Design and
Manufacturing
Mechanical Assignment Help
Visit:
www.matlabassignmentexperts.com
Mail:
info@matlabassignmentexperts.com
Problem 1: What are the design considerations in replacing a metal container for
carbonated beverages with plastic bottles? Think about the functional requirements
and explain how the design of a plastic container differs from that of a metal can.
Solution : While the functional requirements, naturally, are almost the same for
metal and plastic containers (remember: functional requirements are “what you
want” and solution neutral), the design parameters to fulfill the functional
requirements may differ. In particular the following differences can be stated:
o Since plastic is a cheap material and less dense than metal, the urge for a
material saving design is not as strong as when using aluminum.
o Special attention has to be paid to the permeability of plastic. In order to conserve
the gas for a long period of time (less than 15% loss in 120 days, from the lecture),
a special processing with low permeability plastic is necessary.
o Plastic is not as strong as metal. The wall thickness can be increased, small
corrugation or, better, a wavy structure (like small coke bottles) can be used. The
bottom is usually thick to provide rigidity and a save stand.
o Because plastic is easier to form into complicated shapes than cans, it became
more feasible to make them more aesthetically and ergonomically pleasing; hence,
soda in bottles again, but now with grippy sides. Also scaling up the size is feasible.
o In principle, plastic didn’t eat that much of Al cans, but replaced most of the glass
bottles.
Problem 2: Consider the injection molded L-bracket made of Polycarbonate shown in
Figure 1. You are asked to find the mold design with the parting line that leads to the
minimum possible clamping force to mold the part.
a) What would be the minimum clamping force required for this part? Indicate the
location of gate and the location of parting line/plane for the minimum clamping force
design. Assume that the peak injection pressure is 6,000 psi. Also discuss the
potential problems in producing the part with this design.
b) You soon realize that the minimum clamping force is not as important as the quality
of the part and productivity of the process (as long as the machine has enough
clamping force). i) What would be a better position of the parting line/plane and gate
and direction of injection molding? Why? ii) What is the clamping force required for
Solution a) The minimum cross-sectional area projected on the parting plane A will
require the minimum clamping force.
Amin=62 -52 =11mm2
Fmin=PxAmin=6000 x 11/(25.4) 2 =102.3 lbs=0.05 ton
However, this parting line is not a good choice due to the following potential
problems.
Potential Problems
a) The hole on the vertical wall from the parting plane needs a sliding core, which
makes it costly in mold machining and injection molding operations.
b) High aspect ratio deep groove machining on the cavity plate is needed, which
may require the use of very expensive machines, like: EDM (Electro Discharge
Machining) machine. If you move the parting line along the z-axis, you need to
machine both the cavity plate and core plate, which is also costly.
c) High aspect ratio and little/no draft angle in vertical (or injection) direction will
make it very difficult to eject the molded part.
Solution b) Normally, the clamping capacity of injection molding machines is over
10 tons and the magnitude of it is not an important parameter with few
exceptions. Mold design for better quality of parts and lower cost process is much
more important than the minimum clamping force. When you choose a parting
line or plane, the direction of injection is of more importance, in general.
i) Parting plane B and C are much better choices than plane A, with a gate location
ii) The injection direction normal to the parting plane B/C does not require any sliding
core to form the whole feature at the bottom. Also, slight draft angle can be given to the
side of cavity, with a conventional milling machine. With the gate position marked in the
figure, a weld line will be formed across the hole from the gate. Since the weld line is
formed while the melt temperature is still hot, quite strong weld line will be formed and
remain as strong as the bulk.
iii) Projected area on the plane B=6x10 – 3.14(1.5)2 = 52.9 mm2 (it´s the same for C),
Clamping force is F=6000 x 52.9/(25.4)2 = 492 lbs = 0.5 ton
Problem 3: The following pictures show one half of an injection molded housing. With
the basic design rules for injection molding in mind, is this a good design? Explain
why/why not and suggest any improvements you might want to make. If you would like
to, you can make a sketch to explain your thoughts.
Solution:
Injection Molding Design Guidelines
Much has been written regarding design guidelines for injection molding. Yet, the
design guidelines can be summed up in just a few design rules.
• Use uniform wall thicknesses throughout the part. This will minimize sinking,
warping, residual stresses, and improve mold fill and cycle times.
• Use generous radius at all corners. The inside corner radius should be a minimum
of one material thickness.
• Use the least thickness compliant with the process, material, or product design
requirements. Using the least wall thickness for the process ensures rapid cooling,
short cycle times, and minimum shot weight. All these result in the least possible part
cost.
• Design parts to facilitate easy withdrawal from the mold by providing draft (taper) in
the direction of mold opening or closing.
• Use ribs or gussets to improve part stiffness in bending. This avoids the use of
thick section to achieve the same, thereby saving on part weight, material costs, and
cycle time costs.
For the case of figure 2/3, the points to note are the radii (missing!) and thickness
(not uniform!). Also, on closer inspection a draft angle is missing.
a) Radii
o Sharp corners greatly increase the stress concentration. This high amount of
stress concentration can often lead to failure of plastic parts.
o Sharp corners can come about in non-obvious places. Examples of this are a
boss attached to a surface, or a strengthening rib. These corners need to be
radiused just like all other corners. The stress concentration factor varies with
radius, for a given thickness.
o In addition to reducing stresses, fillet radiuses provide streamlined flow paths for
the molten plastic resulting in easier fills.
b) Thickness
o Parts should have a uniform wall thickness. Thick sections cool slower than thin
sections. The thin section first solidifies, and the thick section is still not fully
solidified. As the thick section cools, it shrinks and the material for the shrinkage
comes only from the unsolidified areas, which are connected, to the already
solidified thin section.
o Parts should be designed with a minimum wall thickness consistent with part
function and mold filling considerations. The thinner the wall the faster the part
cools, and the cycle times are short, resulting in the lowest possible part costs.
o Also, thinner parts weight less, which results in smaller amounts of the plastic
used per part which also results in lower part costs.
o This builds stresses near the boundary of the thin section to thick section. Since
c) Draft angle
o Drafts (or taper) in a mold, facilitates part removal from the mold. The amount of
draft angle depends on the depth of the part in the mold, and its required end use
function.
o The draft is in the offset angle in a direction parallel to the mold opening and
closing.
Problem 4: You are going to make tools for your Yo-Yo in two weeks. You should
define your functional requirements first before you seek design parameters,
which meet the requirements. Please define the functional requirements of your
own Yo-Yo and try to find design parameters that fulfill those requirements. Show
the mapping process in between “What” and “How” at the top two levels. This is
not a single solution problem. In the world of design, you, as a designer, have all
the power to explore any possible design (at least until it is proven to be a poor
one). Feel free to sketch your design on a piece of paper.
Solution : This is a progressive type problem you will find your own solution during
the course of 2.008 laboratory sessions. Discuss you design with your lab group
members before the lab session IV and try to synthesize a better design solution
for your group’s Yo-Yo.
The following paragraph gives an overview of how your functional requirements,
manufacturing restrictions and design parameters might look like.
o FR3: pass drop test could be another FR for your Yo-Yo
o Remember that the functional requirements are the WHAT you want the yo-yo to
accomplish. “Has a radio tracking device embedded in it” is a design parameter; “
Is easy to find” would be the functional requirement.
Design parameters (DP)
o Top level To meet FR1, you need to have a DP1: the device should look like a Yo-
Yo (a rounded mass around the rim to transform potential energy to rotational
energy, and vice versa). If you have additional FR, for example “FR2: Easy to
find”, you need to find a solution to meet the FR2 such as, DP2: Embedded radio
tracking device. DP3 for FR3 could be a rigid design with no thin parts sticking
out.
Since you are supposed to make your product with the processes available at the
shop, we need to think
about the mapping process between DP domain and Process Domain.
o 2nd level To meet DP1 in the process domain, PV1 should be moldability of your
DP1. PV2 may be the possibility to integrate the radio device into your Yo-Yo.
Since we don’t have a detailed design yet, we cannot go further down at this
process domain and need to go back to the FR domain one level down (zig-
zagging).
For a given DP1 and PV1, FR1 needs to be further broken down to fulfill what you
want. You may need
etc. (These may differ for each designer.) FR31 might be that the Yo-Yo doesn´t fall
apart when dropped
by a certain distance, FR 32 that it doesn´t break when dropped.
DP11 may be the cross sectional shape of the Yo-Yo. DP12: Gap for string (about 1.5
of the string
diameter.), DP13: Outer dimension of Yo-Yo. (look, this will be constrained by the
machine and mold
size, when you map this one to the process domain.) DP14: Kind of plastic material or
non-sharp edges.
When you map between DP’s to PV’s, the design for injection molding needs to be
considered, such as;
thinnest possible uniform thickness, etc. DP31 can be the overlapping of the different
parts, DP32 the
wall thickness or the inclusion of ribs.
If you have FR2 in your design, you then need to map between FR2 and DP2 by
defining children of FR2
for a chosen DP2.

More Related Content

PPTX
Design and Manufacturing Homework Help
PDF
A Simulation Study on Warpage Analysis of Injection Moulded Plastic Part
PDF
Engineering Guidelines to Designing Plastic Parts for Injection Molding
PPT
Automotive plasticssss product design.ppt
PPT
Quality tool for education purpose for students
PPTX
4571 Mold Design.vvvvvvvvvvvvvvvvvvvvvvvvvvvvpptx
PDF
How to design injection molding product?
PDF
A Review of FDM Based Parts to Act as Rapid Tooling
Design and Manufacturing Homework Help
A Simulation Study on Warpage Analysis of Injection Moulded Plastic Part
Engineering Guidelines to Designing Plastic Parts for Injection Molding
Automotive plasticssss product design.ppt
Quality tool for education purpose for students
4571 Mold Design.vvvvvvvvvvvvvvvvvvvvvvvvvvvvpptx
How to design injection molding product?
A Review of FDM Based Parts to Act as Rapid Tooling

Similar to Mechanical Assignment Help (20)

PDF
101070670 6-exercises-solutions-2009
PDF
Design & Development of Injection Mold Using Flow Analysis and Higher End Des...
PDF
IRJET- Design of Spoon Mold using Flow Analysis and Higher End Design Software
PDF
Mt2421032111
PDF
Project Report File of Mouldflow Analysis
PDF
Paper id 25201416
PPTX
Plastic component design for manufacturability
PDF
Moldflow Insight 2011 Detail Brochure Us
PDF
A Review of FDM Based Parts to Act as Rapid Tooling
PDF
Influence of feeding system in injection moulding for
PDF
Influence of feeding system in injection moulding for lower washer of a bearing
PDF
moldflow/moldex software objective questions
PDF
IRJET- Simulation for Optimum Gate Location in Plastic Injection Moulding for...
PDF
Lean Strategies For Injection Molding 3 Hour E Learning
PDF
ManufacturingInducedDistortion_Composites
PDF
PDF
Dg mf mold components
PDF
IRJET- Simulation and Analysis of Step Light Mid Part using Mold Flow Analysis
PDF
Injection Molding Design Guide
PPT
3 plastics
101070670 6-exercises-solutions-2009
Design & Development of Injection Mold Using Flow Analysis and Higher End Des...
IRJET- Design of Spoon Mold using Flow Analysis and Higher End Design Software
Mt2421032111
Project Report File of Mouldflow Analysis
Paper id 25201416
Plastic component design for manufacturability
Moldflow Insight 2011 Detail Brochure Us
A Review of FDM Based Parts to Act as Rapid Tooling
Influence of feeding system in injection moulding for
Influence of feeding system in injection moulding for lower washer of a bearing
moldflow/moldex software objective questions
IRJET- Simulation for Optimum Gate Location in Plastic Injection Moulding for...
Lean Strategies For Injection Molding 3 Hour E Learning
ManufacturingInducedDistortion_Composites
Dg mf mold components
IRJET- Simulation and Analysis of Step Light Mid Part using Mold Flow Analysis
Injection Molding Design Guide
3 plastics
Ad

More from Matlab Assignment Experts (20)

PPTX
Digital Communication Through Biorthogonal Codes: A MATLAB Assignment Solution
PPTX
Solution to MATLAB Assignment on Signals and Systems
PPTX
🚀 Need Expert MATLAB Assignment Help? Look No Further! 📊
PPTX
Matlab Assignment Help
PPTX
Matlab Assignment Help
PPTX
Matlab Assignment Help
PPTX
MAtlab Assignment Help
PPTX
Matlab Assignment Help
PPTX
Matlab Assignment Help
PPTX
Matlab Homework Help
PPTX
MATLAB Assignment Help
PPTX
Matlab Homework Help
PPTX
Matlab Assignment Help
PPTX
Computer vision (Matlab)
PPTX
Online Matlab Assignment Help
PPTX
Modelling & Simulation Assignment Help
PPTX
CURVE FITING ASSIGNMENT HELP
PPTX
Digital Image Processing Assignment Help
PPTX
Signals and Systems Assignment Help
PPTX
Signal Processing Assignment Help
Digital Communication Through Biorthogonal Codes: A MATLAB Assignment Solution
Solution to MATLAB Assignment on Signals and Systems
🚀 Need Expert MATLAB Assignment Help? Look No Further! 📊
Matlab Assignment Help
Matlab Assignment Help
Matlab Assignment Help
MAtlab Assignment Help
Matlab Assignment Help
Matlab Assignment Help
Matlab Homework Help
MATLAB Assignment Help
Matlab Homework Help
Matlab Assignment Help
Computer vision (Matlab)
Online Matlab Assignment Help
Modelling & Simulation Assignment Help
CURVE FITING ASSIGNMENT HELP
Digital Image Processing Assignment Help
Signals and Systems Assignment Help
Signal Processing Assignment Help
Ad

Recently uploaded (20)

PDF
Uderstanding digital marketing and marketing stratergie for engaging the digi...
PDF
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
DOCX
Cambridge-Practice-Tests-for-IELTS-12.docx
PDF
Paper A Mock Exam 9_ Attempt review.pdf.
PDF
IGGE1 Understanding the Self1234567891011
PDF
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
PDF
International_Financial_Reporting_Standa.pdf
PPTX
202450812 BayCHI UCSC-SV 20250812 v17.pptx
PDF
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
PPTX
Share_Module_2_Power_conflict_and_negotiation.pptx
PDF
Vision Prelims GS PYQ Analysis 2011-2022 www.upscpdf.com.pdf
PDF
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 1)
PPTX
Virtual and Augmented Reality in Current Scenario
PPTX
Computer Architecture Input Output Memory.pptx
PDF
My India Quiz Book_20210205121199924.pdf
PDF
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
PPTX
TNA_Presentation-1-Final(SAVE)) (1).pptx
PDF
FORM 1 BIOLOGY MIND MAPS and their schemes
PDF
Practical Manual AGRO-233 Principles and Practices of Natural Farming
PDF
Chinmaya Tiranga quiz Grand Finale.pdf
Uderstanding digital marketing and marketing stratergie for engaging the digi...
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
Cambridge-Practice-Tests-for-IELTS-12.docx
Paper A Mock Exam 9_ Attempt review.pdf.
IGGE1 Understanding the Self1234567891011
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
International_Financial_Reporting_Standa.pdf
202450812 BayCHI UCSC-SV 20250812 v17.pptx
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
Share_Module_2_Power_conflict_and_negotiation.pptx
Vision Prelims GS PYQ Analysis 2011-2022 www.upscpdf.com.pdf
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 1)
Virtual and Augmented Reality in Current Scenario
Computer Architecture Input Output Memory.pptx
My India Quiz Book_20210205121199924.pdf
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
TNA_Presentation-1-Final(SAVE)) (1).pptx
FORM 1 BIOLOGY MIND MAPS and their schemes
Practical Manual AGRO-233 Principles and Practices of Natural Farming
Chinmaya Tiranga quiz Grand Finale.pdf

Mechanical Assignment Help

  • 1. Design and Manufacturing Mechanical Assignment Help Visit: www.matlabassignmentexperts.com Mail: info@matlabassignmentexperts.com
  • 2. Problem 1: What are the design considerations in replacing a metal container for carbonated beverages with plastic bottles? Think about the functional requirements and explain how the design of a plastic container differs from that of a metal can. Solution : While the functional requirements, naturally, are almost the same for metal and plastic containers (remember: functional requirements are “what you want” and solution neutral), the design parameters to fulfill the functional requirements may differ. In particular the following differences can be stated: o Since plastic is a cheap material and less dense than metal, the urge for a material saving design is not as strong as when using aluminum. o Special attention has to be paid to the permeability of plastic. In order to conserve the gas for a long period of time (less than 15% loss in 120 days, from the lecture), a special processing with low permeability plastic is necessary. o Plastic is not as strong as metal. The wall thickness can be increased, small corrugation or, better, a wavy structure (like small coke bottles) can be used. The bottom is usually thick to provide rigidity and a save stand. o Because plastic is easier to form into complicated shapes than cans, it became more feasible to make them more aesthetically and ergonomically pleasing; hence, soda in bottles again, but now with grippy sides. Also scaling up the size is feasible. o In principle, plastic didn’t eat that much of Al cans, but replaced most of the glass bottles.
  • 3. Problem 2: Consider the injection molded L-bracket made of Polycarbonate shown in Figure 1. You are asked to find the mold design with the parting line that leads to the minimum possible clamping force to mold the part. a) What would be the minimum clamping force required for this part? Indicate the location of gate and the location of parting line/plane for the minimum clamping force design. Assume that the peak injection pressure is 6,000 psi. Also discuss the potential problems in producing the part with this design. b) You soon realize that the minimum clamping force is not as important as the quality of the part and productivity of the process (as long as the machine has enough clamping force). i) What would be a better position of the parting line/plane and gate and direction of injection molding? Why? ii) What is the clamping force required for
  • 4. Solution a) The minimum cross-sectional area projected on the parting plane A will require the minimum clamping force. Amin=62 -52 =11mm2 Fmin=PxAmin=6000 x 11/(25.4) 2 =102.3 lbs=0.05 ton However, this parting line is not a good choice due to the following potential problems. Potential Problems a) The hole on the vertical wall from the parting plane needs a sliding core, which makes it costly in mold machining and injection molding operations. b) High aspect ratio deep groove machining on the cavity plate is needed, which may require the use of very expensive machines, like: EDM (Electro Discharge Machining) machine. If you move the parting line along the z-axis, you need to machine both the cavity plate and core plate, which is also costly. c) High aspect ratio and little/no draft angle in vertical (or injection) direction will make it very difficult to eject the molded part. Solution b) Normally, the clamping capacity of injection molding machines is over 10 tons and the magnitude of it is not an important parameter with few exceptions. Mold design for better quality of parts and lower cost process is much more important than the minimum clamping force. When you choose a parting line or plane, the direction of injection is of more importance, in general. i) Parting plane B and C are much better choices than plane A, with a gate location
  • 5. ii) The injection direction normal to the parting plane B/C does not require any sliding core to form the whole feature at the bottom. Also, slight draft angle can be given to the side of cavity, with a conventional milling machine. With the gate position marked in the figure, a weld line will be formed across the hole from the gate. Since the weld line is formed while the melt temperature is still hot, quite strong weld line will be formed and remain as strong as the bulk. iii) Projected area on the plane B=6x10 – 3.14(1.5)2 = 52.9 mm2 (it´s the same for C), Clamping force is F=6000 x 52.9/(25.4)2 = 492 lbs = 0.5 ton Problem 3: The following pictures show one half of an injection molded housing. With the basic design rules for injection molding in mind, is this a good design? Explain why/why not and suggest any improvements you might want to make. If you would like to, you can make a sketch to explain your thoughts.
  • 6. Solution: Injection Molding Design Guidelines Much has been written regarding design guidelines for injection molding. Yet, the design guidelines can be summed up in just a few design rules. • Use uniform wall thicknesses throughout the part. This will minimize sinking, warping, residual stresses, and improve mold fill and cycle times. • Use generous radius at all corners. The inside corner radius should be a minimum of one material thickness. • Use the least thickness compliant with the process, material, or product design requirements. Using the least wall thickness for the process ensures rapid cooling, short cycle times, and minimum shot weight. All these result in the least possible part cost. • Design parts to facilitate easy withdrawal from the mold by providing draft (taper) in the direction of mold opening or closing. • Use ribs or gussets to improve part stiffness in bending. This avoids the use of thick section to achieve the same, thereby saving on part weight, material costs, and cycle time costs.
  • 7. For the case of figure 2/3, the points to note are the radii (missing!) and thickness (not uniform!). Also, on closer inspection a draft angle is missing. a) Radii o Sharp corners greatly increase the stress concentration. This high amount of stress concentration can often lead to failure of plastic parts. o Sharp corners can come about in non-obvious places. Examples of this are a boss attached to a surface, or a strengthening rib. These corners need to be radiused just like all other corners. The stress concentration factor varies with radius, for a given thickness. o In addition to reducing stresses, fillet radiuses provide streamlined flow paths for the molten plastic resulting in easier fills. b) Thickness o Parts should have a uniform wall thickness. Thick sections cool slower than thin sections. The thin section first solidifies, and the thick section is still not fully solidified. As the thick section cools, it shrinks and the material for the shrinkage comes only from the unsolidified areas, which are connected, to the already solidified thin section. o Parts should be designed with a minimum wall thickness consistent with part function and mold filling considerations. The thinner the wall the faster the part cools, and the cycle times are short, resulting in the lowest possible part costs. o Also, thinner parts weight less, which results in smaller amounts of the plastic used per part which also results in lower part costs. o This builds stresses near the boundary of the thin section to thick section. Since
  • 8. c) Draft angle o Drafts (or taper) in a mold, facilitates part removal from the mold. The amount of draft angle depends on the depth of the part in the mold, and its required end use function. o The draft is in the offset angle in a direction parallel to the mold opening and closing. Problem 4: You are going to make tools for your Yo-Yo in two weeks. You should define your functional requirements first before you seek design parameters, which meet the requirements. Please define the functional requirements of your own Yo-Yo and try to find design parameters that fulfill those requirements. Show the mapping process in between “What” and “How” at the top two levels. This is not a single solution problem. In the world of design, you, as a designer, have all the power to explore any possible design (at least until it is proven to be a poor one). Feel free to sketch your design on a piece of paper. Solution : This is a progressive type problem you will find your own solution during the course of 2.008 laboratory sessions. Discuss you design with your lab group members before the lab session IV and try to synthesize a better design solution for your group’s Yo-Yo. The following paragraph gives an overview of how your functional requirements, manufacturing restrictions and design parameters might look like.
  • 9. o FR3: pass drop test could be another FR for your Yo-Yo o Remember that the functional requirements are the WHAT you want the yo-yo to accomplish. “Has a radio tracking device embedded in it” is a design parameter; “ Is easy to find” would be the functional requirement. Design parameters (DP) o Top level To meet FR1, you need to have a DP1: the device should look like a Yo- Yo (a rounded mass around the rim to transform potential energy to rotational energy, and vice versa). If you have additional FR, for example “FR2: Easy to find”, you need to find a solution to meet the FR2 such as, DP2: Embedded radio tracking device. DP3 for FR3 could be a rigid design with no thin parts sticking out. Since you are supposed to make your product with the processes available at the shop, we need to think about the mapping process between DP domain and Process Domain. o 2nd level To meet DP1 in the process domain, PV1 should be moldability of your DP1. PV2 may be the possibility to integrate the radio device into your Yo-Yo. Since we don’t have a detailed design yet, we cannot go further down at this process domain and need to go back to the FR domain one level down (zig- zagging). For a given DP1 and PV1, FR1 needs to be further broken down to fulfill what you want. You may need
  • 10. etc. (These may differ for each designer.) FR31 might be that the Yo-Yo doesn´t fall apart when dropped by a certain distance, FR 32 that it doesn´t break when dropped. DP11 may be the cross sectional shape of the Yo-Yo. DP12: Gap for string (about 1.5 of the string diameter.), DP13: Outer dimension of Yo-Yo. (look, this will be constrained by the machine and mold size, when you map this one to the process domain.) DP14: Kind of plastic material or non-sharp edges. When you map between DP’s to PV’s, the design for injection molding needs to be considered, such as; thinnest possible uniform thickness, etc. DP31 can be the overlapping of the different parts, DP32 the wall thickness or the inclusion of ribs. If you have FR2 in your design, you then need to map between FR2 and DP2 by defining children of FR2 for a chosen DP2.