theknowledgeacademy
 
 
 
 
 
PMP Exam Preparation 
“Boot Camp” Course 
 
Trainer Notes  
 
theknowledgeacademy
 
1 
 
Welcome to The Knowledge Academy! 
It is our goal at The Knowledge Academy to provide the best preparation for the PMP test 
available anywhere.  To that end, we have designed a course in the four‐day “boot camp” format 
that we believe serves that purpose with distinction! 
 
To prepare yourself as a PMP trainer of The Knowledge Academy, please review the notes below 
and on the following pages. 
 
1. Format of the Courseware 
 
The majority of the questions on the PMP exam are based directly on the content of the PMBOK.  
In fact, it advisable that Students read the PMBOK thoroughly before taking the exam.  Our 
courseware is therefore based on the format or structure of the PMBOK, specifically: 
 
1. Knowledge Areas and Processes.  The processes are presented by Knowledge Area in the 
order in which the Knowledge Areas are presented in the PMBOK. 
2. Inputs, Tools and Techniques, and Outputs (ITOs).  Similarly, the (ITOs) of each process are 
presented in the order in which the PMBOK presents them. 
 
To the second point above, you will see in the Slide Presentation that our handling of the ITOs is 
unique.  As you know, many ITOs, particularly the Tools/Techniques, appear again and again 
throughout the PMBOK.  When an ITO is presented for the first time in our Slide Presentation, we 
provide an adequate but concise explanation, and we highlight the title of the ITO in red to 
indicate that this is the first appearance of the ITO in both the PMBOK and our slides.  However, in 
subsequent appearances of the ITO, instead a repeating the explanation, we present short 
questions pertaining to the ITO, as a way of reinforcing the Students’ understanding of the item – 
and avoiding redundancy!  
 
   
theknowledgeacademy
 
2 
 
The following stylistic elements also characterize The Knowledge Academy’s unique Slide 
Presentation: 
3. Processes Summary Slide.  At the start of each Knowledge Area, the first slide is a Processes 
Summary slide, which presents a summary of each process that is related to that 
Knowledge Area.  (See Figure 1‐1, on the next page.) 
Figure 1‐1.  Knowledge Area Processes Summary Slide 
© 2012 The Knowledge Academy Ltd  V3.4   53
Integration Management
4.1 Develop Project Charter
– Produce the Project Charter, which formally 
authorizes the project, names the Project 
Manager, and provides the him/her with the 
authority to use the organization’s resources to 
accomplish project objectives.
4.2 Develop Project Management Plan
─ Produce the Project Management Plan – a single, 
cohesive guide to project execution comprised of 
management plans, baselines, and other 
documents.
 
 
4. What‐How‐When Slide.  After the title page is the What‐How‐When slide, which explains 
what the purpose of the process is; how it helps in the management of the project; and 
when the process occurs in the overall flow of the project. (Figure 1‐2.) 
 
Figure 1‐2.  What‐How‐When Slide 
© 2012 The Knowledge Academy Ltd  V3.4   57
Develop Project Charter
What’s the purpose?
─ Produce the Project Charter, which formally authorizes the 
project, names the Project Manager, and provides the 
him/her with the authority to use the organization’s 
resources to accomplish project objectives.
How does it help?
─ Provides the project with a defined start and established 
boundaries and senior management with the opportunity 
to formally accept and commit to the effort.
When does it happen?
─ At the very beginning of the Project Life Cycle – before any 
substantial project planning on the part of the Project 
Manager and project management team .
 
theknowledgeacademy
 
3 
 
 
 
5. Graphical Display of the ITOs.  In each process section, following the What‐How‐When 
slide, there is a slide containing a Graphical Display of the ITOs that are introduced or used 
in the process.  Those ITOs that are “introduced” – that is, appear in the PMBOK (and 
therefore in the Slide Presentation) for the first time are shown on this Graphical Display 
slide in red.  (See Figure 1‐3.) 
Figure 1‐3.  Graphical Display of ITOs Slide 
 
 
6. Presentation of the ITOs.  Following the Graphical Display slide, there begins a presentation 
of the ITOs that constitute “the meat” of the process.  These ITOs are presented in the Slide 
Presentation in the same order in which they are discussed in the PMBOK.   
As noted above in point 5, some of these ITOs may be presented in the PMBOK (and thus in 
the Slide Presentation) for the first time.  Those ITOs appearing for the first time are 
described in adequate but concise detail, approximating the language of the PMBOK as 
closely as possible.   
The titles of these ITOs are shown in red to indicate their debut appearance.  As shown 
below in Figure 1‐4, Accepted Deliverables is introduced in the Close Project or Phase 
process for the first time, as indicated by its appearance in red, while Project Management 
 
 
Plan ha
plain b
Note th
an ITO 
Trainer
further
7. Extras.
section
matter
materi
that th
Extras, 
the
as already 
lue font.   
hat throug
being intro
rs are enco
r elaborate
.  At the en
n titled, Ext
r than is no
al in the PM
is material
it is by no 
ekno
been intro
ghout the S
oduced for
ouraged to
e the subst
Figu
nd of the pr
tras.  (See e
ot directly f
MBOK.  As
l will appea
means ma
owle
oduced in t
Slide Presen
r the first t
o turn to th
tance of the
ure 1‐4.  Pr
rocess sect
example o
from the P
such, ther
ar on the te
andatory a
Figure 1‐
edge
the PMBOK
ntation a p
time.  (See 
he PMBOK
e ITOs. 
resentation
tion in eac
of Extras in 
MBOK but
re is a lesse
est.  Altho
and is left to
‐5.  Examp
eaca
K in a previ
page refere
again Acce
, as approp
n of ITOs P
h Knowled
Figure 1‐5
t is, rather,
er likelihoo
ugh Traine
o the discr
ple of Extra
dem
ious proces
ence to the
epted Deliv
priate and 
Page. 
dge Area, th
.)  The Extr
 “implied b
od, compar
ers are enc
retion of th
as. 
my
ss, as indic
e PMBOK a
verables, b
time perm
 
here may a
ras consist
by” or “der
red to PMB
couraged t
he Trainer. 
cated by th
appears wi
below.)  
mitting, to 
appear a 
t of subject
rived from
BOK conten
o present t
    
4 
he 
th 
t 
” 
nt, 
the 
 
 
8. Sample
five or 
presen
purpos
with ad
the Kno
the
e Test Que
six Sample
nted inform
ses.  Traine
dditional q
owledge A
ekno
estions.  Fo
e Test Que
mally during
ers are enc
uestions th
Area proces
Figur
owle
ollowing th
estions is p
g the class,
couraged t
hat would 
sses. 
re 1‐6.  Exa
edge
he last proc
resented. T
, more as a
to expand v
test the St
ample of Sa
 
eaca
cess section
These que
a learning t
verbally up
tudents’ re
ample Tes
dem
n in each K
stions are 
tool than fo
pon these S
ecall of the 
t Question
my
 
Knowledge
intended t
for assessm
Sample Te
material p
ns. 
 
e Area, a se
to be 
ment 
st Questio
presented i
5 
et of 
ns 
in 
 
 
2.  
 
The
in t
sect
 
2.1
 
Gra
Gro
Gra
 
 
It is
eac
Disp
An Ans
provide
Color Co
e use of Co
he header 
tion and in
1  Color Co
aphical Disp
oup to whic
aphical Disp
Pr
s important
ch process 
play slides 
the
swer Key fo
ed by The 
oding an
lor Coding
areas of th
n the text o
 
oding in t
plays of ITO
ch each pr
plays, Colo
rocess Gr
 Initiat
 Plann
 Execu
 Monit
 Closin
t that Stud
has a conn
are shown
ekno
or all Samp
Knowledge
nd Boldf
g is an impo
he Graphic
of the displ
the Grap
Os are show
ocess belo
or Coding u
roup 
ting:
ing:
uting: 
toring & Co
ng: 
dents know
nection.  D
n, Trainers 
owle
ple Test Qu
e Academy
facing/U
ortant feat
cal Displays
ays; and (b
hical Disp
wn at the s
ongs, as sho
used as bac
ontrolling:
w the Proce
uring the c
are encou
edge
uestions th
y. 
Underlin
ture in our 
s of ITOs th
b) in the te
plays of IT
start of eac
own in Figu
ckground i
Color 





ess Group, 
course of in
uraged to p
eaca
hat appear 
ning in th
Slide Prese
hat appear
ext of the s
TOs 
ch process
ures 2.1‐1 t
in the head
Coding
Gray
Green
Blue
Yellow
Red
as well as 
nstruction,
point out to
dem
in the Slid
he Cours
entation.  C
r at the star
lides.  
s section to
through 2.
der area is 
the Knowl
 particular
o the Stud
my
 
e Presenta
seware 
Color Codi
rt of each p
o indicate t
.1‐5, below
s as follows
ledge Area
rly when th
ents the P
ation will b
ng is used 
process 
the Process
w.  In these
s: 
a, with whic
he Graphic
rocess Gro
6 
be 
(a) 
s 
e 
ch 
al 
oups 
theknowledgeacademy
 
7 
 
and the Knowledge Areas to which the processes belong.  Note that both Process Group and 
Knowledge Area are shown (under the process title) in the colored header area of each Graphical 
Display.  (See Figures 2.1‐1 through 2.1‐5.)   
 
Trainers are encouraged to make frequent reference to page 61 of the PMBOK, which shows the 
“PMI anatomy” – that is, the relationship of each of the 47 processes to a Process Group and to a 
Knowledge Area.  Remember: each of the 47 processes is related to one and only one Process 
Group and one and only one Knowledge Area!    
 
Color Coding – specifically, the color red – is also used in the body of the graphical displays to 
indicate the first appearance of an ITO in the PMBOK.   
 
In the first example below, Develop Project Charter, all of the ITOs are introduced (in the PMBOK 
and in the Knowledge Academy Slide Presentation) for the first time and, therefore, are shown in 
red.   
 
In the second example, Develop Project Management Plan, only Outputs from Other Processes 
and Project Management Plan are introduced for the first time – and, therefore, shown in red.  
The other ITOs are “repeats” and shown in plain blue font.  
Figure 2.1‐1.  Initiating Process Group.   
Both of the 2 Initiating processes appear with a gray heading: 
 
Figure 2.1‐2.  Planning Process Group. 
All of the 24 Planning processes appear with a green heading: 
theknowledgeacademy
 
8 
 
 
Figure 2.1‐3.  Executing Process Group. 
The 8 Executing processes appear with a blue heading: 
 
Figure 2.1‐4.  Monitoring & Controlling Process Group. 
The 11 Monitoring & Controlling processes appear with a light yellow heading: 
 
Figure 2.1‐5.  Closing Process Group. 
And the 2 Closing processes appear with a red heading: 
theknowledgeacademy
 
9 
 
 
Trainers are encouraged to remind Students of the Process Groups related to the processes, as 
indicated by the Color Coding.  
2. 2  Color Coding in the Text of the Slides 
Color Coding – again, specifically, the color red – is used in the text of the slides, as follows: 
 
 On the Processes Summary page, which appears at the start of each Knowledge Area.   
(See Figure 2.2‐1, below.) 
 On the What‐How‐When page, which constitutes the first page of every process section.  
(See Figure 2.2‐2.) 
 To highlight the first page of Inputs, the first page of Tools/Techniques, and the first page of 
Outputs in every process section; and to highlight an ITO being introduced for the first time.  
(See Figure 2.2‐3.) 
Figure 2.2‐1.  Knowledge Area Processes Summary Page.   
Red is used on the Processes Summary page that appears at the start of each Knowledge Area. 
theknowledgeacademy
 
10 
 
© 2012 The Knowledge Academy Ltd  V3.4   53
Integration Management
4.1 Develop Project Charter
– Produce the Project Charter, which formally 
authorizes the project, names the Project 
Manager, and provides the him/her with the 
authority to use the organization’s resources to 
accomplish project objectives.
4.2 Develop Project Management Plan
─ Produce the Project Management Plan – a single, 
cohesive guide to project execution comprised of 
management plans, baselines, and other 
documents.
 
 
Figure 2.2‐2.  What‐How‐When Page.   
Red is used on the What‐How‐When page that constitutes the first page of every process section. 
© 2012 The Knowledge Academy Ltd  V3.4   57
Develop Project Charter
What’s the purpose?
─ Produce the Project Charter, which formally authorizes the 
project, names the Project Manager, and provides the 
him/her with the authority to use the organization’s 
resources to accomplish project objectives.
How does it help?
─ Provides the project with a defined start and established 
boundaries and senior management with the opportunity 
to formally accept and commit to the effort.
When does it happen?
─ At the very beginning of the Project Life Cycle – before any 
substantial project planning on the part of the Project 
Manager and project management team .
 
   
 
 
Re
2. 3
Libe
stud
and
pre
ed is used 
se
3  Boldfac
eral use of 
dent and t
d it allows t
senting the
the
Fi
to highligh
ection.  It is 
cing/Und
boldfacing
he trainer.
the Trainer
e material 
Figu
ekno
igure 2.2‐3
ht the first 
also used 
• Projec
– A for
deliv
of sp
 Fo
Pr
ne
 Fo
Cu
Pr
– SOW
desc
derlining i
g and unde
.  Boldfacin
r to highlig
verbally.  S
ure 2.3‐1.  
owle
3.  ITO First
page of Inp
to highligh
ct Statemen
rmal docume
verables, and
pecified proj
or Internal Pro
roject Sponso
eeds, and serv
or External Pro
ustomer as pa
rocurement D
W references 
cription, and
Devel
in the Tex
erlining in t
ng/underlin
ght, with th
See examp
Example o
edge
t Page and
puts, Tools
ht an ITO b
nt of Work
ent describin
d timescale
ect work.
ojects: SOW s
or and detail th
vice requireme
ojects: SOW s
art of an Agree
ocument (RFP
business ne
d (if internal) 
op Project C
Inputs
xt of the 
the text of 
ning allows
he use of a 
ple below.
of Boldfaci
eaca
d First Appe
s/Techniqu
being introd
© 2012 The Kno
k (SOW) PMB
ng activities,
for the perfo
should be prov
he product, bu
ents. 
should come f
ement (contra
P, RFI, or IFB/).
eed, product
strategic pla
Charter
Slides 
the slides 
s Students
laser point
 
ing/Highlig
dem
earance IT
ues, and Ou
duced for t
owledge Academy Ltd  V3.4   60
BOK 68
,
ormance 
vided by 
usiness 
rom 
act) or 
.  
scope 
an. 
is intended
to quickly 
ter, the sam
ghting in Sl
my
TO.   
utputs in e
the first tim
 
d to aid bo
focus on k
me key wo
lide. 
 
every proce
me. 
oth the 
key words, 
ords while 
11 
ess 
theknowledgeacademy
 
12 
 
3.  Errors / Discrepancies in PMBOK, Version 5 
 
Trainers are encouraged to point the following errors and discrepancies in the PMBOK.  PMBOK, 
version 5, is new to all of us.  We therefore encourage to also bring to our attention other errors, 
discrepancies, or inconsistencies that you may surface in your review and use of this foundational 
document.  
 
3.1  Verify vs. Validate 
 
Deliverables are produced as an Output of the Direct & Manage Project Work process, an 
Integration Knowledge Area process.  Thereafter, deliverables are referred to “Verified 
Deliverables” – and, in one isolated case, as “Validated Deliverables”: 
 
 On page 106, in Figure 5‐1, “Verified Deliverables” are shown as a key Input into the 
Validate Scope process. 
 On page 133, in the short table of ITOs at the beginning of the Validate Scope section, 
“Verified Deliverables” are shown as a key Input into the process.  
 On page 135, in the body of the Validate Scope section, “Verified Deliverables” are again 
shown as a key Input into the process.  
 On page 249, in the short table of ITOs at the beginning of the Control Quality section, 
“Verified Deliverables” appear as a key Output of the process.  
 On page 253, in the body of the Control Quality section, “Verified Deliverables” are again 
shown as a key Output of the process.  
 
Only on page 230, in Figure 8‐1, are the deliverables referred to as “Validated Deliverables,” an 
Output of the Control Quality process. 
 
In our Slide Presentation, we have therefore chosen to refer to deliverables as they appear after 
the Direct & Manage Project Work process as “Verified Deliverables.”  (Note that confirmation 
from PMI regarding this discrepancy is pending.) 
 
3.2  Risk Breakdown Structure (RBS) vs. Probability Distributions 
 
On page 337 of the PMBOK, sample illustrations of Beta and Triangular Distributions are shown in 
Figure 11‐14.  Unfortunately, the same illustrations are shown on page 317, in Figure 11‐4, which 
should be as stated “Example of Risk Breakdown Structure (RBS).”  
 
theknowledgeacademy
 
13 
 
4.  Lesson Presentation 
 
The Knowledge Academy Slide Presentation has been designed to make in‐class instruction as 
simple and straightforward as possible for all Trainers.  The following is a step‐by‐step process to 
aid you in your presentation.    
 
1. Begin each Knowledge Area with several minutes devoted to the Processes Summary Slide.  
Elaborate as much as possible, showing the connections with reference to Inputs and 
Outputs from one process to another within the Knowledge Area. 
2. Beginning with the first process, introduce the What‐How‐When slide.  Again, devote 
several minutes to this slide and elaborate as much as possible.  This slide, along with the 
preceding Processes Summary Slide, serves to “set the stage” for the process discussions 
that follow.  
3. Continue with the ITOs discussions.  Plan on spending more time on those ITOs that are 
being introduced in the process for the first time (indicated with a title displayed in red) 
than ITOs that are “repeats.”  ITOs that are repeats, those that were previously introduced, 
are not discussed but instead appear in the slides with a few short questions designed to 
test the Students’ recall of the ITOs.  Trainers are encouraged to elaborate verbally with 
additional questions, as appropriate. 
4. Sample test Questions appear at the end of each Knowledge Section.  Here, too, Trainers 
are encouraged to elaborate verbally with additional questions, as appropriate.   
5. Trainers are encouraged to make their best effort to keep to the schedule. (See the Daily 
Schedules, provided at the end of this document.)  Much of Day 4 will be devoted to the 
Simulated PMP Test.  It is therefore imperative that the schedule be maintained as much as 
possible in order to reserve time for this important item. 
 
In order for Trainers to be successful, it is important that a few “must haves” be firmly in place:    
 
1. Trainer must have a detailed and thorough understanding of the PMBOK, version 5.  It 
should go without saying that all Trainers must have previously read the PMBOK cover to 
cover. 
2. Trainer must have a detailed and thorough understanding of The Knowledge Academy 
Slide Presentation.  The slides will be provided to you by The Knowledge Academy prior to 
the class in sufficient time to allow you a good “walk through” of the content.  
3. All Trainers should have a good slide advance/laser pointer tool for use in class. 
4. It is advisable that all trainers walk themselves through the Slide Presentation several 
times, using their slide advance/laser pointer tool, prior to the class. 
5. Trainers are encouraged to supplement their verbal presentations with their own 
perspectives on the content and relevant real‐life experiences that may relate to the 
content at hand. 
 
 
 
 
 
W
 
6. In class
 Ma
 Spe
 Stay
 Mo
 Lea
 And
 
7. Keep it
ahead 
as you 
 
 
We’re
for St
the
s, by all me
ke eye con
eak firmly 
y on your f
ove around
arn the stud
d smile – b
t fun!  Prep
and inject 
can! 
 here 
tuden
ekno
eans be you
ntact 
feet 
d the room
dents’ nam
broadly and
paring for t
some hum
Go
An
to ma
nts – an
owle
urself.  How
mes, and ca
d often! 
the PMP Ex
mor in the p
od Lu
 
nd ke
ake thi
nd a g
Tr
edge
wever, Tra
all on them
xam can b
presentatio
uck, T
eep in
is a gre
great t
rainer
eaca
ainers are e
m by name
e very stre
on – as app
Traine
n touc
eat lea
trainin
rs! 
dem
encourage
essful for m
propriate, 
ers! 
 
ch. 
arning
ng exp
my
ed to also: 
many Stude
of course, 
g expe
erienc
ents, so go 
and as oft
erience
ce for 
14 
ten 
e 
theknowledgeacademy
 
15 
 
Four‐Day Boot Camp Time Table  
 
 
 
 
 
Introductions.  Section 1, PMBOK Introduction. 1 ─ 24 8:30 10:00 1.5
Break 10:00 10:05 5 Minutes
Section 2, Organizational Influences and Project Life 
Cycle.  Section 3, Project Management Processes.
25 ─ 49 10:05 11:35 1.5
Integration Knowledge Area and Processes: 
Develop Project Charter, 
Develop Project Management Plan.
52 ─ 100 11:35 12:35 1
Lunch Break 12:35 12:55 20 Minutes
Direct & Manage Project Work, Monitor & Control 
Project Work, Perform Integration Change Control, 
Close Project or Phase, Sample Test Questions.
101 ─ 172 12:55 2:55 2
Break 2:55 3:00 5 Minutes
Scope Knowledge Area and Processes: 
Plan Scope Management, 
Collect Requirements, Define Scope. 
173 ─ 227 3:00 4:30 1.5
Create WBS, Validate Scope, 
Control Scope, Sample Test Questions.
228 ─ 274 4:30 6:00 1.5
9 30Total Contact Hours:
Day 1
Slide 
Numbers
Start 
Time
Finish 
Time
Contact 
Hours
Break 
Minutes
Time Knowledge Area and Processes: 
Plan Schedule Management, Define Activities, 
Sequence Activities, Estimate Activity Resources.
275 ─ 324 8:30 10:00 1.5
Break 10:00 10:05 5 Minutes
Estimate Activity Durations, Develop Schedule, 
Control Schedule, Sample Test Questions.
325 ─ 419 10:05 11:35 1.5
Cost Knowledge Area and Processes: 
Plan Cost Management, Estimate Costs.
420 ─ 444 11:35 12:35 1
Lunch Break 12:35 12:55 20 Minutes
Determine Budget, Control Costs, 
Sample Test Questions.
445 ─ 519 12:55 2:55 2
Break 2:55 3:00 5 Minutes
Quality Knowledge Area and Processes: 
Plan Quality Management, Perform Quality Assurance.
520 ─ 584 3:00 4:30 1.5
Perform Quality Assurance (cont'd), 
Control Quality, Sample Test Questions.
585 ─ 614 4:30 6:00 1.5
9 30Total Contact Hours:
Break 
MinutesDay 2
Slide 
Numbers
Start 
Time
Finish 
Time
Contact 
Hours
theknowledgeacademy
 
16 
 
 
 
 
 
 
 
   
Human Resource Knowledge Area and Processes:  Plan 
Human Resource Management, Acquire Project Team.
615 ─ 652 8:30 10:00 1.5
Break 10:00 10:05 5 Minutes
Develop Project Team, 
Manage Project Team, Sample Test Questions.
653 ─ 714 10:05 11:35 1.5
Communication Knowledge Area and Processes: 
Plan Communication Management, 
Manage Communications, Control Communications, 
Sample Test Questions.
715 ─ 766 11:35 12:35 1
Lunch Break 12:35 12:55 20 Minutes
Risk Knowledge Area and Processes: 
Plan Risk Management, Identify Risks, 
Perform Qualitative Risk Analysis.
767 ─ 816 12:55 2:55 2
Break 2:55 3:00 5 Minutes
Perform Quantitative Risk Analysis, Plan Risk Responses, 
Control Risks, Sample Test Questions.
817 ─ 872 3:00 4:30 1.5
Procurement Knowledge Area and Processes: Plan 
Procurement Management, Conduct Procurements. 
873 ─ 938 4:30 6:00 1.5
9 30Total Contact Hours:
Day 3
Slide 
Numbers
Start 
Time
Finish 
Time
Contact 
Hours
Break 
Minutes
Control Procurements, 
Close Procurements, Sample Test Questions.
939 ─ 970 8:30 9:30 1
Break 9:30 9:35 5 Minutes
Stakeholder Knowledge Area and Processes: 
Identify Stakeholders, Plan Stakeholder Management, 
Manage Stakeholder Engagement, Control Stakeholder 
Engagement, Sample Test Questions.
971 ─ 1031 9:35 10:35 1
Break 10:35 10:40 5 Minutes
Code of Ethics, Study & Exam Advice 1032 ─ 1048 10:40 11:40 1
Lunch Break 11:40 12:10 30 Minutes
200‐Question Simulated PMP Test 12:10 4:10 4
Break 4:10 4:15 5 Minutes
Review of Questions 4:15 5:15 1
8 45Total Contact Hours:
Contact 
Hours
Break 
Minutes
Day 4
Slide 
Numbers
Start 
Time
Finish 
Time
theknowledgeacademy
 
17 
 
Answers to  
CPM Exercises 1, 2, and 3 
 
 
   
theknowledgeacademy
 
18 
 
 
 
 
 
   
8
C
START END
4
D
5
B
8
E
6
A
7
F
5
G
7
H
1 7
1 7
13 19
14 20
8 12
8 12
1 6
2 7
13 20
13 20
8 12
8 12
25 32
25 32
21 24
21 24
1
Total Float
Free Float
1
1
Total Float
There’s a mistake in this diagram. Can you find it?
There are two Critical Paths in this diagram.
One is F-B-C-D-E. The other is F-G-C-D-E.
The mistake in this diagram is the line from Activity H to
the End. Activity H has a relationship with Activity D
and, therefore, cannot also be the last activity on a path.
Free Float
1
theknowledgeacademy
 
19 
 
 
 
 
 
   
V5.2 1
Sample Test Questions
with PowerPoint presentation 
Knowledge Area’s
Trainer’s Copy
`
Sample Test Questions
Answer Key
Integration  Scope  Time  Cost 
Question  Answer  Question  Answer  Question  Answer  Question  Answer 
1  C  1 A 1 D 1 A
2  B  2 A 2 A 2 B
3  B  3  D  3  D  3  C 
4  B  4  D  4  A  4  D 
5  A  5  B  5  D  5  D 
6  D 
Quality  Human Resources  Communications  Risk 
Question  Answer  Question  Answer  Question  Answer  Question  Answer 
1  D  1 A 1 A 1 C
2  C  2 A 2 A 2 B
3  D  3 C 3 B 3 A
4  A  4 D 4 C 4 B
5  B  5 D 5 B 5 A
  Procurement  Stakeholder 
    Question  Answer  Question  Answer 
    1 C 1 D
    2 C 2 C
    3 A 3 C
    4 B 4 A
    5 A 5 A
 
theknowledgeacademy
 
20 
 
 
Answers to 
Sample Test Questions 
Answers to the Sample Test Questions that appear at the end of the  
each Knowledge Area in the slide presentation are shown below.  
 
 
Integration  Scope  Time  Cost 
Question  Answer  Question  Answer  Question  Answer  Question  Answer 
1  C 1  A 1 D 1 A 
2  B 2  A 2 A 2 B 
3  B 3  D 3 D 3 C 
4  B 4  D 4 A 4 D 
5  A 5  B 5 D 5 D 
6  D
Quality  Human Resources  Communications  Risk 
Question  Answer  Question  Answer  Question  Answer  Question  Answer 
1  D 1  A 1 A 1 C 
2  C 2  A 2 A 2 B 
3  D 3  C 3 B 3 A 
4  A 4  D 4 C 4 B 
5  B 5  D 5 B 5 A 
  Procurement  Stakeholder 
    Question  Answer  Question  Answer 
    1  C 1 D
    2  C 2 C
    3  A 3 C
    4  B 4 A
    5  A 5 A
 
V5.2 2
Integration Knowledge Area
Sample Test Questions
1.  Which of the following processes develops the document 
that formally authorizes the project?
a. Direct and Manage Project Work
b. Monitor and Control Project Work
c. Develop Project Charter
d. Develop Project Management Plan
2.  Which of the following is not an example of a project success 
factor?
a. Top management support
b. Delivering to time and budget 
c. A clear project mission
d. Adequate resources
Integration Knowledge Area
Sample Test Questions
3.  A Change Control Board (CCB) is ___.
a. Recommended for use on all projects, large or small 
b. Used as required to approve or reject change requests
c. Managed by the Project Manager who serves as its 
secretary 
d. Composed of key members of the project team
4.  Within the five Process Groups, which group is superimposed 
on the other four?
a. Planning
b. Monitoring & Control 
c. Execution
d. Closure
V5.2 3
Integration Knowledge Area
Sample Test Questions
5.  Which of the following is NOT part of Direct and Manage 
Project Execution?
a. Manage expected project benefits 
b. Manage risk
c. Manage change
d. Manage contractors
6.  Which of the following would you NOT expect to find in the 
Project Charter?
a. Project success criteria
b. Outline budget and schedule
c. Project Manager authority level
d. Project team roles and responsibilities
Scope Knowledge Area
Sample Test Questions
1.  The Output of the Validate Scope process is ___.
a. Accepted deliverables 
b. Verified deliverables
c. Processed invoices 
d. Paid bills
2.  There is only one process that produces two management 
plans as major Outputs, both of which will be included in the 
Project Management Plan.  Which process is this?
a. Plan Scope Management 
b. Plan Schedule Management 
c. Plan Cost Management
d. Plan Quality Management
V5.2 4
Scope Knowledge Area
Sample Test Questions
3.  All the following statements about a Work Breakdown 
Structure are true except ___.
a. It provides a framework for organizing and ordering the 
activities that make up a project.
b. It breaks a project down into successively greater detail by 
level. 
c. It is a planning tool.
d. It specifies how long activities should take and when 
they should be completed.
Scope Knowledge Area
Sample Test Questions
4.  Scope validation ___.
a.  Improves cost and schedule accuracy, particularly on 
projects using innovative techniques or technology. 
b.  Is the last activity performed on a project before handoff 
to the customer.
c.  Documents the characteristics of the product or service 
that the project was undertaken to create.
d.  Differs from quality control in that scope validation is 
concerned with the acceptance — not the correctness —
of the work results.
V5.2 5
Scope Knowledge Area
Sample Test Questions
5.  A WBS is a product‐oriented “family tree” of project 
components.  Each item in the WBS is generally assigned a 
unique identifier, all of which are known collectively as ___.
a. The chart of accounts 
b. The code of accounts
c.  Work package control numbers 
d.  WBS ID numbers
Time Knowledge Area
Sample Test Questions
1.  If Activity A has 15 days of Free Float and 25 days of Total 
Float and the Early Start date is delayed 30 days what is the 
effect on the project?
a. The following activity will be delayed 15 days. 
b. The project is delayed 30 days.
c. The project will be delayed 5 days.
d. Both a and c.
2.  In any network diagram, float is found when ___.
a.   Early start and late start are not equal. 
b.   Early start and late finish are not equal.
c.   Late finish plus lag is greater than zero. 
d.   Early start and late finish equal zero.
V5.2 6
Time Knowledge Area
Sample Test Questions
3.  An activity has 5 days of Free Float and 10 days of Total Float. 
Its start is delayed 7 days.  What is the effect?
a. The project is delayed by 2 days. 
b.   The project is not delayed.
c.   The following activity slips at least 2 days. 
d.   Both b and c.
4.  An activity has an Early Start date of 10, a Late Start date of 
19, and an Activity Duration of 4.  Based on this information, 
what can you conclude about the activity?
a.   Total Float for the activity is 9 days.
b.   The Early Finish date is the end of the day on the 14th. 
c.   The Late Finish date is the 25th.
d.   It can be completed in 2 days if resources are doubled.
Time Knowledge Area
Sample Test Questions
5.  The difference between Fast Tracking and Crashing is best 
described by which of the following statements?
a.   There is no difference.
b.   Fast Tracking involves dealing with cost constraints; 
Crashing is concerned with schedule problems.
c.   Fast Tracking attempts to finish a project earlier than 
schedules; Crashing attempts to complete the project on 
schedule at no additional cost.
d.   Fast Tracking involves changing the approach to perform 
activities in parallel; Crashing adds resources to project 
activities for earlier completion.
V5.2 7
Cost Knowledge Area
Sample Test Questions
1.  At the end of phase 2, you find you have spent $400,000.  
You had planned on spending only $325,000.  The value of the 
work accomplished so far is $350,000.  What is your CPI?
a.  0.875  c. 0.928
b. 1.076  d. 1.231
2.  At the end of phase 2, you find that you have spent $400,000 
but had planned on spending only $325,000.  The value of the 
work accomplished so far is $350,000.  What is your SV?
a. ‐$25,000 c. ‐$75,000 
b. $25,000 d. ‐$50,000
Cost Knowledge Area
Sample Test Questions
3.  At the midway point in your project, you find that you have a 
CPI of 1.8.  This tells you that ___. 
a.  You are spending $1.80 for every dollar you had planned 
to spend. 
b.  Your project is in trouble because your team is spending 
80% more than planned. 
c.  You are earning value on your project at 1.8 times the 
rate you had planned. 
d.  You are earning $1.00 of value for every $1.80 you 
planned to earn.
V5.2 8
Cost Knowledge Area
Sample Test Questions
4.  Life Cycle Costing involves ___.
a.   Determining what physical resources will be needed to 
complete a project. 
b.   Calculating the internal rate of return. 
c. Assigning a value to each activity on the project.
d. Considering the overall costs of a project during and 
after its completion. 
5.  Earned value analysis on a 12‐month project estimated to 
cost $1.5 million showed, month six, EV of $650,000, a BCWS of 
$750,000, and actual costs of $800,000.  What are the 
variances? 
a. SV = +$100,000 and CV = +$150,000
b.  SV = +$150,000 and CV = +$100,000
c.  SV = ‐$50,000 and CV = +$150,000 
d.  SV = ‐$100,000 and CV = ‐$150,000
Quality Knowledge Area
Sample Test Questions
1.  The 80/20 rule, also known as the Pareto Principle, is best 
described by which one of the following statements?
a.   80% of the problems in quality can be ascribed to 
management and 20% to the employees. 
b.   80% of the cost of a product is in 20 % of the labor.
c. Eighty percent of all causes lead to 20% of all problems.
d. Many problems, perhaps as high as 80% of all problems, 
are generated by a comparatively small number of 
causes, perhaps 20%.
V5.2 9
Quality Knowledge Area
Sample Test Questions
2.  What is the mean, median, and mode of the following 
numbers: 2, 6, 10, 12, 12, 18?
a. 12, 6, 10 c. 10, 11, 12
b. 6, 11, 12 d. 10, 12, 11
3.  With regard to the traditional project constraint triangle, 
known as the Triple Constraint, where does quality rank?
a.   First, as the prime driver for a project
b.   Second, behind cost, but ahead of schedule 
c.   Second, behind schedule, but ahead of cost 
d.   As a secondary constraint ─ behind scope, time, and cost
Quality Knowledge Area
Sample Test Questions
4.  The Plan‐Do‐Check‐Act (PDCA) Cycle is associated with ___.
a.  Deming 
b.  Crosby 
c.  Juran
d.  Taguchi
5.  One of the major objectives of the Control Quality process is 
to verify the deliverables.  These Verified Deliverables serve as 
an essential Input to which process?
a.  Perform Quality Assurance
b.  Close Project or Phase
c.  Validate Scope
d.  Monitor & Control Project Work
V5.2 10
Human Resource Knowledge Area
Sample Test Questions
1.  Of the various types of power that might be employed by 
Project Managers, PMI recommends that ___  power be used as 
much as possible.  
a.  Reward and Expert c.  Legitimate and Expert
b.  Reward and Legitimate  d.  Reward and Coercive
2.  Whose theory of motivation stipulates that such needs as 
food and shelter must be satisfied before a person is capable of 
focusing energies on achieving higher levels of needs, for 
example, PMP Certification?
a.  Maslow’s theory c.  McGregor’s
b.  Deming's d.  Herzberg’s
Human Resource Knowledge Area
Sample Test Questions
3.  The three key components of the Human Resource 
Management Plan are ___.
a.   Roles and responsibilities, RACI charts, and a staffing 
management plan
b.   Roles and responsibilities, project organization charts, and 
a staff release plan 
c.   Roles and responsibilities, project organization charts, 
and a staffing management plan
d.   Roles and responsibilities, RACI charts, a staff release plan
V5.2 11
Human Resource Knowledge Area
Sample Test Questions
4.  All the following assumptions about employees are held by 
Theory X managers except ___.
a.   Most people think work is distasteful and try to avoid it.
b.   Most people prefer to be directed and must often be 
forced to do their work.
c.   Most people are not ambitious, do not want get ahead, 
and do not want responsibility.
d.   Most people are motivated primarily by their desire for 
self‐fulfillment (self‐actualization).
Human Resource Knowledge Area
Sample Test Questions
5.  All the following have been found to be major barriers to 
building effective project teams except ___.
a.   Role conflicts.
b.   Lack of team member commitment.
c.   Amount of office space allocated to each member.
d.   Differing priorities, interests, and judgments of team 
members. 
V5.2 12
Communications Knowledge Area
Sample Test Questions
1.  Motivating others to provide encouragement and coaching 
them to improve performance are examples of ___.
a.   Both general and project management skills
b.   Excellent and exclusive project management skills 
c.   A sequential communication method
d.   Some of the Project Sponsor's responsibilities 
Communications Knowledge Area
Sample Test Questions
2.  Work Performance Reports, Work Performance Data, and 
Work Performance Information are key Outputs and Inputs 
throughout the 47 processes.  What is the correct order of the 
flow?
a.   Work Performance Data to Work Performance 
Information to Work Performance Reports.
b.   Work Performance Data to Work Performance Reports to 
Work Performance Information.
c.   Work Performance Information to Work Performance 
Data to Work Performance Reports.
d.   Work Performance Reports to Work Performance Data to 
Work Performance Information.
V5.2 13
Communications Knowledge Area
Sample Test Questions
3.  There were 10 people on your project, and 5 more people 
were added last week.  How many additional channels of 
communication were created?
a.  105 c.  45 
b.  60 d.  90
4.  Letters, memos, reports, and faxes are all examples of 
the ___ Communication Method.
a.  Pull c.  Push
b.  Interactive d.  Formal Written
5.  In general, disagreement amongst stakeholders should be 
resolved in favor of ___.
a.  The Sponsor c.  The Performing Organization
b.  The Customer d.  End users
Risk Knowledge Area
Sample Test Questions
1.  Which of the following would you NOT expect to find in a 
Risk Management Plan?
a.  Risk methodology c. Responses to specific risks
b.  Risk Categories d. How risks will be tracked
2.  If a risk event has a 90 percent chance of occurring and the 
impact will be $10,000, what does $9,000 represent?
a. Risk value c. Real value
b.  Expected value d. Contingency budget
3. A risk event is the precise description of what might happen 
to the  of the project.
a. Detriment or benefit c. Risk profile
b. Detriment d. Budget
V5.2 14
Risk Knowledge Area
Sample Test Questions
4.  The risk management process has identified 120 risks with an 
average probability of 2% and an average impact of $8,000.  It 
has been decided to accept all the risks without individual 
mitigation.  How much contingency should be added to the 
budget?
a.  $192,000 c. $1,920
b.  $19,200 d. None of the above
5.  At what stage in the Project Life Cycle does the Project 
Manager have the most ability to influence risk?
a.  Concept c. Execution 
b.  Definition d. Closing
Procurement Knowledge Area
Sample Test Questions
1. Which of the following contract types places the greatest risk 
on the seller to control costs?
a.   Fixed Price with Economic Price Adjustment (FP‐EPA)
b.   Fixed Price incentive Fee (FPIF)
c.   Firm Fixed Price (FFP)
d.   Cost Plus Award Fee (CPAF)
2.  In a situation where a professional contract administrator is 
assigned to the project, then the Project Manager ___.
a.   Does not need to actively manage the contract.
b.   Can delegate all responsibility to the contract administrator. 
c.   Must still manage all major aspects of the contract.
d.   Does not need to be familiar with the contract’s small print.
V5.2 15
Procurement Knowledge Area
Sample Test Questions
3.  Force Majeure is a term derived from insurance law
meaning ___.
a.   Superior or irresistible force, such as lightning, 
earthquakes, storms, or floods.
b.   Any party to a contract can redress alleged illegalities 
through any U.S. District Court. 
c.   The buyer can seek damages from the seller due to major 
contract breaches.
d.   The seller neglected to exercise due care in performance 
and is thus subject to a breach of contract action.
Procurement Knowledge Area
Sample Test Questions
4.  The four processes of Procurement Management, in the 
order in which they are presented in the PMPOK, are ___.
a.   Plan Procurement, Conduct Procurements, Administer 
Procurement, Contract Closeout. 
b. Plan Procurement Management, Conduct Procurements, 
Control Procurements, Close Procurements. 
c. Planning, Procurement, Administration, Closeout.
d.   Procurement Planning, Source Selection, Contract 
Administration, Contract Closure.
V5.2 16
Procurement Knowledge Area
Sample Test Questions
5.  Of the Knowledge Areas listed below, which one might 
reasonably be associated most closely with the processes of the 
Procurement Knowledge Area, particularly the Plan 
Procurements process, in which contract type is determined?
a.   Risk Management 
b.   Integration Management
c.   Cost Management
d.   Scope Management
Stakeholder Knowledge Area
Sample Test Questions
1.  There are several Project Documents that may serve as Inputs 
to the Control Stakeholder Engagement process.  Of those listed 
below, which group of three do you think would be serve best as 
Inputs?  
a. Risk Register, Issue Log, Change Log
b. Risk Register, Issue Log, Activity List
c. Stakeholder Register, Issue Log, Change Log
d. Stakeholder Register and Management Plan, Issue Log
2.  A major Output of the Control Stakeholder Engagement 
process is ___.  
a.  Power/Influence Grid c. Work Performance Information
b.  Stakeholder Register d. Stakeholder Engagement Log
V5.2 17
Stakeholder Knowledge Area
Sample Test Questions
3.  Which of the following best describes a stakeholder?
a.   People directly involved with the project or whose interests 
may be impacted by the project or its outcomes.  
b.   A group of people or an individual impacted by the 
project’s outcomes or directly involved with the project.  
c.   A group of people or an individual directly involved with 
the project or whose interests may be impacted by the 
project, its outcomes, or decisions made during the 
course of the project by its stakeholders.  
d.   A group of people or an individual directly involved with the 
project or whose interests may impact the project or its 
outcomes.  
Stakeholder Knowledge Area
Sample Test Questions
4.  It is commonly held that stakeholders’ ability to influence a 
project is ___.
a.   Usually high in the early stages of a project and diminishes 
as the project moves through its life cycle.
b.   Typically high in the early stages of a project and increases 
as the project moves through its life cycle.
c.   Typically high in the early stages of the execution phase of a 
project but decreases as the product moves through its life 
cycle
d.   Typically high in the later stages of a project but increases 
as the project moves through its life cycle.
V5.2 18
Stakeholder Knowledge Area
Sample Test Questions
5.  Understanding how human resource requirements will be 
met and how staffing management will be addressed is useful 
information for the Project Manager in developing the 
Stakeholder Management Plan.  This information might be 
found in the  ___, a key Input in the Plan Stakeholder 
Management process.
a.   Project Management Plan
b.   Stakeholder Register 
c.   Communications Management Plan  
d.   Stakeholder Management Plan

More Related Content

PDF
SAP EPM 10 Online Training
PPSX
A look inside LPF Certification Courses
PPT
Rep pmp website
PDF
Sap abap tutorial
PPT
PMP Study Tips, PPC Total study tips for the certification ver e13.1
PPTX
E learning production processes
PDF
EdTech Europe 2014 Innovation Showcase: Papagei
PDF
Course Outline Autumn 07 Guide)
SAP EPM 10 Online Training
A look inside LPF Certification Courses
Rep pmp website
Sap abap tutorial
PMP Study Tips, PPC Total study tips for the certification ver e13.1
E learning production processes
EdTech Europe 2014 Innovation Showcase: Papagei
Course Outline Autumn 07 Guide)

What's hot (7)

PPT
PMP Presentation Professionals Oct 2013
PPT
Pmp corporate presentation 2013
PDF
Cakephp tutorial
DOCX
Bus 475 assignment 2
DOCX
01 Exec Summary
PPTX
Corporate Planning
PPTX
Corporate live project - planning
PMP Presentation Professionals Oct 2013
Pmp corporate presentation 2013
Cakephp tutorial
Bus 475 assignment 2
01 Exec Summary
Corporate Planning
Corporate live project - planning
Ad

Viewers also liked (6)

PPTX
Mastering ITTO DataFlow PMP - PMBOK Version 5
PDF
PMBOK 5th Edition Mind map
PDF
PMBOK fifth edition data flow diagram by english
PDF
PMBOK® Guide 5th edition Processes Flow in English
PDF
PMBOK® Guide 5th edition Processes Flow in English - Simplified Version
PDF
Mapa procesos pmbok 5
Mastering ITTO DataFlow PMP - PMBOK Version 5
PMBOK 5th Edition Mind map
PMBOK fifth edition data flow diagram by english
PMBOK® Guide 5th edition Processes Flow in English
PMBOK® Guide 5th edition Processes Flow in English - Simplified Version
Mapa procesos pmbok 5
Ad

Similar to MASTER_Trainer Notes_V5.2 (20)

PPT
Become a PMP
PDF
PMP Exam Prep (Pass the Exam in a Month!) - Orientation Seminar
PDF
PDF
PMP Course Outline
PPTX
About pmp certification
PDF
Project Management Professional (PMP)® exam preparation.pdf
PPTX
Qualify with flying colors in pmp exam with a proper study schedule
PPTX
BWB PMP pres to Non-Profit PMs 2013
PPSX
ABOUT PMP NEW FORMAT 2021
PPTX
Becoming a Certified PMP
PPTX
Guide To Passing PMI\'s PMP Exam
PPTX
Creating your frst online video course
PPT
PPTX
PMP Exam Preparation Workshop
PPTX
Free PMP Exam Q&A Webinar
PDF
Green pmp exam prep questions answers explanations 2013 edition by christophe...
PDF
Learn SAP BPC by Yourself
PPTX
Pte test
PPTX
PMP Exam Q&A
PPTX
Path to PMP
Become a PMP
PMP Exam Prep (Pass the Exam in a Month!) - Orientation Seminar
PMP Course Outline
About pmp certification
Project Management Professional (PMP)® exam preparation.pdf
Qualify with flying colors in pmp exam with a proper study schedule
BWB PMP pres to Non-Profit PMs 2013
ABOUT PMP NEW FORMAT 2021
Becoming a Certified PMP
Guide To Passing PMI\'s PMP Exam
Creating your frst online video course
PMP Exam Preparation Workshop
Free PMP Exam Q&A Webinar
Green pmp exam prep questions answers explanations 2013 edition by christophe...
Learn SAP BPC by Yourself
Pte test
PMP Exam Q&A
Path to PMP

More from Krishna Sujeer (20)

PPT
1-informatica-training
DOC
SAP REQRUITMENT NOTES03
PDF
KRISHNA NAYAKSujeer B.E(IT), MS(QM) , PGDCA,ITIL PMP,
PDF
KRISHNA NAYAKSujeer B.E(IT), MS(QM) , PGDCA,ITIL PMP,
DOC
KEYTAKEAWAYAS Krishna Nayak v2.0 Notes
PDF
Selenium.PDF
PPT
Recruitment_Process[1]
DOC
ETI_Krishna_Nayak_Sujeer
DOC
KRISHNA_NAYAK_Sujeer
PDF
itil2011foundation-allvolumes-signed-131020235516-phpapp01 (1)
PPT
Software testing strategies
PPT
Software Processes
PPT
Software Quality Management
PPT
Software Testing
DOC
Basic adminstration and configuration techniques
PPTX
LSI - PMP - Training material
DOC
SAP HCM CORE MODULES V1.0
PPTX
20410B_01
PPT
PPT
7_-_Inheritance
1-informatica-training
SAP REQRUITMENT NOTES03
KRISHNA NAYAKSujeer B.E(IT), MS(QM) , PGDCA,ITIL PMP,
KRISHNA NAYAKSujeer B.E(IT), MS(QM) , PGDCA,ITIL PMP,
KEYTAKEAWAYAS Krishna Nayak v2.0 Notes
Selenium.PDF
Recruitment_Process[1]
ETI_Krishna_Nayak_Sujeer
KRISHNA_NAYAK_Sujeer
itil2011foundation-allvolumes-signed-131020235516-phpapp01 (1)
Software testing strategies
Software Processes
Software Quality Management
Software Testing
Basic adminstration and configuration techniques
LSI - PMP - Training material
SAP HCM CORE MODULES V1.0
20410B_01
7_-_Inheritance

MASTER_Trainer Notes_V5.2