Subaqueus Applications with Flowtite Pipes




        Manufacturing Meeting, Spain, January 2005   1
     Manufacturing Meeting, Spain, January 2005
Pipe laminate structure


   EXTERIOR
                                     EXT. SURF.

                                       SKIN



                                       CORE       TOTAL
                                                  THICKNESS

                                       SKIN

                                       LINER
                                     INT.SURF.

   INTERIOR

                                                              2
    Manufacturing Meeting, Spain, January 2005
Site Supervision service


If any request or any requirement, field supervision is provided to achive a
satisfactory installation. Field engineers and technicians can advise the
purchaser or the installer to help him achieve a satisfactory installation.

• Field engineers supervise the installation of GRP pipes,
• Follow the errection closely and submit their comments and recommendations
  to achive satisfactory pipe installation,
• Assist to the installer for decision of installation technics and applications,
• Assist to project firms for computation and determination of thrust block
 dimensions,
• Field technicians assist the workers to achieve satisfactory coupling joint and

 backfilling.
                                                                                    3
           Manufacturing Meeting, Spain, January 2005
Subaqueous Installatıon of GRP Pipes


GRP pipes are used for subaqueous applications such as;
 Waste water outfall,
 Cooling water outfall,
 Sea water intake for
     Drinking water supply,
     Cooling water supply,
     Etc...
 Submarine crossing.




                                                           4
           Manufacturing Meeting, Spain, January 2005
Pipe Joint Systems

 GRP TEST COUPLING JOINT



 Coupling Joint is a flexible joint system.
 GRP lock couplings allow angular deflections.
 Allows preliminary check for each joint under water




                                                       5
     Manufacturing Meeting, Spain, January 2005
Pipe Joint Systems

Marine Harness Lug
Marine harness lugs are used to keep together preassembled pipe strings of several
pipes during loading, transfering, and sinking operations and also to assist divers for
joining operation under water.
Depending on pipe diameter two, three or four pieces of marine harness lugs are
fixed surrounding the ends of the pipes.
It is recommended to remove stud bolts before backfilling in order not to prevent
flexibility of GRP couplings.
Steel lugs are fixed with filament winding method using glassfiber &resin




                                                                                          6
               Manufacturing Meeting, Spain, January 2005
Trench Excavatıon & Backfıllıng

- Excavator, dredger or trencher is used for excavating the trench.
- Excavator or clamshell bucket or flex tubes are used for backfilling.




                                                                          7
              Manufacturing Meeting, Spain, January 2005
Subaqueous Installation Techniques


Depending on project requirements and site or weather conditions
different installation techniques are used.


  Single pipe installation


  Multiple pipe installation


  Multiple pipe installation, providing pipe string




                                                                   8
     Manufacturing Meeting, Spain, January 2005
Subaqueous Installation Techniques

Single Pipe
Pipes are lowered to water and joined under water one by one,




                                                                9
    Manufacturing Meeting, Spain, January 2005
Subaqueous Installation Techniques

Multiple Pipes
Two or three section of pipes are preassembled on land or barge then
lowered to water and joined under water,




                                                                       10
     Manufacturing Meeting, Spain, January 2005
Joining of Pipes under Water

Generally, come along jacks with steel clamps are used for joining of pipes.

Depending on marine conditions marine harness lugs are used to join the pipes
under water.




                                                                                11
              Manufacturing Meeting, Spain, January 2005
Pipe Alingment while Joining


 Depending on project reuirement, marine and weather conditions different
 equipments are used for alingment of pipe ends to join.

 Steel Truss

                                Hydraulic Sea Horse




 Specail GRP
 Coupling




                                                                        12
    Manufacturing Meeting, Spain, January 2005
Trench Backfilling


Excavator or clamshell bucket or flex tubes are used for backfilling.
Backfilling is provided by the divers under water.




                                                                        13
        Manufacturing Meeting, Spain, January 2005
Subaqueous Installation Techniques

MULTIPLE PIPES PROVIDING PIPE STRING
Long pipe sections (100m-300m-500m...) are preassmbled on land or barge
and lowered to water and joined under water.




                                                                     14
     Manufacturing Meeting, Spain, January 2005
TOW Techniques

Depending on shape of the sea bottom, weather conditions and adequacy of
equipment different tow methods can be selected.

• Surface tow
     float and sink

     sub surface tow


• Controlled depth tow
     off-bottom tow

      bottom pull


         Manufacturing Meeting, Spain, January 2005
Onshore-Offshore Transition Zone

Sand bags may be used to prevent floating of pipes and washing out backfill from
wave actions.




                                                                                   16
            Manufacturing Meeting, Spain, January 2005
Onshore-Offshore Transition Zone

Pipes are launched to the sea with different methods as shown on the
pictures.




                                                                       17
      Manufacturing Meeting, Spain, January 2005
Unimar Power Plant Cooling Water Outlet

Client            : Unimar Enerji Yatırımları A.Ş.
Location          : Marmara Ereğlisi / Tekirdağ / TURKEY
Date              : Feb 2005 – June 2005
Capacity          : 480 MW
Main Contractor : STFA Marine Construction Co.
Cooling Water Discharge
DN2400mm-600mm, PN6Atm, SN 5000N/m2 L= 240m




        Manufacturing Meeting, Spain, January 2005
Biga Autoproducer Power Plant
 Cooling Water Inlet & Outlet
Client           :   İçdaş Çelik Enerji Tersane Ulaşım San. A.Ş
Location         :   Çanakkale / Biga / TURKEY
Date             :  Sep 2004 – March 2005
Capacity         :  102 MW
Main Contractor : DETEK Marine Construction Co.
Sea Water Inlet & Outfall Pipes
DN2200mm, PN6Atm, SN 5000N/m2 L= 196m




                                                                  19
      Manufacturing Meeting, Spain, January 2005
Adapazarı Gölprizi Drinking Water Project

Client            :   ADASU Genel Müdürülüğü
Location          :   Adapazarı / TURKEY
Date              :  Jan 2005 – continue
Main Contractor : ZihniÜstünoğulları İnşaat A.Ş.
Lake Water Inlet Pipes
DN1600mm, PN6Atm, SN 5000N/m2 L= 1500m




                                                     20
        Manufacturing Meeting, Spain, January 2005
Constanta North & Eforie South Wwtp Waste Water Outfall


     Client            : ATHENA SA Construction Co.
     Location          : Constanta / ROMANIA
     Date              : June 2005 – continue
     Main Contractor : ATHENA SA Construction Co.
     Waste Water Outlet
     DN1500mm, PN6Atm, SN 10000N/m2 L= 4250m
     DN 700mm, PN6Atm, SN 10000N/m2 L= 1360m
     GRP Test Coupling




                                                       21
          Manufacturing Meeting, Spain, January 2005
İskenderun Sugözü Coal Fired Power Plant

Investor            :   STEAG AG
Project Company     :   İSKEN A.Ş.
Location            :   Adana- Ceyhan / TURKEY
Project Duration    :   2000 - 2003
Net capacity        : 1210 MW
Main Contractors    : Siemens, Babcock, Gama Tekfen JV & Simko
Marine Consultant   : MECC Marine & Land Eng & Consulting Co.
Subcontractor       : STFA Marine Cons. Co.
Intake Line/ Sea-Pump House
DN2800mm, PN6Atm, SN 6500N/m2 L= 1570m
Cooling Line/ Pump House-Seal Pit
DN2600mm, PN6Atm, SN 5000N/m2 L= 800m

Seaoutfall Line/ Seal Pit – Sea
DN2400mm, PN6Atm, SN 6500N/m2 L= 4750m
     Manufacturing Meeting, Spain, January 2005                  22

More Related Content

PPTX
DeesideSeaways MPSS Presentation Ver 3
PDF
SSCS Track Record
PDF
ADC PRS Study-Paper OGJ- June 2014
PDF
MinDOC Photo
PDF
Aqua-Barrier Water Inflated Dams Literature
PPT
Longer, deeper, colder - Technology to cross energy frontiers
PDF
Ballast Water Treatment with VOS™ | N.E.I. Treatment Systems
PDF
Ali Lamont CV 2013
DeesideSeaways MPSS Presentation Ver 3
SSCS Track Record
ADC PRS Study-Paper OGJ- June 2014
MinDOC Photo
Aqua-Barrier Water Inflated Dams Literature
Longer, deeper, colder - Technology to cross energy frontiers
Ballast Water Treatment with VOS™ | N.E.I. Treatment Systems
Ali Lamont CV 2013

What's hot (20)

PDF
Melbourne Pipeline Protection
PPTX
Water shut off ppt
PDF
Ground Engineering Datasheets
PDF
311576 DD Inserts
PPSX
DEPLETED OIL FIELDS - Regeneration with Water_Shutoff - EUCO Group
DOC
F KRUGER diving cv
PPT
Facilities Oil Patch Orientation
PDF
Statoil innovate subsea_technology_v5
PDF
Man Made River Project IV Phase - Ghadames Project - AJRT Regulating Tank 70....
PDF
Expandable liner hanger and packer exceed expectations for first deepwater we...
PDF
Marine applications
KEY
Exploring Tight Gas Reservoir Using Intelligent Well Technology
PPSX
Water coning in oil wells and DWS technology
PDF
SubseaServices
PDF
Pacific Netting Products (1)
PDF
Mining Operations Optimize Dewatering Processes
PDF
Water_Shut_Off_Winter traning(ISM)1
PDF
Man Made River Project - IV Phase / Ghadames Project - Pipelaying
PDF
Does Australia really need a pipeline repair club.... or are we the lucky cou...
PPTX
Offshore Riser Design
Melbourne Pipeline Protection
Water shut off ppt
Ground Engineering Datasheets
311576 DD Inserts
DEPLETED OIL FIELDS - Regeneration with Water_Shutoff - EUCO Group
F KRUGER diving cv
Facilities Oil Patch Orientation
Statoil innovate subsea_technology_v5
Man Made River Project IV Phase - Ghadames Project - AJRT Regulating Tank 70....
Expandable liner hanger and packer exceed expectations for first deepwater we...
Marine applications
Exploring Tight Gas Reservoir Using Intelligent Well Technology
Water coning in oil wells and DWS technology
SubseaServices
Pacific Netting Products (1)
Mining Operations Optimize Dewatering Processes
Water_Shut_Off_Winter traning(ISM)1
Man Made River Project - IV Phase / Ghadames Project - Pipelaying
Does Australia really need a pipeline repair club.... or are we the lucky cou...
Offshore Riser Design
Ad

Viewers also liked (20)

PDF
Installing shutoff valves & supply tubes
PPTX
Las 40 técnicas para innovar usando TRIZ
PPTX
Sesión técnica, sala Tuzandépetl, Evaluación de ductos Marinos que operan a a...
PPT
Sesión técnica, sala FPSO, Arquitecturas submarinas y sus principales equipos...
PPTX
1991 Malibu Skier Euro f3
PDF
SSE Pipefittings Brochure
PPSX
Aoil profile 2016
PDF
catalogue of pipe
PPTX
presentation
PPTX
Internal Combustion Engine [Gasoline/Petrol] presentation
PPT
Advanced internal Combustion Engines
PDF
Oil pipeline 42 inch by 455 km
PPT
Halderman ch019 lecture
PPTX
Alcohol as an alternative fuel in s 2
PPT
Petrol engine vs diesel engine
PPT
Fuel Injectors
PDF
Marine Diesel Engine Exhaust Gas Emissions Control Technologies
PPT
Artificial islands
Installing shutoff valves & supply tubes
Las 40 técnicas para innovar usando TRIZ
Sesión técnica, sala Tuzandépetl, Evaluación de ductos Marinos que operan a a...
Sesión técnica, sala FPSO, Arquitecturas submarinas y sus principales equipos...
1991 Malibu Skier Euro f3
SSE Pipefittings Brochure
Aoil profile 2016
catalogue of pipe
presentation
Internal Combustion Engine [Gasoline/Petrol] presentation
Advanced internal Combustion Engines
Oil pipeline 42 inch by 455 km
Halderman ch019 lecture
Alcohol as an alternative fuel in s 2
Petrol engine vs diesel engine
Fuel Injectors
Marine Diesel Engine Exhaust Gas Emissions Control Technologies
Artificial islands
Ad

Similar to Mod subaqueous flowtite (20)

PDF
Mg innovation flng cn 2010
PPTX
Richard Turnbull CV Supplement 2012
PDF
Mg Innovation Flng Cn 2010 R1
PDF
Qcs Product Brochure
PDF
26-grover-john-final
PDF
EBSE + ES3 Commercial Presentation
PDF
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
PPT
Piping tech general-fluor
PDF
Offshore wind 180811
PDF
Offshore wind 180811
PDF
Piping construction-std
PPTX
Soundown Yacht Presentation
PDF
Khalfan Al Muhairi - High Performance Top Coat Borcoat HE3450
PPT
Trenchless technology
PPT
G cordero roofing (partial)
PDF
120625 0814 Tops
PPTX
General Overview - June 2012
PDF
Simple Piping design
PDF
AME POWER PLANT REFERENCES
Mg innovation flng cn 2010
Richard Turnbull CV Supplement 2012
Mg Innovation Flng Cn 2010 R1
Qcs Product Brochure
26-grover-john-final
EBSE + ES3 Commercial Presentation
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
Piping tech general-fluor
Offshore wind 180811
Offshore wind 180811
Piping construction-std
Soundown Yacht Presentation
Khalfan Al Muhairi - High Performance Top Coat Borcoat HE3450
Trenchless technology
G cordero roofing (partial)
120625 0814 Tops
General Overview - June 2012
Simple Piping design
AME POWER PLANT REFERENCES

Mod subaqueous flowtite

  • 1. Subaqueus Applications with Flowtite Pipes Manufacturing Meeting, Spain, January 2005 1 Manufacturing Meeting, Spain, January 2005
  • 2. Pipe laminate structure EXTERIOR EXT. SURF. SKIN CORE TOTAL THICKNESS SKIN LINER INT.SURF. INTERIOR 2 Manufacturing Meeting, Spain, January 2005
  • 3. Site Supervision service If any request or any requirement, field supervision is provided to achive a satisfactory installation. Field engineers and technicians can advise the purchaser or the installer to help him achieve a satisfactory installation. • Field engineers supervise the installation of GRP pipes, • Follow the errection closely and submit their comments and recommendations to achive satisfactory pipe installation, • Assist to the installer for decision of installation technics and applications, • Assist to project firms for computation and determination of thrust block dimensions, • Field technicians assist the workers to achieve satisfactory coupling joint and backfilling. 3 Manufacturing Meeting, Spain, January 2005
  • 4. Subaqueous Installatıon of GRP Pipes GRP pipes are used for subaqueous applications such as;  Waste water outfall,  Cooling water outfall,  Sea water intake for  Drinking water supply,  Cooling water supply,  Etc...  Submarine crossing. 4 Manufacturing Meeting, Spain, January 2005
  • 5. Pipe Joint Systems GRP TEST COUPLING JOINT Coupling Joint is a flexible joint system. GRP lock couplings allow angular deflections. Allows preliminary check for each joint under water 5 Manufacturing Meeting, Spain, January 2005
  • 6. Pipe Joint Systems Marine Harness Lug Marine harness lugs are used to keep together preassembled pipe strings of several pipes during loading, transfering, and sinking operations and also to assist divers for joining operation under water. Depending on pipe diameter two, three or four pieces of marine harness lugs are fixed surrounding the ends of the pipes. It is recommended to remove stud bolts before backfilling in order not to prevent flexibility of GRP couplings. Steel lugs are fixed with filament winding method using glassfiber &resin 6 Manufacturing Meeting, Spain, January 2005
  • 7. Trench Excavatıon & Backfıllıng - Excavator, dredger or trencher is used for excavating the trench. - Excavator or clamshell bucket or flex tubes are used for backfilling. 7 Manufacturing Meeting, Spain, January 2005
  • 8. Subaqueous Installation Techniques Depending on project requirements and site or weather conditions different installation techniques are used. Single pipe installation Multiple pipe installation Multiple pipe installation, providing pipe string 8 Manufacturing Meeting, Spain, January 2005
  • 9. Subaqueous Installation Techniques Single Pipe Pipes are lowered to water and joined under water one by one, 9 Manufacturing Meeting, Spain, January 2005
  • 10. Subaqueous Installation Techniques Multiple Pipes Two or three section of pipes are preassembled on land or barge then lowered to water and joined under water, 10 Manufacturing Meeting, Spain, January 2005
  • 11. Joining of Pipes under Water Generally, come along jacks with steel clamps are used for joining of pipes. Depending on marine conditions marine harness lugs are used to join the pipes under water. 11 Manufacturing Meeting, Spain, January 2005
  • 12. Pipe Alingment while Joining Depending on project reuirement, marine and weather conditions different equipments are used for alingment of pipe ends to join. Steel Truss Hydraulic Sea Horse Specail GRP Coupling 12 Manufacturing Meeting, Spain, January 2005
  • 13. Trench Backfilling Excavator or clamshell bucket or flex tubes are used for backfilling. Backfilling is provided by the divers under water. 13 Manufacturing Meeting, Spain, January 2005
  • 14. Subaqueous Installation Techniques MULTIPLE PIPES PROVIDING PIPE STRING Long pipe sections (100m-300m-500m...) are preassmbled on land or barge and lowered to water and joined under water. 14 Manufacturing Meeting, Spain, January 2005
  • 15. TOW Techniques Depending on shape of the sea bottom, weather conditions and adequacy of equipment different tow methods can be selected. • Surface tow  float and sink  sub surface tow • Controlled depth tow  off-bottom tow  bottom pull Manufacturing Meeting, Spain, January 2005
  • 16. Onshore-Offshore Transition Zone Sand bags may be used to prevent floating of pipes and washing out backfill from wave actions. 16 Manufacturing Meeting, Spain, January 2005
  • 17. Onshore-Offshore Transition Zone Pipes are launched to the sea with different methods as shown on the pictures. 17 Manufacturing Meeting, Spain, January 2005
  • 18. Unimar Power Plant Cooling Water Outlet Client : Unimar Enerji Yatırımları A.Ş. Location : Marmara Ereğlisi / Tekirdağ / TURKEY Date : Feb 2005 – June 2005 Capacity : 480 MW Main Contractor : STFA Marine Construction Co. Cooling Water Discharge DN2400mm-600mm, PN6Atm, SN 5000N/m2 L= 240m Manufacturing Meeting, Spain, January 2005
  • 19. Biga Autoproducer Power Plant Cooling Water Inlet & Outlet Client : İçdaş Çelik Enerji Tersane Ulaşım San. A.Ş Location : Çanakkale / Biga / TURKEY Date : Sep 2004 – March 2005 Capacity : 102 MW Main Contractor : DETEK Marine Construction Co. Sea Water Inlet & Outfall Pipes DN2200mm, PN6Atm, SN 5000N/m2 L= 196m 19 Manufacturing Meeting, Spain, January 2005
  • 20. Adapazarı Gölprizi Drinking Water Project Client : ADASU Genel Müdürülüğü Location : Adapazarı / TURKEY Date : Jan 2005 – continue Main Contractor : ZihniÜstünoğulları İnşaat A.Ş. Lake Water Inlet Pipes DN1600mm, PN6Atm, SN 5000N/m2 L= 1500m 20 Manufacturing Meeting, Spain, January 2005
  • 21. Constanta North & Eforie South Wwtp Waste Water Outfall Client : ATHENA SA Construction Co. Location : Constanta / ROMANIA Date : June 2005 – continue Main Contractor : ATHENA SA Construction Co. Waste Water Outlet DN1500mm, PN6Atm, SN 10000N/m2 L= 4250m DN 700mm, PN6Atm, SN 10000N/m2 L= 1360m GRP Test Coupling 21 Manufacturing Meeting, Spain, January 2005
  • 22. İskenderun Sugözü Coal Fired Power Plant Investor : STEAG AG Project Company : İSKEN A.Ş. Location : Adana- Ceyhan / TURKEY Project Duration : 2000 - 2003 Net capacity : 1210 MW Main Contractors : Siemens, Babcock, Gama Tekfen JV & Simko Marine Consultant : MECC Marine & Land Eng & Consulting Co. Subcontractor : STFA Marine Cons. Co. Intake Line/ Sea-Pump House DN2800mm, PN6Atm, SN 6500N/m2 L= 1570m Cooling Line/ Pump House-Seal Pit DN2600mm, PN6Atm, SN 5000N/m2 L= 800m Seaoutfall Line/ Seal Pit – Sea DN2400mm, PN6Atm, SN 6500N/m2 L= 4750m Manufacturing Meeting, Spain, January 2005 22