Draw 5S Plan
lay out
Explain 5s
elements to
all staff
Select the
Task force
members
5S Implementation Process
5S Roll Out
Step 1:
Sorting out
carry out
workshop
Revamp-
Major 5S
Step 2:
Set in order
Step 3:
Shine
Scan the
Premises
Step 5:
Self
Discipline
Step 4:
Standardize
5S-Step1 implementation
Sort (Sieri)
Start the 5S Sort- to clear the mess!
 The guide assigns 5S Task Force members for the
sorting event.
 members move from workstation to workstation
tagging items and removing them to the sorting
area.
 Red, Green and yellow tags identify different
actions quickly.
The task force member fills the
information and attaches the tag to
item
 Sort out resistance from
staff on the spot.
 workstation should only
contain a small amount of
work in progress and the
tools and supplies needed to
do the work
 Clear the sorting area by
following the above three 3
colored disposition rules.
Managing tagged area
See the tagged items.
Can even paste the
red tags if items are
large
Unwanted obsolete
equipment moved to sort area
Result is a clean,
efficient & pleasant
work station
Useless papers removed
to Sort area/disposed off
Logging tagged items
Date Loca
tion
Item
Description
Qty In
working
order
Obsol
ete
Not
need
ed
Scrap
/defe
ctive
14/09/10 A Power window
switch
1 x
14/09/10 B Wiper motor 2 x
14/09/10 B Brake pad 2 x
16/9/10 C Tire pressure
gauge
1 x
16/09/10 C Door mirror front 1 x
16/9/10 C Wheel alignment
printer old model
1 x
16/09/10 C Starter pinion 1 X
16/09/10 D Door mirror front 1 x
16/09/10 D Work bench
broken
1 x
16/09/10 D ½” DE spanner
broken
1 x
Decision for
Disposal
Sell scrap
Sell scrap
Return to stores
Return to special
tools section
Sell scrap
Sell
recycle
sell scrap
Repair as standby
Sell scrap
Decisions on the tagged items
Store these items in a separate area
Task force can make a decision about disposing
off the item
Some person may express that a particular item
can still be used in future ‘Write a tentative date
of disposal on the yellow tag.
Red tagged items can be scrapped
Extra items or the one which will be definitely
required in future, are tagged green and can be
kept for use as needed.
Task force can make decisions as above in a
monthly meeting.
By following sort, the place will have only
necessary items.
5S-Step2 implementation.
Set in order (SEITON)
Wake up Sleeping Giants
!!!!
Step 2:
SEITON (Set in order or straighten)
A place for everything and every thing in its place
Perform Daily walks to each station & watch
the employees work.
Take note of wasted movements, because
there would be something out of reach of
employees.
Regularly used items should be placed in a
central location accessible to all (like oil
filters, fuel filters.
All Service literature, manuals must be
available, labeled
Divide the areas into various sections, bays
and demarcate them with yellow lines.
In each bay, mark yellow lines for allocating
places for keeping work benches, trash box,
equipment , tool trolley.
Label each area as A,B,C,D and allocate each
area to one person
 Tools must be put in place when not in use
 All movable objects must have markings
for their locations
 Machines and equipment must have all
parts in place(Safety)
 Visual displays must be in place
 All the tool trolleys to be cleaned and lined
up in a separate room at end of the day.
 Arrange special tools in a shadow board,
label each tool and create a reference
sheet for each label and tool description
Visual examples of straightened workplace
A place for everything and every thing in its place-
Module 3-5S
A place for everything and every thing in
its place--contd
Module 3-5S
Module 3-5S
Fast moving items like oil filters, oil
cans, fuel filters, brake pads, bulbs
placed near the parts entrance for
quick reach to workers.
Bin nos. for
reference of parts
locations
Fast moving Parts ready for issue
before work starts ( Pre picked in
baskets)
Please follow the module 4

More Related Content

PDF
SMED - Single Minute Exchange of Dies
PPTX
5S Implementation Presentation
PDF
5s Impelementation
PPT
5 S – A Program To Improve Project
PPTX
5S: Awareness & Implementation
PDF
5S Auditing Sheet
PPT
"Visual management & 5S " in Lean T.P.S (Workshop slides)
PDF
Jishu Hozen or Autonomous Maintenance
SMED - Single Minute Exchange of Dies
5S Implementation Presentation
5s Impelementation
5 S – A Program To Improve Project
5S: Awareness & Implementation
5S Auditing Sheet
"Visual management & 5S " in Lean T.P.S (Workshop slides)
Jishu Hozen or Autonomous Maintenance

What's hot (20)

PPTX
4M Change ppt.pptx
PDF
5 s training pack
PDF
5S training manual
PDF
Manufacturing wastes
PPTX
Mistake proofing for web1
PDF
Presentation - introduction to 5S
PPTX
Training module 4 m change
PPTX
AUTONOMOUS MAINTENANCE
PPT
Abnomality and jishu hozen
PPTX
Visual management
PDF
Maintenance Autonomous
PPTX
5 s and workplace productivity cet
PPT
5s training slides_432
PDF
Free Guide to 5S
PDF
Preventive / Autonomous Maintenance - Beginners Guide - Tamil
PDF
5S TAMIL
PPT
5 S Presentation Basic Training
PPTX
Value Stream Mapping
4M Change ppt.pptx
5 s training pack
5S training manual
Manufacturing wastes
Mistake proofing for web1
Presentation - introduction to 5S
Training module 4 m change
AUTONOMOUS MAINTENANCE
Abnomality and jishu hozen
Visual management
Maintenance Autonomous
5 s and workplace productivity cet
5s training slides_432
Free Guide to 5S
Preventive / Autonomous Maintenance - Beginners Guide - Tamil
5S TAMIL
5 S Presentation Basic Training
Value Stream Mapping
Ad

Viewers also liked (20)

PPT
5S Implementation - The first step to continuous improvement
PDF
5S - A step-by-step approach to implement 5S at your workplace
PPTX
5 s powerpoint presentation
PPTX
5S: A Workplace Organization Method
PPTX
5 S Program Orientation Powerpoint Presentation
PPT
Presentacion 5 S
PDF
Lean Six Sigma and the principles of Kaizen for your business
PPTX
Module 4-5S
PPTX
5 s kaizen
PPTX
OEE Toolkit Software - product overview april 2013
PPTX
Visual control final presentation
PPT
Oee Explained
PPTX
Visual Management
PPTX
Lean Office 5S : The Next Level
PDF
Benefits of Collecting OEE Data with Production Tracking Software
PPTX
Integrating OEE and Process Improvement
PPTX
Design For OEE (DFOEE)
PPTX
GP Chapitre 5 : Le juste à temps et la méthode KANBAN
PPTX
6s cartoons 1
PDF
Lean 5S Visual Workplace Organization Training Module
5S Implementation - The first step to continuous improvement
5S - A step-by-step approach to implement 5S at your workplace
5 s powerpoint presentation
5S: A Workplace Organization Method
5 S Program Orientation Powerpoint Presentation
Presentacion 5 S
Lean Six Sigma and the principles of Kaizen for your business
Module 4-5S
5 s kaizen
OEE Toolkit Software - product overview april 2013
Visual control final presentation
Oee Explained
Visual Management
Lean Office 5S : The Next Level
Benefits of Collecting OEE Data with Production Tracking Software
Integrating OEE and Process Improvement
Design For OEE (DFOEE)
GP Chapitre 5 : Le juste à temps et la méthode KANBAN
6s cartoons 1
Lean 5S Visual Workplace Organization Training Module
Ad

Similar to Module 3-5S (20)

PDF
5S_Astiadke_pdf.pdf
PPT
Effective shop floor oranization
PPT
5S_Training FOR MANUFACTURE INDUSTRIAL FACTORY
PPT
5S Principles of LEAN for Manufacturing Optimisation
PPTX
Harishkannan Ppt Delphi (1).pptxvajsjsksmsehehejej
PDF
Work environment 5S
PPT
5 S Intro
PDF
Guide-5S Kaizen matters for continuous improvement
PPTX
5s Lean Presentation
PDF
6S Introduction.pdf
PPT
5S Workshop &Visual management - Krishna Heda
PPTX
Creating speed with 5 s
PPTX
How to implement 5 s
PPTX
KAIZEN Updated 030507
PPTX
Accudyn Products, INC.
PPT
3C & 5S.ppt
PPT
5s trg manual woil pro
PDF
6s overview in production floor
5S_Astiadke_pdf.pdf
Effective shop floor oranization
5S_Training FOR MANUFACTURE INDUSTRIAL FACTORY
5S Principles of LEAN for Manufacturing Optimisation
Harishkannan Ppt Delphi (1).pptxvajsjsksmsehehejej
Work environment 5S
5 S Intro
Guide-5S Kaizen matters for continuous improvement
5s Lean Presentation
6S Introduction.pdf
5S Workshop &Visual management - Krishna Heda
Creating speed with 5 s
How to implement 5 s
KAIZEN Updated 030507
Accudyn Products, INC.
3C & 5S.ppt
5s trg manual woil pro
6s overview in production floor

Recently uploaded (20)

PDF
Pistons Volvo EC160C NL EC160CNL Excavator Service Repair Manual.pdf
PPT
Introduction to Hybrid Electric Vehicles
PDF
Caterpillar Cat 324E LN Excavator (Prefix LDG) Service Repair Manual Instant ...
PPTX
45-Days-of-Engineering-Excellence-132-kV-Grid-Substation-Training.pptx
PDF
150 caterpillar motor grader service repair manual EB4
PDF
Transmission John Deere 370E 410E 460E Technical Manual.pdf
PPT
Main/Core Business Application User Manual
PDF
TM1611 John Deere 410E service Repair Manual.pdf
PDF
Fuel injection pump Volvo EC55 Repair Manual.pdf
PDF
Volvo EC20C Excavator Service maintenance schedules.pdf
PPTX
Victory precisions_Die casting foundry_.pptx
PDF
Lightweight-and-quantum-resistant-authentication-for-the-Internet-of-Drones-I...
PDF
MES Chapter 3 Combined UNIVERSITY OF VISVESHWARAYA
PDF
eti_09_TestPrecedurebdciwbwib wdjkcwnowe wdnwdw
PPTX
Moral Theology (PREhhhhhhhhhhhhhhhhhhhhhLIMS) (1).pptx
PDF
Pharmacy is a goood college yvucc7t7tvy7tv7t
PPT
Internal combustion system for the engine fuel system
PDF
Diagnostic Trouble Codes John Deere 370E 410E 460E Technical Manual.pdf
PPTX
PHILOSOPHY lesson for my presentation tomorrow
PPTX
LESSON 3 Apply Safety Practices mmms.pptx
Pistons Volvo EC160C NL EC160CNL Excavator Service Repair Manual.pdf
Introduction to Hybrid Electric Vehicles
Caterpillar Cat 324E LN Excavator (Prefix LDG) Service Repair Manual Instant ...
45-Days-of-Engineering-Excellence-132-kV-Grid-Substation-Training.pptx
150 caterpillar motor grader service repair manual EB4
Transmission John Deere 370E 410E 460E Technical Manual.pdf
Main/Core Business Application User Manual
TM1611 John Deere 410E service Repair Manual.pdf
Fuel injection pump Volvo EC55 Repair Manual.pdf
Volvo EC20C Excavator Service maintenance schedules.pdf
Victory precisions_Die casting foundry_.pptx
Lightweight-and-quantum-resistant-authentication-for-the-Internet-of-Drones-I...
MES Chapter 3 Combined UNIVERSITY OF VISVESHWARAYA
eti_09_TestPrecedurebdciwbwib wdjkcwnowe wdnwdw
Moral Theology (PREhhhhhhhhhhhhhhhhhhhhhLIMS) (1).pptx
Pharmacy is a goood college yvucc7t7tvy7tv7t
Internal combustion system for the engine fuel system
Diagnostic Trouble Codes John Deere 370E 410E 460E Technical Manual.pdf
PHILOSOPHY lesson for my presentation tomorrow
LESSON 3 Apply Safety Practices mmms.pptx

Module 3-5S

  • 1. Draw 5S Plan lay out Explain 5s elements to all staff Select the Task force members 5S Implementation Process 5S Roll Out Step 1: Sorting out carry out workshop Revamp- Major 5S Step 2: Set in order Step 3: Shine Scan the Premises Step 5: Self Discipline Step 4: Standardize
  • 3. Start the 5S Sort- to clear the mess!  The guide assigns 5S Task Force members for the sorting event.  members move from workstation to workstation tagging items and removing them to the sorting area.  Red, Green and yellow tags identify different actions quickly.
  • 4. The task force member fills the information and attaches the tag to item  Sort out resistance from staff on the spot.  workstation should only contain a small amount of work in progress and the tools and supplies needed to do the work  Clear the sorting area by following the above three 3 colored disposition rules.
  • 5. Managing tagged area See the tagged items. Can even paste the red tags if items are large
  • 6. Unwanted obsolete equipment moved to sort area Result is a clean, efficient & pleasant work station Useless papers removed to Sort area/disposed off
  • 7. Logging tagged items Date Loca tion Item Description Qty In working order Obsol ete Not need ed Scrap /defe ctive 14/09/10 A Power window switch 1 x 14/09/10 B Wiper motor 2 x 14/09/10 B Brake pad 2 x 16/9/10 C Tire pressure gauge 1 x 16/09/10 C Door mirror front 1 x 16/9/10 C Wheel alignment printer old model 1 x 16/09/10 C Starter pinion 1 X 16/09/10 D Door mirror front 1 x 16/09/10 D Work bench broken 1 x 16/09/10 D ½” DE spanner broken 1 x Decision for Disposal Sell scrap Sell scrap Return to stores Return to special tools section Sell scrap Sell recycle sell scrap Repair as standby Sell scrap
  • 8. Decisions on the tagged items Store these items in a separate area Task force can make a decision about disposing off the item Some person may express that a particular item can still be used in future ‘Write a tentative date of disposal on the yellow tag. Red tagged items can be scrapped Extra items or the one which will be definitely required in future, are tagged green and can be kept for use as needed. Task force can make decisions as above in a monthly meeting. By following sort, the place will have only necessary items.
  • 10. Wake up Sleeping Giants !!!!
  • 11. Step 2: SEITON (Set in order or straighten) A place for everything and every thing in its place Perform Daily walks to each station & watch the employees work. Take note of wasted movements, because there would be something out of reach of employees. Regularly used items should be placed in a central location accessible to all (like oil filters, fuel filters. All Service literature, manuals must be available, labeled
  • 12. Divide the areas into various sections, bays and demarcate them with yellow lines. In each bay, mark yellow lines for allocating places for keeping work benches, trash box, equipment , tool trolley. Label each area as A,B,C,D and allocate each area to one person
  • 13.  Tools must be put in place when not in use  All movable objects must have markings for their locations  Machines and equipment must have all parts in place(Safety)  Visual displays must be in place  All the tool trolleys to be cleaned and lined up in a separate room at end of the day.  Arrange special tools in a shadow board, label each tool and create a reference sheet for each label and tool description
  • 14. Visual examples of straightened workplace A place for everything and every thing in its place-
  • 16. A place for everything and every thing in its place--contd
  • 19. Fast moving items like oil filters, oil cans, fuel filters, brake pads, bulbs placed near the parts entrance for quick reach to workers. Bin nos. for reference of parts locations Fast moving Parts ready for issue before work starts ( Pre picked in baskets)
  • 20. Please follow the module 4