ROUTE OPTIMIZATION &
TOWER SPOTTING OF TRANSMISSION LINE
USING
REMOTE SENSING & GIS TECHNIQUES
Objective
 Base Map Creation using IRS LISS III & PAN merged/ LISS IV Satellite images & SOI
sheets
 Preliminary Alternative Route identification with detail report & BOQ
 Digital Terrain Modeling (DTM) using GIS on Hilly area
 Fly-thru generation along the selected route on Hilly area
 Approx B-line
End Coordinates
Angle & Suspension Tower Design
Inputs
Inputs from Client:
Other Sources:
 SOI Topo sheets
 Satellite Imagery
 Proposed plans for Future developments (Railway, National Highways, Transmission
Lines, Industrial area, city development, Airport, Forest areas etc.) along the proposed
corridor
Procurement of SOI
Toposheets Acquisition of Satellite Data
(LISS & PAN)/LISS IV
Scanning
Geo-referencing on UTM
Geo-referencing
Layer Specification
Base Map Preparation
Merging/Processing
of LISS & PAN data
Updation of Base Map
Marking of 3 Alternative Route
alignments
Walkover Survey
Comparison Reports & Selection of Proposed Route for
Detailed Survey
Methodology / Work Process
Import Satellite Raw
LISS III & Pan data
Geometric correction
(UTM projection) on the
bases of ground control points
DIP Fuse LISS III+Pan
Coordinates transformation
from satellite image
to scanned Toposheets
Base map preparation
Digitize constant layers
from Toposheet
Update base map from real
time data (Variable layers)
Mark 3 alternatives on
the bases of specifications
along the “B” line
Prepare the comparison
report for all three alternatives
Prepare fly-thru along
the best proposed route
Preliminary
Submission
Detail survey using GPS, capture all
feature data in coordinates in their feature code
Approved
Route
Geotechnical Investigation
Collect Soil Sample as per Specification
(7 mts borehole normal area,
40 mts borehole river crossing )
Update base map with alignment
from detail survey data
Final Route
Submission
Prepare conductor, Tower design in
Power Line software using tower spotting
parameters
Input detail survey data for Profiling
foundation Classification
(including cutting, Benching, revetment )
Tower spotting data
Submission
Bill Of Quantities,
Detailed all reports as required
as per specification and work
Receive
Input-data
Approval
On
Final Delivery
Work Process Flow Chart
Deliverables
Preliminary Approval
 Update Digitize base map with 3 alternatives
 Digital Terrain Model
 Detail Draft Report
Final Approval
 Update digitize base map with
survey route 3 alternatives
Survey report & Annexure
BOQ

More Related Content

PPT
Survey & ts for ehv lines
PPT
modern techniques work flow for transmission line
PPTX
ppt viva.pptx
PDF
Construction EHV Transmission Line
PPTX
INDUSTRIAL_TRAINING_PRESENTATION_REPORT.pptx
PPTX
Site Investigation for Tunneling_TTN.pptx
PDF
Madcom osp design & engineering capabilities
PDF
Terrestrial Gis Corporate Profile.pdf
Survey & ts for ehv lines
modern techniques work flow for transmission line
ppt viva.pptx
Construction EHV Transmission Line
INDUSTRIAL_TRAINING_PRESENTATION_REPORT.pptx
Site Investigation for Tunneling_TTN.pptx
Madcom osp design & engineering capabilities
Terrestrial Gis Corporate Profile.pdf

Similar to modern techniques for advance survey.ppt (20)

PDF
Don Talend Geospatial Rural Utility Mobile Mapping Article
PDF
HV Transmission line specifications
PDF
Future Inspection of Overhead Transmission Lines
PDF
Session 15: Grzegorz Marecki - AI Innovation for the Permitting Process
PPT
PPTX
ISM 2016 A Mining Imperative: Enhanced accuracy of real-time spatial data and...
PDF
High-Accuracy GPS for GIS: From 1ft to 4in.
PDF
IRJET- Bus Route Optimization in Jyothi Engineering College using ARC- GIS
PPT
BVOperations
PPT
Unicorn Wireless Engineering Presentation
PPT
Unicorn Wireless Engineering Presentation
PDF
Automated Tunnel Monitoring System (ATMS)
PPTX
Validation
PPT
data - analysis and modelling concepts.ppt
PDF
HOW TO CARRY OUT ROUTE SURVEY FOR FIBER PROJECT IMPLEMENTATION
PPT
Hack2o Facilities Mapping
PPT
Tx dot gps applications fuegner
PDF
Tim_Robb_Resume_PMS_ProjectDutyList_Mueller
PDF
Work Experience large
PPTX
mannan_PPT on Geological Experience in Tunnel 2007-2024.pptx
Don Talend Geospatial Rural Utility Mobile Mapping Article
HV Transmission line specifications
Future Inspection of Overhead Transmission Lines
Session 15: Grzegorz Marecki - AI Innovation for the Permitting Process
ISM 2016 A Mining Imperative: Enhanced accuracy of real-time spatial data and...
High-Accuracy GPS for GIS: From 1ft to 4in.
IRJET- Bus Route Optimization in Jyothi Engineering College using ARC- GIS
BVOperations
Unicorn Wireless Engineering Presentation
Unicorn Wireless Engineering Presentation
Automated Tunnel Monitoring System (ATMS)
Validation
data - analysis and modelling concepts.ppt
HOW TO CARRY OUT ROUTE SURVEY FOR FIBER PROJECT IMPLEMENTATION
Hack2o Facilities Mapping
Tx dot gps applications fuegner
Tim_Robb_Resume_PMS_ProjectDutyList_Mueller
Work Experience large
mannan_PPT on Geological Experience in Tunnel 2007-2024.pptx
Ad

More from AASPEConsultants (10)

PPT
Aerial Photography_traditional method.ppt
PPT
Presentation_for_GIS-LIS Land/Crop compensation
PPT
stereo_cameras stereoscopic viewing and stereo algorithms
PPT
Dahod_Presentation Tribal Development department
PPT
e-goverence, E-governance best practices
PPT
Hybird GIS Analysis using different data.ppt
PPT
remote sensing data types for soil mapping.ppt
PDF
about acrosol soil in africa sub continent
PPT
remote sensing data types, Optical scanners spectrometers and altimeters
PPTX
20 fingers.pptx
Aerial Photography_traditional method.ppt
Presentation_for_GIS-LIS Land/Crop compensation
stereo_cameras stereoscopic viewing and stereo algorithms
Dahod_Presentation Tribal Development department
e-goverence, E-governance best practices
Hybird GIS Analysis using different data.ppt
remote sensing data types for soil mapping.ppt
about acrosol soil in africa sub continent
remote sensing data types, Optical scanners spectrometers and altimeters
20 fingers.pptx
Ad

Recently uploaded (20)

PDF
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
PPTX
Unit 4 Skeletal System.ppt.pptxopresentatiom
PDF
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
PPTX
Chinmaya Tiranga Azadi Quiz (Class 7-8 )
PPTX
CHAPTER IV. MAN AND BIOSPHERE AND ITS TOTALITY.pptx
PDF
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
PDF
What if we spent less time fighting change, and more time building what’s rig...
PPTX
UNIT III MENTAL HEALTH NURSING ASSESSMENT
PDF
Computing-Curriculum for Schools in Ghana
PPTX
Introduction to Building Materials
PDF
Indian roads congress 037 - 2012 Flexible pavement
PPTX
Tissue processing ( HISTOPATHOLOGICAL TECHNIQUE
PDF
Classroom Observation Tools for Teachers
PPTX
202450812 BayCHI UCSC-SV 20250812 v17.pptx
PDF
A systematic review of self-coping strategies used by university students to ...
PDF
Practical Manual AGRO-233 Principles and Practices of Natural Farming
PDF
RMMM.pdf make it easy to upload and study
PPTX
Digestion and Absorption of Carbohydrates, Proteina and Fats
PPTX
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
PPTX
Final Presentation General Medicine 03-08-2024.pptx
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
Unit 4 Skeletal System.ppt.pptxopresentatiom
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
Chinmaya Tiranga Azadi Quiz (Class 7-8 )
CHAPTER IV. MAN AND BIOSPHERE AND ITS TOTALITY.pptx
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
What if we spent less time fighting change, and more time building what’s rig...
UNIT III MENTAL HEALTH NURSING ASSESSMENT
Computing-Curriculum for Schools in Ghana
Introduction to Building Materials
Indian roads congress 037 - 2012 Flexible pavement
Tissue processing ( HISTOPATHOLOGICAL TECHNIQUE
Classroom Observation Tools for Teachers
202450812 BayCHI UCSC-SV 20250812 v17.pptx
A systematic review of self-coping strategies used by university students to ...
Practical Manual AGRO-233 Principles and Practices of Natural Farming
RMMM.pdf make it easy to upload and study
Digestion and Absorption of Carbohydrates, Proteina and Fats
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
Final Presentation General Medicine 03-08-2024.pptx

modern techniques for advance survey.ppt

  • 1. ROUTE OPTIMIZATION & TOWER SPOTTING OF TRANSMISSION LINE USING REMOTE SENSING & GIS TECHNIQUES
  • 2. Objective  Base Map Creation using IRS LISS III & PAN merged/ LISS IV Satellite images & SOI sheets  Preliminary Alternative Route identification with detail report & BOQ  Digital Terrain Modeling (DTM) using GIS on Hilly area  Fly-thru generation along the selected route on Hilly area
  • 3.  Approx B-line End Coordinates Angle & Suspension Tower Design Inputs Inputs from Client: Other Sources:  SOI Topo sheets  Satellite Imagery  Proposed plans for Future developments (Railway, National Highways, Transmission Lines, Industrial area, city development, Airport, Forest areas etc.) along the proposed corridor
  • 4. Procurement of SOI Toposheets Acquisition of Satellite Data (LISS & PAN)/LISS IV Scanning Geo-referencing on UTM Geo-referencing Layer Specification Base Map Preparation Merging/Processing of LISS & PAN data Updation of Base Map Marking of 3 Alternative Route alignments Walkover Survey Comparison Reports & Selection of Proposed Route for Detailed Survey Methodology / Work Process
  • 5. Import Satellite Raw LISS III & Pan data Geometric correction (UTM projection) on the bases of ground control points DIP Fuse LISS III+Pan Coordinates transformation from satellite image to scanned Toposheets Base map preparation Digitize constant layers from Toposheet Update base map from real time data (Variable layers) Mark 3 alternatives on the bases of specifications along the “B” line Prepare the comparison report for all three alternatives Prepare fly-thru along the best proposed route Preliminary Submission Detail survey using GPS, capture all feature data in coordinates in their feature code Approved Route Geotechnical Investigation Collect Soil Sample as per Specification (7 mts borehole normal area, 40 mts borehole river crossing ) Update base map with alignment from detail survey data Final Route Submission Prepare conductor, Tower design in Power Line software using tower spotting parameters Input detail survey data for Profiling foundation Classification (including cutting, Benching, revetment ) Tower spotting data Submission Bill Of Quantities, Detailed all reports as required as per specification and work Receive Input-data Approval On Final Delivery Work Process Flow Chart
  • 6. Deliverables Preliminary Approval  Update Digitize base map with 3 alternatives  Digital Terrain Model  Detail Draft Report Final Approval  Update digitize base map with survey route 3 alternatives Survey report & Annexure BOQ