SlideShare a Scribd company logo
Managing the DeploymentManaging the Deployment
of ERP Systems in theof ERP Systems in the
Publishing DomainPublishing Domain
ControllingtheoutcomeofERP
Projects.
Managing the outcome of an ERP deployment is difficult at best. There are many obstacles to
success, the least of which is the basic understanding that accepting an ERP system into a
business is a significant disruptive event. This document describes the processes and activities
involved in deploying ERP. The contributions of a consulting firm can significantly add to the
probability of success. In the newspaper business domain, the successful deployment of an
ERP system not only impacts the backoffice and financial operations, but also the editorial,
advertising and press operations. ERP is a mission critical function of any modern newspaper
and must be treated as such.
Glen B. Alleman
Niwot Ridge Consulting
In Associate With
Nilan–Sanders Associates
Introduction
ERP projects are not IT projects. The IT project management playbook is not a good fit for
an ERP project. IT systems management emphasizes exhaustive requirements definition
and detailed planning. This process however and has never really worked on large scale
IT projects. As a result the IT project management method is poorly suited for ERP
projects.
Thinking of an ERP project as large–scale computer project leads to propositions that
would look ridiculous to a board of directors or a finance person.
n Lets’ spend $2 million, $20 million, maybe even $200 million dollars up front.
n With a risk of 50% to 70% of a partial or total write off.
n If unwilling to write off the investment, you will then have to invest double the original
investment to stay in the game.
n The potential returns could be as high as ten times the original investment.
n The team that will work on this opportunity is exceptionally talented but has a long
history of missing milestones and failing to deliver the business benefits to the
stakeholders.
ERP Projects are New Ventures
The risk profile of the ERP project, fraught with technological, organizational, and business
complexities, resembles a new business venture rather than an IT development project.
The methods used to manage the ERP project should be taken from the Venture
Capitalist playbook not an IT managers playbook.
n Investments must be staged. Capital must be conserved. Cash flows must be assured
before more investment takes place.
n Great care must be taken to see that all participants in the initiative (including
members of the senior management team) share the risk in a way that facilitates
success.
n The composition of the team – the sponsors, consultants, product vendors, IT staff,
and line managers – is of the utmost importance. VC’s usually start with the resumes
when reading a business plan. Who is involved matters more than what the plan is.
ERP as Enterprise Transformation
There are there major processes that make an ERP project significantly different than an
IT project.
n Practical process reengineering – is about replacing historically evolved business
processes with more effective and efficient standard processes. However, ERP starts
with a set of templates. The task of redesigning a process is made easier using these
templates. But if the templates don’t match the desired business process the
temptation to “customize” them. This removes much of the benefit originally provided
by the ERP system. And creates and instant legacy system with the same
maintenance and support problems of the previous environment.
n Package approaches to delivering IT capability – with numerous business
advantages. Installing a packaged solution provides many well documented benefits.
One overlooked benefit is the imposition of a discipline on process and software
changes. If the organization is not prepared to accept this discipline, this benefit soon
disappears.
n Shift toward modularity of fundamental business processes – may in the end have the
most significant impact on the organization – the modularization of the organization’s
architectures. There is technical architecture, data architecture, application
architecture, and enterprise process architecture. All of these architectures will be
impacted in some way. Without preparing for this impact the project will soon exhaust
the skills, resources, and patience of the staff, vendors and sponsors.
Types of ERP Implementations
There are there basic types of ERP projects:
n Comprehensive – represents an ambitious implementation approach
n Multi–national company
n Multiple sites
n Full functionality of ERP, the 12 main modules of SAP R/3 for example
n An independently evolved business process
n Scope and level of the business process reengineering is high
n Long deployment process based on module–by–module or full system
implementation.
n $10M expected investment
n Middle of the Road – is mid way between comprehensive and vanilla
n Multiple sites
n Implementation of only core ERP modules, financials, Asset Management, and
Project systems in R/3
n BPR level is significant, but not as extensive as the comprehensive process
n $3M expected investment
n Vanilla – is the least ambitious
n One site
n Small number of users (< 100)
n Core functionality only
n Alignment of the company processes with the ERP process, means no BPR.
n $1–2M expected investment
How to Implement an ERP System
IT projects traditionally use a formal management, development, and deployment process
that emphasizes planning. These processes organize the work into phases seperated by
decision points. The supporters of this approach emphasize that changes made early in
the project is less expensive than changes made late in the project.
This waterfall approach is based on several flawed assumptions:
n It is not humanly possible to execute a planning process so that implementation is
merely a matter of performing the defined tasks.
n Plans for complex systems rarely turn out to be good enough.
n Unanticipated problems are the norm rather than the exception.
n It is not possible to protect against late changes.
n All businesses face late changing competitive environments.
n Windows of business opportunity open and close at the whim of the markets
not the project manager.
n Business usually commit to a plan. By making this commitment, they lose much of
their ability to take advantage of fortuitous developments in the business environment.
n In a financial setting this is the option value of the decision.
n Deferring decisions to take advantage of new information and new
opportunities is rarely taken into account on IT projects. It is vital to the success
of an ERP project.
The Road to Hell is Paved with Good Intentions
These flawed assumptions usually lead to a dysfunctional dynamic that undermines the
effectiveness of the project team. This dysfunctional dynamic takes place in the following
way:
n The client company pretends that it is possible to plan well enough to lay out specific
milestones far in advance and then writes a contract with these milestones in it.
n The vendor pretends that it knows how to meet these milestones in order to win the
business.
Neither party can possibly know what it is pretending to know. Both parties know that, but
each feels compelled to maintain the pretense of good project management. This simply
clogs the communication channels between the projects participants.
Planning in the Presence of Uncertainty
The difficulty of planning in an uncertain environment does not remove the need for
planning – it simply changes its purpose.
n Plan to gain understanding.
n Plan for unanticipated events, this is risk management.
n Don’t take planning too seriously, the original plan is simply a guide to the future it is
not the future.
Avoiding Dysfunction
ERP projects should be thought of and managed as new business ventures.
n Staging – ERP paradox of absorbing the ERP system whole to gain the benefits of
the integration and infrastructure is not a good venture decision. In fact the venture
capitalist would say this is a lousy business opportunity.
n Different businesses have different cash flow requirements
n Investment moves to those businesses that have acceptable or low cash flow
requirements.
n The risk / reward proposition must be reasonable.
n Incentive alignment and risk sharing – among the parties cooperative problem solving
behaviors are not only encouraged they are demanded.
n Vendor and system integrator payments linked to the accomplishment of real
tasks, not milestone dates.
n Senior mangers compensation based on successfully delivering components of
the project.
n No conditional support, every one must have some skin in the game.
Conditional support is the kiss of death for an ERP project. It’s going to get ugly
no matter what happens, so everyone has to be 100% committed.
n These incentive plans must be balanced by common sense.
n People are the key to success – any venture is based on having the right people first.
An “A” team with a “B” idea is always better than a “B” team with an “A” idea.
How NSA Can Help
Nilan–Sanders Associates is a small consulting firm with extensive experience in a variety
of software product development and deployment processes. We base our value to our
clients on the simple idea that:
n In an environment of uncertainty, money buys information (it’s the options game all
over again). Knowing something that you did not know before is very valuable when
you are managing a new venture. We are professional information sources. Our role
as consultants is to bring to our clients the not only the latest information, but the
information that will contribute to the successful outcome of the project.
n Anything that interferes with the lines of communications between the ERP team,
vendors, system integrators, and customers of the system will led to less than
acceptable results. Our role is to facilitate these communication links.
n Maintaining an effective problem–solving environment is a critical success factor in all
technology ventures. The creation of detailed plans, even if they are obsolete from the
moment they are published is a skill we provide.
What does not kill me makes me stronger.
— Fredrich Nietsche
ERP has the potential to make an organization stronger. The trick is not to die in the
process.
Resumes
Glen B. Alleman
Glen is an experienced IT consultant with over 15 years of major client management
responsibility in a broad variety of industries. His over 22 years of progressive
responsibility in the design, development, and management of industrial strength
software systems provides a solid foundation for architecting state of the art e-
commerce and business systems. His direct hands-on experience with large–scale
integration environments and business domains include: IT Strategies, object based
system architecture, enterprise application integration, business process
reengineering, and product development strategies.
Glen's extensive program management experience, with multiple concurrent projects
involving hardware, software, multiple sites and legacy business systems integration
forms the basis of a strong business focused on delivering the system, on time and on
budget, which meets the requirements of the client. Glen holds a MBA from the
University of Southern California and a B.S. in Physics from the University of
California, Irvine.
Richard A. Sanders
Rick has a 20 year background in high technology systems and software
development focusing on publishing, multimedia and mission critical IT solutions.
From 1996–99 he was Vice President of Research and Development at SII,
responsible for the technical direction and the development of all products. Rick was
also with SII from 1986 until 1993 starting as the Director of R&D. In 1991, Rick was
chosen to start up SII's Telco Division – a Yellow Pages electronic publishing joint
venture with US–West in Englewood, Colorado.
Rick left SII in 1993 and joined Visionary Corporate Technologies, Inc. in Palo Alto as
a multimedia publishing business developer. In 1994, he became the Vice president
of R&D at American Fundware. In the 1980's, he held positions as manager of
software development at Logicon, Inc. and, later, Harris Corporation. Rick holds a BS
in Computer Sciences and a Masters Degree in Business from the University of
California at Irvine.
Stephan E. Nilan
Steve has 20 plus years experience in high technology marketing and strategic
business planning with a focus on publishing and media, including newspapers, cable
television and the Internet. Prior to forming Nilan–Sanders in 1997 with Rick Sanders,
he was Vice President of Marketing and, later, Vice President of Business
Development at System Integrators, Inc. (SII), a worldwide provider of newspaper
publishing systems. At SII, Steve formed MediaBridge, the Company’s new media
division with a focus on Internet publishing ventures.
Steve was President and co–founder of MediaExpress, a cable television–to–PC
information broadcast service. Steve has also held marketing management positions
with Logicon, Inc., Harris Corporation and Unify Corporation. He holds a BA from
Villanova University and an MBA from Iona College.

More Related Content

PDF
Performance based management in a nut shell (v5)
PDF
Making Agile Development work in Government Contracting
PDF
Earned Value Management and Agile
DOCX
Increasing the probability of program success
PPTX
Essential views of the IPMR
PDF
Process Flow and Narrative for Agile+PPM
PDF
Capabilities based planning essay
PPTX
Establishing schedule margin using monte carlo simulation
Performance based management in a nut shell (v5)
Making Agile Development work in Government Contracting
Earned Value Management and Agile
Increasing the probability of program success
Essential views of the IPMR
Process Flow and Narrative for Agile+PPM
Capabilities based planning essay
Establishing schedule margin using monte carlo simulation

What's hot (20)

PDF
Building the perfect schedule (v6)
PDF
Immutable principles of project management (utah pmi)(v1)(no exercise)
PDF
Focus on the nine I's (v9)
DOCX
Risk Management Guidance
PDF
A Guide for Capital Project Mamnagers
DOCX
Continuous Risk Management
PDF
Earned Value Management Meets Big Data
PDF
5 immutable principles and 5 processes in 60 seconds
DOCX
Managing Risk as Opportunity
PPTX
Risk adjusted engineering management
PPTX
From WBS to Integrated Master Schedule
PDF
Deliverables based planning handbook
PDF
Capabilities based planning
PDF
EVM+Agile the darkside
PDF
Five immutable principles
PDF
Forecasting cost and schedule performance
PDF
Probabilistic Schedule and Cost Analysis
PDF
The 5 Immutable principles of project management
PDF
Probabilistic Risk Management (With Notes)
PDF
Assessing Enterprise Project Risk
Building the perfect schedule (v6)
Immutable principles of project management (utah pmi)(v1)(no exercise)
Focus on the nine I's (v9)
Risk Management Guidance
A Guide for Capital Project Mamnagers
Continuous Risk Management
Earned Value Management Meets Big Data
5 immutable principles and 5 processes in 60 seconds
Managing Risk as Opportunity
Risk adjusted engineering management
From WBS to Integrated Master Schedule
Deliverables based planning handbook
Capabilities based planning
EVM+Agile the darkside
Five immutable principles
Forecasting cost and schedule performance
Probabilistic Schedule and Cost Analysis
The 5 Immutable principles of project management
Probabilistic Risk Management (With Notes)
Assessing Enterprise Project Risk
Ad

Similar to Managing the Deployment of ERP (20)

PDF
Beating the ERP Implementation Odds
PDF
The key to successful Digital Transformation
PDF
ERP - it's not (only) about IT
PDF
Enterprise Project Management Solutions - Install and train, job done? by "Da...
PDF
Attain the ‘State of Readiness’ Before You Embark on Implementing New ERP Sol...
PDF
Sage ERP Cost Benefit Analysis
DOCX
Erp notes
PPTX
Erp
PDF
Why Erp Implementations Fail
PDF
The right Software Development Company Facilitates Business Growth.pdf
PDF
Casewise - 7 steps to business architecture
PDF
SAP Business Transformations - Mandrekar
PPTX
About Corelynx
PPTX
Top 6 Factors for ERP Success
PDF
Erp notes
PPTX
Genesis Company Overview
PDF
Understanding the risks in enterprise project management
PDF
Zd article delivering-erp_success_041812
PDF
Implementing ERP In Public Sector
PDF
ERP For Project Focused Organizations
Beating the ERP Implementation Odds
The key to successful Digital Transformation
ERP - it's not (only) about IT
Enterprise Project Management Solutions - Install and train, job done? by "Da...
Attain the ‘State of Readiness’ Before You Embark on Implementing New ERP Sol...
Sage ERP Cost Benefit Analysis
Erp notes
Erp
Why Erp Implementations Fail
The right Software Development Company Facilitates Business Growth.pdf
Casewise - 7 steps to business architecture
SAP Business Transformations - Mandrekar
About Corelynx
Top 6 Factors for ERP Success
Erp notes
Genesis Company Overview
Understanding the risks in enterprise project management
Zd article delivering-erp_success_041812
Implementing ERP In Public Sector
ERP For Project Focused Organizations
Ad

More from Glen Alleman (20)

PDF
Managing risk with deliverables planning
PDF
A Gentle Introduction to the IMP/IMS
PDF
Increasing the Probability of Project Success
PDF
Practices of risk management
PDF
Principles of Risk Management
PDF
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
PDF
From Principles to Strategies for Systems Engineering
PDF
NAVAIR Integrated Master Schedule Guide guide
PDF
Building a Credible Performance Measurement Baseline
PDF
Integrated master plan methodology (v2)
PDF
IMP / IMS Step by Step
PDF
DHS - Using functions points to estimate agile development programs (v2)
PDF
Making the impossible possible
PDF
Heliotropic Abundance
PDF
Process Flow and Narrative for Agile
PDF
Building the Performance Measurement Baseline
PPTX
Program Management Office Lean Software Development and Six Sigma
PDF
Policy and Procedure Rollout
PDF
Integrated Master Plan Development
PDF
Project Management Theory
Managing risk with deliverables planning
A Gentle Introduction to the IMP/IMS
Increasing the Probability of Project Success
Practices of risk management
Principles of Risk Management
Deliverables Based Planning, PMBOK® and 5 Immutable Principles of Project Suc...
From Principles to Strategies for Systems Engineering
NAVAIR Integrated Master Schedule Guide guide
Building a Credible Performance Measurement Baseline
Integrated master plan methodology (v2)
IMP / IMS Step by Step
DHS - Using functions points to estimate agile development programs (v2)
Making the impossible possible
Heliotropic Abundance
Process Flow and Narrative for Agile
Building the Performance Measurement Baseline
Program Management Office Lean Software Development and Six Sigma
Policy and Procedure Rollout
Integrated Master Plan Development
Project Management Theory

Recently uploaded (20)

PPTX
Big Data Technologies - Introduction.pptx
PDF
Spectral efficient network and resource selection model in 5G networks
PDF
Empathic Computing: Creating Shared Understanding
PDF
Encapsulation theory and applications.pdf
PDF
Peak of Data & AI Encore- AI for Metadata and Smarter Workflows
PDF
Agricultural_Statistics_at_a_Glance_2022_0.pdf
PPTX
Programs and apps: productivity, graphics, security and other tools
PDF
Blue Purple Modern Animated Computer Science Presentation.pdf.pdf
PPTX
Understanding_Digital_Forensics_Presentation.pptx
PDF
Build a system with the filesystem maintained by OSTree @ COSCUP 2025
PDF
Network Security Unit 5.pdf for BCA BBA.
PPTX
Detection-First SIEM: Rule Types, Dashboards, and Threat-Informed Strategy
PDF
How UI/UX Design Impacts User Retention in Mobile Apps.pdf
PDF
Architecting across the Boundaries of two Complex Domains - Healthcare & Tech...
PPTX
MYSQL Presentation for SQL database connectivity
PDF
Encapsulation_ Review paper, used for researhc scholars
PDF
Chapter 3 Spatial Domain Image Processing.pdf
PDF
NewMind AI Weekly Chronicles - August'25 Week I
PDF
7 ChatGPT Prompts to Help You Define Your Ideal Customer Profile.pdf
PDF
TokAI - TikTok AI Agent : The First AI Application That Analyzes 10,000+ Vira...
Big Data Technologies - Introduction.pptx
Spectral efficient network and resource selection model in 5G networks
Empathic Computing: Creating Shared Understanding
Encapsulation theory and applications.pdf
Peak of Data & AI Encore- AI for Metadata and Smarter Workflows
Agricultural_Statistics_at_a_Glance_2022_0.pdf
Programs and apps: productivity, graphics, security and other tools
Blue Purple Modern Animated Computer Science Presentation.pdf.pdf
Understanding_Digital_Forensics_Presentation.pptx
Build a system with the filesystem maintained by OSTree @ COSCUP 2025
Network Security Unit 5.pdf for BCA BBA.
Detection-First SIEM: Rule Types, Dashboards, and Threat-Informed Strategy
How UI/UX Design Impacts User Retention in Mobile Apps.pdf
Architecting across the Boundaries of two Complex Domains - Healthcare & Tech...
MYSQL Presentation for SQL database connectivity
Encapsulation_ Review paper, used for researhc scholars
Chapter 3 Spatial Domain Image Processing.pdf
NewMind AI Weekly Chronicles - August'25 Week I
7 ChatGPT Prompts to Help You Define Your Ideal Customer Profile.pdf
TokAI - TikTok AI Agent : The First AI Application That Analyzes 10,000+ Vira...

Managing the Deployment of ERP

  • 1. Managing the DeploymentManaging the Deployment of ERP Systems in theof ERP Systems in the Publishing DomainPublishing Domain ControllingtheoutcomeofERP Projects. Managing the outcome of an ERP deployment is difficult at best. There are many obstacles to success, the least of which is the basic understanding that accepting an ERP system into a business is a significant disruptive event. This document describes the processes and activities involved in deploying ERP. The contributions of a consulting firm can significantly add to the probability of success. In the newspaper business domain, the successful deployment of an ERP system not only impacts the backoffice and financial operations, but also the editorial, advertising and press operations. ERP is a mission critical function of any modern newspaper and must be treated as such. Glen B. Alleman Niwot Ridge Consulting In Associate With Nilan–Sanders Associates
  • 2. Introduction ERP projects are not IT projects. The IT project management playbook is not a good fit for an ERP project. IT systems management emphasizes exhaustive requirements definition and detailed planning. This process however and has never really worked on large scale IT projects. As a result the IT project management method is poorly suited for ERP projects. Thinking of an ERP project as large–scale computer project leads to propositions that would look ridiculous to a board of directors or a finance person. n Lets’ spend $2 million, $20 million, maybe even $200 million dollars up front. n With a risk of 50% to 70% of a partial or total write off. n If unwilling to write off the investment, you will then have to invest double the original investment to stay in the game. n The potential returns could be as high as ten times the original investment. n The team that will work on this opportunity is exceptionally talented but has a long history of missing milestones and failing to deliver the business benefits to the stakeholders. ERP Projects are New Ventures The risk profile of the ERP project, fraught with technological, organizational, and business complexities, resembles a new business venture rather than an IT development project. The methods used to manage the ERP project should be taken from the Venture Capitalist playbook not an IT managers playbook. n Investments must be staged. Capital must be conserved. Cash flows must be assured before more investment takes place. n Great care must be taken to see that all participants in the initiative (including members of the senior management team) share the risk in a way that facilitates success. n The composition of the team – the sponsors, consultants, product vendors, IT staff, and line managers – is of the utmost importance. VC’s usually start with the resumes when reading a business plan. Who is involved matters more than what the plan is. ERP as Enterprise Transformation There are there major processes that make an ERP project significantly different than an IT project. n Practical process reengineering – is about replacing historically evolved business processes with more effective and efficient standard processes. However, ERP starts with a set of templates. The task of redesigning a process is made easier using these templates. But if the templates don’t match the desired business process the temptation to “customize” them. This removes much of the benefit originally provided by the ERP system. And creates and instant legacy system with the same maintenance and support problems of the previous environment. n Package approaches to delivering IT capability – with numerous business advantages. Installing a packaged solution provides many well documented benefits.
  • 3. One overlooked benefit is the imposition of a discipline on process and software changes. If the organization is not prepared to accept this discipline, this benefit soon disappears. n Shift toward modularity of fundamental business processes – may in the end have the most significant impact on the organization – the modularization of the organization’s architectures. There is technical architecture, data architecture, application architecture, and enterprise process architecture. All of these architectures will be impacted in some way. Without preparing for this impact the project will soon exhaust the skills, resources, and patience of the staff, vendors and sponsors. Types of ERP Implementations There are there basic types of ERP projects: n Comprehensive – represents an ambitious implementation approach n Multi–national company n Multiple sites n Full functionality of ERP, the 12 main modules of SAP R/3 for example n An independently evolved business process n Scope and level of the business process reengineering is high n Long deployment process based on module–by–module or full system implementation. n $10M expected investment n Middle of the Road – is mid way between comprehensive and vanilla n Multiple sites n Implementation of only core ERP modules, financials, Asset Management, and Project systems in R/3 n BPR level is significant, but not as extensive as the comprehensive process n $3M expected investment n Vanilla – is the least ambitious n One site n Small number of users (< 100) n Core functionality only n Alignment of the company processes with the ERP process, means no BPR. n $1–2M expected investment How to Implement an ERP System IT projects traditionally use a formal management, development, and deployment process that emphasizes planning. These processes organize the work into phases seperated by decision points. The supporters of this approach emphasize that changes made early in the project is less expensive than changes made late in the project. This waterfall approach is based on several flawed assumptions:
  • 4. n It is not humanly possible to execute a planning process so that implementation is merely a matter of performing the defined tasks. n Plans for complex systems rarely turn out to be good enough. n Unanticipated problems are the norm rather than the exception. n It is not possible to protect against late changes. n All businesses face late changing competitive environments. n Windows of business opportunity open and close at the whim of the markets not the project manager. n Business usually commit to a plan. By making this commitment, they lose much of their ability to take advantage of fortuitous developments in the business environment. n In a financial setting this is the option value of the decision. n Deferring decisions to take advantage of new information and new opportunities is rarely taken into account on IT projects. It is vital to the success of an ERP project. The Road to Hell is Paved with Good Intentions These flawed assumptions usually lead to a dysfunctional dynamic that undermines the effectiveness of the project team. This dysfunctional dynamic takes place in the following way: n The client company pretends that it is possible to plan well enough to lay out specific milestones far in advance and then writes a contract with these milestones in it. n The vendor pretends that it knows how to meet these milestones in order to win the business. Neither party can possibly know what it is pretending to know. Both parties know that, but each feels compelled to maintain the pretense of good project management. This simply clogs the communication channels between the projects participants. Planning in the Presence of Uncertainty The difficulty of planning in an uncertain environment does not remove the need for planning – it simply changes its purpose. n Plan to gain understanding. n Plan for unanticipated events, this is risk management. n Don’t take planning too seriously, the original plan is simply a guide to the future it is not the future. Avoiding Dysfunction ERP projects should be thought of and managed as new business ventures. n Staging – ERP paradox of absorbing the ERP system whole to gain the benefits of the integration and infrastructure is not a good venture decision. In fact the venture capitalist would say this is a lousy business opportunity. n Different businesses have different cash flow requirements
  • 5. n Investment moves to those businesses that have acceptable or low cash flow requirements. n The risk / reward proposition must be reasonable. n Incentive alignment and risk sharing – among the parties cooperative problem solving behaviors are not only encouraged they are demanded. n Vendor and system integrator payments linked to the accomplishment of real tasks, not milestone dates. n Senior mangers compensation based on successfully delivering components of the project. n No conditional support, every one must have some skin in the game. Conditional support is the kiss of death for an ERP project. It’s going to get ugly no matter what happens, so everyone has to be 100% committed. n These incentive plans must be balanced by common sense. n People are the key to success – any venture is based on having the right people first. An “A” team with a “B” idea is always better than a “B” team with an “A” idea. How NSA Can Help Nilan–Sanders Associates is a small consulting firm with extensive experience in a variety of software product development and deployment processes. We base our value to our clients on the simple idea that: n In an environment of uncertainty, money buys information (it’s the options game all over again). Knowing something that you did not know before is very valuable when you are managing a new venture. We are professional information sources. Our role as consultants is to bring to our clients the not only the latest information, but the information that will contribute to the successful outcome of the project. n Anything that interferes with the lines of communications between the ERP team, vendors, system integrators, and customers of the system will led to less than acceptable results. Our role is to facilitate these communication links. n Maintaining an effective problem–solving environment is a critical success factor in all technology ventures. The creation of detailed plans, even if they are obsolete from the moment they are published is a skill we provide. What does not kill me makes me stronger. — Fredrich Nietsche ERP has the potential to make an organization stronger. The trick is not to die in the process.
  • 6. Resumes Glen B. Alleman Glen is an experienced IT consultant with over 15 years of major client management responsibility in a broad variety of industries. His over 22 years of progressive responsibility in the design, development, and management of industrial strength software systems provides a solid foundation for architecting state of the art e- commerce and business systems. His direct hands-on experience with large–scale integration environments and business domains include: IT Strategies, object based system architecture, enterprise application integration, business process reengineering, and product development strategies. Glen's extensive program management experience, with multiple concurrent projects involving hardware, software, multiple sites and legacy business systems integration forms the basis of a strong business focused on delivering the system, on time and on budget, which meets the requirements of the client. Glen holds a MBA from the University of Southern California and a B.S. in Physics from the University of California, Irvine. Richard A. Sanders Rick has a 20 year background in high technology systems and software development focusing on publishing, multimedia and mission critical IT solutions. From 1996–99 he was Vice President of Research and Development at SII, responsible for the technical direction and the development of all products. Rick was also with SII from 1986 until 1993 starting as the Director of R&D. In 1991, Rick was chosen to start up SII's Telco Division – a Yellow Pages electronic publishing joint venture with US–West in Englewood, Colorado. Rick left SII in 1993 and joined Visionary Corporate Technologies, Inc. in Palo Alto as a multimedia publishing business developer. In 1994, he became the Vice president of R&D at American Fundware. In the 1980's, he held positions as manager of software development at Logicon, Inc. and, later, Harris Corporation. Rick holds a BS in Computer Sciences and a Masters Degree in Business from the University of California at Irvine. Stephan E. Nilan Steve has 20 plus years experience in high technology marketing and strategic business planning with a focus on publishing and media, including newspapers, cable television and the Internet. Prior to forming Nilan–Sanders in 1997 with Rick Sanders, he was Vice President of Marketing and, later, Vice President of Business Development at System Integrators, Inc. (SII), a worldwide provider of newspaper publishing systems. At SII, Steve formed MediaBridge, the Company’s new media division with a focus on Internet publishing ventures. Steve was President and co–founder of MediaExpress, a cable television–to–PC information broadcast service. Steve has also held marketing management positions with Logicon, Inc., Harris Corporation and Unify Corporation. He holds a BA from Villanova University and an MBA from Iona College.