SlideShare a Scribd company logo
ibuyer.hk – software for raw material purchase
receiving dispatch BOM production. For factory
manufacturer workshop parts management.
documentation software textile software costing
software sampling software development software
invoicing system quality assurance software export
shipping software documentation software fiber
inventory software fabric costing software export
trading company software merchandising
management system apparel software clothing
factory software fabric mill inventory system cotton
mill costing software factory evaluation software AQL
inspection system sample & sourcing software
product development system yarn woven knit fabric
costing inventory software garment merchandising
system raw material resources planning system
software wholesaler inventory system order system
export trading shipping document system catalog
software trading invoice software stock management
software warehouse movement system garment
software for merchandiser production tracking
software export shipment system order management
Page 2 of 12
Welcome to the MaterialNet specific manual – this is a step by step illustration of using MaterialNet
- This is a specific instruction for MaterialNet V3.58 onward. For earlier version please refer to the old manual.
- For installation instruction, please refer to the separate installation guide.
- For the general instruction of our software, please refer to the ibuyer.hk general software manual.
- For the platform, database structure and design change of software, please refer to the technical manual
Table of content
01. Target user of MaterialNet. (p.03)
02. The design concept of MaterialNet. (p.03)
03. Parts – gather parts, accessories, trims & raw materials. (P.04)
04. BOM – bills of material modules. (p.04)
05. Purchase. (p.06)
06. Receiving. (p.07)
07. Dispatch. (p.08)
08. Adjustment. (p.09)
09. Re-order. (p.09)
10. Inventory report – item master (p.10)
11. Closing stock report. (p.11)
12. Workgroup user name and password. (p.12)
Page 3 of 12
Target user of MaterialNet
The MaterialNet aimed at manufacturer, ODM factory with product line, factory with own design end product, Workshop and
material procurement department. The MaterialNet is simply saying an inventory system for raw material management.
Design concept of MaterialNet
It manage the logistic, movement of raw material, trims, accessories and parts from the warehouse till dispatch to the workshop. The
workflow is;
1. Parts; gather the parts, accessories, trims and raw material information
2. BOM – Bills of Material; parts list required to produce an end product
3. Purchasing; purchase raw material, parts
4. Receiving; when supplier deliver parts to your warehouse
5. Dispatch; distribute the parts to workshop
6. Adjustment; record damages, lost, stolen, stock count or return items
7. Re-order; for procurement or purchasing department to issue re-orders
When you open the MaterialNet, you will see the dashboard.
It’s not only a dashboard, it also serve the purpose of the workflow for everyone to follow.
Please follow the workflows buttons, left to right, top to bottom to input, input & edit the information to the database.
Simply saying the workflows is parts, BOM, purchase, receiving, dispatch, adjustment and re-order
Page 4 of 12
Parts
Parts modules is used to gather all the parts, accessories, trims and raw material information from the supplier. Which can be re-used
in the rest of the MaterialNet modules. Suppose you have a watch glass parts for making a watch in your factory. You may ask all of
your supplier to quote a price to you and keep the detail information here. There is a price quote comparison report which pull out
all the parts with same item group or brand name for price compare. This could find out the cheapest supplier of the same parts and
help the purchasing department to get the best cost element.
BOM – Bills of Material Modules
This is the most important modules of MaterialNet.
It holds the BOM of all the end products of your factory and all the parts breakdown were listed on sub-table.
If your factory has 200 end products, then you have to create 200 BOM, those BOM sheet has all the parts that required to
reproduce it and listed on sub-table.
First fill in parts information and then create BOM by using the parts information.
User are supposed to use the BOM to control the dispatch, purchase of parts by the BOM modules.
There is 2 button to achieve this purpose;
1. Convert BOM to dispatch button
2. Convert BOM to purchase button
Please see below screenshot
Page 5 of 12
- Convert BOM to dispatch
For example, if the factory want to start the production of an end product, they can use the BOM modules to review the parts
inventory information before doing so. This could help the workshop and production department to know the where about of the
parts before making a go or no go decision.
If workshop is looking for JIS – a just in time production as their goal, this modules could be very helpful to them.
Once they have decided to start with the job order, they can simply click the convert current BOMID to dispatch button, then the
MaterialNet will convert the current BOM to a dispatch information with the dispatch parts and the dispatching quantity.
So that warehouse stock keeper can prepare the parts for production of the required job order.
In case of re-production of any end product, they just need to change the bulk quantity of the new job order, then the MaterialNet
Will re-calculate the parts required quantity according to the new bulk quantity. Such that it helps the production department to
oversee the full picture of the parts situation and if it has enough parts to start with. Before converting it to a dispatch record for the
warehouse stock keeper to arrange dispatching the relevant parts.
The status field will automatically check the warehouse inventory and see if the required quantity (parts) is good enough to carry out
the production of the new job order.
- Convert BOM to purchase
The purchasing officer, procurement officer or production manager can use this to review the inventory level of the parts
That required to start the production of a particular job order. First to determine whether the warehouse have sufficient parts to
finish the job order or replenishment is required. If it is insufficient, they can convert it to a purchase order.
Page 6 of 12
Purchase
You have to issue purchase order for parts, raw material and so your supplier will deliver it to your warehouse. (The item selection
will only show up on receiving & dispatch if it has created an ItemID with it) Click the purchase button and follow purchase form will
be opened.
There is three way to create a purchase order
- Add a new purchase order and fill in the part directly. (by the select & insert button on right end)
- Convert from the BOM modules. (by the convert button on right side)
- Convert from the re-Order modules. (by the convert button on right top)
After you have fill in or convert a purchase information, may print preview the purchase order or comparison report by the right
hand side pull down list. Another receiving & pending history list will show you the actual receiving quality and outstanding quantity
of the current purchase order by clicking it.
Please be reminded that a parts must be created in the purchase form (with an ItemID No.) in order to show up in the selection pull
down-list of the receiving, dispatch and adjustment form sub-table.
If you are using the MaterialNet at the very beginning, you need to prepare an opening stock for the existing warehouse item. This
can be done by creating a purchase record with all the existing parts and then convert it to a receiving record. Pretended that the
existing items all went through a purchase and receiving. As a result, all the existing items will have a valid inventory record in the
MaterialNet system.
Page 7 of 12
Receiving
When a supplier deliver goods to your warehouse, stock keeper will process stock in (receiving) procedure. By that time, they need to
fill in records of receiving. When you open the receiving form, you will see following screen.
Stock keeper may create a receiving record by
- Add a new receiving and fill in the stock in part directly. (by the select & insert button on right end)
- Convert from the purchase modules. (by the convert button on right side)
Once selected & inserted, you have to fill in the rest details;
- storage location
- Spec.; specification of the goods, color, size, weight, volume, lot, shade, EAN#, IMIE# and etc.
- package description
- Quantity; quantity of the stock in goods
- Expiry date; expiry date of the goods
- No of case; total case number, carton box, packs, pallets description.
Page 8 of 12
Dispatch
When the production department wanted to start a job order and move parts to workshop for production.
Production department may create a dispatch record by
- Add a new dispatch and fill in the stock out part directly. (by the select & insert button on right end)
- Convert from the BOM modules. (by the convert button on right side)
Converting a dispatch from the BOM modules is strongly recommended. As the production department can review the inventory
situation before converting and they had a better idea of which parts are good enough or insufficient. Such that they can arrange
purchase of the insufficient parts right away.
After creating a dispatch, the stock keep can arrange a dispatch of the parts to workshop ready for production by the pick list.
Page 9 of 12
Adjustment
From time to time, the stock keeper need to do some adjustment on the warehouse record. This could be missing, stolen, damage,
broken goods, return, on hold, malfunction of the parts after stock taking.
Stock keeper may use this adjustment form to fill in and record these parts into the database
Re-Order
The procurement or purchasing department may issue re-orders easily by this. It has a list of all the parts and list out both the
leftover quantity and pending quantity (outstanding, non-delivering parts) current inventory position.
The purchasing officer may use the filter to sort out parts by their group natures. Either by description, item group, brand name,
leftover quantity or supplier code. After reviewing the inventory position, convert the whole group to a purchase record by the
convert button.
Page 10 of 12
Inventory report – item master
The item master will display a summary of an item one by one. With all the inventory reports help you to get leftover, storage,
movement, closing stock, low level and current item stock in / stock out summary.
The item master shows all the parts that you purchased and show up one by one. With the most recent record being shown on top
together with leftover quantity, stock-in and stock-out summary. So that management can see every single item in one screen, you
can navigate record to see the rest parts inventory. The item master is a read only panel, user is not supposed to carry out any input
or edit of the inventory information in this form. It’s only a read only module to show you a summary of every item inside your
warehouse with receiving & deliveries detail. Stock keeper can use this panel to find, search for any item or group of items.
Management can have overall reports of the inventory leftover in real time with the help of this item master.
Page 11 of 12
Closing stock report
In the year end, the accounts department needs to perform an audit on the value of the leftover inventory. The old fashion way is to
carry out a stock taking for the entire warehouse, this is very labor intensive and time consuming. However, you may print this
closing stock report to list out the total leftover quantity and the total value. The closing stock report will be grouped by currency
with the total value. Make it easier for both stock keeper and accounts.
The auditor may also ask for a certain parts movement in the warehouse within a certain period. To find out this item movement
between the particular period would be very time consuming or even impossible. But we have a movement and closing stock report
between a data range could help solve this problem.
Page 12 of 12
Workgroup user name and password
Our database software by nature is being used by multiple user over a company network in order to get the most benefit of its
information sharing purpose, thus a structural database is very powerful for business operation. On top of sharing data beyond
merchandisers, user right control is also important to limit individual staff to access any sensitive information. In this connection, we
have designed our database software with build-in user right workgroup to achieve this goal. Listed below is the build-in user name,
password and their right.
By default, all users password is 123 for all logon names.
User name password right
Ibuyer.hk 6691144911 project designer
VP 123 admin
CEO 123 admin
Boss 123 admin
GM 123 all data user
MM 123 all data user
ReadOnly 123 read only
AddOnly 123 add data only
EditOnly 123 edits data only
Purchaser 123 purchasing modules
Purchaser01 123 purchasing modules
Purchaser02 123 purchasing modules
Purchaser03 123 purchasing modules
Purchaser04 123 purchasing modules
Sales 123 sales modules
Sales01 123 sales modules
Sales02 123 sales modules
Sales03 123 sales modules
Sales04 123 sales modules
Keeper 123 stock modules
Keeper01 123 stock modules
Keeper02 123 stock modules
Keeper03 123 stock modules
Keeper04 123 stock modules
Shipping 123 shipping modules
Shipping01 123 shipping modules
Shipping02 123 shipping modules
Shipping03 123 shipping modules
Shipping04 123 shipping modules

More Related Content

PDF
Oracle R12 SCM Functional Interview Questions - Order Management,
PDF
Scm660 handling-unit-management
PDF
Co product costing master data
DOCX
Sap mrp-configuration-pp
PDF
Stock transfer between_plant_usingdeliveryorder
PPTX
SAP Product costing Calculation With Components - Skillstek
PPTX
Oracle R12 Work In Process
PPTX
Introduction to Bill Of Materials
Oracle R12 SCM Functional Interview Questions - Order Management,
Scm660 handling-unit-management
Co product costing master data
Sap mrp-configuration-pp
Stock transfer between_plant_usingdeliveryorder
SAP Product costing Calculation With Components - Skillstek
Oracle R12 Work In Process
Introduction to Bill Of Materials

What's hot (20)

PDF
Bn1010 demo ppt sap pp
PPTX
Sap sd org
PPTX
SAP Innovations:Are you overlooking important functionality in SAP Controlling
PPT
Stock requirements list md04
DOC
SAP PP End User Document - www.sapdocs.info
DOCX
Oracle Process Manufacturing Setup EBS12.2
DOC
SAP MM SD INTEGRATION WITH FICO
PDF
20150202.pdf
PDF
62729459 sap-mm-master-data
PPT
Oracle Shop Floor Management R12
PPTX
Product costing ppt
PPTX
Oracle process manufacturing training
PPTX
Sap pp org
PDF
Oracle WIP – Supply Types:
PDF
Inventory counting using Dynamics AX
PDF
Sample sap mm pp course material
DOC
Ckm3 material price analysis
PDF
Bill of Material Federation
DOCX
SAP MM Standard Business Processes
PDF
SAP STO config
Bn1010 demo ppt sap pp
Sap sd org
SAP Innovations:Are you overlooking important functionality in SAP Controlling
Stock requirements list md04
SAP PP End User Document - www.sapdocs.info
Oracle Process Manufacturing Setup EBS12.2
SAP MM SD INTEGRATION WITH FICO
20150202.pdf
62729459 sap-mm-master-data
Oracle Shop Floor Management R12
Product costing ppt
Oracle process manufacturing training
Sap pp org
Oracle WIP – Supply Types:
Inventory counting using Dynamics AX
Sample sap mm pp course material
Ckm3 material price analysis
Bill of Material Federation
SAP MM Standard Business Processes
SAP STO config
Ad

Similar to Materialnet specific user manual (20)

PPT
IIG's Process Manufacturing Solution for Sage 100
PDF
Generic concept of erp
PPTX
ERP 101: Work Orders - The Starting Points of Manufacturing
PPTX
SAP Material management overview and configuration ppt
PDF
Warehousenet specific
PPTX
ERP 101 Series: Engineering Basics - The Importance of Part Master Records an...
PDF
MerchanNet specific user manual
PDF
WholesaleNet specific user manual
PPTX
ERP 101: MRP - Step through an overview of this vital ERP subset
PPT
An exclusive ERP solution for Project Industry
PPT
Eresource nfra erp
PPTX
ERP 101: Procurement - Link Your Vendors and Purchase Part via ERP
PDF
Dynamic 365 business central guild on material request and shipment
PPTX
Lect 3_Procurement of Raw materials & MRP.pptx
DOCX
Complete step by step guide to odoo manufacturing
DOCX
SAP MM Essential Master Data
PPSX
Microsoft Dynamics AX 2009 WMS on handheld device
PDF
TS421_1 Col26 SAP S/4HANA Production Planning & Manufacturing, Academy Part I...
IIG's Process Manufacturing Solution for Sage 100
Generic concept of erp
ERP 101: Work Orders - The Starting Points of Manufacturing
SAP Material management overview and configuration ppt
Warehousenet specific
ERP 101 Series: Engineering Basics - The Importance of Part Master Records an...
MerchanNet specific user manual
WholesaleNet specific user manual
ERP 101: MRP - Step through an overview of this vital ERP subset
An exclusive ERP solution for Project Industry
Eresource nfra erp
ERP 101: Procurement - Link Your Vendors and Purchase Part via ERP
Dynamic 365 business central guild on material request and shipment
Lect 3_Procurement of Raw materials & MRP.pptx
Complete step by step guide to odoo manufacturing
SAP MM Essential Master Data
Microsoft Dynamics AX 2009 WMS on handheld device
TS421_1 Col26 SAP S/4HANA Production Planning & Manufacturing, Academy Part I...
Ad

Recently uploaded (20)

PDF
Navsoft: AI-Powered Business Solutions & Custom Software Development
PDF
Internet Downloader Manager (IDM) Crack 6.42 Build 42 Updates Latest 2025
PPTX
Patient Appointment Booking in Odoo with online payment
PDF
AutoCAD Professional Crack 2025 With License Key
PDF
AI-Powered Threat Modeling: The Future of Cybersecurity by Arun Kumar Elengov...
PDF
Odoo Companies in India – Driving Business Transformation.pdf
PPTX
Reimagine Home Health with the Power of Agentic AI​
PDF
Designing Intelligence for the Shop Floor.pdf
PDF
Internet Downloader Manager (IDM) Crack 6.42 Build 41
PDF
iTop VPN Crack Latest Version Full Key 2025
PPTX
Computer Software and OS of computer science of grade 11.pptx
PPTX
history of c programming in notes for students .pptx
PPTX
CHAPTER 2 - PM Management and IT Context
PDF
Adobe Illustrator 28.6 Crack My Vision of Vector Design
PDF
17 Powerful Integrations Your Next-Gen MLM Software Needs
DOCX
Greta — No-Code AI for Building Full-Stack Web & Mobile Apps
PPTX
Monitoring Stack: Grafana, Loki & Promtail
PPTX
Embracing Complexity in Serverless! GOTO Serverless Bengaluru
PDF
wealthsignaloriginal-com-DS-text-... (1).pdf
PPTX
Weekly report ppt - harsh dattuprasad patel.pptx
Navsoft: AI-Powered Business Solutions & Custom Software Development
Internet Downloader Manager (IDM) Crack 6.42 Build 42 Updates Latest 2025
Patient Appointment Booking in Odoo with online payment
AutoCAD Professional Crack 2025 With License Key
AI-Powered Threat Modeling: The Future of Cybersecurity by Arun Kumar Elengov...
Odoo Companies in India – Driving Business Transformation.pdf
Reimagine Home Health with the Power of Agentic AI​
Designing Intelligence for the Shop Floor.pdf
Internet Downloader Manager (IDM) Crack 6.42 Build 41
iTop VPN Crack Latest Version Full Key 2025
Computer Software and OS of computer science of grade 11.pptx
history of c programming in notes for students .pptx
CHAPTER 2 - PM Management and IT Context
Adobe Illustrator 28.6 Crack My Vision of Vector Design
17 Powerful Integrations Your Next-Gen MLM Software Needs
Greta — No-Code AI for Building Full-Stack Web & Mobile Apps
Monitoring Stack: Grafana, Loki & Promtail
Embracing Complexity in Serverless! GOTO Serverless Bengaluru
wealthsignaloriginal-com-DS-text-... (1).pdf
Weekly report ppt - harsh dattuprasad patel.pptx

Materialnet specific user manual

  • 1. ibuyer.hk – software for raw material purchase receiving dispatch BOM production. For factory manufacturer workshop parts management. documentation software textile software costing software sampling software development software invoicing system quality assurance software export shipping software documentation software fiber inventory software fabric costing software export trading company software merchandising management system apparel software clothing factory software fabric mill inventory system cotton mill costing software factory evaluation software AQL inspection system sample & sourcing software product development system yarn woven knit fabric costing inventory software garment merchandising system raw material resources planning system software wholesaler inventory system order system export trading shipping document system catalog software trading invoice software stock management software warehouse movement system garment software for merchandiser production tracking software export shipment system order management
  • 2. Page 2 of 12 Welcome to the MaterialNet specific manual – this is a step by step illustration of using MaterialNet - This is a specific instruction for MaterialNet V3.58 onward. For earlier version please refer to the old manual. - For installation instruction, please refer to the separate installation guide. - For the general instruction of our software, please refer to the ibuyer.hk general software manual. - For the platform, database structure and design change of software, please refer to the technical manual Table of content 01. Target user of MaterialNet. (p.03) 02. The design concept of MaterialNet. (p.03) 03. Parts – gather parts, accessories, trims & raw materials. (P.04) 04. BOM – bills of material modules. (p.04) 05. Purchase. (p.06) 06. Receiving. (p.07) 07. Dispatch. (p.08) 08. Adjustment. (p.09) 09. Re-order. (p.09) 10. Inventory report – item master (p.10) 11. Closing stock report. (p.11) 12. Workgroup user name and password. (p.12)
  • 3. Page 3 of 12 Target user of MaterialNet The MaterialNet aimed at manufacturer, ODM factory with product line, factory with own design end product, Workshop and material procurement department. The MaterialNet is simply saying an inventory system for raw material management. Design concept of MaterialNet It manage the logistic, movement of raw material, trims, accessories and parts from the warehouse till dispatch to the workshop. The workflow is; 1. Parts; gather the parts, accessories, trims and raw material information 2. BOM – Bills of Material; parts list required to produce an end product 3. Purchasing; purchase raw material, parts 4. Receiving; when supplier deliver parts to your warehouse 5. Dispatch; distribute the parts to workshop 6. Adjustment; record damages, lost, stolen, stock count or return items 7. Re-order; for procurement or purchasing department to issue re-orders When you open the MaterialNet, you will see the dashboard. It’s not only a dashboard, it also serve the purpose of the workflow for everyone to follow. Please follow the workflows buttons, left to right, top to bottom to input, input & edit the information to the database. Simply saying the workflows is parts, BOM, purchase, receiving, dispatch, adjustment and re-order
  • 4. Page 4 of 12 Parts Parts modules is used to gather all the parts, accessories, trims and raw material information from the supplier. Which can be re-used in the rest of the MaterialNet modules. Suppose you have a watch glass parts for making a watch in your factory. You may ask all of your supplier to quote a price to you and keep the detail information here. There is a price quote comparison report which pull out all the parts with same item group or brand name for price compare. This could find out the cheapest supplier of the same parts and help the purchasing department to get the best cost element. BOM – Bills of Material Modules This is the most important modules of MaterialNet. It holds the BOM of all the end products of your factory and all the parts breakdown were listed on sub-table. If your factory has 200 end products, then you have to create 200 BOM, those BOM sheet has all the parts that required to reproduce it and listed on sub-table. First fill in parts information and then create BOM by using the parts information. User are supposed to use the BOM to control the dispatch, purchase of parts by the BOM modules. There is 2 button to achieve this purpose; 1. Convert BOM to dispatch button 2. Convert BOM to purchase button Please see below screenshot
  • 5. Page 5 of 12 - Convert BOM to dispatch For example, if the factory want to start the production of an end product, they can use the BOM modules to review the parts inventory information before doing so. This could help the workshop and production department to know the where about of the parts before making a go or no go decision. If workshop is looking for JIS – a just in time production as their goal, this modules could be very helpful to them. Once they have decided to start with the job order, they can simply click the convert current BOMID to dispatch button, then the MaterialNet will convert the current BOM to a dispatch information with the dispatch parts and the dispatching quantity. So that warehouse stock keeper can prepare the parts for production of the required job order. In case of re-production of any end product, they just need to change the bulk quantity of the new job order, then the MaterialNet Will re-calculate the parts required quantity according to the new bulk quantity. Such that it helps the production department to oversee the full picture of the parts situation and if it has enough parts to start with. Before converting it to a dispatch record for the warehouse stock keeper to arrange dispatching the relevant parts. The status field will automatically check the warehouse inventory and see if the required quantity (parts) is good enough to carry out the production of the new job order. - Convert BOM to purchase The purchasing officer, procurement officer or production manager can use this to review the inventory level of the parts That required to start the production of a particular job order. First to determine whether the warehouse have sufficient parts to finish the job order or replenishment is required. If it is insufficient, they can convert it to a purchase order.
  • 6. Page 6 of 12 Purchase You have to issue purchase order for parts, raw material and so your supplier will deliver it to your warehouse. (The item selection will only show up on receiving & dispatch if it has created an ItemID with it) Click the purchase button and follow purchase form will be opened. There is three way to create a purchase order - Add a new purchase order and fill in the part directly. (by the select & insert button on right end) - Convert from the BOM modules. (by the convert button on right side) - Convert from the re-Order modules. (by the convert button on right top) After you have fill in or convert a purchase information, may print preview the purchase order or comparison report by the right hand side pull down list. Another receiving & pending history list will show you the actual receiving quality and outstanding quantity of the current purchase order by clicking it. Please be reminded that a parts must be created in the purchase form (with an ItemID No.) in order to show up in the selection pull down-list of the receiving, dispatch and adjustment form sub-table. If you are using the MaterialNet at the very beginning, you need to prepare an opening stock for the existing warehouse item. This can be done by creating a purchase record with all the existing parts and then convert it to a receiving record. Pretended that the existing items all went through a purchase and receiving. As a result, all the existing items will have a valid inventory record in the MaterialNet system.
  • 7. Page 7 of 12 Receiving When a supplier deliver goods to your warehouse, stock keeper will process stock in (receiving) procedure. By that time, they need to fill in records of receiving. When you open the receiving form, you will see following screen. Stock keeper may create a receiving record by - Add a new receiving and fill in the stock in part directly. (by the select & insert button on right end) - Convert from the purchase modules. (by the convert button on right side) Once selected & inserted, you have to fill in the rest details; - storage location - Spec.; specification of the goods, color, size, weight, volume, lot, shade, EAN#, IMIE# and etc. - package description - Quantity; quantity of the stock in goods - Expiry date; expiry date of the goods - No of case; total case number, carton box, packs, pallets description.
  • 8. Page 8 of 12 Dispatch When the production department wanted to start a job order and move parts to workshop for production. Production department may create a dispatch record by - Add a new dispatch and fill in the stock out part directly. (by the select & insert button on right end) - Convert from the BOM modules. (by the convert button on right side) Converting a dispatch from the BOM modules is strongly recommended. As the production department can review the inventory situation before converting and they had a better idea of which parts are good enough or insufficient. Such that they can arrange purchase of the insufficient parts right away. After creating a dispatch, the stock keep can arrange a dispatch of the parts to workshop ready for production by the pick list.
  • 9. Page 9 of 12 Adjustment From time to time, the stock keeper need to do some adjustment on the warehouse record. This could be missing, stolen, damage, broken goods, return, on hold, malfunction of the parts after stock taking. Stock keeper may use this adjustment form to fill in and record these parts into the database Re-Order The procurement or purchasing department may issue re-orders easily by this. It has a list of all the parts and list out both the leftover quantity and pending quantity (outstanding, non-delivering parts) current inventory position. The purchasing officer may use the filter to sort out parts by their group natures. Either by description, item group, brand name, leftover quantity or supplier code. After reviewing the inventory position, convert the whole group to a purchase record by the convert button.
  • 10. Page 10 of 12 Inventory report – item master The item master will display a summary of an item one by one. With all the inventory reports help you to get leftover, storage, movement, closing stock, low level and current item stock in / stock out summary. The item master shows all the parts that you purchased and show up one by one. With the most recent record being shown on top together with leftover quantity, stock-in and stock-out summary. So that management can see every single item in one screen, you can navigate record to see the rest parts inventory. The item master is a read only panel, user is not supposed to carry out any input or edit of the inventory information in this form. It’s only a read only module to show you a summary of every item inside your warehouse with receiving & deliveries detail. Stock keeper can use this panel to find, search for any item or group of items. Management can have overall reports of the inventory leftover in real time with the help of this item master.
  • 11. Page 11 of 12 Closing stock report In the year end, the accounts department needs to perform an audit on the value of the leftover inventory. The old fashion way is to carry out a stock taking for the entire warehouse, this is very labor intensive and time consuming. However, you may print this closing stock report to list out the total leftover quantity and the total value. The closing stock report will be grouped by currency with the total value. Make it easier for both stock keeper and accounts. The auditor may also ask for a certain parts movement in the warehouse within a certain period. To find out this item movement between the particular period would be very time consuming or even impossible. But we have a movement and closing stock report between a data range could help solve this problem.
  • 12. Page 12 of 12 Workgroup user name and password Our database software by nature is being used by multiple user over a company network in order to get the most benefit of its information sharing purpose, thus a structural database is very powerful for business operation. On top of sharing data beyond merchandisers, user right control is also important to limit individual staff to access any sensitive information. In this connection, we have designed our database software with build-in user right workgroup to achieve this goal. Listed below is the build-in user name, password and their right. By default, all users password is 123 for all logon names. User name password right Ibuyer.hk 6691144911 project designer VP 123 admin CEO 123 admin Boss 123 admin GM 123 all data user MM 123 all data user ReadOnly 123 read only AddOnly 123 add data only EditOnly 123 edits data only Purchaser 123 purchasing modules Purchaser01 123 purchasing modules Purchaser02 123 purchasing modules Purchaser03 123 purchasing modules Purchaser04 123 purchasing modules Sales 123 sales modules Sales01 123 sales modules Sales02 123 sales modules Sales03 123 sales modules Sales04 123 sales modules Keeper 123 stock modules Keeper01 123 stock modules Keeper02 123 stock modules Keeper03 123 stock modules Keeper04 123 stock modules Shipping 123 shipping modules Shipping01 123 shipping modules Shipping02 123 shipping modules Shipping03 123 shipping modules Shipping04 123 shipping modules