SlideShare a Scribd company logo
Material Requirement Planning  (MRP-1)
Material Requirement Planning (MRP-1) Types Of Techniques PUSH  PULL MRP1  JIT MRP2  KANBAN DRP1 DRP2
HAPPY CUSTOMER. HAPPY SUPPLIER…..
Major Problem Dependent on Accurate Forecasting Only Solution… Buy ‘Just Enough’ Stock
Material Requirement Planning  (MRP-1) Introduction of MRP in 1960’s by  Dr Joseph Orlicky. Definition : MRP is a software based production, planning and inventory control system used to manage the manufacturing process. It is a computer based system in which the given Master Schedule is exploded with Bills Of Material, into the required amount of raw material, parts and subassemblies needed top produce the final products in each tome period of say a week or month (called as “Buckets”)
MRP 1 -  Functions Forecasting Order, Planning and Control Priority Planning and Control Planning Capacity Requirement and Development of Broad Business Plans
Objectives  Ensure The Availability of Material Components and Products For Planned Production and Customer Delivery. Maintain The Lowest Possible Inventory Level. Plan Manufacturing Activities, Delivery Schedules and Purchasing Activities.
Key Elements Of MRP 1 Demand Forecasting:- It is the quantity demanded per year or per unit time which indirectly helps in knowing quantity to be supplied. Master Production Schedule (MPS):- MPS is a series of time phased quantities for each item that a company manufactures. It gives the details of the products to be manufactured over the given space of time. -
Example of MPS Forecast requires 10 desks in May 20 desks in June Material Required 880 screws 40 handles 240 planks 10 tops and 40 legs  5.55 tubes of glue 1760 screws 80 handles 480 planks 20 tops and 80 legs  11.1 tubes of glue
Bills Of Material (BOM):- BOM is the document generated at design stage. It gives the details of the structure of the product by dividing the final assembly into major assemblies and sub-assemblies. BOM provides details such as part name, part no., description, quantity required material, etc.
 
Inventory Status File (ISF):- ISF reports the inventory on hand. It allows the company to subtract existing inventory from gross requirements, so net requirements can be ordered. The ISF also reports on safety stock needs and lead times for each item.
MRP Program:- This is a computer software programme. First, it explodes the finish product’s demand into gross requirement for parts. Second, the package determines net requirements based on the ISF. Third, it place orders to meet the net quantities needed and lead times.
Material Requirements Planning MRP1 Master Production Schedule MRP Material requirement planning Material plans Customer orders Bill of materials Purchase orders Demand forecast Inventory records Works orders
Outputs And Reports:- The MRP 1 package generates many reports such as action notices, priority reports, inventory status information.
Advantages of MRP 1  Improved Business Results Improved Manufacturing Results More Accurate And Timely Information Less Inventory Less Materials Obsolescence Time Phased Ordering Of Materials
Higher Reliability More Responsiveness To Market Demand Reduced Production Cost
Disadvantages  Increase In Material Acquisition Cost Higher Transportation Costs And Higher Unit Cost Potential Hazard Of A Production Slowdown Or Shutdown
Use Of Standardized Software Packages Does not Take Into Account Plant Capacity And Distribution Capacity High Stock-Out Costs.
Manufacturing Requirement Planning (MRP II)
 
Manufacturing Resource Planning  ( MRP II ) is defined as a method for the effective planning of all resources of a manufacturing company. Ideally, it addresses operational planning in units, financial planning in dollars, and has a simulation capability to answer "what-if" questions and extension of closed-loop MRP.
 
 
 
Major Developments From MRP Feedback Allocating reserves Matching the requirements Software extension programmers Data accuracy
 
Significant Payback Achieved By Coca-cola
Coca Cola: "Always" Class A MRP II Inventory levels:  down Productivity:  up Customer delivery performance:  improved Supplier delivery performance:  better Business Processes:  improved Data integrity:  high Cost of goods:  down Team Spirit:  high
Benefits In Different Levels
For Management An accurate, consistent and effective way to run the whole business The ability to manage orderly growth The ability to cope with difficult economic conditions
For Management Information Quicker, better information on which to base decisions Consistent information at all levels, in all departments Accurate records for internal and external use
For Sales / Marketing Improved on-time deliveries to customers Faster, more accurate delivery promising Improved responsiveness to customer needs
For Production Improved productivity and resource utilization Increased through output Better reliability of production plans
For Materials Management Better control of inventories Improved scheduling Productive relationships with suppliers
For Design / Engineering Improved design control Better quality and quality control
For Financial and Costing Reduced working capital for inventory Improved cash flow through quicker deliveries Accurate inventory records Timely and valid cost and profitability information
For And Against MRPII
FOR Long term planning tool for complex products Can give accurate completion date at time of order Fits in with conventional accounting Progress of manufacture available at all times Inventory size available at all times Control of work orders and changes is tight Many types of software available
Against File/database accuracy must be maintained Inventory accuracy is vital (99% accuracy is a typical requirement) Highly computer based Does not affect quality management, line balancing, or other production management issues Inflexible and relies on forecast. Temptation exists to over-ride and go manual
Distribution Requirements Planning  (DRP – I)
Distribution Requirements Planning (DRP I)   DRP is the application of MRP principles to the distribution environment. It integrates   the, special needs of distribution. It is a dynamic model which looks at a time-phased plan of   events that affect inventory.
What is DRP? DRP provides the basis for integrating supply chain inventory information and physical distribution activities with the Manufacturing Planning and Control  system.
What is DRP? Managing the flow of materials between firms, warehouses, distribution centers. DRP helps manage these material flows. Just like MRP did in Manufacturing. Links firms in the supply chain by providing planning records that carry demand information from receiving points to supply points and vice versa.
DRP Menu Items   Component Description Purpose in DRP Material Master Creates stock items and controlling elements of items, locations and policies that are used in the deployment process. Inventory Management Tracks inventory availability in all stock categories and supply and demand for an item.Also allows for the physical movement of inventory. Sales Planning, Forecasting and Demand Management Creates forecasts of customer demand which results in the creation of independent requirements at the distribution center.These independent requirements are later consumed by actual customer orders. Purchasing Creates quota arrangements that control the supply relationships in the network. Materials Requirements Planning Determines net supply and demand resulting in a proposal for the transfer of inventory from the plant to the distribution center.
Marketing Benefits Increases service level and decrease customer complaints. Improve inventory coordination. Enhances ability to offer customer a coordinated inventory management service.
Logistical Benefits Reduces freight costs. Reduces inventory level. Decreases warehousing space. Reduces customer freight cost. Enhances budgeting capitability.
Constraints of DRP Inventory planning systems require accurate and coordinated forecasts for each distribution center. Integrated planning is subject to system nervousness and frequent rescheduling, because of production breakdowns and delivery delays.  DRP is not the universal solution for inventory management.
Distribution Resource planning (DRP-II)
Distribution Resource planning   Distribution resource planning [DRP II] is an extension of DRP I.Distribution resource planning applies the time phased logic of DRP I to replenish inventories in multi echelon warehousing systems.Distribution resources planning extends DRP I to include the planning of key resources in a distribution system – warehouse space, equipments, labors, transport capacity [e.g trucks,rail cars] and financial flows
Objectives Of DRP II   The objective of Distribution Resource Planning are,   To improve customer service levels by anticipating customer demand at distribution centers and providing finished products at the correct location when customer needs arise . To provide an accurate requirements plan for manufacturing.   To optimize the distribution of available stock in the distribution network using the deployment function.
DRP II Provides a framework   Distribution resource planning provides a framework for determining the need to replenish inventory by:   Linking market requirements with manufacturing and demand management.   Relating current inventory positions and demand forecasts to production scheduling.   Matching material supply to manufacturing demand, and customer demand to product supply.
Factors needed for Implementing DRP II   Before the use of DRP for planning and deployment, we must set up a distribution network. A distribution network represents possible delivery relationships between the supplying plants and the distribution centers. DRP entails planning the supply chain from sales planning through delivery to the distribution centers, assuming there are sales orders or that sales forecasts are available. The primary aim of planning is to determine the quantities required on specific dates,including the lead times of the distribution lanes. The distribution network defines the normal supply method for execution.
CUSTOMERS DISTRIBUTIO N  CENTER DISTRIBUTION CENTER DISTRIBUTION CENTER DISTRIBUTION CENTER REGIONAL WAREHOUSE  DISTRIBUTION CENTER DISTRIBUTION CENTER REGIONAL  WAREHOUSE PLANT WAREHOUSE FINAL ASSMEBLY (MANUFACTURING)  SUB ASSEMBLY B SUB ASSEMBLY C SUB ASSEMBLY D SUB ASSEMBLY A PART C PART D PART E PART A PART B RAW MATERIALS
Difference between DRP and MRP   Raw materials stores,conversion process & finished goods store   MRP DRP Scope Inbound logistics Outbound logistics Guiding factor Guided by production schedules Guided by customer demand Control of the firm Under control of the firm Not under control of the firm Demand situation Operates in dependant demand situation Operates in independent demand situation Area of operation & coordination Coordinates scheduling & integration of materials into finished goods Coordinates demand between outlets & supply sources Stage of functioning Controls inventory until manufacturing & assembly is complete Controls inventory after manufacturing & assembly of finished goods Planning availability of stock at? Market[retailers] & warehouses

More Related Content

PPTX
Regulatory compliance and Benchmarking.pptx
PDF
SAP PP Course Documentation
PDF
Sap MRP materials requirements planning
PPT
SAP Production Planning
PDF
SAP Configuration Guide for Functional Modules (Based on IDES)
PPT
material requirement planning
PPTX
operation management and operation strategy
Regulatory compliance and Benchmarking.pptx
SAP PP Course Documentation
Sap MRP materials requirements planning
SAP Production Planning
SAP Configuration Guide for Functional Modules (Based on IDES)
material requirement planning
operation management and operation strategy

What's hot (20)

PPTX
PPTX
Material resource planning
PPTX
Material Requirement Planning (mrp)
PPTX
Material requirement planning - Production and Operation Management
PPT
Mrp ii
PDF
What is master production schedule
PPTX
manufacturing resource planning
PPTX
MATERIAL PLANNING PROCESS
DOCX
material requirement planning
PPT
Master production schedule
DOCX
MRP, MRP2 and ERP system in supply chain
PPTX
PPTX
Material requirement planning (mrp1)
PPTX
MRP I and MRP II
PPTX
MATERIAL REQUIREMENTS PLANNING (MRP)
PPT
Material requirement planning presentation
PPT
Material requirement planning presentation
PPTX
Material requirement planning, MRP.
PPTX
Manufacturing resource planning and capacity resource planning ppt
PPT
Capacity planning
Material resource planning
Material Requirement Planning (mrp)
Material requirement planning - Production and Operation Management
Mrp ii
What is master production schedule
manufacturing resource planning
MATERIAL PLANNING PROCESS
material requirement planning
Master production schedule
MRP, MRP2 and ERP system in supply chain
Material requirement planning (mrp1)
MRP I and MRP II
MATERIAL REQUIREMENTS PLANNING (MRP)
Material requirement planning presentation
Material requirement planning presentation
Material requirement planning, MRP.
Manufacturing resource planning and capacity resource planning ppt
Capacity planning
Ad

Viewers also liked (18)

PDF
Job shop scheduling
PPTX
Production planning control ppt
PPTX
Presentation aggregate planning
PPT
Centre of gravity method of location planning
DOCX
Location models
PPT
Aggregate Production Planning
PPSX
Aggregate planning
PDF
PPT
Production planning-and-control
PDF
Production planning and control
PPT
Material requirement planning presentation
PPT
Production planning
PPT
Scheduling
PPTX
LEARNING CURVE
PPT
Production planning & control
PPTX
Production planning & control & Forecasting
Job shop scheduling
Production planning control ppt
Presentation aggregate planning
Centre of gravity method of location planning
Location models
Aggregate Production Planning
Aggregate planning
Production planning-and-control
Production planning and control
Material requirement planning presentation
Production planning
Scheduling
LEARNING CURVE
Production planning & control
Production planning & control & Forecasting
Ad

Similar to (Mrp 1) Prsntation Slides (20)

PPT
IT for Production & Manufacturing
PPTX
MRP and Planning Overview
PPT
Mrp1 prsntation-slides-1226827392037035-8
PPT
Ch17 Mrp
PPSX
Erp viva
PPT
93760232-Material-Requirement-Planning.ppt
PPT
Basics of SAP for noobs (dummies)
PPTX
Erp chapter 3
PPTX
PPTX
MRP IN SERVICES & ERP
PDF
QAD solution (ENG)
PDF
MRP & ERP.pdf
PPTX
Mrp
PPT
Lect 6.ppt
PPTX
MRP- Lecture PPT.pptx
DOCX
Class assignment on mrp
PDF
Material requirements planning and manufacturing resource planning difference
PPTX
Material Requirements Planning (MRP).pptx
PPTX
0201B Aggregate Resource Planning
PPTX
SCM Chap 6mmmmmmmmmmmmmmmmmmmmmmmmm.pptx
IT for Production & Manufacturing
MRP and Planning Overview
Mrp1 prsntation-slides-1226827392037035-8
Ch17 Mrp
Erp viva
93760232-Material-Requirement-Planning.ppt
Basics of SAP for noobs (dummies)
Erp chapter 3
MRP IN SERVICES & ERP
QAD solution (ENG)
MRP & ERP.pdf
Mrp
Lect 6.ppt
MRP- Lecture PPT.pptx
Class assignment on mrp
Material requirements planning and manufacturing resource planning difference
Material Requirements Planning (MRP).pptx
0201B Aggregate Resource Planning
SCM Chap 6mmmmmmmmmmmmmmmmmmmmmmmmm.pptx

More from Hitesh Chhatwani (6)

PPT
Services Marketing Courier.......(2)
PPT
Ppt Of Assest center
PPT
Lux Presentation
PPT
Don T Drink And Drive1
PPT
Wto Final
PPT
Effective Communication
Services Marketing Courier.......(2)
Ppt Of Assest center
Lux Presentation
Don T Drink And Drive1
Wto Final
Effective Communication

Recently uploaded (20)

PPT
340036916-American-Literature-Literary-Period-Overview.ppt
PDF
Outsourced Audit & Assurance in USA Why Globus Finanza is Your Trusted Choice
PDF
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
PDF
Types of control:Qualitative vs Quantitative
PDF
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
PPTX
Dragon_Fruit_Cultivation_in Nepal ppt.pptx
PPTX
svnfcksanfskjcsnvvjknsnvsdscnsncxasxa saccacxsax
PPTX
Belch_12e_PPT_Ch18_Accessible_university.pptx
PDF
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
PDF
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
PDF
SIMNET Inc – 2023’s Most Trusted IT Services & Solution Provider
PDF
Roadmap Map-digital Banking feature MB,IB,AB
DOCX
Euro SEO Services 1st 3 General Updates.docx
PPTX
Probability Distribution, binomial distribution, poisson distribution
PDF
Ôn tập tiếng anh trong kinh doanh nâng cao
DOCX
unit 1 COST ACCOUNTING AND COST SHEET
PPTX
HR Introduction Slide (1).pptx on hr intro
PDF
Solara Labs: Empowering Health through Innovative Nutraceutical Solutions
PDF
COST SHEET- Tender and Quotation unit 2.pdf
DOCX
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement
340036916-American-Literature-Literary-Period-Overview.ppt
Outsourced Audit & Assurance in USA Why Globus Finanza is Your Trusted Choice
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
Types of control:Qualitative vs Quantitative
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
Dragon_Fruit_Cultivation_in Nepal ppt.pptx
svnfcksanfskjcsnvvjknsnvsdscnsncxasxa saccacxsax
Belch_12e_PPT_Ch18_Accessible_university.pptx
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
SIMNET Inc – 2023’s Most Trusted IT Services & Solution Provider
Roadmap Map-digital Banking feature MB,IB,AB
Euro SEO Services 1st 3 General Updates.docx
Probability Distribution, binomial distribution, poisson distribution
Ôn tập tiếng anh trong kinh doanh nâng cao
unit 1 COST ACCOUNTING AND COST SHEET
HR Introduction Slide (1).pptx on hr intro
Solara Labs: Empowering Health through Innovative Nutraceutical Solutions
COST SHEET- Tender and Quotation unit 2.pdf
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement

(Mrp 1) Prsntation Slides

  • 2. Material Requirement Planning (MRP-1) Types Of Techniques PUSH PULL MRP1 JIT MRP2 KANBAN DRP1 DRP2
  • 3. HAPPY CUSTOMER. HAPPY SUPPLIER…..
  • 4. Major Problem Dependent on Accurate Forecasting Only Solution… Buy ‘Just Enough’ Stock
  • 5. Material Requirement Planning (MRP-1) Introduction of MRP in 1960’s by Dr Joseph Orlicky. Definition : MRP is a software based production, planning and inventory control system used to manage the manufacturing process. It is a computer based system in which the given Master Schedule is exploded with Bills Of Material, into the required amount of raw material, parts and subassemblies needed top produce the final products in each tome period of say a week or month (called as “Buckets”)
  • 6. MRP 1 - Functions Forecasting Order, Planning and Control Priority Planning and Control Planning Capacity Requirement and Development of Broad Business Plans
  • 7. Objectives Ensure The Availability of Material Components and Products For Planned Production and Customer Delivery. Maintain The Lowest Possible Inventory Level. Plan Manufacturing Activities, Delivery Schedules and Purchasing Activities.
  • 8. Key Elements Of MRP 1 Demand Forecasting:- It is the quantity demanded per year or per unit time which indirectly helps in knowing quantity to be supplied. Master Production Schedule (MPS):- MPS is a series of time phased quantities for each item that a company manufactures. It gives the details of the products to be manufactured over the given space of time. -
  • 9. Example of MPS Forecast requires 10 desks in May 20 desks in June Material Required 880 screws 40 handles 240 planks 10 tops and 40 legs 5.55 tubes of glue 1760 screws 80 handles 480 planks 20 tops and 80 legs 11.1 tubes of glue
  • 10. Bills Of Material (BOM):- BOM is the document generated at design stage. It gives the details of the structure of the product by dividing the final assembly into major assemblies and sub-assemblies. BOM provides details such as part name, part no., description, quantity required material, etc.
  • 11.  
  • 12. Inventory Status File (ISF):- ISF reports the inventory on hand. It allows the company to subtract existing inventory from gross requirements, so net requirements can be ordered. The ISF also reports on safety stock needs and lead times for each item.
  • 13. MRP Program:- This is a computer software programme. First, it explodes the finish product’s demand into gross requirement for parts. Second, the package determines net requirements based on the ISF. Third, it place orders to meet the net quantities needed and lead times.
  • 14. Material Requirements Planning MRP1 Master Production Schedule MRP Material requirement planning Material plans Customer orders Bill of materials Purchase orders Demand forecast Inventory records Works orders
  • 15. Outputs And Reports:- The MRP 1 package generates many reports such as action notices, priority reports, inventory status information.
  • 16. Advantages of MRP 1 Improved Business Results Improved Manufacturing Results More Accurate And Timely Information Less Inventory Less Materials Obsolescence Time Phased Ordering Of Materials
  • 17. Higher Reliability More Responsiveness To Market Demand Reduced Production Cost
  • 18. Disadvantages Increase In Material Acquisition Cost Higher Transportation Costs And Higher Unit Cost Potential Hazard Of A Production Slowdown Or Shutdown
  • 19. Use Of Standardized Software Packages Does not Take Into Account Plant Capacity And Distribution Capacity High Stock-Out Costs.
  • 21.  
  • 22. Manufacturing Resource Planning ( MRP II ) is defined as a method for the effective planning of all resources of a manufacturing company. Ideally, it addresses operational planning in units, financial planning in dollars, and has a simulation capability to answer "what-if" questions and extension of closed-loop MRP.
  • 23.  
  • 24.  
  • 25.  
  • 26. Major Developments From MRP Feedback Allocating reserves Matching the requirements Software extension programmers Data accuracy
  • 27.  
  • 29. Coca Cola: "Always" Class A MRP II Inventory levels: down Productivity: up Customer delivery performance: improved Supplier delivery performance: better Business Processes: improved Data integrity: high Cost of goods: down Team Spirit: high
  • 31. For Management An accurate, consistent and effective way to run the whole business The ability to manage orderly growth The ability to cope with difficult economic conditions
  • 32. For Management Information Quicker, better information on which to base decisions Consistent information at all levels, in all departments Accurate records for internal and external use
  • 33. For Sales / Marketing Improved on-time deliveries to customers Faster, more accurate delivery promising Improved responsiveness to customer needs
  • 34. For Production Improved productivity and resource utilization Increased through output Better reliability of production plans
  • 35. For Materials Management Better control of inventories Improved scheduling Productive relationships with suppliers
  • 36. For Design / Engineering Improved design control Better quality and quality control
  • 37. For Financial and Costing Reduced working capital for inventory Improved cash flow through quicker deliveries Accurate inventory records Timely and valid cost and profitability information
  • 39. FOR Long term planning tool for complex products Can give accurate completion date at time of order Fits in with conventional accounting Progress of manufacture available at all times Inventory size available at all times Control of work orders and changes is tight Many types of software available
  • 40. Against File/database accuracy must be maintained Inventory accuracy is vital (99% accuracy is a typical requirement) Highly computer based Does not affect quality management, line balancing, or other production management issues Inflexible and relies on forecast. Temptation exists to over-ride and go manual
  • 42. Distribution Requirements Planning (DRP I) DRP is the application of MRP principles to the distribution environment. It integrates the, special needs of distribution. It is a dynamic model which looks at a time-phased plan of events that affect inventory.
  • 43. What is DRP? DRP provides the basis for integrating supply chain inventory information and physical distribution activities with the Manufacturing Planning and Control system.
  • 44. What is DRP? Managing the flow of materials between firms, warehouses, distribution centers. DRP helps manage these material flows. Just like MRP did in Manufacturing. Links firms in the supply chain by providing planning records that carry demand information from receiving points to supply points and vice versa.
  • 45. DRP Menu Items Component Description Purpose in DRP Material Master Creates stock items and controlling elements of items, locations and policies that are used in the deployment process. Inventory Management Tracks inventory availability in all stock categories and supply and demand for an item.Also allows for the physical movement of inventory. Sales Planning, Forecasting and Demand Management Creates forecasts of customer demand which results in the creation of independent requirements at the distribution center.These independent requirements are later consumed by actual customer orders. Purchasing Creates quota arrangements that control the supply relationships in the network. Materials Requirements Planning Determines net supply and demand resulting in a proposal for the transfer of inventory from the plant to the distribution center.
  • 46. Marketing Benefits Increases service level and decrease customer complaints. Improve inventory coordination. Enhances ability to offer customer a coordinated inventory management service.
  • 47. Logistical Benefits Reduces freight costs. Reduces inventory level. Decreases warehousing space. Reduces customer freight cost. Enhances budgeting capitability.
  • 48. Constraints of DRP Inventory planning systems require accurate and coordinated forecasts for each distribution center. Integrated planning is subject to system nervousness and frequent rescheduling, because of production breakdowns and delivery delays. DRP is not the universal solution for inventory management.
  • 50. Distribution Resource planning Distribution resource planning [DRP II] is an extension of DRP I.Distribution resource planning applies the time phased logic of DRP I to replenish inventories in multi echelon warehousing systems.Distribution resources planning extends DRP I to include the planning of key resources in a distribution system – warehouse space, equipments, labors, transport capacity [e.g trucks,rail cars] and financial flows
  • 51. Objectives Of DRP II The objective of Distribution Resource Planning are, To improve customer service levels by anticipating customer demand at distribution centers and providing finished products at the correct location when customer needs arise . To provide an accurate requirements plan for manufacturing. To optimize the distribution of available stock in the distribution network using the deployment function.
  • 52. DRP II Provides a framework Distribution resource planning provides a framework for determining the need to replenish inventory by: Linking market requirements with manufacturing and demand management. Relating current inventory positions and demand forecasts to production scheduling. Matching material supply to manufacturing demand, and customer demand to product supply.
  • 53. Factors needed for Implementing DRP II Before the use of DRP for planning and deployment, we must set up a distribution network. A distribution network represents possible delivery relationships between the supplying plants and the distribution centers. DRP entails planning the supply chain from sales planning through delivery to the distribution centers, assuming there are sales orders or that sales forecasts are available. The primary aim of planning is to determine the quantities required on specific dates,including the lead times of the distribution lanes. The distribution network defines the normal supply method for execution.
  • 54. CUSTOMERS DISTRIBUTIO N CENTER DISTRIBUTION CENTER DISTRIBUTION CENTER DISTRIBUTION CENTER REGIONAL WAREHOUSE DISTRIBUTION CENTER DISTRIBUTION CENTER REGIONAL WAREHOUSE PLANT WAREHOUSE FINAL ASSMEBLY (MANUFACTURING) SUB ASSEMBLY B SUB ASSEMBLY C SUB ASSEMBLY D SUB ASSEMBLY A PART C PART D PART E PART A PART B RAW MATERIALS
  • 55. Difference between DRP and MRP Raw materials stores,conversion process & finished goods store   MRP DRP Scope Inbound logistics Outbound logistics Guiding factor Guided by production schedules Guided by customer demand Control of the firm Under control of the firm Not under control of the firm Demand situation Operates in dependant demand situation Operates in independent demand situation Area of operation & coordination Coordinates scheduling & integration of materials into finished goods Coordinates demand between outlets & supply sources Stage of functioning Controls inventory until manufacturing & assembly is complete Controls inventory after manufacturing & assembly of finished goods Planning availability of stock at? Market[retailers] & warehouses