for the
civil,mechanical and electrical
works etc.
*Receiving , registering, updating
and filing all correspondence
from/to project
client,subcontractors and main
equipment and materials suppliers
and distributing it to each
concerned department or
dept.chief according to
instructions of the site manager.
Document
Controller Chief
for Construction
Contractor
SINOPEC Second
Construction Company-
EO/EG Project and Crude
Oil Boiler Project( Jubail
Industry City, KSA)
03/2007-
02/2010
*Development of Document
Controlling Procedures as per the
specifications and management
procures from the EPC contractor
CTCI,
*Execution of the daily
management & control of the
correspondence , documents and
drawings from/to the EPC
contractor /subcontractors, as
well as the daily management of
the 4 document controllers from
China and Philippine.
Document
Controller Chief
for Construction
Contractor
SINOPEC Nangjing
Engineering&Construction
Inc.(SNEC)- RT1P
Piperack Project ( Jubail
Industry City, Kingdom of
Saudi Arabian)
03/2013-
06/2014
*Development of Document
Controlling Procedures as per the
specifications and management
procures from the EPC contractor
Fluor,
*Execution of the daily
management & control of the
documents/drawings from/to the
EPC contractor /subcontractors,
as well as the daily management
Philippine document controllers
Document Control Procedure( SINOPEC Second Construction Company in
EO/EG Project and Crude Oil Boiler Project( Jubail Industry City, KSA)
* Receiving all approved construction drawings(in hard/soft copies) from document controllers of
the engineering contractor CTCI (for EOEG project )and/or POL system(Project-on-line) of the
Project Management Contractor FLUOR for Crude Oil Boiler Project, and all correspondence and
documents from/to CTCI,FLUOR and subcontractor/suppliers.
* Making/generating a drawings/document distribution instruction sheet and submit it to the site
manager for further drawing/document distribution instructions while registering and updating
drawing and document registration log
* Distributing the drawings and documents respectively to departments/subcontractors for
execution of the civil,mechanical,electrical.etc works on site according to the distribution
instructions from the site manager;
* Filing all approved drawings and documents in soft/hard copies:hard copies of drawings and
document shall be filed in the files with different labels and the soft copies shall be filed in a
Project Document&Drawing Control System,except for the documents containing confidential
information/data.
* Weekly emailing the project documents/correspondence registration log to the documents
controller of the project engineering contractor CTCI , project management contractor
FLUOR,subcontractors and supplier for confirmation of document/correspondence
status(replied/closed or not);
* Weekly emailing the updated project drawing registration log to the documents controller of the
project engineering contractor CTCI , project management contractor FLUOR and subcontractors
for confirmation of drawing status(drawing reversion) to ensure all newest revision drawings have
been distributed to the construction contractor/subcontractor timely.
Project Document&Drawing Control System
For your information all documents and drawings ,either incoming or outgoing , will be filed in
soft and hard copies .All soft/electronic copy of drawings and documents for the project,except the
document containing confidential information/data, will be filed in a project document/drawing
control system shared by all employees authorized (most of employees serving for this project will
only be authorized to have access of checking and copying drawing/documents from this system,
only the document controllers are authorized to edit, copy and delete the documents in the
system). In case the document/drawings are received only in hard copy/ies, the DOC have to make
a scan of the documents to generating a soft copy and file it in the document control
system.Regarding to the drawings only in hard copy, document controllers(DOC) shall strive to
coordinate with the PMC or engineering contractor for obtaining the soft copy to ensure the
completion of the DOC system.
Three key points for a qualified documents:
1. Promptness&Accuracy: All documents and drawings shall be distributed to the right
person/parties/department/subcontractors timely and promptly .
2. Integrity/completeness : All documents and drawings for the project shall be filed in soft and
hard copies for ensuring its integrity and completeness.
3. Track&trace-ability: all document and drawings shall be traceable and it shall could be
found easily and promptly while it is needed.
Following are the simplest Structural Diagram for my Project Document Control System.
traceability
Project Document&Drawing Control System
Project Drawings
Incoming
Documents
Outgoing
Documents
AFC
Drawings
from PMC
or
Engineering
Contractor
Design
Drawing to
be
submitted
for approval
of PMC
Incoming
Correspondence
Incoming other documents
Corresponden
ce from PMC
Correspondence from
Subcontractors
Other
Corresponde
nce
Documents
from PMC
Documents
from Supplier
Documents
from
Subcontractors
Documents submitted to PMC for approval Documents distributed to subcontractors
for execution of construction
Subcontractor
/supplier Pre-
qualifcation
Documents
Method
Statements
Procedures Other
Documents to
be submitted
for approval
Civil&Architectur
al Drawing
Structural
Drawings
Electrical
Drawings

More Related Content

PDF
Bill resume
PPTX
Epc projects and cad tools
PDF
Epc presentation robert foxpresentation
PDF
InstallerTraining11_14_2014Final _
PDF
Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1
Bill resume
Epc projects and cad tools
Epc presentation robert foxpresentation
InstallerTraining11_14_2014Final _
Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1

What's hot (19)

PPT
ACH 216 Lecture 02 (Project Format)
DOCX
Maaden Exp.
PDF
GCC2015 Course_Day2
PDF
30 60 90 percent ifc engineering what is the project progress - Oracle Prim...
PPT
Construction Administration Seminar
PDF
Epc project interdepency and Work Flow- promo
PDF
Advanced training for construction management: CONTRACTS MANAGEMENT part 2 (...
PPTX
FIDIC-Relevant to Time Management
DOC
Resume Acc
PPT
EPC Business Model
PDF
Curriculum Vitae end to start 19-7-2016
PPT
Epc issues and recommendations
PDF
Construction Monthly Progress Report - June 2011
PPTX
Preventing savar like tragedy by engr. golam mostafa
PDF
NEC4: Evolution of the ECC by "Ben Walker - NEC4 Contract Drafter, CEO for CE...
PDF
EXTENSION OF TIME CLAIMS IN OIL AND GAS CONSTRUCTION PROJECTS
ACH 216 Lecture 02 (Project Format)
Maaden Exp.
GCC2015 Course_Day2
30 60 90 percent ifc engineering what is the project progress - Oracle Prim...
Construction Administration Seminar
Epc project interdepency and Work Flow- promo
Advanced training for construction management: CONTRACTS MANAGEMENT part 2 (...
FIDIC-Relevant to Time Management
Resume Acc
EPC Business Model
Curriculum Vitae end to start 19-7-2016
Epc issues and recommendations
Construction Monthly Progress Report - June 2011
Preventing savar like tragedy by engr. golam mostafa
NEC4: Evolution of the ECC by "Ben Walker - NEC4 Contract Drafter, CEO for CE...
EXTENSION OF TIME CLAIMS IN OIL AND GAS CONSTRUCTION PROJECTS
Ad

Similar to Lou Fanglin's Document Control Procedure and DOC Experience Summary (20)

PDF
my_resume Updatea (4 (3)
DOC
Faisal Khan - Documents Controller
DOC
MUSLIM Curriculum Vitea
DOC
Khan Afsar_17 May 2016
DOC
Anthony_M._Antigulas
PDF
Manzur c v_document_controller
DOC
CV Mohamed Aly Elshareh3
DOC
Anil nair cv
DOC
Curriculum Vitae-Document Controller-Total 20 Years UAE Experience (6 yrs-Oil...
PDF
CV- Meeran Sharfudeen
PDF
CV_-_V._Chalapati__Doc._Controller
DOC
Resume Leonardo Edwin Manzana Tdcb Uae
PDF
Bazmi - Document Control Manager
PDF
Working Experience
PDF
CV - Karim
PDF
CV Joel Esguerra
PDF
Muhammad Younus Suleman
DOC
CV_Alana Miles-2015-
PDF
CV - Hariharan (2015 12)
PDF
Document controller
my_resume Updatea (4 (3)
Faisal Khan - Documents Controller
MUSLIM Curriculum Vitea
Khan Afsar_17 May 2016
Anthony_M._Antigulas
Manzur c v_document_controller
CV Mohamed Aly Elshareh3
Anil nair cv
Curriculum Vitae-Document Controller-Total 20 Years UAE Experience (6 yrs-Oil...
CV- Meeran Sharfudeen
CV_-_V._Chalapati__Doc._Controller
Resume Leonardo Edwin Manzana Tdcb Uae
Bazmi - Document Control Manager
Working Experience
CV - Karim
CV Joel Esguerra
Muhammad Younus Suleman
CV_Alana Miles-2015-
CV - Hariharan (2015 12)
Document controller
Ad

Lou Fanglin's Document Control Procedure and DOC Experience Summary

  • 1. Position Description of Employer &Project Duration Works Description Document controller for EPC contractor OTV Engineering Co., Ltd- Baoji 9KM&FJS Water Treatment Plants Rebuilding &Expansion Project 08/2005- 02/2007 *Receiving , registering, updating and filing all approved drawings from engineering contractor and distributing it respectively to subcontractors for the civil,mechanical and electrical works etc. *Receiving , registering, updating and filing all correspondence from/to project client,subcontractors and main equipment and materials suppliers and distributing it to each concerned department or dept.chief according to instructions of the site manager. Document Controller Chief for Construction Contractor SINOPEC Second Construction Company- EO/EG Project and Crude Oil Boiler Project( Jubail Industry City, KSA) 03/2007- 02/2010 *Development of Document Controlling Procedures as per the specifications and management procures from the EPC contractor CTCI, *Execution of the daily management & control of the correspondence , documents and drawings from/to the EPC contractor /subcontractors, as well as the daily management of the 4 document controllers from China and Philippine. Document Controller Chief for Construction Contractor SINOPEC Nangjing Engineering&Construction Inc.(SNEC)- RT1P Piperack Project ( Jubail Industry City, Kingdom of Saudi Arabian) 03/2013- 06/2014 *Development of Document Controlling Procedures as per the specifications and management procures from the EPC contractor Fluor, *Execution of the daily management & control of the documents/drawings from/to the EPC contractor /subcontractors, as well as the daily management
  • 2. Philippine document controllers Document Control Procedure( SINOPEC Second Construction Company in EO/EG Project and Crude Oil Boiler Project( Jubail Industry City, KSA) * Receiving all approved construction drawings(in hard/soft copies) from document controllers of the engineering contractor CTCI (for EOEG project )and/or POL system(Project-on-line) of the Project Management Contractor FLUOR for Crude Oil Boiler Project, and all correspondence and documents from/to CTCI,FLUOR and subcontractor/suppliers. * Making/generating a drawings/document distribution instruction sheet and submit it to the site manager for further drawing/document distribution instructions while registering and updating drawing and document registration log * Distributing the drawings and documents respectively to departments/subcontractors for execution of the civil,mechanical,electrical.etc works on site according to the distribution instructions from the site manager; * Filing all approved drawings and documents in soft/hard copies:hard copies of drawings and document shall be filed in the files with different labels and the soft copies shall be filed in a Project Document&Drawing Control System,except for the documents containing confidential information/data. * Weekly emailing the project documents/correspondence registration log to the documents controller of the project engineering contractor CTCI , project management contractor FLUOR,subcontractors and supplier for confirmation of document/correspondence status(replied/closed or not); * Weekly emailing the updated project drawing registration log to the documents controller of the project engineering contractor CTCI , project management contractor FLUOR and subcontractors for confirmation of drawing status(drawing reversion) to ensure all newest revision drawings have been distributed to the construction contractor/subcontractor timely. Project Document&Drawing Control System For your information all documents and drawings ,either incoming or outgoing , will be filed in soft and hard copies .All soft/electronic copy of drawings and documents for the project,except the document containing confidential information/data, will be filed in a project document/drawing control system shared by all employees authorized (most of employees serving for this project will only be authorized to have access of checking and copying drawing/documents from this system,
  • 3. only the document controllers are authorized to edit, copy and delete the documents in the system). In case the document/drawings are received only in hard copy/ies, the DOC have to make a scan of the documents to generating a soft copy and file it in the document control system.Regarding to the drawings only in hard copy, document controllers(DOC) shall strive to coordinate with the PMC or engineering contractor for obtaining the soft copy to ensure the completion of the DOC system. Three key points for a qualified documents: 1. Promptness&Accuracy: All documents and drawings shall be distributed to the right person/parties/department/subcontractors timely and promptly . 2. Integrity/completeness : All documents and drawings for the project shall be filed in soft and hard copies for ensuring its integrity and completeness. 3. Track&trace-ability: all document and drawings shall be traceable and it shall could be found easily and promptly while it is needed. Following are the simplest Structural Diagram for my Project Document Control System. traceability Project Document&Drawing Control System Project Drawings Incoming Documents Outgoing Documents AFC Drawings from PMC or Engineering Contractor Design Drawing to be submitted for approval of PMC Incoming Correspondence Incoming other documents Corresponden ce from PMC Correspondence from Subcontractors Other Corresponde nce Documents from PMC Documents from Supplier Documents from Subcontractors Documents submitted to PMC for approval Documents distributed to subcontractors for execution of construction Subcontractor /supplier Pre- qualifcation Documents Method Statements Procedures Other Documents to be submitted for approval Civil&Architectur al Drawing Structural Drawings Electrical Drawings