SlideShare a Scribd company logo
B A S H I R A H M E D
House 4340-A, St# 3 , Muhalla Ali Pura Khushab
Mobile : +92300-5658477
OBJECTIVE
Seeking position as a Project Management technical side in the Field of
Telecommunication and challenging environment where I can professionally
utilize my Academics, Professional, Managerial and Administrative Skills.
WORK HISTORY
DIN NEWS
April 2014- TO Date
Designation: Bearue Chief Khushab
Working Experience
Work on a file zilla, camera and reporting. Our aim is make better report for our channels.
We give your channel all reports our Area incedents local and important.
Our management is too good.
SBN TV SAHAR NEWS
April 2013- TO Date 2014
Designation: Bearue Chief Khushab
Working Experience
Work on a file zilla, camera and reporting. Our aim is make better report for our channels.
We give your channel all reports our Area incedents local and important.
Our management is too good.
We have a office for work. Our reporting system is reliable, and give 100% report.
We have all Equipments in working position.
Maftel Network
 A International subcontractor worked with ZTE technologies
 Mar 2013 – To Date
 Designation: Project MANAGER
 Project : CM Pak, TP & PTCL Projects
Manegarial Experience
 Manage the installation/swap project of Telenor and CMPak.
 Manage the PTCL New sites installation project as per ZTE standard.
 Prepare and share daily Report with customer.
 Achive the installation target as per custome time line.
CCS International (China com)
 A International subcontractor worked with ZTE technologies
 Aug 2007 – Feb 2013
 Designation: Project MANAGER (O & M)
 Project : CM Pak O&M Project
 Manegarial Experience
 O& M of complete site including Microwave, ZTE BTS, SDR and other equipments
 Troubleshooting of all kinds of SDH and PDH Transmission Equipments including , DG
Telecom Microwave equipment installed on CMPak sites
 Trace all types of BTS troubleshooting regarding to rectifier, BTS hardware
 Responsible for removing all types of external and internal alarms
 Health Check of complete site
 Quality Assurance & Quality Control of Installed equipment.
 Responsible for coordinating with the customer of issues that arise at the site on daily basis
 Monthly KPI Meeting with Customer to improve Network.
 Co-Ordination and meetings with Client regarding project for their satisfaction.
 Strong technical support to field Engineers for Network services improvement.
 Documentation of Network for all of regional project.
 Sites Audit for PM [Preventive Maintenance] and CM [Corrective Maintenance ] to check
out the quality of Maintenance and give a better response to Customer.
 Connection with NOC for site status and then to guide field engineers.
 Daily feedback to NOC for Maintain table-1. Table-2, Table-3 and table-6
 Focus on Work Orders timely execution
 To prepare PO & Invoices against services & work order.
 Management Experience
 Monthly Meeting with Customer to improve Network.
 Supervision of Daily, Weekly and monthly basis reporting.
 471 sites Resource management (staff of Field, NOC and Admin)
 Co-Ordination and meetings with Customer regarding project for their satisfaction.
 Strong technical support to field Engineers for Network services improvement.
 Documentation of Network for the entire regional project.
 Managing Work Orders generation, execution & WO Summary on monthly basis
 Sites Audit for PM [Preventive Maintenance] and CM [Corrective Maintenance] to check out
the quality of Maintenance and give a better response to Customer.
 Co-ordination with NOC for site status and then to guide field engineers.
 Daily feedback to NOC for Maintain table-1.
 Providing Technical support and expert suggestions to all regional team to meet CM pak
Quality standards.
 Attend trouble ticket and take required action for resolving issues.
 Rectification of Alcatle BTS software faults by doing Off-line commissioning.
 Resolving Evolium BTS hardware faults by changing SUMA Card, TRE, Combiner, RI
Cable, Abis Cable, CSO3 jumper cable, CSO4 jumper cable, Alarm card, Network
Interfacing card, FSCB card, TFT Board and Shelf.
 Removing RF cable issues by using Site Master like VSWR.
 BTS Alarm patching.
 Resoling Transmission related issues. Like E1 break, HiBer, LowBer and RSL
improvement.
 Replace and Configure NEC iPassolink, Passolink NEO, Passolink Compect and
Passolink IDUs.
 Changing E1 traffic from one media path to another.
 Removing idu and odu alarm by resolving issues.
 Supervise Power related issues resolving activities like ATS, DBX, Rectifier, genset ATS,
Alternator related faults.
 I have good knowledge and worked at many kinds of Gensets NEQ 31KVA-27KVA,
OLYMPIAN-30-27-12.5KVA, POWER TECH 27-20-13KVA, SIEMENS32.5KVA,Mets
30KVA, Impac 27kva).
 I have good knowledge and working experience at many kinds of ATS PANELS
(Ghadder duel PLC, single PLC, without PLC, Arena Tech, High Tech, allied Eng. Duel,
Combine Eng. Duel and Siemens made. Competent in Project Management,
Administration
 Meet challenges and achieve target with in given time duration
 Manpower training and development
 Technical and management training
 Feed back of timely and accurate information to the management such as
efficiency, loss time, earning & losses analysis, individual and group
performance.
 Contributes to building a positive team spirit
 NORTHERN Net
 A Local subcontractor worked with ZTE technologies.
 Dec 2006 to Aug 2007
 Designation : BSS and MW Engineer
 Project: Ufone and PTCL Project
 Responsibilities
 Installation and data configuration of Huawei GSM BTS, 3012, 3012AE.
 Trouble Shooting and Maintenance of HUAWEI BTS
 Diagnosis and rectification of major and minor fault in Huawei GSM.
 Survey & installation Of new BTS (Indoor BTS)
 Commissioning of new sites
 Expansion of the existing sites
 Commissioning and Integration of Microwave Links. Commissioning, Integration and
configuration of BTS. Complete Sweep Testing (VSWR, DTF and Return Loss Testing).
TRX Power Testing and E1 Testing
 Bit Error Rate Test (BERT) and analysis,of Microwave Link
 Broad Band (IP T V) Installation Hardware and Software
 Training from UET (University of Engineering Technology) Three Month
 UET (University of Engineering Technology) Training BTS and Microwave (HUAWEI)
 Working in Broad Band IPTV Of PTCL
 Rooter installation
 Installation of Mobilink, Ufone, CM Pak MSC hang Installation of PDF and VOD PTCL
Exceing
 InterSES Pvt Ltd
 A Local subcontractor worked with Huawei technologies.
 Sep 2005 to Dec 2006
 Designation : MW Engineer
 Project: Ufone, Motorolla and Warid
 Responsibilities
 Trouble Shooting and Maintenance of BTS. Installation & commissioning of NEC PDH &
SDH microwave transmission equipment with NORTEL for Ufone Ph-3 & PH-4
Expansion projects.
 Installation of NEC Cnode & SMS150V multiplexers including 19 inch transmission &
ETSI racks.
 Installation of Siemens PDH & SDH MW links for Telenor project.
 Installation of NEC MW equipment for WARID, PAKTEL GSM & PTCL WLL project.
 Installation of ZTE BTS equipment for PTCL WLL project.
 Supervision of GSM antenna & feeder cable installation at BTS sites.
 Conduct Line of sight (LOS), draft, panoramic & balloon surveys for MW paths.
 Supervision of Cable laying, ODU & MW Antenna installation at towers.
 Preparation of Survey reports.
 Installation of Alcatel PDH Microwave link for Mobilink /Paktel projects.
 MOTOROLLA/ WATEEN (WIMAX)
 Worked as Regional Project Coordinator in InterSES for Motorola / Wateen WiMax
Project.
 Fully conversant with Installation, Commissioning and Optimizing of Microwave
Transmission Equipment (Sagem IDU & ODU) and WiMax.
 Performed Extensive Surveys for MW (Sagem IDU & ODU) and WiMax Equipment
(Motorola ULAP/DAPs and CMM/BCU) deployment on the Existing Warid Sites.
 Performing Site Surveys (Providing Feasibility and proposals for Equipment deployment on
the site.)
 Spectrum Solution Pvt Ltd
 A Local subcontractor worked with Huawei, ZTE and Ericsson technologies.
 Aug 2005 to Sep 2006
 Designation : MW and BSS Engineer
 Project: Warid Rollout Project
 Responsibilities
 Working on DXX Node-3 , Node-16 on Ericsson equipment for Warid project.
 BTS Installation of ZTE for PAKTEL GSM.
 Manage the Daily report, SMR and MR.
 Commissioning and Integration of Microwave Links. Commissioning, Integration and
configuration of BTS. Complete Sweep Testing (VSWR, DTF and Return Loss Testing).
 Creating BOQs for GSM Equipment
 NCI Pvt Ltd
 A Local subcontractor worked with Huawei, ZTE and Ericsson technologies.
 Oct 2004 to Aug 2005
 Designation : MW and BSS Engineer
 Project: Warid Rollout Project
 Responsibilities
 Working on Ericsson Equipment Indoor/Outdoor for Warid Project (BTS and M/W)
 Survey & installation Of new BTS (Indoor BTS)
 ACADEMIC CAREER

 UET Pakistan (2004)
 BSC
 Joharabad Digree Collage. (1995)
 HSE ( 1st
Div)
 Sargodha board of secondary Education. (1993)
 Secondary School Certification (1st Div)
 TECHNICAL TRAININGS

 Huawei Training Centre UET Lahore
 1st
Oct 2007 ---- 5 Oct 2007
 5 days Training on Huawei GSM Equipments (BTS3012, BTS3012AE)
 Huawei Training Centre UET Lahore
 Jan 2007 ---- March 2007
 3 Month Training on GSM Equipments and IPTV Rooter
 Training of BSS of CDMA from HUAWEI at UET Lahore(3606,
3012AE,3012)
 Training of Microwave from Huawei at UET , Lahore
 Diploma in mobile communication from IET(6 months)
 Training of BSS of GSM from HUAWEI(3900,3900A and DBS 3900)
 Training of Quality Control of BSS from Huawei (Overall of Huawei)
 PERSONAL INFORMATION
 Father’s Name : Haji Aziz Ahmed
 N.I.C. No : 61101-9922403-5
 Date of Birth : 20-Aug-1976
 Contact : +9233 3816-2405
 Language : English , Urdu, Punjabi
 Marital Status : Married
 Nationality : Pakistani
 Secondary School Certification (1st Div)
 TECHNICAL TRAININGS

 Huawei Training Centre UET Lahore
 1st
Oct 2007 ---- 5 Oct 2007
 5 days Training on Huawei GSM Equipments (BTS3012, BTS3012AE)
 Huawei Training Centre UET Lahore
 Jan 2007 ---- March 2007
 3 Month Training on GSM Equipments and IPTV Rooter
 Training of BSS of CDMA from HUAWEI at UET Lahore(3606,
3012AE,3012)
 Training of Microwave from Huawei at UET , Lahore
 Diploma in mobile communication from IET(6 months)
 Training of BSS of GSM from HUAWEI(3900,3900A and DBS 3900)
 Training of Quality Control of BSS from Huawei (Overall of Huawei)
 PERSONAL INFORMATION
 Father’s Name : Haji Aziz Ahmed
 N.I.C. No : 61101-9922403-5
 Date of Birth : 20-Aug-1976
 Contact : +9233 3816-2405
 Language : English , Urdu, Punjabi
 Marital Status : Married
 Nationality : Pakistani

More Related Content

DOC
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
DOCX
Rabia Mokeddem Resume 2
DOC
MOHAMMAD SALEEM CV.
PDF
BSS Updated cv
DOCX
Adeel Ahmed- CV
DOCX
DOCX
Cv huawe alcate zte_nsn cv
DOC
RAMAKANTA SAHOO Resume
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
Rabia Mokeddem Resume 2
MOHAMMAD SALEEM CV.
BSS Updated cv
Adeel Ahmed- CV
Cv huawe alcate zte_nsn cv
RAMAKANTA SAHOO Resume

What's hot (20)

DOC
Afsar_CW FTTH & OSP Senior Engineer-Resume
DOC
Esrar Alam Transmission Engineer
DOC
CV For OSP Planning & Design-Kumaran
DOCX
DOCX
priyank _cv
DOC
Resume Deepak Pandey Ericsson
PDF
Cv Project manager & solution architect ftth
DOCX
Bharath R-CV
DOCX
Ashish_CV
PDF
CV LUTFI DESTIAN
DOC
zakaria atta
DOC
Telecom Resume
DOCX
Campbell michael resume mtli 7
DOCX
ARSHAD cv with pic
DOCX
Nawal Kishore
DOCX
ADEEL SHAHZAD Resume
DOCX
Pmp rf engineer resume
DOC
SANTOSH_TELECOM_CV
PDF
Rami Abou Omeira_CV
Afsar_CW FTTH & OSP Senior Engineer-Resume
Esrar Alam Transmission Engineer
CV For OSP Planning & Design-Kumaran
priyank _cv
Resume Deepak Pandey Ericsson
Cv Project manager & solution architect ftth
Bharath R-CV
Ashish_CV
CV LUTFI DESTIAN
zakaria atta
Telecom Resume
Campbell michael resume mtli 7
ARSHAD cv with pic
Nawal Kishore
ADEEL SHAHZAD Resume
Pmp rf engineer resume
SANTOSH_TELECOM_CV
Rami Abou Omeira_CV
Ad

Viewers also liked (6)

PDF
Zxsdr bs8906 e product description(configured with b8100) 20100825
PPTX
Zte cabinets
PPTX
Zte macro bts introduction
PPTX
zte mobilink bts swap
PPT
ZXSDR Trainning
PPT
Bts-site-installation
Zxsdr bs8906 e product description(configured with b8100) 20100825
Zte cabinets
Zte macro bts introduction
zte mobilink bts swap
ZXSDR Trainning
Bts-site-installation
Ad

Similar to Bashir_cv (20)

DOCX
Naveed CV (1) (1)
DOC
CV - Rashid
DOC
Rajbir Resume
DOCX
CV_VIKAS RAJPUROHIT
PDF
Amjad Dar_ CV pic Mobily 15y
DOC
Zaheer cv latest
DOC
Yuvarajkumar CV
PDF
Waqas_Abbasi
DOCX
Rizwan Ahmad (f)
DOCX
SAHEEM CV
DOCX
6+ Years experience in telecom Ratnadip_Chatterjee
DOCX
RAMZAN MALIK
DOCX
DOCX
DOCX
Vaijanath resume Updated
DOCX
my Resume
DOCX
Nasir Zohaib CV
PDF
CV_Umer Haneef
DOCX
CV of Saad
DOC
Resume With 5.1 years exp.
Naveed CV (1) (1)
CV - Rashid
Rajbir Resume
CV_VIKAS RAJPUROHIT
Amjad Dar_ CV pic Mobily 15y
Zaheer cv latest
Yuvarajkumar CV
Waqas_Abbasi
Rizwan Ahmad (f)
SAHEEM CV
6+ Years experience in telecom Ratnadip_Chatterjee
RAMZAN MALIK
Vaijanath resume Updated
my Resume
Nasir Zohaib CV
CV_Umer Haneef
CV of Saad
Resume With 5.1 years exp.

Bashir_cv

  • 1. B A S H I R A H M E D House 4340-A, St# 3 , Muhalla Ali Pura Khushab Mobile : +92300-5658477 OBJECTIVE Seeking position as a Project Management technical side in the Field of Telecommunication and challenging environment where I can professionally utilize my Academics, Professional, Managerial and Administrative Skills. WORK HISTORY DIN NEWS April 2014- TO Date Designation: Bearue Chief Khushab Working Experience Work on a file zilla, camera and reporting. Our aim is make better report for our channels. We give your channel all reports our Area incedents local and important. Our management is too good. SBN TV SAHAR NEWS April 2013- TO Date 2014 Designation: Bearue Chief Khushab Working Experience Work on a file zilla, camera and reporting. Our aim is make better report for our channels. We give your channel all reports our Area incedents local and important. Our management is too good. We have a office for work. Our reporting system is reliable, and give 100% report. We have all Equipments in working position. Maftel Network  A International subcontractor worked with ZTE technologies  Mar 2013 – To Date  Designation: Project MANAGER  Project : CM Pak, TP & PTCL Projects Manegarial Experience  Manage the installation/swap project of Telenor and CMPak.
  • 2.  Manage the PTCL New sites installation project as per ZTE standard.  Prepare and share daily Report with customer.  Achive the installation target as per custome time line. CCS International (China com)  A International subcontractor worked with ZTE technologies  Aug 2007 – Feb 2013  Designation: Project MANAGER (O & M)  Project : CM Pak O&M Project  Manegarial Experience  O& M of complete site including Microwave, ZTE BTS, SDR and other equipments  Troubleshooting of all kinds of SDH and PDH Transmission Equipments including , DG Telecom Microwave equipment installed on CMPak sites  Trace all types of BTS troubleshooting regarding to rectifier, BTS hardware  Responsible for removing all types of external and internal alarms  Health Check of complete site  Quality Assurance & Quality Control of Installed equipment.  Responsible for coordinating with the customer of issues that arise at the site on daily basis  Monthly KPI Meeting with Customer to improve Network.  Co-Ordination and meetings with Client regarding project for their satisfaction.  Strong technical support to field Engineers for Network services improvement.  Documentation of Network for all of regional project.  Sites Audit for PM [Preventive Maintenance] and CM [Corrective Maintenance ] to check out the quality of Maintenance and give a better response to Customer.  Connection with NOC for site status and then to guide field engineers.  Daily feedback to NOC for Maintain table-1. Table-2, Table-3 and table-6  Focus on Work Orders timely execution  To prepare PO & Invoices against services & work order.  Management Experience  Monthly Meeting with Customer to improve Network.  Supervision of Daily, Weekly and monthly basis reporting.
  • 3.  471 sites Resource management (staff of Field, NOC and Admin)  Co-Ordination and meetings with Customer regarding project for their satisfaction.  Strong technical support to field Engineers for Network services improvement.  Documentation of Network for the entire regional project.  Managing Work Orders generation, execution & WO Summary on monthly basis  Sites Audit for PM [Preventive Maintenance] and CM [Corrective Maintenance] to check out the quality of Maintenance and give a better response to Customer.  Co-ordination with NOC for site status and then to guide field engineers.  Daily feedback to NOC for Maintain table-1.  Providing Technical support and expert suggestions to all regional team to meet CM pak Quality standards.  Attend trouble ticket and take required action for resolving issues.  Rectification of Alcatle BTS software faults by doing Off-line commissioning.  Resolving Evolium BTS hardware faults by changing SUMA Card, TRE, Combiner, RI Cable, Abis Cable, CSO3 jumper cable, CSO4 jumper cable, Alarm card, Network Interfacing card, FSCB card, TFT Board and Shelf.  Removing RF cable issues by using Site Master like VSWR.  BTS Alarm patching.  Resoling Transmission related issues. Like E1 break, HiBer, LowBer and RSL improvement.  Replace and Configure NEC iPassolink, Passolink NEO, Passolink Compect and Passolink IDUs.  Changing E1 traffic from one media path to another.  Removing idu and odu alarm by resolving issues.  Supervise Power related issues resolving activities like ATS, DBX, Rectifier, genset ATS, Alternator related faults.  I have good knowledge and worked at many kinds of Gensets NEQ 31KVA-27KVA, OLYMPIAN-30-27-12.5KVA, POWER TECH 27-20-13KVA, SIEMENS32.5KVA,Mets 30KVA, Impac 27kva).  I have good knowledge and working experience at many kinds of ATS PANELS (Ghadder duel PLC, single PLC, without PLC, Arena Tech, High Tech, allied Eng. Duel, Combine Eng. Duel and Siemens made. Competent in Project Management, Administration  Meet challenges and achieve target with in given time duration  Manpower training and development  Technical and management training  Feed back of timely and accurate information to the management such as efficiency, loss time, earning & losses analysis, individual and group performance.  Contributes to building a positive team spirit  NORTHERN Net  A Local subcontractor worked with ZTE technologies.  Dec 2006 to Aug 2007  Designation : BSS and MW Engineer
  • 4.  Project: Ufone and PTCL Project  Responsibilities  Installation and data configuration of Huawei GSM BTS, 3012, 3012AE.  Trouble Shooting and Maintenance of HUAWEI BTS  Diagnosis and rectification of major and minor fault in Huawei GSM.  Survey & installation Of new BTS (Indoor BTS)  Commissioning of new sites  Expansion of the existing sites  Commissioning and Integration of Microwave Links. Commissioning, Integration and configuration of BTS. Complete Sweep Testing (VSWR, DTF and Return Loss Testing). TRX Power Testing and E1 Testing  Bit Error Rate Test (BERT) and analysis,of Microwave Link  Broad Band (IP T V) Installation Hardware and Software  Training from UET (University of Engineering Technology) Three Month  UET (University of Engineering Technology) Training BTS and Microwave (HUAWEI)  Working in Broad Band IPTV Of PTCL  Rooter installation  Installation of Mobilink, Ufone, CM Pak MSC hang Installation of PDF and VOD PTCL Exceing  InterSES Pvt Ltd  A Local subcontractor worked with Huawei technologies.  Sep 2005 to Dec 2006  Designation : MW Engineer  Project: Ufone, Motorolla and Warid  Responsibilities  Trouble Shooting and Maintenance of BTS. Installation & commissioning of NEC PDH & SDH microwave transmission equipment with NORTEL for Ufone Ph-3 & PH-4 Expansion projects.  Installation of NEC Cnode & SMS150V multiplexers including 19 inch transmission & ETSI racks.  Installation of Siemens PDH & SDH MW links for Telenor project.  Installation of NEC MW equipment for WARID, PAKTEL GSM & PTCL WLL project.  Installation of ZTE BTS equipment for PTCL WLL project.  Supervision of GSM antenna & feeder cable installation at BTS sites.  Conduct Line of sight (LOS), draft, panoramic & balloon surveys for MW paths.  Supervision of Cable laying, ODU & MW Antenna installation at towers.  Preparation of Survey reports.  Installation of Alcatel PDH Microwave link for Mobilink /Paktel projects.  MOTOROLLA/ WATEEN (WIMAX)
  • 5.  Worked as Regional Project Coordinator in InterSES for Motorola / Wateen WiMax Project.  Fully conversant with Installation, Commissioning and Optimizing of Microwave Transmission Equipment (Sagem IDU & ODU) and WiMax.  Performed Extensive Surveys for MW (Sagem IDU & ODU) and WiMax Equipment (Motorola ULAP/DAPs and CMM/BCU) deployment on the Existing Warid Sites.  Performing Site Surveys (Providing Feasibility and proposals for Equipment deployment on the site.)  Spectrum Solution Pvt Ltd  A Local subcontractor worked with Huawei, ZTE and Ericsson technologies.  Aug 2005 to Sep 2006  Designation : MW and BSS Engineer  Project: Warid Rollout Project  Responsibilities  Working on DXX Node-3 , Node-16 on Ericsson equipment for Warid project.  BTS Installation of ZTE for PAKTEL GSM.  Manage the Daily report, SMR and MR.  Commissioning and Integration of Microwave Links. Commissioning, Integration and configuration of BTS. Complete Sweep Testing (VSWR, DTF and Return Loss Testing).  Creating BOQs for GSM Equipment  NCI Pvt Ltd  A Local subcontractor worked with Huawei, ZTE and Ericsson technologies.  Oct 2004 to Aug 2005  Designation : MW and BSS Engineer  Project: Warid Rollout Project  Responsibilities  Working on Ericsson Equipment Indoor/Outdoor for Warid Project (BTS and M/W)  Survey & installation Of new BTS (Indoor BTS)  ACADEMIC CAREER   UET Pakistan (2004)  BSC  Joharabad Digree Collage. (1995)  HSE ( 1st Div)  Sargodha board of secondary Education. (1993)
  • 6.  Secondary School Certification (1st Div)  TECHNICAL TRAININGS   Huawei Training Centre UET Lahore  1st Oct 2007 ---- 5 Oct 2007  5 days Training on Huawei GSM Equipments (BTS3012, BTS3012AE)  Huawei Training Centre UET Lahore  Jan 2007 ---- March 2007  3 Month Training on GSM Equipments and IPTV Rooter  Training of BSS of CDMA from HUAWEI at UET Lahore(3606, 3012AE,3012)  Training of Microwave from Huawei at UET , Lahore  Diploma in mobile communication from IET(6 months)  Training of BSS of GSM from HUAWEI(3900,3900A and DBS 3900)  Training of Quality Control of BSS from Huawei (Overall of Huawei)  PERSONAL INFORMATION  Father’s Name : Haji Aziz Ahmed  N.I.C. No : 61101-9922403-5  Date of Birth : 20-Aug-1976  Contact : +9233 3816-2405  Language : English , Urdu, Punjabi  Marital Status : Married  Nationality : Pakistani
  • 7.  Secondary School Certification (1st Div)  TECHNICAL TRAININGS   Huawei Training Centre UET Lahore  1st Oct 2007 ---- 5 Oct 2007  5 days Training on Huawei GSM Equipments (BTS3012, BTS3012AE)  Huawei Training Centre UET Lahore  Jan 2007 ---- March 2007  3 Month Training on GSM Equipments and IPTV Rooter  Training of BSS of CDMA from HUAWEI at UET Lahore(3606, 3012AE,3012)  Training of Microwave from Huawei at UET , Lahore  Diploma in mobile communication from IET(6 months)  Training of BSS of GSM from HUAWEI(3900,3900A and DBS 3900)  Training of Quality Control of BSS from Huawei (Overall of Huawei)  PERSONAL INFORMATION  Father’s Name : Haji Aziz Ahmed  N.I.C. No : 61101-9922403-5  Date of Birth : 20-Aug-1976  Contact : +9233 3816-2405  Language : English , Urdu, Punjabi  Marital Status : Married  Nationality : Pakistani