METHOD STATEMENT & ASSESSMENT FOR LOAD TEST
INJECTION PILING WORKS
LIPIDS TERMINAL SDN BHD
Jalan Kenanga 1, Kawasan Liquid Bulk Terminal
Westport, Pulau Indah
42009 Klang, Selangor Darul Ehsan
Tel : 03-31010011 / Fax : 03-31011800
LIPIDS TERMINAL SDN.BHD
18/11/2022 2
Proposed Extension Of Bulk Storage Facilities At Liquid Bulk Terminal Westports,
Pulau Indah Klang, Selangor Darul Ehsan For Lipids Terminal Sdn Bhd
1. Above Ground Tank Storage
2. Bund Wall
3. Weighbridge
4. Pipe Rack Crossing Road
5. Motorized Sliding Gate - Entrance
6. Guard House
7. Internal Road & Drainage
Consultant :-
Konsultant Proses Sdn Bhd
(Project Managers & Consulting Engineers)
Wisma Konpro
No 1, Persiaran Teknologi Subang,
Subang Hi Tech Industrial Park,
47500 Subang Jaya, Selangor Darul Ehsan
Project Information
18/11/2022 3
Foundation Illustration
18/11/2022 4
Load Influence Zone - Illustration
18/11/2022 5
1) INTRODUCTION
• Load Test involves measurement of pile head displacement in the response to a physically applied test
load. It is the most fundamental form of pile load tes and is considered as the bench mark of pile
performance
2) TYPE OF LOAD TEST
• Load Test will be carried out for the following configurations :
a) Compression
b) Tension
c) Lateral
3) INITIAL LOAD TERST ON PILES
This test is performed to confirm the design load calculations and to provide guidelines for setting up
the limits of acceptance for routine tests. It also gives an idea of the suitability of the piling system.
Initial Test on piles are to be carried out at one or more locations depending on the number of piles
required.
Load applied for the initial (cyclic) load test is 2.5 times the safe carrying capacity of the pile.
4) ROUTINE LOAD TEST ON PILES
Selection of piles for the Routine Test is done based on number of piles required subject to maximum
of total number of piles required. The number of tests may be increased depending on the nature /
type of structure. The test load applied is 1½ times the safe carrying capacity of the pile.
LOAD TEST PROCEDURE
18/11/2022 6
LOAD TEST PROCEDURE
18/11/2022 7
LOAD TEST PROCEDURE
18/11/2022 8
LOAD TEST PROCEDURE
18/11/2022 9
LOAD TEST PROCEDURE
18/11/2022 10
5) THIS TEST WILL BE PERFROMED FOR THE FOLLOWING PURPOSES.
• To ensure the safe load capacity of piles
• Detection of any unusual performance contrary to the findings of the Initial Test.
• The tests shall be performed at the cut-off level only.
• A detailed report for the test result is prepared.
6) VERTICAL LOAD TESTS ON PILES
Pile Head – The pile head shall be chipped off till sound concrete is met wherever applicable. The
reinforcement shall be cut and head levelled. A bearing plate with a hole shall be placed on the head
for the jack to rest.
Reaction- Kentledge shall be suitably designed to get the desired reaction on the piles. Anchor piles
(if required) shall be placed at a centre to centre distance of 3 times the pile diameter subject to a
minimum distance of 2 M.
Settlement- 2 dial gauges for a single pile and 4 dial gauges for a group of piles with 0.01 mm
sensitivity shall be used.
Application of load- It shall be applied as specified depending on the type of test (routine / initial).
Each load shall be maintained till the rate of displacement of the pile top is either 0.1 mm in the first
30 minutes or 0.2 mm in the first one hour or 2 hours whichever occurs first. The next increment in
the load shall be applied on achieving the aforesaid criterion. (Instruction may vary by terminal
instructions)
The test load shall be maintained for 24 hours to 72 hours
LOAD TEST PROCEDURE
18/11/2022 11
LOAD TEST PROCEDURE
18/11/2022 12
LOAD TEST PROCEDURE
18/11/2022 13
Initial Tests– The safe load on a single pile shall be the least of the following:
• 2/3rd of the final load at which the total displacement attains a value of 12 mm unless otherwise
required in a given case on the basis of nature and type of structure in which case, the safe load
should be corresponding to the stated total displacement permissible.
• 50% of the final load at which the total displacement equals 10% of the pile diameter in case of
uniform diameter piles or 7.5% of the bulb diameter in case of under reamed piles.
Routine Tests – Acceptance
The maximum settlement at test load should not exceed 12 mm.
Lateral Load Tests on Piles
• The jack should be placed horizontally, between two piles. The load on the jack shall be the same
on both the piles. The load will be applied in increments of 20% of the estimated safe load and at
the cut off level. The load will be increased after the rate of displacement is nearer to 0.1 mm per
30 minutes. If the cut-off level is approachable, one dial gauge exactly at the cut-off level shall
measure the displacement. In case the cut-off level is not approachable, 2 dial gauges 30 cm
apart vertically, shall be set up and the lateral displacement of the cut-off level calculated by
similar triangles.
The safe load on the pile shall be the least of the following:
• 50% of the final load at which the total displacement increases to 12 mm.
• Final load at which the total displacement corresponds to 5 mm.
LOAD TEST PROCEDURE
18/11/2022 14
HIRARC - CRANE OPERATION
HIRARC - MACHINERIES
18/11/2022 15
HIRARC - LIFTING OPERATION
18/11/2022 16
HIRARC - TEMPORARY WORKS
HIRARC - HOT WORKS
18/11/2022 17
Date : 6th Jan 2021
For Internal Use Only
Prepared By;
Sri Shanmuganathan M Subramaniam
Safety, Security, Health & Environment
Dip (Mgmt), B.A.hons, B.Sc(Mgmt), M.Sc (OSH), Grad IOSH (UK), CMILT, IOW (BEM)
JKKP Registered Safety & Health Officer (SHO)
Maritime Safety Registered (Terminal, Longshoring & Shipyard) - National Safety Council (USA)
Registered IMDG Code Specific - Jabatan Laut Malaysia
Registered Inspector of Works, Board of Engineers (BEM)
HRDF & CIDB Registered Trainer

More Related Content

PPTX
SCAFFOLDING
PPTX
Slip form Construction Technology
PPT
Pile foundation ppt 2 (usefulsearch.org) (useful search)
PDF
Tutorial Staad-Pro
PPTX
Analysis and design of pre engineered building using is 800:2007 and Internat...
PPT
Connections in steel structures
PPTX
Slip formwork for chimney
PDF
Intze tank design
SCAFFOLDING
Slip form Construction Technology
Pile foundation ppt 2 (usefulsearch.org) (useful search)
Tutorial Staad-Pro
Analysis and design of pre engineered building using is 800:2007 and Internat...
Connections in steel structures
Slip formwork for chimney
Intze tank design

What's hot (20)

PDF
Civil engineering - thumb rule
PPTX
Industrial building
PPTX
Pile foundation
PPTX
PILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONS
PPTX
Reinforced column design
PPTX
Bolted connections
PPTX
Seismic Analysis of regular & Irregular RCC frame structures
PPT
grouting and guniting
PDF
Calulation of deflection and crack width according to is 456 2000
PPTX
Chapter 5 formwork
PDF
Concrete Mix Design Report
PPT
Formwork failures and remedial measures
DOCX
Quality control of concrete
DOCX
FOOTING CONSTRUCTION
PPTX
Design of steel structure as per is 800(2007)
PPTX
Machine foundations
PPTX
Construction of rigid pavement
PPTX
Flexural strength in concrete test
PDF
IS 456 2000 summary
PPTX
Jkr Probe Test
Civil engineering - thumb rule
Industrial building
Pile foundation
PILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONS
Reinforced column design
Bolted connections
Seismic Analysis of regular & Irregular RCC frame structures
grouting and guniting
Calulation of deflection and crack width according to is 456 2000
Chapter 5 formwork
Concrete Mix Design Report
Formwork failures and remedial measures
Quality control of concrete
FOOTING CONSTRUCTION
Design of steel structure as per is 800(2007)
Machine foundations
Construction of rigid pavement
Flexural strength in concrete test
IS 456 2000 summary
Jkr Probe Test
Ad

Similar to METHOD AND ASSESSMENT FOR LOAD TEST.ppt (15)

PDF
Methodology-of-Static-Pile-Load-Test.pdf
PPTX
Pile load test ppt
PDF
Axial%20 load%20test%20procedures%20for%20pile%20foundations
PDF
Loadtestinghandbook
PDF
06 02-27-load-testing-handbook-2006
DOCX
4-pile foundation.docx pile foundation.docx
PPTX
PILE LOAD TEST-abhishek.pptx
PDF
YJACK | PS Handbook on Pile Load Testing.pdf
PDF
publication_1580218342.pdf
PPTX
Pile load test
PPTX
1.Pile foundations 2021 (1).pptx
PPTX
PILE FOUNDATION.pptx
PDF
The static loading test bengt h. fellenius
PPTX
Plate load test and its interpretations
Methodology-of-Static-Pile-Load-Test.pdf
Pile load test ppt
Axial%20 load%20test%20procedures%20for%20pile%20foundations
Loadtestinghandbook
06 02-27-load-testing-handbook-2006
4-pile foundation.docx pile foundation.docx
PILE LOAD TEST-abhishek.pptx
YJACK | PS Handbook on Pile Load Testing.pdf
publication_1580218342.pdf
Pile load test
1.Pile foundations 2021 (1).pptx
PILE FOUNDATION.pptx
The static loading test bengt h. fellenius
Plate load test and its interpretations
Ad

Recently uploaded (20)

PDF
BMEC211 - INTRODUCTION TO MECHATRONICS-1.pdf
PDF
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
PDF
composite construction of structures.pdf
PPT
Project quality management in manufacturing
PPTX
CYBER-CRIMES AND SECURITY A guide to understanding
PDF
Automation-in-Manufacturing-Chapter-Introduction.pdf
PDF
PPT on Performance Review to get promotions
PDF
Well-logging-methods_new................
PPTX
MCN 401 KTU-2019-PPE KITS-MODULE 2.pptx
PPTX
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
PPTX
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
PPTX
Infosys Presentation by1.Riyan Bagwan 2.Samadhan Naiknavare 3.Gaurav Shinde 4...
PPTX
IOT PPTs Week 10 Lecture Material.pptx of NPTEL Smart Cities contd
PPTX
Foundation to blockchain - A guide to Blockchain Tech
PPTX
KTU 2019 -S7-MCN 401 MODULE 2-VINAY.pptx
PDF
Enhancing Cyber Defense Against Zero-Day Attacks using Ensemble Neural Networks
PDF
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
DOCX
573137875-Attendance-Management-System-original
PDF
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
PPTX
UNIT-1 - COAL BASED THERMAL POWER PLANTS
BMEC211 - INTRODUCTION TO MECHATRONICS-1.pdf
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
composite construction of structures.pdf
Project quality management in manufacturing
CYBER-CRIMES AND SECURITY A guide to understanding
Automation-in-Manufacturing-Chapter-Introduction.pdf
PPT on Performance Review to get promotions
Well-logging-methods_new................
MCN 401 KTU-2019-PPE KITS-MODULE 2.pptx
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
Infosys Presentation by1.Riyan Bagwan 2.Samadhan Naiknavare 3.Gaurav Shinde 4...
IOT PPTs Week 10 Lecture Material.pptx of NPTEL Smart Cities contd
Foundation to blockchain - A guide to Blockchain Tech
KTU 2019 -S7-MCN 401 MODULE 2-VINAY.pptx
Enhancing Cyber Defense Against Zero-Day Attacks using Ensemble Neural Networks
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
573137875-Attendance-Management-System-original
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
UNIT-1 - COAL BASED THERMAL POWER PLANTS

METHOD AND ASSESSMENT FOR LOAD TEST.ppt

  • 1. 18/11/2022 1 METHOD STATEMENT & ASSESSMENT FOR LOAD TEST INJECTION PILING WORKS LIPIDS TERMINAL SDN BHD Jalan Kenanga 1, Kawasan Liquid Bulk Terminal Westport, Pulau Indah 42009 Klang, Selangor Darul Ehsan Tel : 03-31010011 / Fax : 03-31011800 LIPIDS TERMINAL SDN.BHD
  • 2. 18/11/2022 2 Proposed Extension Of Bulk Storage Facilities At Liquid Bulk Terminal Westports, Pulau Indah Klang, Selangor Darul Ehsan For Lipids Terminal Sdn Bhd 1. Above Ground Tank Storage 2. Bund Wall 3. Weighbridge 4. Pipe Rack Crossing Road 5. Motorized Sliding Gate - Entrance 6. Guard House 7. Internal Road & Drainage Consultant :- Konsultant Proses Sdn Bhd (Project Managers & Consulting Engineers) Wisma Konpro No 1, Persiaran Teknologi Subang, Subang Hi Tech Industrial Park, 47500 Subang Jaya, Selangor Darul Ehsan Project Information
  • 4. 18/11/2022 4 Load Influence Zone - Illustration
  • 5. 18/11/2022 5 1) INTRODUCTION • Load Test involves measurement of pile head displacement in the response to a physically applied test load. It is the most fundamental form of pile load tes and is considered as the bench mark of pile performance 2) TYPE OF LOAD TEST • Load Test will be carried out for the following configurations : a) Compression b) Tension c) Lateral 3) INITIAL LOAD TERST ON PILES This test is performed to confirm the design load calculations and to provide guidelines for setting up the limits of acceptance for routine tests. It also gives an idea of the suitability of the piling system. Initial Test on piles are to be carried out at one or more locations depending on the number of piles required. Load applied for the initial (cyclic) load test is 2.5 times the safe carrying capacity of the pile. 4) ROUTINE LOAD TEST ON PILES Selection of piles for the Routine Test is done based on number of piles required subject to maximum of total number of piles required. The number of tests may be increased depending on the nature / type of structure. The test load applied is 1½ times the safe carrying capacity of the pile. LOAD TEST PROCEDURE
  • 10. 18/11/2022 10 5) THIS TEST WILL BE PERFROMED FOR THE FOLLOWING PURPOSES. • To ensure the safe load capacity of piles • Detection of any unusual performance contrary to the findings of the Initial Test. • The tests shall be performed at the cut-off level only. • A detailed report for the test result is prepared. 6) VERTICAL LOAD TESTS ON PILES Pile Head – The pile head shall be chipped off till sound concrete is met wherever applicable. The reinforcement shall be cut and head levelled. A bearing plate with a hole shall be placed on the head for the jack to rest. Reaction- Kentledge shall be suitably designed to get the desired reaction on the piles. Anchor piles (if required) shall be placed at a centre to centre distance of 3 times the pile diameter subject to a minimum distance of 2 M. Settlement- 2 dial gauges for a single pile and 4 dial gauges for a group of piles with 0.01 mm sensitivity shall be used. Application of load- It shall be applied as specified depending on the type of test (routine / initial). Each load shall be maintained till the rate of displacement of the pile top is either 0.1 mm in the first 30 minutes or 0.2 mm in the first one hour or 2 hours whichever occurs first. The next increment in the load shall be applied on achieving the aforesaid criterion. (Instruction may vary by terminal instructions) The test load shall be maintained for 24 hours to 72 hours LOAD TEST PROCEDURE
  • 13. 18/11/2022 13 Initial Tests– The safe load on a single pile shall be the least of the following: • 2/3rd of the final load at which the total displacement attains a value of 12 mm unless otherwise required in a given case on the basis of nature and type of structure in which case, the safe load should be corresponding to the stated total displacement permissible. • 50% of the final load at which the total displacement equals 10% of the pile diameter in case of uniform diameter piles or 7.5% of the bulb diameter in case of under reamed piles. Routine Tests – Acceptance The maximum settlement at test load should not exceed 12 mm. Lateral Load Tests on Piles • The jack should be placed horizontally, between two piles. The load on the jack shall be the same on both the piles. The load will be applied in increments of 20% of the estimated safe load and at the cut off level. The load will be increased after the rate of displacement is nearer to 0.1 mm per 30 minutes. If the cut-off level is approachable, one dial gauge exactly at the cut-off level shall measure the displacement. In case the cut-off level is not approachable, 2 dial gauges 30 cm apart vertically, shall be set up and the lateral displacement of the cut-off level calculated by similar triangles. The safe load on the pile shall be the least of the following: • 50% of the final load at which the total displacement increases to 12 mm. • Final load at which the total displacement corresponds to 5 mm. LOAD TEST PROCEDURE
  • 14. 18/11/2022 14 HIRARC - CRANE OPERATION HIRARC - MACHINERIES
  • 15. 18/11/2022 15 HIRARC - LIFTING OPERATION
  • 16. 18/11/2022 16 HIRARC - TEMPORARY WORKS HIRARC - HOT WORKS
  • 17. 18/11/2022 17 Date : 6th Jan 2021 For Internal Use Only Prepared By; Sri Shanmuganathan M Subramaniam Safety, Security, Health & Environment Dip (Mgmt), B.A.hons, B.Sc(Mgmt), M.Sc (OSH), Grad IOSH (UK), CMILT, IOW (BEM) JKKP Registered Safety & Health Officer (SHO) Maritime Safety Registered (Terminal, Longshoring & Shipyard) - National Safety Council (USA) Registered IMDG Code Specific - Jabatan Laut Malaysia Registered Inspector of Works, Board of Engineers (BEM) HRDF & CIDB Registered Trainer