Monitoring and Controlling Of Electric
Overhead Travelling Crane Using PLC and
SCADA
1
Alok Dewangan, 2
Prof. Neelesh Kumar
1
Research Scholar MTech, 2
Assistant Professor
1,2 Disha Institute of Management and Technology, Raipur(C.G.), India
Abstract: PLC and SCADA are the two new approaches used to control the motion of Electric Overhead travelling
crane. Ladder logic diagram for EOT Cranes are designed for motion using variable frequency drives and
contactor logic and performance of various parameters are analyzed and compared and image of E.O.T crane are
designed in SCADA software and communication between PLC and Scada is done with the help of Siemens
simulator .There is a provision of hydraulic motor for motion in main hoist if power failure of cranes takes place to
avoid the unsafe condition and work under extreme condition.
Keywords: Electric overhead travelling crane, PLC, SCADA, Ladder logic, Siemens make Simulator.
1. INTRODUCTION
A crane is the type of machine mainly used for handling heavy loads in different industry branches: metallurgy, paper and
cement industry. By the construction, cranes are divided into overhead cranes and gantry cranes. Overhead and gantry
cranes are typically used for moving containers, loading trucks or material storage. This crane type usually consists of
three separate motions for transporting material. The first motion is the hoist, which raises and lowers the material. The
second is the trolley (cross travel), which allows the hoist to be positioned directly above the material for placement. The
third is the gantry or bridge motion (long travel), which allows the entire crane to be moved along the working area.
This paper presents the loading zone and unloading zone. Three-motors namely Main hoist, long travel And Cross travel
are used for accomplishing movements of electric overhead travelling cranes in desired directions.. PLC are used for
controlling the three motors using programs. Drives are used to control the speed of motors proportional to the weights.
SCADA techniques are used for monitoring and data acquisition and used as a communicating tool between the client,
PLC and other control systems of the crane.
2. BRIEF INTRODUCTION TO PLC AND SCADA
A digitally operating electronic apparatus which uses a programming memory for the internal storage of instructions for
implementing specific functions such as logic, sequencing, timing, counting and arithmetic to control through digital or
analog modules, various types of machines or process. Programmable Logic Controller (PLC) is used to control machines
and process . PLCs can be used with a wide range of control systems, which vary widely in their nature and complexity.
After programming the PLC, before starting a real process, the operator has to verify if the program is correct, i.e. if the
PLC correctly performs the predefined control task. Therefore, the operator monitors the states at input and output port of
the PLC. A usual way is to monitor all the states and program variables online, during the operation of PLC, with the
same programming environment which was used for programming the PLC. However, it is best to develop a physical
ISSN 2350-1049
International Journal of Recent Research in Interdisciplinary Sciences (IJRRIS)
Vol. 3, Issue 2, pp: (1-10), Month: April 2016 - June 2016, Available at: www.paperpublications.org
Page | 2
Paper Publications
educational model of the system, where the operator manually enters the inputs of the PLC and monitors its output states.
However, this can take a long time depending on the complexity of the system. Also, this solution isn‟t modular because it
is difficult to rebuild the model if some changes are necessary. The most complex system for monitoring and control of
industrial processes which is widely used nowadays is Supervisory Control and Data Acquisition (SCADA) system. This
system requires use of communication protocols between the client on one side and PLC and other parts of control system
on the other side. Although the SCADA is standard monitoring and data acquisition system in industry, it isn‟t easy to
make, so it isn‟t appropriate in simple control systems, when it is necessary to make a simple cost-effective monitoring
system. The operator uses software simulator to activate certain inputs of the PLC, while the application receives the
information about output states of the PLC and it shows them graphically, i.e. in animation. This process is realized
through interface board which communicates with PC and controls/reads input/output ports of the PLC.
Fig.1: Major Components of a Common PLC
POWER SUPPLY: Provides the voltage needed to run the primary PLC components
I/O MODULES: Provides signal conversion and isolation between the internal logic- level signals inside the PLC and
the field‟s high level signal.
PROCESSOR: Provides intelligence to command and govern the activities of the entire PLC systems.
PROGRAMMING DEVICE: Used to enter the desired program that will determine the sequence of operation and
control of process equipment or driven machine.
Advantages of PLCs :
1. Less wiring
2. Wiring between devices and relay contacts are done in the PLC program.
3. Easier and faster to make changes.
4. Trouble shooting aids make programming easier and reduce downtime.
5. Reliable components make these likely to operate for years before failure.
METHODOLOGY OF THE PROPOSED WORK:
The methodology which has been proposed for the solution of the problems identified in the project is as shown in the
Figure 2.
ISSN 2350-1049
International Journal of Recent Research in Interdisciplinary Sciences (IJRRIS)
Vol. 3, Issue 2, pp: (1-10), Month: April 2016 - June 2016, Available at: www.paperpublications.org
Page | 3
Paper Publications
Fig.2: Methodology of the proposed work
To perform the experiment, we will need the Simatic software to simulate for the same.
Methodology in Detail:
Step 1:- Switch on the Simatic manager Software
 Siemens Automation is a company to run PLC (Programmable Logic Controller). This software is used with the help of
ladder logic, statement logic etc.
 The Ladder logic is chosen and with the help of the software, methodology is performed.
 It Consists of a switch „ON‟ and „OFF‟ and it is used to regulate the programmable approach.
Step 2:- Simulate the PLC (Programmable Logic Controller) and SCADA (Supervisory Control and Data Acquisition).
Switch on the Simatic manager Software
Simulate the PLC and SCADA
Download the designed ladder logic in order to make use of it in
existing Ladder logic
Using ladder logic, control the motion of Electric overhead crane
in the desired direction
Mode selection through ladder logic and selection of speed i.e.
35 %, 70 % or 100 %
If Power
Start
Hydraulic Mode for
Main hoist Only
Normal mode in
3D direction
Performance Analysis
Stop
ISSN 2350-1049
International Journal of Recent Research in Interdisciplinary Sciences (IJRRIS)
Vol. 3, Issue 2, pp: (1-10), Month: April 2016 - June 2016, Available at: www.paperpublications.org
Page | 4
Paper Publications
 Programmable Logic Controller (PLC) is used to control machine and processes. PLCs can be used with a wide range
of control systems, which vary broadly in their nature and complexity.
 The most difficult system for monitoring and control of industrial processes which is widely used nowadays is
Supervisory Control and Data Acquisition (SCADA) system. This system needs use of communication protocols
between the client on one side and PLC and other part of control system on the other side.
 The Crane normally used to run 24 hours without stoppage, which results in frequent electric failure. It was a major
issue regarding the operation of crane.
 Using variable frequency drive (VFD) simulation fed in Ladder logic programming, the crane has been designed to run
at a variable speed and variable voltage to avoid the above software.
 Designing of E.O.T Crane model by using Siemens make WINCC SCADA software and communicating it with
SIEMENS PLC and communicating with programmes is the main operation.
 This VFD was successful to overcome this problem and hence PLC and SCADA has been designed to control the
motion of the electric overhead crane.
 PLC is a Digital Electronic Device that uses a Programmable memory to store instruction and to implement function
such as Timing, Counting, Logic, Sequencing and Arithmetic in order to control the machines and their processes. Input
Devices such as switches, different types of sensors are used to control the input switching and output devices such as
motors solenoids are used to control the output circuitry. Input devices e.g. switches, and output e.g Motors.
 Ladder Language:
LADDER LOGIC:
 The Ladder logic is widely used in programming PLC where sequential control of a process or manufacturing operation
is required. It is a graphic Language and can be used to transcribe relay diagrams, and is suited to combinational
processing. It provides basic graphic symbols, contacts, coils, and blocks. Specific calculations can be executed within the
operation blocks. Any control task modifications are done by changing the program.
Fig.3: LADDER LOGIC FOR MAIN HOIST
ISSN 2350-1049
International Journal of Recent Research in Interdisciplinary Sciences (IJRRIS)
Vol. 3, Issue 2, pp: (1-10), Month: April 2016 - June 2016, Available at: www.paperpublications.org
Page | 5
Paper Publications
In the above logic diagram, the ladder logic for motion of electric hoist for up motion is described. In the same manner
ladder logic for main hoist, cross travel is described for both variable frequency drive simulation and contactor logic is
Described.
Fig.4: FOR MAIN HOIST VFD
ISSN 2350-1049
International Journal of Recent Research in Interdisciplinary Sciences (IJRRIS)
Vol. 3, Issue 2, pp: (1-10), Month: April 2016 - June 2016, Available at: www.paperpublications.org
Page | 6
Paper Publications
Fig.5: LADDER LOGIC FOR CROSS TRAVEL MOTION
ISSN 2350-1049
International Journal of Recent Research in Interdisciplinary Sciences (IJRRIS)
Vol. 3, Issue 2, pp: (1-10), Month: April 2016 - June 2016, Available at: www.paperpublications.org
Page | 7
Paper Publications
Fig.6: LADDER LOGIC FOR CROSS TRAVEL USING VFD LOGIC FOR CROSS TRAVEL BY USING
CONTACTOR LOGIC
ISSN 2350-1049
International Journal of Recent Research in Interdisciplinary Sciences (IJRRIS)
Vol. 3, Issue 2, pp: (1-10), Month: April 2016 - June 2016, Available at: www.paperpublications.org
Page | 8
Paper Publications
Specification Of 5 Ton Electric Overhead Travelling Crane:
List OF Equipment Specification
Main hoist 35 h.p,1480 r.p.m,, Squirrel cage Induction motor
Cross Travel 5 H.P, 1480 r.p.m, ,, Squirrel cage Induction motor
LONG Travel 15 h.p, 1480 r.p.m,, Squirrel cage Induction motor
Hydraulic Motor 35 h.p, 1480 r.pm, Hydraulic Motor
3. RESULTS AND DISCUSSIONS
FIG.7: COMPARISION OF VFD SIMULATION AND CONTACTOR LOGIC SIMULATION AT NO LOAD
Fig.8: COMPARISION OF VFD SIMULATION AND CONTACTOR LOGIC SIMULATION AT 5TON LOAD
ISSN 2350-1049
International Journal of Recent Research in Interdisciplinary Sciences (IJRRIS)
Vol. 3, Issue 2, pp: (1-10), Month: April 2016 - June 2016, Available at: www.paperpublications.org
Page | 9
Paper Publications
Based upon the steps discussed in the Methodology, the graphical user interface is designed in Simatic Software with the
help of WinCC, which makes the task easier. It has been cleared from SCADA picture that starting as well as running
performance of electric overhead travelling crane is improved and variable frequency drive simulation shows better
performance when compared with contactor logic and these will help us in reducing electrical failures and helps us in
improving the performance of electric overhead travelling crane.
4. CONCLUSION
PLC and SCADA today are advancing in terms of applicability and capability. The System works during normal
operation and greatly improved the automation processes with the use of the PLC ladder diagram. The ladder logic for
contactor logic and variable frequency simulation has been designed and comparison shows that variable frequency drives
based simulation shows better performance in starting as well running current for motions in desired directions at
different values of speed and troubleshooting and monitoring is easy.
5. FUTURE ENHANCEMENT
The system performance can be improved with simulation of electric overhead travelling crane of higher capacity rating
and these system can be implemented in any existing contactor logic system. In the further research, detailed ladder logic
has been explained for electric overhead crane.
REFERENCES
[1] Prof. Burali Y. N.,” PLC Based Industrial Crane Automation & Monitoring”., ISSN: 2278-4721, Vol. 1, Issue 3
(Sept 2015), PP 01-04.
[2] M.Kanmani, J.Nivedha, G.Sundar.,” Belt Conveyor Monitoring and Fault DetectingUsing PLC and SCADA”,may
2014.
[3] Joanna Marie M. Baroro, Melchizedek I. Alipio, Michael Lawrence T. Huang,Teodoro M. Ricamara, Angelo A.
Beltran Jr..,” Automation of Packaging and Material HandlingUsing Programmable Logic Controller”,(ISSN: 2277
– 1581),Volume No. 3, Issue No. 6, pp: 767 – 770. 1 June 2014 .
[4] Chief Editor:„Dr.K.R.Harane‟,Editor: „Prof D.O.Patil‟, „Prof R.M.Sahu‟. ,“ plc based power plant coal level sensing
system using ultrasonic sensor”.,International Journal of Innovative Technology & Adaptive Management (IJITAM)
ISSN: 2347-3622, Volume-1, Issue-6 , March, 2014.
[5] Hemant Ahuja, Arika Singh, Saubhagya Tandon, Shreya Srivastava, Sandeep Pal.,” Automatic Filling Management
System for Industries”.,February 2014.
[6] Shashank Lingappa M.1, Vijayavithal Bongale2, Sreerajendra3.,”PLC Controlled Low Cost Automatic Packing
Machine”.,2014.
[7] Sunil R. Kewate1, S.V. Karmare2, Nehal Sayankar3 and Siddharth Gavhale4.,”Automatic Speed Control System by
the Color Sensor for Automobiles -AnInnovative Model Based Approach”., ISSN 2250-3234 Volume 4, Number 2
(2014), pp. 223-230.
[8] Mohammed Bani Younis and Georg Frey,” A formal Method Based Re-Implementation Concept for PLC Program
and Its Application”
[9] MIKELL P.GROOVER, Automation, Production Systems and Computer Integrated Manufacturing, Prentice Hall,
Inc., New Jersey
[10] Maung Thaw Zin Myo, “Design and Construction of Overhead Travelling Crane( Design Calculation For Gear Box
and I-Section Beams), Yangon Technological University, March 2004.
[11] Ma Thida Khaing, “Design and Operation of A PLC Controlled Filler And Crowner, Mandalay Technological
University, November 2005.
ISSN 2350-1049
International Journal of Recent Research in Interdisciplinary Sciences (IJRRIS)
Vol. 3, Issue 2, pp: (1-10), Month: April 2016 - June 2016, Available at: www.paperpublications.org
Page | 10
Paper Publications
[12] Prof. Dr. –Ing. Dr. h. c. P. Gohner, “Experimental No.4, PLC-Programmable Logic Controllers, Laboratory Course,
Industrial Automation, University Stuttgart.
[13] Backstrand, J.E. (1992). The Application of Adjustable Frequency Drives to Electric Overhead Cranes, Industry
Applications Society Annual Meeting, 1992, Conf. Rec.1992 IEEE 4-9 Oct. 1992, vol.2, pp.1986 – 1991.
[14] Jeftenic B., Bebic M. & Statkic S. (2006). Controlled Multi-motor Drives, Intern. Symp. SPEEDAM 2006, Taormina
(Sicily) - Italy, 23-26 May 2006 , pp. 1392- 1398.
[15] One vfd can control multiple motors By: Kay Dekker, Building Automation Marketing Specialist at the Drives &
Motion Division of Yaskawa America; Joe Koepke, Building Automation Application Engineer at the Drives &
Motion Division of Yaskawa America February 2011
[16] G. S. Buja, R. Menis, and M. I.Valla, “MRAS identification of th induction motor parameters in PWM inverter
drives at standstill,” in Proc. IEEE Ind. Electron. Soc. Annu. Meeting, 1995, pp. 1041—1041-
[17] Development Environment for Monitoring, Data Acquisition and Simulation of PLC Controlled Applications.

More Related Content

PPTX
Hydro Electric Power Plant
DOCX
Hydro power plant
PPTX
Hydro power plant
PPTX
Wide area network in smart grid kundan
PPTX
Unit 4 Automatic Generation Control
PPTX
solar based smart irrigation system
PPT
Dc Power System
Hydro Electric Power Plant
Hydro power plant
Hydro power plant
Wide area network in smart grid kundan
Unit 4 Automatic Generation Control
solar based smart irrigation system
Dc Power System

What's hot (20)

DOCX
Directional over current relay
PPTX
Chapter 5 corona
PPT
Over head power lines
PPTX
Ktps ppt
PPTX
HYDRO-ELECTRIC POWER PLANT
PPTX
Power flow through transmission line.
PPTX
Hydro power plant
PPTX
Conductors used in transmission line
PDF
kota thermal power plant
PDF
Protection of transmission lines (distance)
PPTX
Hydro Electric Power plant
PPTX
An Overview of Thermal Power Plant
PPTX
Unit commitment
PDF
220 kv G.S.S (report)
PPTX
Methods of voltage control
PPTX
Hydro Power Plants
PPTX
study of lightning arrester
PDF
Understanding Solar Energy
PDF
FAULT ANALISIS IN HVDC & HVAC TRANSMISSION LINE
PPT
Best ppt on thermal power station working
Directional over current relay
Chapter 5 corona
Over head power lines
Ktps ppt
HYDRO-ELECTRIC POWER PLANT
Power flow through transmission line.
Hydro power plant
Conductors used in transmission line
kota thermal power plant
Protection of transmission lines (distance)
Hydro Electric Power plant
An Overview of Thermal Power Plant
Unit commitment
220 kv G.S.S (report)
Methods of voltage control
Hydro Power Plants
study of lightning arrester
Understanding Solar Energy
FAULT ANALISIS IN HVDC & HVAC TRANSMISSION LINE
Best ppt on thermal power station working
Ad

Viewers also liked (20)

PDF
Internal Audit Independence and Share Performance of Firms Listed In the Nair...
PDF
Invitro Study of Antibacterial Activity of Leaf and Root Extract of Rauvolfia...
PDF
A Review on Suppression of Secondary Arc Current Trough Single-Phase Auto-Rec...
PDF
Evaluation of Protective Efficacy of Hydro Alcoholic Extract and Methanol Fra...
PDF
Water Quality Assessment - Case Study PCMC Area
PDF
Factors Affecting the Adoption of Electronic Health Records by Nurse
PDF
Socioeconomic Status of Women in Lesotho
PDF
Evolution Analysis of Structures And Landforms Of Thalisain Area, Garhwal Him...
PDF
Barriers to Development and Progress of Entreprenurs: Case of Lesotho
PDF
PRELIMINARY STUDY ON NUTRIENT REMOVAL OF DAIRY WASTEWATER BY PILOT SCALE SUBS...
PDF
PROBLEMS FACED IN AUTOMATION
PDF
A Descriptive Study to Assess the Quality of Marital Life among the Wives of ...
PDF
Problems and Prospects of SMES Loan Management: Case of Lesotho
PDF
Work related musculoskeletal symptoms among Traffic Police: Cross sectional S...
PDF
Grievance Resolution Mechanism on Employee Productivity: Commercial Banks in ...
PDF
Microalgae as Potential Feedstock for Biodiesel Production-A Review
PDF
Family Attachment to Coffee Farms, a Case of Coffee Farming in Kisii County, ...
PDF
Study of Bio-Nano Composite of Poly-Lactic Acid for Food Packaging- A Review
PDF
The Prevalence of Pseudomonas Aeruginosa on Recommended Glasses of Selected V...
PDF
DESIGN AND DEVELOPMENT OF SMES BASED DVR MODEL IN SIMULINK
Internal Audit Independence and Share Performance of Firms Listed In the Nair...
Invitro Study of Antibacterial Activity of Leaf and Root Extract of Rauvolfia...
A Review on Suppression of Secondary Arc Current Trough Single-Phase Auto-Rec...
Evaluation of Protective Efficacy of Hydro Alcoholic Extract and Methanol Fra...
Water Quality Assessment - Case Study PCMC Area
Factors Affecting the Adoption of Electronic Health Records by Nurse
Socioeconomic Status of Women in Lesotho
Evolution Analysis of Structures And Landforms Of Thalisain Area, Garhwal Him...
Barriers to Development and Progress of Entreprenurs: Case of Lesotho
PRELIMINARY STUDY ON NUTRIENT REMOVAL OF DAIRY WASTEWATER BY PILOT SCALE SUBS...
PROBLEMS FACED IN AUTOMATION
A Descriptive Study to Assess the Quality of Marital Life among the Wives of ...
Problems and Prospects of SMES Loan Management: Case of Lesotho
Work related musculoskeletal symptoms among Traffic Police: Cross sectional S...
Grievance Resolution Mechanism on Employee Productivity: Commercial Banks in ...
Microalgae as Potential Feedstock for Biodiesel Production-A Review
Family Attachment to Coffee Farms, a Case of Coffee Farming in Kisii County, ...
Study of Bio-Nano Composite of Poly-Lactic Acid for Food Packaging- A Review
The Prevalence of Pseudomonas Aeruginosa on Recommended Glasses of Selected V...
DESIGN AND DEVELOPMENT OF SMES BASED DVR MODEL IN SIMULINK
Ad

Similar to Monitoring and Controlling Of Electric Overhead Travelling Crane Using PLC and SCADA (20)

PDF
Introduction of Programmable Logic Controller to Electric Overhead Travelling...
PDF
Paper id 37201531
PDF
Implementation of T-Junction Traffic Light Control System Using Simatic S7-20...
PDF
IRJET- Automatic Load Balancing and Phase Balancing by PLC and Scada
PDF
Scada Based Online Circuit Breaker Monitoring System
PPTX
New ppt seminor.pptx
PDF
Power system automation
PPTX
PLC programmable logic controller (MSME)
PDF
PLC and SCADA training.
PDF
Discription of PLC and SCADA
PDF
B43050518
PDF
Speed Control of Induction Motor Using PLC and SCADA System
PDF
Speed Control of Induction Motor Using PLC and SCADA System
PDF
PLC Based Automatic Bottle Filling and Capping System
DOCX
training report. automation,plc , scada
PPT
L1 PLC SCADA Orientation
PDF
Feasible Interfacing and Programming of Industrial Control Technology Unit wi...
PDF
An overview of a continuous monitoring and control system for 3 phase induct
DOCX
PLC SCADA report Paras Singhal
Introduction of Programmable Logic Controller to Electric Overhead Travelling...
Paper id 37201531
Implementation of T-Junction Traffic Light Control System Using Simatic S7-20...
IRJET- Automatic Load Balancing and Phase Balancing by PLC and Scada
Scada Based Online Circuit Breaker Monitoring System
New ppt seminor.pptx
Power system automation
PLC programmable logic controller (MSME)
PLC and SCADA training.
Discription of PLC and SCADA
B43050518
Speed Control of Induction Motor Using PLC and SCADA System
Speed Control of Induction Motor Using PLC and SCADA System
PLC Based Automatic Bottle Filling and Capping System
training report. automation,plc , scada
L1 PLC SCADA Orientation
Feasible Interfacing and Programming of Industrial Control Technology Unit wi...
An overview of a continuous monitoring and control system for 3 phase induct
PLC SCADA report Paras Singhal

Recently uploaded (20)

PPT
POSITIONING IN OPERATION THEATRE ROOM.ppt
PPTX
Microbiology with diagram medical studies .pptx
PPTX
TOTAL hIP ARTHROPLASTY Presentation.pptx
PPTX
DRUG THERAPY FOR SHOCK gjjjgfhhhhh.pptx.
PPT
The World of Physical Science, • Labs: Safety Simulation, Measurement Practice
PDF
Mastering Bioreactors and Media Sterilization: A Complete Guide to Sterile Fe...
PPTX
G5Q1W8 PPT SCIENCE.pptx 2025-2026 GRADE 5
PDF
Biophysics 2.pdffffffffffffffffffffffffff
PPTX
GEN. BIO 1 - CELL TYPES & CELL MODIFICATIONS
PPTX
ANEMIA WITH LEUKOPENIA MDS 07_25.pptx htggtftgt fredrctvg
PPTX
Taita Taveta Laboratory Technician Workshop Presentation.pptx
PPTX
7. General Toxicologyfor clinical phrmacy.pptx
PPTX
cpcsea ppt.pptxssssssssssssssjjdjdndndddd
PPTX
microscope-Lecturecjchchchchcuvuvhc.pptx
PDF
Phytochemical Investigation of Miliusa longipes.pdf
PPTX
2. Earth - The Living Planet earth and life
PDF
SEHH2274 Organic Chemistry Notes 1 Structure and Bonding.pdf
PPTX
The KM-GBF monitoring framework – status & key messages.pptx
PDF
. Radiology Case Scenariosssssssssssssss
PDF
bbec55_b34400a7914c42429908233dbd381773.pdf
POSITIONING IN OPERATION THEATRE ROOM.ppt
Microbiology with diagram medical studies .pptx
TOTAL hIP ARTHROPLASTY Presentation.pptx
DRUG THERAPY FOR SHOCK gjjjgfhhhhh.pptx.
The World of Physical Science, • Labs: Safety Simulation, Measurement Practice
Mastering Bioreactors and Media Sterilization: A Complete Guide to Sterile Fe...
G5Q1W8 PPT SCIENCE.pptx 2025-2026 GRADE 5
Biophysics 2.pdffffffffffffffffffffffffff
GEN. BIO 1 - CELL TYPES & CELL MODIFICATIONS
ANEMIA WITH LEUKOPENIA MDS 07_25.pptx htggtftgt fredrctvg
Taita Taveta Laboratory Technician Workshop Presentation.pptx
7. General Toxicologyfor clinical phrmacy.pptx
cpcsea ppt.pptxssssssssssssssjjdjdndndddd
microscope-Lecturecjchchchchcuvuvhc.pptx
Phytochemical Investigation of Miliusa longipes.pdf
2. Earth - The Living Planet earth and life
SEHH2274 Organic Chemistry Notes 1 Structure and Bonding.pdf
The KM-GBF monitoring framework – status & key messages.pptx
. Radiology Case Scenariosssssssssssssss
bbec55_b34400a7914c42429908233dbd381773.pdf

Monitoring and Controlling Of Electric Overhead Travelling Crane Using PLC and SCADA

  • 1. ISSN 2350-1049 International Journal of Recent Research in Interdisciplinary Sciences (IJRRIS) Vol. 3, Issue 2, pp: (1-10), Month: April 2016 - June 2016, Available at: www.paperpublications.org Page | 1 Paper Publications Monitoring and Controlling Of Electric Overhead Travelling Crane Using PLC and SCADA 1 Alok Dewangan, 2 Prof. Neelesh Kumar 1 Research Scholar MTech, 2 Assistant Professor 1,2 Disha Institute of Management and Technology, Raipur(C.G.), India Abstract: PLC and SCADA are the two new approaches used to control the motion of Electric Overhead travelling crane. Ladder logic diagram for EOT Cranes are designed for motion using variable frequency drives and contactor logic and performance of various parameters are analyzed and compared and image of E.O.T crane are designed in SCADA software and communication between PLC and Scada is done with the help of Siemens simulator .There is a provision of hydraulic motor for motion in main hoist if power failure of cranes takes place to avoid the unsafe condition and work under extreme condition. Keywords: Electric overhead travelling crane, PLC, SCADA, Ladder logic, Siemens make Simulator. 1. INTRODUCTION A crane is the type of machine mainly used for handling heavy loads in different industry branches: metallurgy, paper and cement industry. By the construction, cranes are divided into overhead cranes and gantry cranes. Overhead and gantry cranes are typically used for moving containers, loading trucks or material storage. This crane type usually consists of three separate motions for transporting material. The first motion is the hoist, which raises and lowers the material. The second is the trolley (cross travel), which allows the hoist to be positioned directly above the material for placement. The third is the gantry or bridge motion (long travel), which allows the entire crane to be moved along the working area. This paper presents the loading zone and unloading zone. Three-motors namely Main hoist, long travel And Cross travel are used for accomplishing movements of electric overhead travelling cranes in desired directions.. PLC are used for controlling the three motors using programs. Drives are used to control the speed of motors proportional to the weights. SCADA techniques are used for monitoring and data acquisition and used as a communicating tool between the client, PLC and other control systems of the crane. 2. BRIEF INTRODUCTION TO PLC AND SCADA A digitally operating electronic apparatus which uses a programming memory for the internal storage of instructions for implementing specific functions such as logic, sequencing, timing, counting and arithmetic to control through digital or analog modules, various types of machines or process. Programmable Logic Controller (PLC) is used to control machines and process . PLCs can be used with a wide range of control systems, which vary widely in their nature and complexity. After programming the PLC, before starting a real process, the operator has to verify if the program is correct, i.e. if the PLC correctly performs the predefined control task. Therefore, the operator monitors the states at input and output port of the PLC. A usual way is to monitor all the states and program variables online, during the operation of PLC, with the same programming environment which was used for programming the PLC. However, it is best to develop a physical
  • 2. ISSN 2350-1049 International Journal of Recent Research in Interdisciplinary Sciences (IJRRIS) Vol. 3, Issue 2, pp: (1-10), Month: April 2016 - June 2016, Available at: www.paperpublications.org Page | 2 Paper Publications educational model of the system, where the operator manually enters the inputs of the PLC and monitors its output states. However, this can take a long time depending on the complexity of the system. Also, this solution isn‟t modular because it is difficult to rebuild the model if some changes are necessary. The most complex system for monitoring and control of industrial processes which is widely used nowadays is Supervisory Control and Data Acquisition (SCADA) system. This system requires use of communication protocols between the client on one side and PLC and other parts of control system on the other side. Although the SCADA is standard monitoring and data acquisition system in industry, it isn‟t easy to make, so it isn‟t appropriate in simple control systems, when it is necessary to make a simple cost-effective monitoring system. The operator uses software simulator to activate certain inputs of the PLC, while the application receives the information about output states of the PLC and it shows them graphically, i.e. in animation. This process is realized through interface board which communicates with PC and controls/reads input/output ports of the PLC. Fig.1: Major Components of a Common PLC POWER SUPPLY: Provides the voltage needed to run the primary PLC components I/O MODULES: Provides signal conversion and isolation between the internal logic- level signals inside the PLC and the field‟s high level signal. PROCESSOR: Provides intelligence to command and govern the activities of the entire PLC systems. PROGRAMMING DEVICE: Used to enter the desired program that will determine the sequence of operation and control of process equipment or driven machine. Advantages of PLCs : 1. Less wiring 2. Wiring between devices and relay contacts are done in the PLC program. 3. Easier and faster to make changes. 4. Trouble shooting aids make programming easier and reduce downtime. 5. Reliable components make these likely to operate for years before failure. METHODOLOGY OF THE PROPOSED WORK: The methodology which has been proposed for the solution of the problems identified in the project is as shown in the Figure 2.
  • 3. ISSN 2350-1049 International Journal of Recent Research in Interdisciplinary Sciences (IJRRIS) Vol. 3, Issue 2, pp: (1-10), Month: April 2016 - June 2016, Available at: www.paperpublications.org Page | 3 Paper Publications Fig.2: Methodology of the proposed work To perform the experiment, we will need the Simatic software to simulate for the same. Methodology in Detail: Step 1:- Switch on the Simatic manager Software  Siemens Automation is a company to run PLC (Programmable Logic Controller). This software is used with the help of ladder logic, statement logic etc.  The Ladder logic is chosen and with the help of the software, methodology is performed.  It Consists of a switch „ON‟ and „OFF‟ and it is used to regulate the programmable approach. Step 2:- Simulate the PLC (Programmable Logic Controller) and SCADA (Supervisory Control and Data Acquisition). Switch on the Simatic manager Software Simulate the PLC and SCADA Download the designed ladder logic in order to make use of it in existing Ladder logic Using ladder logic, control the motion of Electric overhead crane in the desired direction Mode selection through ladder logic and selection of speed i.e. 35 %, 70 % or 100 % If Power Start Hydraulic Mode for Main hoist Only Normal mode in 3D direction Performance Analysis Stop
  • 4. ISSN 2350-1049 International Journal of Recent Research in Interdisciplinary Sciences (IJRRIS) Vol. 3, Issue 2, pp: (1-10), Month: April 2016 - June 2016, Available at: www.paperpublications.org Page | 4 Paper Publications  Programmable Logic Controller (PLC) is used to control machine and processes. PLCs can be used with a wide range of control systems, which vary broadly in their nature and complexity.  The most difficult system for monitoring and control of industrial processes which is widely used nowadays is Supervisory Control and Data Acquisition (SCADA) system. This system needs use of communication protocols between the client on one side and PLC and other part of control system on the other side.  The Crane normally used to run 24 hours without stoppage, which results in frequent electric failure. It was a major issue regarding the operation of crane.  Using variable frequency drive (VFD) simulation fed in Ladder logic programming, the crane has been designed to run at a variable speed and variable voltage to avoid the above software.  Designing of E.O.T Crane model by using Siemens make WINCC SCADA software and communicating it with SIEMENS PLC and communicating with programmes is the main operation.  This VFD was successful to overcome this problem and hence PLC and SCADA has been designed to control the motion of the electric overhead crane.  PLC is a Digital Electronic Device that uses a Programmable memory to store instruction and to implement function such as Timing, Counting, Logic, Sequencing and Arithmetic in order to control the machines and their processes. Input Devices such as switches, different types of sensors are used to control the input switching and output devices such as motors solenoids are used to control the output circuitry. Input devices e.g. switches, and output e.g Motors.  Ladder Language: LADDER LOGIC:  The Ladder logic is widely used in programming PLC where sequential control of a process or manufacturing operation is required. It is a graphic Language and can be used to transcribe relay diagrams, and is suited to combinational processing. It provides basic graphic symbols, contacts, coils, and blocks. Specific calculations can be executed within the operation blocks. Any control task modifications are done by changing the program. Fig.3: LADDER LOGIC FOR MAIN HOIST
  • 5. ISSN 2350-1049 International Journal of Recent Research in Interdisciplinary Sciences (IJRRIS) Vol. 3, Issue 2, pp: (1-10), Month: April 2016 - June 2016, Available at: www.paperpublications.org Page | 5 Paper Publications In the above logic diagram, the ladder logic for motion of electric hoist for up motion is described. In the same manner ladder logic for main hoist, cross travel is described for both variable frequency drive simulation and contactor logic is Described. Fig.4: FOR MAIN HOIST VFD
  • 6. ISSN 2350-1049 International Journal of Recent Research in Interdisciplinary Sciences (IJRRIS) Vol. 3, Issue 2, pp: (1-10), Month: April 2016 - June 2016, Available at: www.paperpublications.org Page | 6 Paper Publications Fig.5: LADDER LOGIC FOR CROSS TRAVEL MOTION
  • 7. ISSN 2350-1049 International Journal of Recent Research in Interdisciplinary Sciences (IJRRIS) Vol. 3, Issue 2, pp: (1-10), Month: April 2016 - June 2016, Available at: www.paperpublications.org Page | 7 Paper Publications Fig.6: LADDER LOGIC FOR CROSS TRAVEL USING VFD LOGIC FOR CROSS TRAVEL BY USING CONTACTOR LOGIC
  • 8. ISSN 2350-1049 International Journal of Recent Research in Interdisciplinary Sciences (IJRRIS) Vol. 3, Issue 2, pp: (1-10), Month: April 2016 - June 2016, Available at: www.paperpublications.org Page | 8 Paper Publications Specification Of 5 Ton Electric Overhead Travelling Crane: List OF Equipment Specification Main hoist 35 h.p,1480 r.p.m,, Squirrel cage Induction motor Cross Travel 5 H.P, 1480 r.p.m, ,, Squirrel cage Induction motor LONG Travel 15 h.p, 1480 r.p.m,, Squirrel cage Induction motor Hydraulic Motor 35 h.p, 1480 r.pm, Hydraulic Motor 3. RESULTS AND DISCUSSIONS FIG.7: COMPARISION OF VFD SIMULATION AND CONTACTOR LOGIC SIMULATION AT NO LOAD Fig.8: COMPARISION OF VFD SIMULATION AND CONTACTOR LOGIC SIMULATION AT 5TON LOAD
  • 9. ISSN 2350-1049 International Journal of Recent Research in Interdisciplinary Sciences (IJRRIS) Vol. 3, Issue 2, pp: (1-10), Month: April 2016 - June 2016, Available at: www.paperpublications.org Page | 9 Paper Publications Based upon the steps discussed in the Methodology, the graphical user interface is designed in Simatic Software with the help of WinCC, which makes the task easier. It has been cleared from SCADA picture that starting as well as running performance of electric overhead travelling crane is improved and variable frequency drive simulation shows better performance when compared with contactor logic and these will help us in reducing electrical failures and helps us in improving the performance of electric overhead travelling crane. 4. CONCLUSION PLC and SCADA today are advancing in terms of applicability and capability. The System works during normal operation and greatly improved the automation processes with the use of the PLC ladder diagram. The ladder logic for contactor logic and variable frequency simulation has been designed and comparison shows that variable frequency drives based simulation shows better performance in starting as well running current for motions in desired directions at different values of speed and troubleshooting and monitoring is easy. 5. FUTURE ENHANCEMENT The system performance can be improved with simulation of electric overhead travelling crane of higher capacity rating and these system can be implemented in any existing contactor logic system. In the further research, detailed ladder logic has been explained for electric overhead crane. REFERENCES [1] Prof. Burali Y. N.,” PLC Based Industrial Crane Automation & Monitoring”., ISSN: 2278-4721, Vol. 1, Issue 3 (Sept 2015), PP 01-04. [2] M.Kanmani, J.Nivedha, G.Sundar.,” Belt Conveyor Monitoring and Fault DetectingUsing PLC and SCADA”,may 2014. [3] Joanna Marie M. Baroro, Melchizedek I. Alipio, Michael Lawrence T. Huang,Teodoro M. Ricamara, Angelo A. Beltran Jr..,” Automation of Packaging and Material HandlingUsing Programmable Logic Controller”,(ISSN: 2277 – 1581),Volume No. 3, Issue No. 6, pp: 767 – 770. 1 June 2014 . [4] Chief Editor:„Dr.K.R.Harane‟,Editor: „Prof D.O.Patil‟, „Prof R.M.Sahu‟. ,“ plc based power plant coal level sensing system using ultrasonic sensor”.,International Journal of Innovative Technology & Adaptive Management (IJITAM) ISSN: 2347-3622, Volume-1, Issue-6 , March, 2014. [5] Hemant Ahuja, Arika Singh, Saubhagya Tandon, Shreya Srivastava, Sandeep Pal.,” Automatic Filling Management System for Industries”.,February 2014. [6] Shashank Lingappa M.1, Vijayavithal Bongale2, Sreerajendra3.,”PLC Controlled Low Cost Automatic Packing Machine”.,2014. [7] Sunil R. Kewate1, S.V. Karmare2, Nehal Sayankar3 and Siddharth Gavhale4.,”Automatic Speed Control System by the Color Sensor for Automobiles -AnInnovative Model Based Approach”., ISSN 2250-3234 Volume 4, Number 2 (2014), pp. 223-230. [8] Mohammed Bani Younis and Georg Frey,” A formal Method Based Re-Implementation Concept for PLC Program and Its Application” [9] MIKELL P.GROOVER, Automation, Production Systems and Computer Integrated Manufacturing, Prentice Hall, Inc., New Jersey [10] Maung Thaw Zin Myo, “Design and Construction of Overhead Travelling Crane( Design Calculation For Gear Box and I-Section Beams), Yangon Technological University, March 2004. [11] Ma Thida Khaing, “Design and Operation of A PLC Controlled Filler And Crowner, Mandalay Technological University, November 2005.
  • 10. ISSN 2350-1049 International Journal of Recent Research in Interdisciplinary Sciences (IJRRIS) Vol. 3, Issue 2, pp: (1-10), Month: April 2016 - June 2016, Available at: www.paperpublications.org Page | 10 Paper Publications [12] Prof. Dr. –Ing. Dr. h. c. P. Gohner, “Experimental No.4, PLC-Programmable Logic Controllers, Laboratory Course, Industrial Automation, University Stuttgart. [13] Backstrand, J.E. (1992). The Application of Adjustable Frequency Drives to Electric Overhead Cranes, Industry Applications Society Annual Meeting, 1992, Conf. Rec.1992 IEEE 4-9 Oct. 1992, vol.2, pp.1986 – 1991. [14] Jeftenic B., Bebic M. & Statkic S. (2006). Controlled Multi-motor Drives, Intern. Symp. SPEEDAM 2006, Taormina (Sicily) - Italy, 23-26 May 2006 , pp. 1392- 1398. [15] One vfd can control multiple motors By: Kay Dekker, Building Automation Marketing Specialist at the Drives & Motion Division of Yaskawa America; Joe Koepke, Building Automation Application Engineer at the Drives & Motion Division of Yaskawa America February 2011 [16] G. S. Buja, R. Menis, and M. I.Valla, “MRAS identification of th induction motor parameters in PWM inverter drives at standstill,” in Proc. IEEE Ind. Electron. Soc. Annu. Meeting, 1995, pp. 1041—1041- [17] Development Environment for Monitoring, Data Acquisition and Simulation of PLC Controlled Applications.