Import Satellite Raw
LISS III & Pan data
Geometric correction
(UTM projection) on the
bases of ground control points
DIP Fuse LISS III+Pan
Coordinates transformation
from satellite image
to scanned Toposheets
Base map preparation
Digitize constant layers
from Toposheet
Update base map from real
time data (Variable layers)
Mark 3 alternatives on
the bases of specifications
along the “B” line
Prepare the comparison
report for all three alternatives
Prepare fly-thru along
the best proposed route
Preliminary
Submission
Detail survey using GPS, capture all
feature data in coordinates in their feature code
Approved
Route
Geotechnical Investigation
Collect Soil Sample as per Specification
(7 mts borehole normal area,
40 mts borehole river crossing )
Update base map with alignment
from detail survey data
Final Route
Submission
Prepare conductor, Tower design in
Power Line software using tower spotting
parameters
Input detail survey data for Profiling
foundation Classification
(including cutting, Benching, revetment )
Tower spotting data
Submission
Bill Of Quantities,
Detailed all reports as required
as per specification and work
Receive
Input-data
Approval
On
Final Delivery
Work Process Flow Chart

More Related Content

PPT
Aerial Photography_traditional method.ppt
PPT
Presentation_for_GIS-LIS Land/Crop compensation
PPT
stereo_cameras stereoscopic viewing and stereo algorithms
PPT
Dahod_Presentation Tribal Development department
PPT
modern techniques for advance survey.ppt
PPT
e-goverence, E-governance best practices
PPT
Hybird GIS Analysis using different data.ppt
PPT
remote sensing data types for soil mapping.ppt
Aerial Photography_traditional method.ppt
Presentation_for_GIS-LIS Land/Crop compensation
stereo_cameras stereoscopic viewing and stereo algorithms
Dahod_Presentation Tribal Development department
modern techniques for advance survey.ppt
e-goverence, E-governance best practices
Hybird GIS Analysis using different data.ppt
remote sensing data types for soil mapping.ppt

Recently uploaded (20)

PDF
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
PDF
FOISHS ANNUAL IMPLEMENTATION PLAN 2025.pdf
PPTX
ELIAS-SEZIURE AND EPilepsy semmioan session.pptx
PDF
IGGE1 Understanding the Self1234567891011
PDF
Hazard Identification & Risk Assessment .pdf
PPTX
Virtual and Augmented Reality in Current Scenario
PDF
LDMMIA Reiki Yoga Finals Review Spring Summer
PDF
Weekly quiz Compilation Jan -July 25.pdf
PDF
Vision Prelims GS PYQ Analysis 2011-2022 www.upscpdf.com.pdf
PPTX
Share_Module_2_Power_conflict_and_negotiation.pptx
PDF
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
PDF
Environmental Education MCQ BD2EE - Share Source.pdf
PPTX
Unit 4 Computer Architecture Multicore Processor.pptx
PDF
My India Quiz Book_20210205121199924.pdf
DOC
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
PDF
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 2).pdf
PPTX
TNA_Presentation-1-Final(SAVE)) (1).pptx
PDF
MBA _Common_ 2nd year Syllabus _2021-22_.pdf
PDF
AI-driven educational solutions for real-life interventions in the Philippine...
PDF
Paper A Mock Exam 9_ Attempt review.pdf.
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
FOISHS ANNUAL IMPLEMENTATION PLAN 2025.pdf
ELIAS-SEZIURE AND EPilepsy semmioan session.pptx
IGGE1 Understanding the Self1234567891011
Hazard Identification & Risk Assessment .pdf
Virtual and Augmented Reality in Current Scenario
LDMMIA Reiki Yoga Finals Review Spring Summer
Weekly quiz Compilation Jan -July 25.pdf
Vision Prelims GS PYQ Analysis 2011-2022 www.upscpdf.com.pdf
Share_Module_2_Power_conflict_and_negotiation.pptx
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
Environmental Education MCQ BD2EE - Share Source.pdf
Unit 4 Computer Architecture Multicore Processor.pptx
My India Quiz Book_20210205121199924.pdf
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 2).pdf
TNA_Presentation-1-Final(SAVE)) (1).pptx
MBA _Common_ 2nd year Syllabus _2021-22_.pdf
AI-driven educational solutions for real-life interventions in the Philippine...
Paper A Mock Exam 9_ Attempt review.pdf.
Ad
Ad

modern techniques work flow for transmission line

  • 1. Import Satellite Raw LISS III & Pan data Geometric correction (UTM projection) on the bases of ground control points DIP Fuse LISS III+Pan Coordinates transformation from satellite image to scanned Toposheets Base map preparation Digitize constant layers from Toposheet Update base map from real time data (Variable layers) Mark 3 alternatives on the bases of specifications along the “B” line Prepare the comparison report for all three alternatives Prepare fly-thru along the best proposed route Preliminary Submission Detail survey using GPS, capture all feature data in coordinates in their feature code Approved Route Geotechnical Investigation Collect Soil Sample as per Specification (7 mts borehole normal area, 40 mts borehole river crossing ) Update base map with alignment from detail survey data Final Route Submission Prepare conductor, Tower design in Power Line software using tower spotting parameters Input detail survey data for Profiling foundation Classification (including cutting, Benching, revetment ) Tower spotting data Submission Bill Of Quantities, Detailed all reports as required as per specification and work Receive Input-data Approval On Final Delivery Work Process Flow Chart