Tony Smith
Melbourne Emergence Meetup
14 December 2017
Nepean Bay Bar Update
Priorities this evening?
• Preparations Pretending to be Policies and Politics
• Pristine Port Phillip Mythology and Bromance
• Precarious State of Pretentious Freight State
• Projections and Uncertainties of Sea Level Rise
• Providing Capacity to and beyond Drysdale and Baxter
• Practicalities from Arden-Macaulay to Westernport
Contacts with DELWP point to studies being done in Geelong
Failure of policy and politics to comprehend
likely trajectory of sea level rise
Lesson from Narooma:
Erosion and Deposition
processes do not respect
human-defined shorelines
• Submitted SlideShare link to our February presentation with
notes to Draft Port Phillip Bay Environmental Management
Plan 2017-2027 process and received encouraging response
confirming Dan Ierodiaconou’s involvement
• Late April dropped in at Moolap Coastal Strategic Framework
session which added introduction to OurCoast Bellarine-Corio
Bay process that references considerable technical work
including Neville Rosengren and Great Sands
• Found another interested DELWP person at Transport Camp
in October and copied them the information
• As yet nobody is chasing us for more, seeming to be acting as
though their job is to apply romantically coloured bandaids
• The 0.8 metres by 2100 furphy refuses to die in politically
mandated assumptions, even when it is admitted that it was
from another millennium and should be treated as a minimum
• More interesting is 0.2 metres by 2040, maybe not enough to
scare the cats unless they see where it must go from there
• No end of details of both historic rates and current risk areas
continue to be identified by those not buying denialist line
• The deep problem that political determinations can’t cope with
is that no matter what the date and what the depth, sea level
will still be rising and most likely still accelerating because of
components that are already locked into the system, so there is
no point planing for just those mandated levels
Need to challenge romantic delusion about
pristine Port Phillip, natural fixations
Variety of bird species exploit
permanent high flow litter
trap on Moonee Ponds Creek
below Racecourse Road
• Port Phillip refilled only 1,000 years ago and so is still young
in ecological terms and anything but a pristine environment
• Viewed in the light of historic records of the marine invasion
of Zuiderzee and charts from early British explorers, shallow
erosion of Nepean Bay Bar has likely been a gradual process
• Since the unauthorised invasion by Post Phillip Association
from Tasmania in 1835, the bay floor has been trashed 3 ways
• dredging oyster and mussel reefs to make lime for concrete
• dredging shipping channels
• dredging for scallops
• together leaving a trashed bottom unseen by surface admirers
• Similarly, the most committed of environmentalists can form
attachments to their images of pristine conditions somehow
immune from the passage of time
• The reality is that most life forms adapt to change so long as
there continues to be somewhere and somehow for them to,
but on a different timetable to news, politics and profit reports
• Werribee Sewage Treatment Farm is the state’s most
significant bird site. Trin Warren Tam-boore wetland tops
species counts. Both are in areas which have historically been
bird habitat, but both are much modified, yet still found
• Many species seem comfortable in areas that offend human
aesthetics, maybe because humans mostly keep away
Increasing evidence it was and is not smart to
aspire to be THE Freight State
Circuitous Webb Dock freight
line adjacent Lorimer Street,
opened 1986, ceased
operation 1992, closed 1996
• The 2008 round of channel deepening remains contested by
those who opposed it. Is it that, the to date minor sea level rise
or a combination that is accelerating bayside erosion?
• Containers are transported “around the equator” on very deep
draft vessels then transferred, in Australia’s case, in Singapore
to more moderate draft vessels which typically visit all five
mainland capitals’ ports, so the depths have needed to be
consistent between the five with no incentive to go deeper
• Victoria remains a battleground between standard gauge and
broad gauge rail with ports often using dual gauge at the end
• Current locations of logistics hubs, container storage and ports
are mostly poor candidates for freight rail separation
• It may not be very wise to make projections extrapolating
business/growth as usual deep into the future
• As even WWII fades from living memory it may be useful to
reflect on the recency of many underpinnings of modern life
• While blatant vested interests obstruct recognition of resource
constraints and unintended consequences of technologies,
“finite planet” is more than a truism
• Concurrent knowledge explosion shows interconnectedness of
living systems, encouraging attempts at moderation
• Before the globalised world starts to spiral out of control,
should Australia reduce its dependence and become an ark?
Continuing updates to projections for climate
change and sea level, reality at high end
Last day of November heat
draws late afternoon crowd
to Port Noarlunga Jetty
• Despite the noise of the anti-science crowd on their scientific
devices and the desperation of declining media to boost any
hint of controversy, climate science still tackles hard questions
• Taking the planetary temperature is not like taking the local
temperature, but we are identifying variations in circulation
patterns which have predictable impacts on best estimates
• If we could account for all sinks and sources, any composite
measure of global thermal energy would be rising year on year
• Challenge to find measure to quickly detect going off curve
• Various feedback loops have triggered or are threatening to,
but as yet we are mostly seeing signs, not inescapable signals
• Scientists are ever more accurately identifying signals from
geological records of sea level and associated causal factors
• Other scientists are identifying destabilisation risks for all
three major ice sheets: Greenland, East and West Antarctica
• Never enough scientists are studying the interacting roles of
fresh water, soils, forests, agriculture, urbanisation, life itself
• In the process they are finding that aridity from Australia to
the Sahara may follow early blossomings of human agriculture
• Measures of recent sea level rise are still too small and multi
factorial to give a lot of confidence as to where we are on the
curve, but once we do, we know turning back won’t get easier
Challenges for transport network evolution to
service barrier from both ends
Six tracks at Geelong Station
are pointed into single track
1876 tunnel too low to take
full height container freight
GeelongEasternBypass
Indicative Nepean Bay Bar ApproachFormer Drysdale Queenscliff Railway
Skyrail Breakwater-Drysdale avoids level
crossings and Moolap Lowland inundation
Geelong Eastern Bypass via Point Henry will
distribute Melbourne metropolitan traffic
Most of route Drysdale-St Leonards is above
20 metre contour so should be less hurried
Identifying route across Nepean Bay Bar
ahead of significant sea level rise is critical
Construction of foundations to most of that
route may reduce tides and erosion in north
Locks should enable operation of Webb and
Swanston Docks while project completed
Mornington Peninsula Freeway ReservationDundasStreet
CanteburyJettyRoad
Bay South Floating Port
Drawing acceptable line in the sand hills will
be a big challenge for local community
Need an impervious wall as foundation for at
least 20 metre elevated transport routes
Can’t try to be prescriptive at this stage, just
set out constraints and essential components
Route from beyond Boneo Road to Baxter has
been thoroughly canvassed by Rob Whitehill
His Peninsula Rail Plan is primarily passenger
so East-West-Port freight needs to be added
Assume Baxter-Dandenong and more will be
needed to distribute metropolitan traffic
Sorrento
• Zone: 4
• Platforms: 2
• Staff level: Staffed full-time
• Melway Ref: 156 K7
Although it was once thought impossible to run rail
beyond Rye station, the recent controversy over the Skyrail
project between Caulfield and Dandenong stations has
revealed the possibility of running elevated rail beyond Rye,
to Sorrento. The line would run along the reserve for the
Mornington Peninsula Freeway extension, and then alongside
Melbourne Road, elevated for its entire length except for parts
of the freeway extension reserve where the line would run
along the ground, and when it crosses Melbourne Road
opposite Tarakan Street, where it would go under the road in
order to maintain level track.
Sorrento station itself would be located above Ocean
Beach Road, just a short walk away from existing carparks,
which would be connected to the station by a ramp.
19 October 7, 2016
Closer look at particularly vulnerable locations
from Macaulay to Westernport
Accessible sea level monitoring
where Moonee Ponds Creek
flows into tidal Railway Canal
outside Macaulay Station
Areas within Land Subject to Inundation
Overlay are prime development targets
Focus remains on floods coming downstream
but adjacent tidal streams sea level the issue
Concerned about vulnerability of major
infrastructure proposed for Arden-Macaulay,
City of Melbourne enlisted Melbourne Water
Expert witness to West Gate Tunnel Inquiry
and Assessment Committee showed much
wider vulnerability across the flood plains
Healthy Waterways Catchment Collaborations
for Moonee Ponds Creek and Maribyrnong
West Melbourne Lagoon abused by industry
but can strike back hard with sea level rise
Wider closure of Westernport not practical
but large area at risk from north arm alone
Significant tidal channel wraps northwest
corner of French Island with smaller one
between northeast corner and mainland
If these channels are closed an impervious
foundation could link highlands via Island
Try to preserve Island’s ecological isolation
Port Phillip and Westernport catchments are
separated with a low point above 25 metres
elevation near Pound Road, Clyde North
Establishing impervious foundations that can
be raised to 20 metre elevation offers medium
term confidence in greater Melbourne region
• Making progress will require slaughtering sacred cows
• Marine and Coastal Act submission October 2016
• Email today re 2nd reading yesterday; but not others
• Mud Islands tour operator shut up shop December 9
• Adding 2 slides used in Kororoit Institute presentation
re West Gate Tunnel Environmental Effects Statement
Questions?
Holdgate et al 2011
St. Leonards
East Sorrento

More Related Content

PDF
Assessment of Swan and Canning River Tidal and Storm Surge Water Levels - Ala...
PDF
Hawaii Pacific GIS Conference 2012: Disaster Management and Emergency Respons...
PPT
Wetland and Stream Crossing Impacts of Proposed M-83
PPTX
Quander Road Outfall and Stream Restoration
PDF
Highway_40-10_Flood Repairs Report_2013_FINAL_Oct15
PDF
Integrating Flood Risk Into Catchment Management - Michael Butts (DHI)
PPTX
2. PORT PLANNING (PHE) GTU 3170623
PPT
ASDSO NE Regional 2009 Presentation
Assessment of Swan and Canning River Tidal and Storm Surge Water Levels - Ala...
Hawaii Pacific GIS Conference 2012: Disaster Management and Emergency Respons...
Wetland and Stream Crossing Impacts of Proposed M-83
Quander Road Outfall and Stream Restoration
Highway_40-10_Flood Repairs Report_2013_FINAL_Oct15
Integrating Flood Risk Into Catchment Management - Michael Butts (DHI)
2. PORT PLANNING (PHE) GTU 3170623
ASDSO NE Regional 2009 Presentation

What's hot (20)

PPTX
Clean Rivers, Clean Lake 8 -- New Projects on KK and Menomonee Rivers -- Dave...
PDF
Jacobson_MuirBeach_FinalBoards
PPTX
RCC OT Case Studies - JYoung RCC2015
PPTX
M83 Flood Plain Impact
PPT
Flood resilient presentation 05.16.12
PPTX
Processes and Landforms of the Willamette River and Floodplain
PPTX
Stormwater Management Information Sharing with Shandong Province, China
PPTX
Colvin Run Phase I Lake Fairfax Park Stream Restoration Project
PPTX
Sunshine Skyway Bridge
PDF
Tyler Hall - Project Experience
PPTX
Dead Run Stream Restoration Public meeting February 18, 2015
PPTX
Dead Run Stream Restoration Public Meeting April 23, 2014
PPSX
Master Plan Project Report on Remodeling of Storm Water Drains_BBMP
PDF
Drainage Salvation-JRiopelle
PPTX
Willamette River Basin Inundation Mapping - Brandt
PDF
Tripps Run Stream Improvement
PPTX
Draft Chesapeake Bay TMDL Action Plan Public Meeting
PDF
Modelling extreme conditions for wave overtopping at Weymouth - Oliver Way (H...
PPTX
Contractor Awareness Training Stormwater Facilities Introduction 2016
PDF
Marine_Brochure_For_Web
Clean Rivers, Clean Lake 8 -- New Projects on KK and Menomonee Rivers -- Dave...
Jacobson_MuirBeach_FinalBoards
RCC OT Case Studies - JYoung RCC2015
M83 Flood Plain Impact
Flood resilient presentation 05.16.12
Processes and Landforms of the Willamette River and Floodplain
Stormwater Management Information Sharing with Shandong Province, China
Colvin Run Phase I Lake Fairfax Park Stream Restoration Project
Sunshine Skyway Bridge
Tyler Hall - Project Experience
Dead Run Stream Restoration Public meeting February 18, 2015
Dead Run Stream Restoration Public Meeting April 23, 2014
Master Plan Project Report on Remodeling of Storm Water Drains_BBMP
Drainage Salvation-JRiopelle
Willamette River Basin Inundation Mapping - Brandt
Tripps Run Stream Improvement
Draft Chesapeake Bay TMDL Action Plan Public Meeting
Modelling extreme conditions for wave overtopping at Weymouth - Oliver Way (H...
Contractor Awareness Training Stormwater Facilities Introduction 2016
Marine_Brochure_For_Web
Ad

Similar to Nepean Bay Bar update (20)

PDF
Infrastructure Growing Pains
PDF
Nepean Bay Bar
PDF
Cynefin meets the Maribyrnong and Moonee Ponds Creek
PDF
USP170-SeaLevelRiseAdaptionStrategyOceansideCA
PDF
CRCTI CoP/CCRF Webinar: Changes in the Oceans Surrounding Canada (June 26, 2019)
PPTX
Coastal Urban DEM project - Mapping the vulnerability of Australia's Coast
PPT
Slovinsky Coastal Resiliency
PDF
Rob Thieler, Changing Climate, Changing Coasts
PPTX
Sea Level Rise Inundation Mapping for the ART Project
PPT
Nichi.11-12-13.san francisco.stevegoldbeck
PPT
Flood plains to floor drains design standard adaptation for urban flood risk ...
PPT
Aggregateact
PDF
Back to the Future: The Climate for Change and the Hydrographer of the Future
PDF
Relative sea level changes and vulnerability on the cordillera nature reserve
PPTX
IONS Seminar 2014 - Session 3 - Climate Change and Risk for Sea Ports
DOCX
Coastal Management Report, 11020965 (1)
PDF
Working with the System
PPT
Coasts Booklet
PDF
Czm great marsh_20131114sm
PDF
Surface water and geomorphology herrera report-oct 2005
Infrastructure Growing Pains
Nepean Bay Bar
Cynefin meets the Maribyrnong and Moonee Ponds Creek
USP170-SeaLevelRiseAdaptionStrategyOceansideCA
CRCTI CoP/CCRF Webinar: Changes in the Oceans Surrounding Canada (June 26, 2019)
Coastal Urban DEM project - Mapping the vulnerability of Australia's Coast
Slovinsky Coastal Resiliency
Rob Thieler, Changing Climate, Changing Coasts
Sea Level Rise Inundation Mapping for the ART Project
Nichi.11-12-13.san francisco.stevegoldbeck
Flood plains to floor drains design standard adaptation for urban flood risk ...
Aggregateact
Back to the Future: The Climate for Change and the Hydrographer of the Future
Relative sea level changes and vulnerability on the cordillera nature reserve
IONS Seminar 2014 - Session 3 - Climate Change and Risk for Sea Ports
Coastal Management Report, 11020965 (1)
Working with the System
Coasts Booklet
Czm great marsh_20131114sm
Surface water and geomorphology herrera report-oct 2005
Ad

More from Tony Smith (20)

PDF
Larger than Life
PDF
What Does Water Know?
PDF
What do Words Know?
PDF
Minding this Water Planet
PDF
My ¾ time huddle
PDF
Stony Creek Case Study
PDF
OverFlow Chart Introduction and Application to Gateway Drugs
PDF
Hydro-powered Geomorphology
PDF
Life as Necessarily Addictive
PDF
The Deep Stack of Existence: Seeing Life and its Substrates as Richly Connect...
PDF
Debate authorising Inquiry into Ecosystem Decline in Victoria
PDF
Sand Talk Review and Discussion
PDF
Life and Death as Systems Collapse
PDF
Life's Infrastructure
PDF
Slaughtering Sacred Cows
PDF
Informed Dissent
PDF
Self-organised Criticality
PDF
Activity report to Friends of Maribyrnong Valley
PDF
Upper Stony Creek Diversions
PDF
Dissipating Gradients & Sinks (Supervenience)
Larger than Life
What Does Water Know?
What do Words Know?
Minding this Water Planet
My ¾ time huddle
Stony Creek Case Study
OverFlow Chart Introduction and Application to Gateway Drugs
Hydro-powered Geomorphology
Life as Necessarily Addictive
The Deep Stack of Existence: Seeing Life and its Substrates as Richly Connect...
Debate authorising Inquiry into Ecosystem Decline in Victoria
Sand Talk Review and Discussion
Life and Death as Systems Collapse
Life's Infrastructure
Slaughtering Sacred Cows
Informed Dissent
Self-organised Criticality
Activity report to Friends of Maribyrnong Valley
Upper Stony Creek Diversions
Dissipating Gradients & Sinks (Supervenience)

Recently uploaded (20)

PPTX
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
PPTX
Lecture Notes Electrical Wiring System Components
DOCX
573137875-Attendance-Management-System-original
PPTX
Internet of Things (IOT) - A guide to understanding
PPTX
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
PPTX
Geodesy 1.pptx...............................................
PPTX
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
PDF
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
DOCX
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
PPTX
additive manufacturing of ss316l using mig welding
PPTX
Construction Project Organization Group 2.pptx
PPTX
Strings in CPP - Strings in C++ are sequences of characters used to store and...
PDF
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
PDF
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
PPTX
CYBER-CRIMES AND SECURITY A guide to understanding
PPTX
KTU 2019 -S7-MCN 401 MODULE 2-VINAY.pptx
PPTX
web development for engineering and engineering
PDF
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
PPTX
CH1 Production IntroductoryConcepts.pptx
PPTX
Lesson 3_Tessellation.pptx finite Mathematics
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
Lecture Notes Electrical Wiring System Components
573137875-Attendance-Management-System-original
Internet of Things (IOT) - A guide to understanding
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
Geodesy 1.pptx...............................................
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
additive manufacturing of ss316l using mig welding
Construction Project Organization Group 2.pptx
Strings in CPP - Strings in C++ are sequences of characters used to store and...
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
CYBER-CRIMES AND SECURITY A guide to understanding
KTU 2019 -S7-MCN 401 MODULE 2-VINAY.pptx
web development for engineering and engineering
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
CH1 Production IntroductoryConcepts.pptx
Lesson 3_Tessellation.pptx finite Mathematics

Nepean Bay Bar update

  • 1. Tony Smith Melbourne Emergence Meetup 14 December 2017 Nepean Bay Bar Update
  • 2. Priorities this evening? • Preparations Pretending to be Policies and Politics • Pristine Port Phillip Mythology and Bromance • Precarious State of Pretentious Freight State • Projections and Uncertainties of Sea Level Rise • Providing Capacity to and beyond Drysdale and Baxter • Practicalities from Arden-Macaulay to Westernport
  • 3. Contacts with DELWP point to studies being done in Geelong
  • 4. Failure of policy and politics to comprehend likely trajectory of sea level rise Lesson from Narooma: Erosion and Deposition processes do not respect human-defined shorelines
  • 5. • Submitted SlideShare link to our February presentation with notes to Draft Port Phillip Bay Environmental Management Plan 2017-2027 process and received encouraging response confirming Dan Ierodiaconou’s involvement • Late April dropped in at Moolap Coastal Strategic Framework session which added introduction to OurCoast Bellarine-Corio Bay process that references considerable technical work including Neville Rosengren and Great Sands • Found another interested DELWP person at Transport Camp in October and copied them the information • As yet nobody is chasing us for more, seeming to be acting as though their job is to apply romantically coloured bandaids
  • 6. • The 0.8 metres by 2100 furphy refuses to die in politically mandated assumptions, even when it is admitted that it was from another millennium and should be treated as a minimum • More interesting is 0.2 metres by 2040, maybe not enough to scare the cats unless they see where it must go from there • No end of details of both historic rates and current risk areas continue to be identified by those not buying denialist line • The deep problem that political determinations can’t cope with is that no matter what the date and what the depth, sea level will still be rising and most likely still accelerating because of components that are already locked into the system, so there is no point planing for just those mandated levels
  • 7. Need to challenge romantic delusion about pristine Port Phillip, natural fixations Variety of bird species exploit permanent high flow litter trap on Moonee Ponds Creek below Racecourse Road
  • 8. • Port Phillip refilled only 1,000 years ago and so is still young in ecological terms and anything but a pristine environment • Viewed in the light of historic records of the marine invasion of Zuiderzee and charts from early British explorers, shallow erosion of Nepean Bay Bar has likely been a gradual process • Since the unauthorised invasion by Post Phillip Association from Tasmania in 1835, the bay floor has been trashed 3 ways • dredging oyster and mussel reefs to make lime for concrete • dredging shipping channels • dredging for scallops • together leaving a trashed bottom unseen by surface admirers
  • 9. • Similarly, the most committed of environmentalists can form attachments to their images of pristine conditions somehow immune from the passage of time • The reality is that most life forms adapt to change so long as there continues to be somewhere and somehow for them to, but on a different timetable to news, politics and profit reports • Werribee Sewage Treatment Farm is the state’s most significant bird site. Trin Warren Tam-boore wetland tops species counts. Both are in areas which have historically been bird habitat, but both are much modified, yet still found • Many species seem comfortable in areas that offend human aesthetics, maybe because humans mostly keep away
  • 10. Increasing evidence it was and is not smart to aspire to be THE Freight State Circuitous Webb Dock freight line adjacent Lorimer Street, opened 1986, ceased operation 1992, closed 1996
  • 11. • The 2008 round of channel deepening remains contested by those who opposed it. Is it that, the to date minor sea level rise or a combination that is accelerating bayside erosion? • Containers are transported “around the equator” on very deep draft vessels then transferred, in Australia’s case, in Singapore to more moderate draft vessels which typically visit all five mainland capitals’ ports, so the depths have needed to be consistent between the five with no incentive to go deeper • Victoria remains a battleground between standard gauge and broad gauge rail with ports often using dual gauge at the end • Current locations of logistics hubs, container storage and ports are mostly poor candidates for freight rail separation
  • 12. • It may not be very wise to make projections extrapolating business/growth as usual deep into the future • As even WWII fades from living memory it may be useful to reflect on the recency of many underpinnings of modern life • While blatant vested interests obstruct recognition of resource constraints and unintended consequences of technologies, “finite planet” is more than a truism • Concurrent knowledge explosion shows interconnectedness of living systems, encouraging attempts at moderation • Before the globalised world starts to spiral out of control, should Australia reduce its dependence and become an ark?
  • 13. Continuing updates to projections for climate change and sea level, reality at high end Last day of November heat draws late afternoon crowd to Port Noarlunga Jetty
  • 14. • Despite the noise of the anti-science crowd on their scientific devices and the desperation of declining media to boost any hint of controversy, climate science still tackles hard questions • Taking the planetary temperature is not like taking the local temperature, but we are identifying variations in circulation patterns which have predictable impacts on best estimates • If we could account for all sinks and sources, any composite measure of global thermal energy would be rising year on year • Challenge to find measure to quickly detect going off curve • Various feedback loops have triggered or are threatening to, but as yet we are mostly seeing signs, not inescapable signals
  • 15. • Scientists are ever more accurately identifying signals from geological records of sea level and associated causal factors • Other scientists are identifying destabilisation risks for all three major ice sheets: Greenland, East and West Antarctica • Never enough scientists are studying the interacting roles of fresh water, soils, forests, agriculture, urbanisation, life itself • In the process they are finding that aridity from Australia to the Sahara may follow early blossomings of human agriculture • Measures of recent sea level rise are still too small and multi factorial to give a lot of confidence as to where we are on the curve, but once we do, we know turning back won’t get easier
  • 16. Challenges for transport network evolution to service barrier from both ends Six tracks at Geelong Station are pointed into single track 1876 tunnel too low to take full height container freight
  • 17. GeelongEasternBypass Indicative Nepean Bay Bar ApproachFormer Drysdale Queenscliff Railway Skyrail Breakwater-Drysdale avoids level crossings and Moolap Lowland inundation Geelong Eastern Bypass via Point Henry will distribute Melbourne metropolitan traffic Most of route Drysdale-St Leonards is above 20 metre contour so should be less hurried Identifying route across Nepean Bay Bar ahead of significant sea level rise is critical Construction of foundations to most of that route may reduce tides and erosion in north Locks should enable operation of Webb and Swanston Docks while project completed
  • 18. Mornington Peninsula Freeway ReservationDundasStreet CanteburyJettyRoad Bay South Floating Port Drawing acceptable line in the sand hills will be a big challenge for local community Need an impervious wall as foundation for at least 20 metre elevated transport routes Can’t try to be prescriptive at this stage, just set out constraints and essential components Route from beyond Boneo Road to Baxter has been thoroughly canvassed by Rob Whitehill His Peninsula Rail Plan is primarily passenger so East-West-Port freight needs to be added Assume Baxter-Dandenong and more will be needed to distribute metropolitan traffic
  • 19. Sorrento • Zone: 4 • Platforms: 2 • Staff level: Staffed full-time • Melway Ref: 156 K7 Although it was once thought impossible to run rail beyond Rye station, the recent controversy over the Skyrail project between Caulfield and Dandenong stations has revealed the possibility of running elevated rail beyond Rye, to Sorrento. The line would run along the reserve for the Mornington Peninsula Freeway extension, and then alongside Melbourne Road, elevated for its entire length except for parts of the freeway extension reserve where the line would run along the ground, and when it crosses Melbourne Road opposite Tarakan Street, where it would go under the road in order to maintain level track. Sorrento station itself would be located above Ocean Beach Road, just a short walk away from existing carparks, which would be connected to the station by a ramp. 19 October 7, 2016
  • 20. Closer look at particularly vulnerable locations from Macaulay to Westernport Accessible sea level monitoring where Moonee Ponds Creek flows into tidal Railway Canal outside Macaulay Station
  • 21. Areas within Land Subject to Inundation Overlay are prime development targets Focus remains on floods coming downstream but adjacent tidal streams sea level the issue Concerned about vulnerability of major infrastructure proposed for Arden-Macaulay, City of Melbourne enlisted Melbourne Water Expert witness to West Gate Tunnel Inquiry and Assessment Committee showed much wider vulnerability across the flood plains Healthy Waterways Catchment Collaborations for Moonee Ponds Creek and Maribyrnong West Melbourne Lagoon abused by industry but can strike back hard with sea level rise
  • 22. Wider closure of Westernport not practical but large area at risk from north arm alone Significant tidal channel wraps northwest corner of French Island with smaller one between northeast corner and mainland If these channels are closed an impervious foundation could link highlands via Island Try to preserve Island’s ecological isolation Port Phillip and Westernport catchments are separated with a low point above 25 metres elevation near Pound Road, Clyde North Establishing impervious foundations that can be raised to 20 metre elevation offers medium term confidence in greater Melbourne region
  • 23. • Making progress will require slaughtering sacred cows • Marine and Coastal Act submission October 2016 • Email today re 2nd reading yesterday; but not others • Mud Islands tour operator shut up shop December 9 • Adding 2 slides used in Kororoit Institute presentation re West Gate Tunnel Environmental Effects Statement Questions?