Draw 5S Plan
lay out
Explain 5s
elements to
all staff
Select the
Task force
members
5S Implementation Process
5S Roll Out
Step 1:
Sorting out
carry out
workshop
Revamp-
Major 5S
Step 2:
Set in order
Step 3:
Shine
Scan the
Premises
Step 5:
Self
Discipline
Step 4:
Standardize
5S step 3 implementation
Shine (Seiso)
 Adopt cleaning as a daily activity and as a part
of inspection. Clean the workplace before
starting of the job and before closing the job.
Put aside 10 or 15 minutes for the same
activity per day.
 Clean and inspect defined areas, workplace,
machines and other items.
 Cleaning indirectly helps to check or inspect
each and every part and place. Hence, it should
be a habit.
 Take remedial action to prevent re-occurrence.
 Schedule as needed paint coating on buildings,
floors, machinery and equipment, during non
productive times
SEISO (SHINE)
 Find ways to prevent dirt and
contamination.
 Sweeping checklists are applied
throughout the day for each of the
common areas
 Safety inspections are performed on a
regularly scheduled basis
 Workers should be responsible to clean
the machines, tools, work benches in
their individual workplace.
 Sweepers should be responsible for the
common areas outside and inside the
premises
Oily floors are a common
problem created by:
 Oil leaking from engines,
transmissions and brake
systems and spoiling the floor
 Keeping the transmission and other parts on the
floor, spilling the oil.
 Draining the oil into a pan, spilling it on the floor.
 Carrying the oil pan to a waste oil drum and
carelessly emptying it in the drum.
 Note the condition of floor in the photograph.
Use 5 Whys or cause-and-effect methods to find
the root causes of slippery floor and take
appropriate corrective and preventive action.
WHY 1
Used Engine oil is
Emptied in a drum
manually causing
it to spill on the
floor
Ask "WHY" five times - get to the root
cause of why the working bays get dirty
Proper oil collector
is not used for
draining the oil.
WHY 2
While carrying it to
the drum, oil spills
all over the place.
WHY 3
The oil drum is
located at a long
distance
WHY 4
Manual transportation
of the used
engine oil is the main
cause of oil Spilling on
the floors
WHY 5
Root
cause
Conclusion: The used oil should not be transported
manually to the waste oil drum
Air line to
oil drain
trolley
pump
Oil drain trolley with
evacuation pump
A
B
c
Method of preventing oil
spillage on the ground
Waste oil tank located
outside the working
area(hidden from view)
PVC
/FRP
WASTE
OIL
TANK
Waste oil sucked by the
purchaser’s tanker
Making use of the root cause analysis, the task force
came up with the above solution to prevent oil spillage.
Floor rubber mats can be laid under the car
lift to prevent leaking engine and
transmission oils spoiling the floor. There is
no special rubber quality required, local
grades of thick rubber sheets would be ok.
The rubber sheet can be washed with a
chemical or detergent frequently.
5S Step 4 implementation
SEIKETSU(STANDARDIZE)
Wake up Sleeping Beauty
!!!!
SEIKETSU (Standardize)
•Establish standards.
Develop visual controls to
expose abnormality.
•integrate with daily work
management.
•Prevent deterioration
using 5W & 1H strategy.
Standards improve reliability and consistency.
Actions items
1. Take “before” photographs.(See module 2 for
before photos)
2. Check that the first three S’s are
implemented properly.
3. All team activity documents/check lists
should be publicly displayed on a 5S board.
4. Establish the routines and standard
practices for regularly and systematically
repeating the first three S’s.
5. Create procedures and forms for regularly
evaluating the status of the first three S’s.
6. Standardize red tag procedures and holding
area rules (see Seiri).
7. Standardize procedures for creating shadow
boards, position lines, and labeling of all items
(see Seiton).
8. Standardize cleaning schedules using the “5S
Owner Check Sheets” (see Seiso).
9. Standardize “single-point lessons” for
documenting and communicating 5S procedures
and improvements in workplace and equipment.
10. Create a maintenance system for
housekeeping. Make a schedule for cleaning of
the workplace. A common approach is to ask a
cross-functional team to do it.
11. Inter-departmental competition is an effective
means of sustaining and enhancing interest in 5S.
12. Assign responsibility to individuals for a work
area and machinery.
Check out
Kaizen suggestion form.xlsx
13. Regular inspection/audit and
evaluation by a special team (including
senior management persons) to be
continued.
14. Instead of criticizing poor cases,
praise and commend good practices or
good performers.
15. Take “after” photographs and post
them on the 5S board(s).
16. Complete evaluation using 5S levels of
implementation with the facility manager
or the authorized persons in the
organization
5S activity Board
•Create an environment
through slogans, posters
and other visuals
•Set an example, from a
habit.
•Conduct audits to evaluate
approach and results.
Recognize 5S achievements
5. SHITSUKE (SELF DISCIPLINE)
Action speaks louder than the words
March04 audit.xls
 Fix up a day when your workshop staff
takes a break from the usual boring schedule.
 Announce at least 3 winners who have
scored maximum points in the 5S audit.
 Distribute T shirts or badges to winners.
Module 4-5S

More Related Content

PPTX
5S Methodology
PDF
5S - A step-by-step approach to implement 5S at your workplace
PPTX
Module 3-5S
PPTX
Understand 5s in 5 minutes
PPTX
5 s technique
PPT
5 S Powerpoint
PPT
5s
PPT
Training program on 5 S
5S Methodology
5S - A step-by-step approach to implement 5S at your workplace
Module 3-5S
Understand 5s in 5 minutes
5 s technique
5 S Powerpoint
5s
Training program on 5 S

What's hot (20)

PDF
How to implement 5S - Japanese technique presentation by netpeckers managemen...
PPT
5s trg manual woil pro
PDF
Improvement of Plant Layout by using 5S technique-An industrial case study
PPTX
5-S Methodology - ADDVALUE - Nilesh Arora
PPT
5 S Basic Training
PPT
5s training slides_138
PPT
5s methodology
PPTX
Tnpa 5 s training modified version
PPTX
5s implimantations
PPT
5s.presentation akash
PPTX
5s Methodlogy
PPT
5 S Work Place
PPTX
5S_DMSC
PPTX
5 s powerpoint presentation
PPTX
QCL-15-V4_[ChallengeNo1]_[VJTI]_[NISHKA VIKAS GULATI]
PPTX
Workplace Management
PPT
Effective shop floor oranization
PPT
5 S
How to implement 5S - Japanese technique presentation by netpeckers managemen...
5s trg manual woil pro
Improvement of Plant Layout by using 5S technique-An industrial case study
5-S Methodology - ADDVALUE - Nilesh Arora
5 S Basic Training
5s training slides_138
5s methodology
Tnpa 5 s training modified version
5s implimantations
5s.presentation akash
5s Methodlogy
5 S Work Place
5S_DMSC
5 s powerpoint presentation
QCL-15-V4_[ChallengeNo1]_[VJTI]_[NISHKA VIKAS GULATI]
Workplace Management
Effective shop floor oranization
5 S

Viewers also liked (20)

ODP
Level 2 certificate in lean organisation management techniques powerpoint
PPT
Morrisons session 2
PPTX
OEE Toolkit Software - product overview april 2013
PPTX
Visual control final presentation
PPT
Oee Explained
PPTX
Visual Management
PPTX
Lean Office 5S : The Next Level
PDF
Benefits of Collecting OEE Data with Production Tracking Software
PPT
5S Implementation - The first step to continuous improvement
PPTX
Integrating OEE and Process Improvement
PPTX
Design For OEE (DFOEE)
PPTX
6s cartoons 1
PPTX
The Six Big Losses of OEE
PDF
5S Housekeeping Standard
PDF
The 7 deadly sins of Overall Equipment Effectiveness (OEE)
PPTX
5s Lean Presentation
PDF
Oee guide
PPT
TO IMPEOVE THE PERFOMANCE OF THE PLANT USING OEE
PPTX
6 OEE overview
Level 2 certificate in lean organisation management techniques powerpoint
Morrisons session 2
OEE Toolkit Software - product overview april 2013
Visual control final presentation
Oee Explained
Visual Management
Lean Office 5S : The Next Level
Benefits of Collecting OEE Data with Production Tracking Software
5S Implementation - The first step to continuous improvement
Integrating OEE and Process Improvement
Design For OEE (DFOEE)
6s cartoons 1
The Six Big Losses of OEE
5S Housekeeping Standard
The 7 deadly sins of Overall Equipment Effectiveness (OEE)
5s Lean Presentation
Oee guide
TO IMPEOVE THE PERFOMANCE OF THE PLANT USING OEE
6 OEE overview

Similar to Module 4-5S (20)

PPT
Qcl 14-v3 poor-5-s_banasthali-university_rashi
PPT
5S Presentation for beginners and professionals for implementation
PPT
The 5 s system
PPTX
5s in the workplace/ sanitation/ cleanliness
PPT
All about housekeeping
DOCX
PPTX
Japanese practice on cleanliness
PPTX
CHP 1 Apply.pptx
PPT
Kaizen and 5S technique Case study
PPT
5%20 s%20training%20first
PPT
my name is sathush i am a bsc studeS.ppt
PPT
Mel751 basics-of-5-s
PPT
5 s concept
PPT
5 S + 1 S
PPT
5 S Net
PPT
Presentation Slides- 5 S.ppt
PPT
All about housekeeping
PPTX
5S The Practice of Good Housekeeping
PPTX
Qcl 14-v3 poor-5-s_banasthali-university_rashi
5S Presentation for beginners and professionals for implementation
The 5 s system
5s in the workplace/ sanitation/ cleanliness
All about housekeeping
Japanese practice on cleanliness
CHP 1 Apply.pptx
Kaizen and 5S technique Case study
5%20 s%20training%20first
my name is sathush i am a bsc studeS.ppt
Mel751 basics-of-5-s
5 s concept
5 S + 1 S
5 S Net
Presentation Slides- 5 S.ppt
All about housekeeping
5S The Practice of Good Housekeeping

Recently uploaded (20)

PDF
System Diagrams John Deere 370E 410E 460E Repair Manual.pdf
PPTX
Moral Theology (PREhhhhhhhhhhhhhhhhhhhhhLIMS) (1).pptx
PDF
Diagnostic Trouble Codes John Deere 370E 410E 460E Technical Manual.pdf
PDF
Smart_Doors_Trunk_Control_Presentation.pdf
PDF
Cylinder head Volvo EC55 Service Repair Manual.pdf
PPT
157_37315_EA221_2013_1__2_1_Chapter 1, introduction to OR.ppt
PDF
Deutz D6D EBE2 Volvo EC160BLC Excavator Service Repair Manual.pdf
PDF
120K 2 caterpillar motor grader service repair manual SZZ
PPTX
Applications of SAP S4HANA in Mechanical by Sidhant Vohra (SET23A24040166).pptx
PDF
Caterpillar Cat 324E LN Excavator (Prefix LDG) Service Repair Manual Instant ...
PPTX
Victory precisions_Die casting foundry_.pptx
PDF
John Deere 410E II Articulated Dump Truck Service Manual.pdf
PDF
Transmission John Deere 370E 410E 460E Technical Manual.pdf
PDF
TM1611 John Deere 410E service Repair Manual.pdf
PPTX
diesel comman rail diesel comman hhh rail
PDF
Chris_Voss_Arta_negocierii_Tehnicile_neg.pdf
PDF
Articulated Dump Truck John Deere 370E 410E 460E Technical Manual.pdf
PPTX
45-Days-of-Engineering-Excellence-132-kV-Grid-Substation-Training.pptx
PPTX
IOT-UNIT 3.pptxaaaasasasasasasaasasasasas
PDF
Dongguan Sunnew ESS Profile for the year of 2023
System Diagrams John Deere 370E 410E 460E Repair Manual.pdf
Moral Theology (PREhhhhhhhhhhhhhhhhhhhhhLIMS) (1).pptx
Diagnostic Trouble Codes John Deere 370E 410E 460E Technical Manual.pdf
Smart_Doors_Trunk_Control_Presentation.pdf
Cylinder head Volvo EC55 Service Repair Manual.pdf
157_37315_EA221_2013_1__2_1_Chapter 1, introduction to OR.ppt
Deutz D6D EBE2 Volvo EC160BLC Excavator Service Repair Manual.pdf
120K 2 caterpillar motor grader service repair manual SZZ
Applications of SAP S4HANA in Mechanical by Sidhant Vohra (SET23A24040166).pptx
Caterpillar Cat 324E LN Excavator (Prefix LDG) Service Repair Manual Instant ...
Victory precisions_Die casting foundry_.pptx
John Deere 410E II Articulated Dump Truck Service Manual.pdf
Transmission John Deere 370E 410E 460E Technical Manual.pdf
TM1611 John Deere 410E service Repair Manual.pdf
diesel comman rail diesel comman hhh rail
Chris_Voss_Arta_negocierii_Tehnicile_neg.pdf
Articulated Dump Truck John Deere 370E 410E 460E Technical Manual.pdf
45-Days-of-Engineering-Excellence-132-kV-Grid-Substation-Training.pptx
IOT-UNIT 3.pptxaaaasasasasasasaasasasasas
Dongguan Sunnew ESS Profile for the year of 2023

Module 4-5S

  • 1. Draw 5S Plan lay out Explain 5s elements to all staff Select the Task force members 5S Implementation Process 5S Roll Out Step 1: Sorting out carry out workshop Revamp- Major 5S Step 2: Set in order Step 3: Shine Scan the Premises Step 5: Self Discipline Step 4: Standardize
  • 2. 5S step 3 implementation Shine (Seiso)
  • 3.  Adopt cleaning as a daily activity and as a part of inspection. Clean the workplace before starting of the job and before closing the job. Put aside 10 or 15 minutes for the same activity per day.  Clean and inspect defined areas, workplace, machines and other items.  Cleaning indirectly helps to check or inspect each and every part and place. Hence, it should be a habit.  Take remedial action to prevent re-occurrence.  Schedule as needed paint coating on buildings, floors, machinery and equipment, during non productive times SEISO (SHINE)
  • 4.  Find ways to prevent dirt and contamination.  Sweeping checklists are applied throughout the day for each of the common areas  Safety inspections are performed on a regularly scheduled basis  Workers should be responsible to clean the machines, tools, work benches in their individual workplace.  Sweepers should be responsible for the common areas outside and inside the premises
  • 5. Oily floors are a common problem created by:  Oil leaking from engines, transmissions and brake systems and spoiling the floor  Keeping the transmission and other parts on the floor, spilling the oil.  Draining the oil into a pan, spilling it on the floor.  Carrying the oil pan to a waste oil drum and carelessly emptying it in the drum.  Note the condition of floor in the photograph. Use 5 Whys or cause-and-effect methods to find the root causes of slippery floor and take appropriate corrective and preventive action.
  • 6. WHY 1 Used Engine oil is Emptied in a drum manually causing it to spill on the floor Ask "WHY" five times - get to the root cause of why the working bays get dirty Proper oil collector is not used for draining the oil. WHY 2 While carrying it to the drum, oil spills all over the place. WHY 3 The oil drum is located at a long distance WHY 4 Manual transportation of the used engine oil is the main cause of oil Spilling on the floors WHY 5 Root cause Conclusion: The used oil should not be transported manually to the waste oil drum
  • 7. Air line to oil drain trolley pump Oil drain trolley with evacuation pump A B c Method of preventing oil spillage on the ground Waste oil tank located outside the working area(hidden from view) PVC /FRP WASTE OIL TANK Waste oil sucked by the purchaser’s tanker Making use of the root cause analysis, the task force came up with the above solution to prevent oil spillage.
  • 8. Floor rubber mats can be laid under the car lift to prevent leaking engine and transmission oils spoiling the floor. There is no special rubber quality required, local grades of thick rubber sheets would be ok. The rubber sheet can be washed with a chemical or detergent frequently.
  • 9. 5S Step 4 implementation SEIKETSU(STANDARDIZE)
  • 10. Wake up Sleeping Beauty !!!!
  • 11. SEIKETSU (Standardize) •Establish standards. Develop visual controls to expose abnormality. •integrate with daily work management. •Prevent deterioration using 5W & 1H strategy. Standards improve reliability and consistency.
  • 12. Actions items 1. Take “before” photographs.(See module 2 for before photos) 2. Check that the first three S’s are implemented properly. 3. All team activity documents/check lists should be publicly displayed on a 5S board. 4. Establish the routines and standard practices for regularly and systematically repeating the first three S’s. 5. Create procedures and forms for regularly evaluating the status of the first three S’s. 6. Standardize red tag procedures and holding area rules (see Seiri).
  • 13. 7. Standardize procedures for creating shadow boards, position lines, and labeling of all items (see Seiton). 8. Standardize cleaning schedules using the “5S Owner Check Sheets” (see Seiso). 9. Standardize “single-point lessons” for documenting and communicating 5S procedures and improvements in workplace and equipment. 10. Create a maintenance system for housekeeping. Make a schedule for cleaning of the workplace. A common approach is to ask a cross-functional team to do it. 11. Inter-departmental competition is an effective means of sustaining and enhancing interest in 5S. 12. Assign responsibility to individuals for a work area and machinery.
  • 14. Check out Kaizen suggestion form.xlsx 13. Regular inspection/audit and evaluation by a special team (including senior management persons) to be continued. 14. Instead of criticizing poor cases, praise and commend good practices or good performers. 15. Take “after” photographs and post them on the 5S board(s). 16. Complete evaluation using 5S levels of implementation with the facility manager or the authorized persons in the organization
  • 16. •Create an environment through slogans, posters and other visuals •Set an example, from a habit. •Conduct audits to evaluate approach and results. Recognize 5S achievements 5. SHITSUKE (SELF DISCIPLINE) Action speaks louder than the words March04 audit.xls
  • 17.  Fix up a day when your workshop staff takes a break from the usual boring schedule.  Announce at least 3 winners who have scored maximum points in the 5S audit.  Distribute T shirts or badges to winners.