Muhammad Naveed Afzal
Nationality : Pakistani
N.I.C # 33202- 1623508-9
Passport No: CH1515082
DOB: 18th jan1985
Mob #, 00971508765569
Email: engr.naveedafzal@gmail.com
Address: Mohallah Qazian wala
Block#8 Jhang city, Pakistan.
OBJECTIVE:
To join a dynamic and progressive organization offering opportunities for diversified
experience as an Engineer.
Seeking a job in the field of Telecommunication, as an Engineer in a reputable organization
by effectively using my capabilities and proving my abilities in an environment where learning never
stops.
WORK EXPERIENCE:
26-Apr-2015 to Date:
Etisalat UAE :
Engineer GPON/FTTH/ Fixed Field Maintenance
Reporting To: Senior Duty Manager:
Location: Dubai Region
Responsibilities and Task Assigned:
Managing and leading Installation teams of GPON at Dubai UAE
Responsible for O & M of GPON network.
Responsible for QC of GPON network
Responsible for complete checking and testing of OSP and ISP equipment.
Responsible for Maintenance of underground fiber cables.
Responsible for Jointing & Splicing of Fiber Optics.
Responsible for testing of newly commissioned OSP network.
Trouble Shooting of OLT, FDH, MDU, ONT, Power Testing of Fiber Optics.
Conducting connection survey for Main Route designing GPON.
Conducting Hand holes and Manholes survey for detailed designing of GPON.
Planning and designing metroand access fiber network.
Designing and implementation of PON (GPON).
Responsible for Providing Technical support for planning of fiber allocation, duct design (PVC)
And Route design.
Training new staff for installation and configuration of ONT.
FTTH/GPON Network Planning, Estimation, Route Selection, OSP Planning, Fiber Management, Fiber link
power Budgeting, ONU, OLT Services.
Hands on Experience on Ericsson (BLM-1500, T083g) and Huawei (MA5600T, HG8245) equipment.
Interacting with Core for backhand configuration.
Interacting with vendor for PAT of GPON equipment.
Managing Billing & Customer Care (BnCC) Software for GPON.
Responsible for close coordination with vendors (Ericsson, Huawei, Cieana, Lucent).
Preparation of feasibility reports, technical and management planning, costing, proposals, technical surveys,
Testing reports, Execution/progress reports and project documentation.
Responsible for the co-ordination of field issues with Huawei and management.
Streamlined processes of fiber laying.
Assignment and proper follow-up of different tasks allotted to different teams.
Resolving coordination issues between the field staff and the design team.
Heading the testing, development, pulling, and installation team both technically and administratively.
Managing NMS/EMS server & looking after trouble tickets & Outage Work Orders
ZTE Pakistan: Multinational Vendor:
01-Sep-2012 ---- 20-Apr-2015
Team Lead Implementation (China Mobile Pakistan Project) :
Reporting To: RPM and Manager P&I:
Location: Faislaabad
Responsibilities and Task Assigned:
, requirements and integration efforts.
t structure.
and Logistics).
chase Order)
line implementation and logistics in a smooth way.
-up
AP/Expansions Projects for China Mobile ZTE SDR 8900,V3 BTS.
Managing all expansion related issues, RRU,Jumpers,Transmission Media etc
s (PAT,PAC,FAT,FAC)
ZTE MicrWave Trial Project for China Mobile Pakistan Central-II Region
-II.
) Project with Zong (China Mobile Pakistan )
Celeros Networks Pvt LTD: SUB CONTRACTOR OF Zong (China Mobile Pakistan).
19-July -2011-----30-Aug-2012
Regional Team Leader (Sahiwal)
Field Operations / Managed Services
Reporting to:
ZTE and Celeros Manager O&M.
Location:
Sahiwal
Responsibilities and Task Assigned:
 Managing C1 Sahiwal region operational sites for Zong .
 Responsible for all Telco & Non Telco O&M(preventive and corrective maintenance).
 Managing Work Orders (approvals, executions and internal approvals) of regional office.
 Conducting and participating in Internal and external audits.
 Providing technical support to the teams in fields.
 Q.A of operational sites and alarm rectification.
 Managing resources for the timely completion of assigned daily, weekly and monthly major tasks by
customer.
 Conduct the meetings with customer to enhance the work progress.
 Site documentation and progress reporting.
 Co-ordinate with OMC and BSc.
 Identifying performance bottlenecks and taking adequate measures to rectify faults.
 Responsible for all customer dealing which include different type of reporting and weekly meetings.
 Preparing plane for optimizing Microwave link by keeping deep eye at NMS.
 Responsible for managing the E1’s BIT ERROR RATE, affect of fading.
 Responsible to manage all generator issues that arises at sites in timely manner.
 Support RAN Department.
 To monitor and resolve the fault in the network elements (Radio & BSS) in timely manner.
 Hands on Experience on SDR 8900 ZTE.
Mobiserve Pakistan: SUB CONTRACTOR OF Zong (CMPak).
17-SEP-2010-----18-JULY-2011
Designation:
BSS/Field Operations/O&M Engineer:
Troubleshooting of MW, BTS and Gen-Set Problems
Reporting to:
ZTE and Mobiserve Manager O&M.
Location:
Jhang
Celeros Networks Pvt LTD: SUB CONTRACTOR OF Zong (CMPak).
07-JULY-2010-----16-SEP-2010
TEAM LEADER (O&M):
Troubleshooting of MW, BTS and Genset Problems
Reporting to:
ZTE and Celeros Manager O&M.
Location:
Bahawalpur (Liaqatpur)
Responsibilities and Task Assigned:
To handle everything to maintain my sites.
To remove VSWR faults on sites.
Rectificationof powerissues on sites.
Troubleshooting of different faults in Microwaveregarding ODU’sand IDU’s.
Preparation of sites forPAT.
Troubleshooting of rectifier faults.
Troubleshooting of faults of GSU withjumper setting.
Troubleshooting of CSU faults.
Fault rectificationof Microwavelink (PDH/SDH) of DG telecom, Ericsson Minilink TN,Huawei 950 &
980 MWand TDM, Alcatel and NEC (Neo Linkand Paso Link)
Trouble shooting of Generator’s operations.
Handling of BTS V3 & V2 Equipment including trouble shooting of TRX, VSWR, SWAPING,
and SECTORSWAPING etc.
 Troubleshooting of various ATS panel faults including Relays faults and Magnetic contactor
faults.
 Verification and testing EASS.
Monthly PM reports for indoor and outdoor sites.
HUITONG TECHNOLOGY CO PVT LTD(H.T) : SUB CONTRACTOR OF Zong (CMPak).
Designation: 14 JAN 2009 – 6-JULY-2010
BSS Engineer:
Troubleshooting of MW, BTS and Genset Problems
Reporting to:
ZTE and HT Manager O&M.
Location:
SAHIWAL (DEEPALPUR)
Responsibilities and Task Assigned:
To handle everything to maintain my sites.
To remove VSWR faults on sites.
Rectificationof powerissues on sites.
Troubleshooting of different faults in Microwaveregarding ODU’sand IDU’s.
Preparation of sites forPAT.
Troubleshooting of rectifier faults.
Troubleshooting of faults of GSU withjumper setting.
Troubleshooting of CSU faults.
Fault rectificationof Microwavelink (PDH/SDH) of DG telecom, Ericsson Minilink TN, Alcatel and
NEC.
Trouble shooting of Generator’s operations.
Handling of BTS Equipment including trouble shooting of TRX,VSWR, SWAPING,and
SECTOR SWAPINGetc.
Troubleshooting of various ATS panel faults including Relays faults and Magnetic contactor
faults.
Verification and testing EASS.
Monthly PM reports for indoor and outdoor sites
Huawei Technologies Pvt Ltd Faisalabad
 Worked as BSS Trainee Engineer 14th Sep 2008 – 14th Nov 2008
Responsibilities and Task Assigned:
 Installation, commissioning of Huawei MicrowaveRTN links.
 Installation, troubleshooting and commissioning of BTS 3012, 3012AE, 3006C, 3002,3900 and BTS
312
 Installation, troubleshooting and Commissioning of BSC6000, BSC32 of Huawei technology.
 Installation and commissioning of PCU 6000.
 Site acceptance of the nominal for Customer satisfaction with Tracks/Routes, Predictions,
Images and snaps.
 Troubleshooting of different alarms on BTS and BSC sites
 Installation, commissioning and troubleshooting of NEC,Ericsson and Siemens Microwave
links in Ufone project.
 Installation and commissioning of CDMA BTS in the PTCL project.
 Power system installation and commission.
 Supervision Earthing/Grounding system at all the collocations.
 Addition and modification of Neighbors cell of a site.
 Defining of radio parameters of the site.
Worked as BSS Internee Engineer in Zong (CMPak), FOPS Deptt. 20th Nov – 10 Jan 2009
Job Responsibilities:
Troubleshooting of faults of ZTE V2 BTS.
Troubleshooting of faults of ZTE V3 BTS.
Troubleshooting of microwave faults in DG telecom equipment.
Conducting the PAT of sites from Vendor (ZTE) according to CMPak standard along with
CMPak team in Central II.
External alarm’s PAT with ZTE team as representative of CMPAK.
Trouble shooting of Generator’s operations.
Handling of BTS Equipment including trouble shooting of TRX,VSWR, SWAPING,and
SECTOR SWAPINGetc.
Performed and carried out more than 100 Technical Sites EASS PAT and maintained them
with vendor.
Handling of different issues with subcontractor.
To remove power faults on sites.
Handling of billing and wapda issue on sites.
FINAL PROJECT:
Worked on Project(LinkCapacityExpansion).Itisenhancement mechanism of the cellular
network,used for mobile communication .when user traffic becomes more than present network
capacity to handle that, link capacity expansion in cellular networkimplemented.
Under:Dr. Syed ZeeshanHaider
Finalproject evaluationwas takenby Prof.Dr.TahirMushtaqfromUNIVERSITY OF
FAISALABAD, as anexternal supervisor.
MAJOR SUBJECTS:
1 Communication Systems.
2 Mobile Communication, Wireless Communication.
3 Optical Communication.
4 Data Communication & Computer Networks.
5 Digital signal Processing.
6 Antenna and Wave Propagation.
7 NetworkSecurity and Management.
8 MicrocontrollerArchitecture & interfacing
9 Electromagnetic theory, Signals & Systems.
10 ElectronicsI & II.
11 Probability & Statistics.
EDUCATION:
BscTelecommunicationEngineering:2.63/4CGPA (2008)
G.C UNIVERSITY FAISALABAD, PAKISTAN.
Intermediate(Pre - Engineering): (2004)
FARAN MODELCOLLEGE JHANG, PAKISTAN.
Matriculation(Science): (2001)
GOVT.HIGHSCHOOL JHANG City, PAKISTAN.
Trainings
Attended various Trainings at Etisalat Academy on GPON/FTTH
References:
Will be furnished upon demand.
Naveed CV (1) (1)

More Related Content

DOCX
Adeel Ahmed- CV
DOCX
CV Abdul jabbar2016Se June 27
DOC
MOHAMMAD SALEEM CV.
DOC
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
DOCX
Cv huawe alcate zte_nsn cv
DOCX
pravendra -cv
DOC
Esrar Alam Transmission Engineer
PDF
BSS Updated cv
Adeel Ahmed- CV
CV Abdul jabbar2016Se June 27
MOHAMMAD SALEEM CV.
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
Cv huawe alcate zte_nsn cv
pravendra -cv
Esrar Alam Transmission Engineer
BSS Updated cv

What's hot (20)

DOC
RAMAKANTA SAHOO Resume
DOCX
Pmp rf engineer resume
DOC
CV - Rashid
DOC
CV Shabbir 1
DOCX
KW resume 2015
DOC
KAMALJEET_SINGH_cv_NEW
DOCX
RAMZAN MALIK
DOC
Electrical Engineer -Nabeel Cv (1)
PDF
Amjad Dar_ CV pic Mobily 15y
DOC
Usman khan Resume
DOC
CV_NARENDRA_RAWAT_EXP-10_YEARS_TELECOM_OPS._AND_PROJECT
PDF
AHSANULLAH BHUTTO CV-DT
DOC
CV_SIVAM OCT.doc 1
DOC
New TP
DOCX
AMIT _RESUME
PDF
CV_Umer Haneef
DOCX
Rizwan Ahmad (f)
DOCX
Resume
DOCX
RTF
APAA SIMON AHUNGWA
RAMAKANTA SAHOO Resume
Pmp rf engineer resume
CV - Rashid
CV Shabbir 1
KW resume 2015
KAMALJEET_SINGH_cv_NEW
RAMZAN MALIK
Electrical Engineer -Nabeel Cv (1)
Amjad Dar_ CV pic Mobily 15y
Usman khan Resume
CV_NARENDRA_RAWAT_EXP-10_YEARS_TELECOM_OPS._AND_PROJECT
AHSANULLAH BHUTTO CV-DT
CV_SIVAM OCT.doc 1
New TP
AMIT _RESUME
CV_Umer Haneef
Rizwan Ahmad (f)
Resume
APAA SIMON AHUNGWA
Ad

Viewers also liked (20)

PPT
DOCX
Tyler Duffy Links to Previous Work
PPTX
Momemto infantil-el-amor-para-el-sabado-
PPT
Presentacion del libro ...gato n
PPTX
Procesadores de textos
PPT
Digitalización.paloma dorado
PPT
SarayAndrea.
PDF
Avivamiento.
PPTX
Evolución tecnológica c y m 88y 14
PDF
EL DON DE DIOS POR DINERO
PDF
Creatividad en el Diseño
PDF
Cuentanos tu idea
PPTX
Personalidad
PPT
PPT
Sistemas operativos
PPTX
Gestion financiera
PDF
El vestido del hombre y la mujer ¿que dice dios y que dicen los hombres
PPS
Presentacion
PPTX
Informatica
PPT
Discurso
Tyler Duffy Links to Previous Work
Momemto infantil-el-amor-para-el-sabado-
Presentacion del libro ...gato n
Procesadores de textos
Digitalización.paloma dorado
SarayAndrea.
Avivamiento.
Evolución tecnológica c y m 88y 14
EL DON DE DIOS POR DINERO
Creatividad en el Diseño
Cuentanos tu idea
Personalidad
Sistemas operativos
Gestion financiera
El vestido del hombre y la mujer ¿que dice dios y que dicen los hombres
Presentacion
Informatica
Discurso
Ad

Similar to Naveed CV (1) (1) (20)

DOC
Bashir_cv
DOCX
DOC
CV_HAFIZ_FAROOQ
PDF
Waqas_Abbasi
DOCX
Mir Ahmed Raza
DOC
Rajbir Resume
DOCX
Talha Ali
DOCX
GOPALAKRISHNAN
DOC
imran cv (1)
DOCX
RANA WASIT MEHMOOD
DOC
Mobeen CV
DOCX
Rana Ali CV
DOCX
Nasir Zohaib CV
DOC
C.V Murtaza Cheema
DOCX
DOCX
Nawal Kishore
DOCX
priyank _cv
DOCX
CV E Atienza new 2 - Copy
DOCX
suresh resume
DOCX
ADEEL SHAHZAD Resume
Bashir_cv
CV_HAFIZ_FAROOQ
Waqas_Abbasi
Mir Ahmed Raza
Rajbir Resume
Talha Ali
GOPALAKRISHNAN
imran cv (1)
RANA WASIT MEHMOOD
Mobeen CV
Rana Ali CV
Nasir Zohaib CV
C.V Murtaza Cheema
Nawal Kishore
priyank _cv
CV E Atienza new 2 - Copy
suresh resume
ADEEL SHAHZAD Resume

Naveed CV (1) (1)

  • 1. Muhammad Naveed Afzal Nationality : Pakistani N.I.C # 33202- 1623508-9 Passport No: CH1515082 DOB: 18th jan1985 Mob #, 00971508765569 Email: engr.naveedafzal@gmail.com Address: Mohallah Qazian wala Block#8 Jhang city, Pakistan. OBJECTIVE: To join a dynamic and progressive organization offering opportunities for diversified experience as an Engineer. Seeking a job in the field of Telecommunication, as an Engineer in a reputable organization by effectively using my capabilities and proving my abilities in an environment where learning never stops. WORK EXPERIENCE: 26-Apr-2015 to Date: Etisalat UAE : Engineer GPON/FTTH/ Fixed Field Maintenance Reporting To: Senior Duty Manager: Location: Dubai Region Responsibilities and Task Assigned: Managing and leading Installation teams of GPON at Dubai UAE Responsible for O & M of GPON network. Responsible for QC of GPON network Responsible for complete checking and testing of OSP and ISP equipment. Responsible for Maintenance of underground fiber cables. Responsible for Jointing & Splicing of Fiber Optics. Responsible for testing of newly commissioned OSP network. Trouble Shooting of OLT, FDH, MDU, ONT, Power Testing of Fiber Optics. Conducting connection survey for Main Route designing GPON. Conducting Hand holes and Manholes survey for detailed designing of GPON. Planning and designing metroand access fiber network. Designing and implementation of PON (GPON). Responsible for Providing Technical support for planning of fiber allocation, duct design (PVC) And Route design. Training new staff for installation and configuration of ONT. FTTH/GPON Network Planning, Estimation, Route Selection, OSP Planning, Fiber Management, Fiber link power Budgeting, ONU, OLT Services. Hands on Experience on Ericsson (BLM-1500, T083g) and Huawei (MA5600T, HG8245) equipment. Interacting with Core for backhand configuration. Interacting with vendor for PAT of GPON equipment.
  • 2. Managing Billing & Customer Care (BnCC) Software for GPON. Responsible for close coordination with vendors (Ericsson, Huawei, Cieana, Lucent). Preparation of feasibility reports, technical and management planning, costing, proposals, technical surveys, Testing reports, Execution/progress reports and project documentation. Responsible for the co-ordination of field issues with Huawei and management. Streamlined processes of fiber laying. Assignment and proper follow-up of different tasks allotted to different teams. Resolving coordination issues between the field staff and the design team. Heading the testing, development, pulling, and installation team both technically and administratively. Managing NMS/EMS server & looking after trouble tickets & Outage Work Orders ZTE Pakistan: Multinational Vendor: 01-Sep-2012 ---- 20-Apr-2015 Team Lead Implementation (China Mobile Pakistan Project) : Reporting To: RPM and Manager P&I: Location: Faislaabad Responsibilities and Task Assigned: , requirements and integration efforts. t structure. and Logistics). chase Order) line implementation and logistics in a smooth way. -up AP/Expansions Projects for China Mobile ZTE SDR 8900,V3 BTS. Managing all expansion related issues, RRU,Jumpers,Transmission Media etc s (PAT,PAC,FAT,FAC) ZTE MicrWave Trial Project for China Mobile Pakistan Central-II Region -II. ) Project with Zong (China Mobile Pakistan )
  • 3. Celeros Networks Pvt LTD: SUB CONTRACTOR OF Zong (China Mobile Pakistan). 19-July -2011-----30-Aug-2012 Regional Team Leader (Sahiwal) Field Operations / Managed Services Reporting to: ZTE and Celeros Manager O&M. Location: Sahiwal Responsibilities and Task Assigned:  Managing C1 Sahiwal region operational sites for Zong .  Responsible for all Telco & Non Telco O&M(preventive and corrective maintenance).  Managing Work Orders (approvals, executions and internal approvals) of regional office.  Conducting and participating in Internal and external audits.  Providing technical support to the teams in fields.  Q.A of operational sites and alarm rectification.  Managing resources for the timely completion of assigned daily, weekly and monthly major tasks by customer.  Conduct the meetings with customer to enhance the work progress.  Site documentation and progress reporting.  Co-ordinate with OMC and BSc.  Identifying performance bottlenecks and taking adequate measures to rectify faults.  Responsible for all customer dealing which include different type of reporting and weekly meetings.  Preparing plane for optimizing Microwave link by keeping deep eye at NMS.  Responsible for managing the E1’s BIT ERROR RATE, affect of fading.  Responsible to manage all generator issues that arises at sites in timely manner.  Support RAN Department.  To monitor and resolve the fault in the network elements (Radio & BSS) in timely manner.  Hands on Experience on SDR 8900 ZTE. Mobiserve Pakistan: SUB CONTRACTOR OF Zong (CMPak). 17-SEP-2010-----18-JULY-2011 Designation: BSS/Field Operations/O&M Engineer: Troubleshooting of MW, BTS and Gen-Set Problems Reporting to: ZTE and Mobiserve Manager O&M. Location: Jhang Celeros Networks Pvt LTD: SUB CONTRACTOR OF Zong (CMPak). 07-JULY-2010-----16-SEP-2010 TEAM LEADER (O&M):
  • 4. Troubleshooting of MW, BTS and Genset Problems Reporting to: ZTE and Celeros Manager O&M. Location: Bahawalpur (Liaqatpur) Responsibilities and Task Assigned: To handle everything to maintain my sites. To remove VSWR faults on sites. Rectificationof powerissues on sites. Troubleshooting of different faults in Microwaveregarding ODU’sand IDU’s. Preparation of sites forPAT. Troubleshooting of rectifier faults. Troubleshooting of faults of GSU withjumper setting. Troubleshooting of CSU faults. Fault rectificationof Microwavelink (PDH/SDH) of DG telecom, Ericsson Minilink TN,Huawei 950 & 980 MWand TDM, Alcatel and NEC (Neo Linkand Paso Link) Trouble shooting of Generator’s operations. Handling of BTS V3 & V2 Equipment including trouble shooting of TRX, VSWR, SWAPING, and SECTORSWAPING etc.  Troubleshooting of various ATS panel faults including Relays faults and Magnetic contactor faults.  Verification and testing EASS. Monthly PM reports for indoor and outdoor sites. HUITONG TECHNOLOGY CO PVT LTD(H.T) : SUB CONTRACTOR OF Zong (CMPak). Designation: 14 JAN 2009 – 6-JULY-2010 BSS Engineer: Troubleshooting of MW, BTS and Genset Problems Reporting to: ZTE and HT Manager O&M. Location: SAHIWAL (DEEPALPUR) Responsibilities and Task Assigned: To handle everything to maintain my sites. To remove VSWR faults on sites. Rectificationof powerissues on sites. Troubleshooting of different faults in Microwaveregarding ODU’sand IDU’s. Preparation of sites forPAT. Troubleshooting of rectifier faults. Troubleshooting of faults of GSU withjumper setting.
  • 5. Troubleshooting of CSU faults. Fault rectificationof Microwavelink (PDH/SDH) of DG telecom, Ericsson Minilink TN, Alcatel and NEC. Trouble shooting of Generator’s operations. Handling of BTS Equipment including trouble shooting of TRX,VSWR, SWAPING,and SECTOR SWAPINGetc. Troubleshooting of various ATS panel faults including Relays faults and Magnetic contactor faults. Verification and testing EASS. Monthly PM reports for indoor and outdoor sites Huawei Technologies Pvt Ltd Faisalabad  Worked as BSS Trainee Engineer 14th Sep 2008 – 14th Nov 2008 Responsibilities and Task Assigned:  Installation, commissioning of Huawei MicrowaveRTN links.  Installation, troubleshooting and commissioning of BTS 3012, 3012AE, 3006C, 3002,3900 and BTS 312  Installation, troubleshooting and Commissioning of BSC6000, BSC32 of Huawei technology.  Installation and commissioning of PCU 6000.  Site acceptance of the nominal for Customer satisfaction with Tracks/Routes, Predictions, Images and snaps.  Troubleshooting of different alarms on BTS and BSC sites  Installation, commissioning and troubleshooting of NEC,Ericsson and Siemens Microwave links in Ufone project.  Installation and commissioning of CDMA BTS in the PTCL project.  Power system installation and commission.  Supervision Earthing/Grounding system at all the collocations.  Addition and modification of Neighbors cell of a site.  Defining of radio parameters of the site. Worked as BSS Internee Engineer in Zong (CMPak), FOPS Deptt. 20th Nov – 10 Jan 2009 Job Responsibilities: Troubleshooting of faults of ZTE V2 BTS. Troubleshooting of faults of ZTE V3 BTS. Troubleshooting of microwave faults in DG telecom equipment. Conducting the PAT of sites from Vendor (ZTE) according to CMPak standard along with CMPak team in Central II. External alarm’s PAT with ZTE team as representative of CMPAK. Trouble shooting of Generator’s operations. Handling of BTS Equipment including trouble shooting of TRX,VSWR, SWAPING,and SECTOR SWAPINGetc. Performed and carried out more than 100 Technical Sites EASS PAT and maintained them with vendor. Handling of different issues with subcontractor. To remove power faults on sites. Handling of billing and wapda issue on sites.
  • 6. FINAL PROJECT: Worked on Project(LinkCapacityExpansion).Itisenhancement mechanism of the cellular network,used for mobile communication .when user traffic becomes more than present network capacity to handle that, link capacity expansion in cellular networkimplemented. Under:Dr. Syed ZeeshanHaider Finalproject evaluationwas takenby Prof.Dr.TahirMushtaqfromUNIVERSITY OF FAISALABAD, as anexternal supervisor. MAJOR SUBJECTS: 1 Communication Systems. 2 Mobile Communication, Wireless Communication. 3 Optical Communication. 4 Data Communication & Computer Networks. 5 Digital signal Processing. 6 Antenna and Wave Propagation. 7 NetworkSecurity and Management. 8 MicrocontrollerArchitecture & interfacing 9 Electromagnetic theory, Signals & Systems. 10 ElectronicsI & II. 11 Probability & Statistics. EDUCATION: BscTelecommunicationEngineering:2.63/4CGPA (2008) G.C UNIVERSITY FAISALABAD, PAKISTAN. Intermediate(Pre - Engineering): (2004) FARAN MODELCOLLEGE JHANG, PAKISTAN. Matriculation(Science): (2001) GOVT.HIGHSCHOOL JHANG City, PAKISTAN. Trainings Attended various Trainings at Etisalat Academy on GPON/FTTH References: Will be furnished upon demand.