SlideShare a Scribd company logo
UNCLASSIFIED / FOUO




                       National Guard
                      Black Belt Training

                          Module 45

                       Quick Changeover


                                            UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




CPI Roadmap – Improve
                                                           8-STEP PROCESS
                                                                                                    6. See
   1.Validate          2. Identify           3. Set         4. Determine        5. Develop                          7. Confirm        8. Standardize
                                                                                                   Counter-
      the             Performance         Improvement           Root             Counter-                            Results            Successful
                                                                                                   Measures
    Problem               Gaps              Targets             Cause           Measures                            & Process            Processes
                                                                                                   Through

        Define                  Measure                      Analyze                       Improve                            Control



                                                                                   TOOLS
                                        ACTIVITIES
                                                                         •Brainstorming
                        •   Develop Potential Solutions
                                                                         •Replenishment Pull/Kanban
                        •   Develop Evaluation Criteria
                                                                         •Stocking Strategy
                        •   Select Best Solutions
                                                                         •Process Flow Improvement
                        •   Develop Future State Process Map(s)
                                                                         •Process Balancing
                        •   Develop Pilot Plan
                                                                         •Standard Work
                        •   Pilot Solution
                                                                         •Quick Change Over
                        •   Develop Full Scale Action/
                                                                         •Design of Experiments (DOE)
                            Implementation Plan
                                                                         •Solution Selection Matrix
                        •   Complete Improve Gate
                                                                         •‘To-Be’ Process Mapping
                                                                         •Poka-Yoke
                                                                         •6S Visual Mgt
                                                                         •RIE

                       Note: Activities and tools vary by project. Lists provided here are not necessarily all-inclusive. UNCLASSIFIED / FOUO          2
UNCLASSIFIED / FOUO




 Changeover Definition

        The amount of time taken to change
      equipment from the Last Good Part of a
        process to the First Good Part of the
                     next process
                      Clock Time, not Labor Time!



                                              UNCLASSIFIED / FOUO   3
UNCLASSIFIED / FOUO




 Traditional vs. CPI Thinking
          Traditional Thinking
           Changeovers cause downtime
           Changeovers cause poor utilization, defects & scrap
           Big Batch Size desirable - “The Bigger, the Better”
               (less changeovers)

          CPI Thinking
           Quick changeovers decrease downtime
           Well designed changeovers decrease waste
           Quick changeovers (with small batches) Increases
               Flexibility

                                                     UNCLASSIFIED / FOUO   4
UNCLASSIFIED / FOUO




 Why Quick Changeover?
                       Shorter Changeover Times

                      More Frequent Changeovers

                         Smaller Batch Sizes

                         Shorter Lead Times


          Increased Combat Capability!
                                                  UNCLASSIFIED / FOUO   5
UNCLASSIFIED / FOUO




 Internal vs. External

      The first task is to recognize that there
     are two essentially different components
      of any changeover, Internal Activities
              and External Activities.




                                      UNCLASSIFIED / FOUO   6
UNCLASSIFIED / FOUO




Changeover Activities


          Internal Activities
                An activity that must be performed while the machine
                 or process is turned off (no product)
                Example – Refuel plane on the ground


          External Activities
                An activity that can be performed while the machine or
                 process is turned on (producing product)
                Example – Refuel plane in the air


                                                          UNCLASSIFIED / FOUO   7
UNCLASSIFIED / FOUO




 Improvement Steps
  1.      Identify changeover activities and document the
          process (time each step).


  2.      Separate Internal activity from External activity

                                    External   Internal        External




                                                          UNCLASSIFIED / FOUO   8
UNCLASSIFIED / FOUO




 Internal vs. External Quiz
     Possible CT Scan Changeover Steps:                          Which are
         1.     Machine is turned off as scan ends               Internal &
         2.     IV is removed from the patient
         3.     Patient is moved off of scan bed
                                                                Which should
         4.     Patient is removed from CT scan room            be External?
         5.     New Patient is identified off of CT scan schedule
         6.     New Patient is brought into CT scan room
         7.     Patient identification is verified
         8.     CT Scan procedure is explained to patient
         9.     Type of Scan is verified from Physician Orders
         10.    IV is started on new Patient
         11.    Patient is placed on CT scan bed
         12.    CT Scan machine is turned on and scan begins
                                                                        Adapted from “A Lean Guide to
                                                                     Transforming Healthcare”, Zidel, 2006

                                                                    UNCLASSIFIED / FOUO                      9
UNCLASSIFIED / FOUO




 Internal vs. External Quiz
   Possible CT Scan Changeover Steps:                       Internal
        1.    Machine is turned off as scan ends            External
        2.    IV is removed from the patient
        3.    Patient is moved off of scan bed
        4.    Patient is removed from CT scan room
        5.    New Patient is identified off of CT scan schedule
        6.    New Patient is brought into CT scan room
        7.    Patient identification is verified
        8.    CT Scan procedure is explained to patient
        9.    Type of Scan is verified from Physician Orders
        10.   IV is started on new Patient
        11.   Patient is placed on CT scan bed
        12.   CT Scan machine is turned on and scan begins
                                                                Adapted from “A Lean Guide to
                                                             Transforming Healthcare”, Zidel, 2006

                                                            UNCLASSIFIED / FOUO                 10
UNCLASSIFIED / FOUO




Improvement Steps
        1.      Identify activities and document the process.


        2.      Separate Internal from External activity


        3.      Convert Internal to External




                                                       UNCLASSIFIED / FOUO   11
UNCLASSIFIED / FOUO




Converting Internal to External

    Prepare operating conditions prior to changeover
           Preheat molds or dies
           Prepare Patient or Care-givers
           Prepare service materials or providers
           Pre-adjust parts
    Use intermediary sets
           Preset tools
           Position dies
    Standardize necessary functions
           Change the fewest parts possible
           Minimize or eliminate adjustments
                                                     UNCLASSIFIED / FOUO   12
UNCLASSIFIED / FOUO




 Improvement Steps
        1.      Identify activities and document the process.


        2.      Separate Internal from External activity


        3.      Convert Internal to External


        4.      Reduce all remaining activities.



                                                       UNCLASSIFIED / FOUO   13
UNCLASSIFIED / FOUO




 Reduce All Remaining Activities

          Perform Parallel Operations
          Improve Clamping Mechanisms
                One turn clamps
                One motion methods
          Eliminate all adjustments
                Numerical Settings vs. “Feel”
          Automate activities where appropriate




                                                   UNCLASSIFIED / FOUO   14
UNCLASSIFIED / FOUO




Pit Stop Photo
                      Team with Pre-assigned Tasks         Placement Clearly
                                                                Defined




        Quick Connect &                       Tools Properly Positioned Prior
       Disconnect Devices                               to Arrival


                                                                UNCLASSIFIED / FOUO   15
UNCLASSIFIED / FOUO




 Takeaways

          Remember Safety at all times!!!
          Change internal to external then reduce all
           activities
          Standards are standards, they are not flexible
          Standardize all changeover operations




                                               UNCLASSIFIED / FOUO   16
UNCLASSIFIED / FOUO




        What other comments or questions
                  do you have?




                                  UNCLASSIFIED / FOUO   17

More Related Content

PDF
NG BB 02 Table of Contents
PDF
NG BB 09 Project Management
PDF
NG BB 18 Theory of Constraints
PDF
NG BB 47 Basic Design of Experiments
PDF
NG BB 17 Takt Time
PDF
NG BB 50 Rapid Improvement Event
PDF
NG BB 46 Mistake Proofing
PDF
NG BB 37 Multiple Regression
NG BB 02 Table of Contents
NG BB 09 Project Management
NG BB 18 Theory of Constraints
NG BB 47 Basic Design of Experiments
NG BB 17 Takt Time
NG BB 50 Rapid Improvement Event
NG BB 46 Mistake Proofing
NG BB 37 Multiple Regression

What's hot (20)

PDF
NG BB 15 MEASURE Roadmap
PDF
NG BB 36 Simple Linear Regression
PDF
NG BB 22 Process Measurement
PDF
NG BB 54 Sustain the Gain
PDF
NG BB 06 Project Charter
PDF
NG BB 43 Standardized Work
PDF
NG BB 07 Multi-Generation Project Planning
PDF
NG BB 49 Risk Assessment
PDF
NG BB 05 Roles and Responsibilities
PDF
NG BB 20 Data Collection
PDF
NG BB 30 Basic Tools
PDF
NG BB 08 Change Management
PDF
NG BB 26 Control Charts
PDF
NG BB 12 High-Level Process Map
PDF
NG BB 21 Intro to Minitab
PDF
NG BB 11 Power Steering
PDF
NG BB 39 IMPROVE Roadmap
PDF
NG BB 38 ANALYZE Tollgate
PDF
NG BB 52 CONTROL Roadmap
PDF
NG BB 19 Document and Analyze the Process
NG BB 15 MEASURE Roadmap
NG BB 36 Simple Linear Regression
NG BB 22 Process Measurement
NG BB 54 Sustain the Gain
NG BB 06 Project Charter
NG BB 43 Standardized Work
NG BB 07 Multi-Generation Project Planning
NG BB 49 Risk Assessment
NG BB 05 Roles and Responsibilities
NG BB 20 Data Collection
NG BB 30 Basic Tools
NG BB 08 Change Management
NG BB 26 Control Charts
NG BB 12 High-Level Process Map
NG BB 21 Intro to Minitab
NG BB 11 Power Steering
NG BB 39 IMPROVE Roadmap
NG BB 38 ANALYZE Tollgate
NG BB 52 CONTROL Roadmap
NG BB 19 Document and Analyze the Process
Ad

Viewers also liked (11)

PDF
NG BB 27 Process Capability
PDF
NG BB 33 Hypothesis Testing Basics
PDF
NG BB 01 Introduction
PDF
NG BB 55 CONTROL Tollgate
PDF
NG BB 53 Process Control [Compatibility Mode]
PDF
NG BB 28 MEASURE Tollgate
PDF
NG BB 42 Visual Management
PDF
NG BB 40 Solution Selection
PDF
NG BB 13 Voice of Customer
PDF
NG BB 32 Failure Modes and Effects Analysis
PDF
How to create a SIPOC diagram
NG BB 27 Process Capability
NG BB 33 Hypothesis Testing Basics
NG BB 01 Introduction
NG BB 55 CONTROL Tollgate
NG BB 53 Process Control [Compatibility Mode]
NG BB 28 MEASURE Tollgate
NG BB 42 Visual Management
NG BB 40 Solution Selection
NG BB 13 Voice of Customer
NG BB 32 Failure Modes and Effects Analysis
How to create a SIPOC diagram
Ad

Similar to NG BB 45 Quick Change Over (10)

PDF
NG BB 39 IMPROVE Roadmap
PDF
NG BB 15 MEASURE Roadmap
PDF
NG BB 23 Measurement System Analysis - Introduction
PDF
NG BB 11 Power Steering
PDF
NG BB 04 DEFINE Roadmap
PDF
NG BB 27 Process Capability
PDF
NG BB 25 Measurement System Analysis - Attribute
PDF
NG BB 36 Simple Linear Regression
PDF
NG BB 30 Basic Tools
PPTX
TQM, 5S, Kaizen, Poka-yoke, JIT, KAnban
NG BB 39 IMPROVE Roadmap
NG BB 15 MEASURE Roadmap
NG BB 23 Measurement System Analysis - Introduction
NG BB 11 Power Steering
NG BB 04 DEFINE Roadmap
NG BB 27 Process Capability
NG BB 25 Measurement System Analysis - Attribute
NG BB 36 Simple Linear Regression
NG BB 30 Basic Tools
TQM, 5S, Kaizen, Poka-yoke, JIT, KAnban

More from Leanleaders.org (20)

PPTX
Variation and mistake proofing
PPT
D11 Define Review
DOC
Blankgage.MTW
DOC
Chi-sq GOF Calculator.xls
PPT
D04 Why6Sigma
PPT
D10 Project Management
DOC
Attrib R&R.xls
PPT
Blank Logo LEAN template
PPT
D07 Project Charter
PPT
ANG_AFSO21_Awareness_Training_(DULUTH)
DOC
Cause and Effect Tree.vst
PPT
LEAN template
PPT
I07 Simulation
PPT
D01 Define Spacer
PDF
NG BB 45 Quick Change Over
DOC
Attribute Process Capability Calculator.xls
PPT
A05 Continuous One Variable Stat Tests
DOC
XY Matrix.xls
PPT
D06 Project Selection
PPT
G04 Root Cause Relationships
Variation and mistake proofing
D11 Define Review
Blankgage.MTW
Chi-sq GOF Calculator.xls
D04 Why6Sigma
D10 Project Management
Attrib R&R.xls
Blank Logo LEAN template
D07 Project Charter
ANG_AFSO21_Awareness_Training_(DULUTH)
Cause and Effect Tree.vst
LEAN template
I07 Simulation
D01 Define Spacer
NG BB 45 Quick Change Over
Attribute Process Capability Calculator.xls
A05 Continuous One Variable Stat Tests
XY Matrix.xls
D06 Project Selection
G04 Root Cause Relationships

Recently uploaded (20)

PDF
Anesthesia in Laparoscopic Surgery in India
PPTX
Introduction to Child Health Nursing – Unit I | Child Health Nursing I | B.Sc...
PDF
RMMM.pdf make it easy to upload and study
PPTX
PPH.pptx obstetrics and gynecology in nursing
PPTX
Renaissance Architecture: A Journey from Faith to Humanism
PDF
Basic Mud Logging Guide for educational purpose
PPTX
school management -TNTEU- B.Ed., Semester II Unit 1.pptx
PDF
Pre independence Education in Inndia.pdf
PPTX
Week 4 Term 3 Study Techniques revisited.pptx
PDF
Insiders guide to clinical Medicine.pdf
PDF
BÀI TẬP BỔ TRỢ 4 KỸ NĂNG TIẾNG ANH 9 GLOBAL SUCCESS - CẢ NĂM - BÁM SÁT FORM Đ...
PDF
Physiotherapy_for_Respiratory_and_Cardiac_Problems WEBBER.pdf
PPTX
Microbial diseases, their pathogenesis and prophylaxis
PDF
Chapter 2 Heredity, Prenatal Development, and Birth.pdf
PDF
102 student loan defaulters named and shamed – Is someone you know on the list?
PDF
3rd Neelam Sanjeevareddy Memorial Lecture.pdf
PPTX
The Healthy Child – Unit II | Child Health Nursing I | B.Sc Nursing 5th Semester
PDF
Classroom Observation Tools for Teachers
PDF
01-Introduction-to-Information-Management.pdf
PDF
Module 4: Burden of Disease Tutorial Slides S2 2025
Anesthesia in Laparoscopic Surgery in India
Introduction to Child Health Nursing – Unit I | Child Health Nursing I | B.Sc...
RMMM.pdf make it easy to upload and study
PPH.pptx obstetrics and gynecology in nursing
Renaissance Architecture: A Journey from Faith to Humanism
Basic Mud Logging Guide for educational purpose
school management -TNTEU- B.Ed., Semester II Unit 1.pptx
Pre independence Education in Inndia.pdf
Week 4 Term 3 Study Techniques revisited.pptx
Insiders guide to clinical Medicine.pdf
BÀI TẬP BỔ TRỢ 4 KỸ NĂNG TIẾNG ANH 9 GLOBAL SUCCESS - CẢ NĂM - BÁM SÁT FORM Đ...
Physiotherapy_for_Respiratory_and_Cardiac_Problems WEBBER.pdf
Microbial diseases, their pathogenesis and prophylaxis
Chapter 2 Heredity, Prenatal Development, and Birth.pdf
102 student loan defaulters named and shamed – Is someone you know on the list?
3rd Neelam Sanjeevareddy Memorial Lecture.pdf
The Healthy Child – Unit II | Child Health Nursing I | B.Sc Nursing 5th Semester
Classroom Observation Tools for Teachers
01-Introduction-to-Information-Management.pdf
Module 4: Burden of Disease Tutorial Slides S2 2025

NG BB 45 Quick Change Over

  • 1. UNCLASSIFIED / FOUO National Guard Black Belt Training Module 45 Quick Changeover UNCLASSIFIED / FOUO
  • 2. UNCLASSIFIED / FOUO CPI Roadmap – Improve 8-STEP PROCESS 6. See 1.Validate 2. Identify 3. Set 4. Determine 5. Develop 7. Confirm 8. Standardize Counter- the Performance Improvement Root Counter- Results Successful Measures Problem Gaps Targets Cause Measures & Process Processes Through Define Measure Analyze Improve Control TOOLS ACTIVITIES •Brainstorming • Develop Potential Solutions •Replenishment Pull/Kanban • Develop Evaluation Criteria •Stocking Strategy • Select Best Solutions •Process Flow Improvement • Develop Future State Process Map(s) •Process Balancing • Develop Pilot Plan •Standard Work • Pilot Solution •Quick Change Over • Develop Full Scale Action/ •Design of Experiments (DOE) Implementation Plan •Solution Selection Matrix • Complete Improve Gate •‘To-Be’ Process Mapping •Poka-Yoke •6S Visual Mgt •RIE Note: Activities and tools vary by project. Lists provided here are not necessarily all-inclusive. UNCLASSIFIED / FOUO 2
  • 3. UNCLASSIFIED / FOUO Changeover Definition The amount of time taken to change equipment from the Last Good Part of a process to the First Good Part of the next process Clock Time, not Labor Time! UNCLASSIFIED / FOUO 3
  • 4. UNCLASSIFIED / FOUO Traditional vs. CPI Thinking  Traditional Thinking  Changeovers cause downtime  Changeovers cause poor utilization, defects & scrap  Big Batch Size desirable - “The Bigger, the Better” (less changeovers)  CPI Thinking  Quick changeovers decrease downtime  Well designed changeovers decrease waste  Quick changeovers (with small batches) Increases Flexibility UNCLASSIFIED / FOUO 4
  • 5. UNCLASSIFIED / FOUO Why Quick Changeover? Shorter Changeover Times More Frequent Changeovers Smaller Batch Sizes Shorter Lead Times Increased Combat Capability! UNCLASSIFIED / FOUO 5
  • 6. UNCLASSIFIED / FOUO Internal vs. External The first task is to recognize that there are two essentially different components of any changeover, Internal Activities and External Activities. UNCLASSIFIED / FOUO 6
  • 7. UNCLASSIFIED / FOUO Changeover Activities  Internal Activities  An activity that must be performed while the machine or process is turned off (no product)  Example – Refuel plane on the ground  External Activities  An activity that can be performed while the machine or process is turned on (producing product)  Example – Refuel plane in the air UNCLASSIFIED / FOUO 7
  • 8. UNCLASSIFIED / FOUO Improvement Steps 1. Identify changeover activities and document the process (time each step). 2. Separate Internal activity from External activity External Internal External UNCLASSIFIED / FOUO 8
  • 9. UNCLASSIFIED / FOUO Internal vs. External Quiz Possible CT Scan Changeover Steps: Which are 1. Machine is turned off as scan ends Internal & 2. IV is removed from the patient 3. Patient is moved off of scan bed Which should 4. Patient is removed from CT scan room be External? 5. New Patient is identified off of CT scan schedule 6. New Patient is brought into CT scan room 7. Patient identification is verified 8. CT Scan procedure is explained to patient 9. Type of Scan is verified from Physician Orders 10. IV is started on new Patient 11. Patient is placed on CT scan bed 12. CT Scan machine is turned on and scan begins Adapted from “A Lean Guide to Transforming Healthcare”, Zidel, 2006 UNCLASSIFIED / FOUO 9
  • 10. UNCLASSIFIED / FOUO Internal vs. External Quiz Possible CT Scan Changeover Steps: Internal 1. Machine is turned off as scan ends External 2. IV is removed from the patient 3. Patient is moved off of scan bed 4. Patient is removed from CT scan room 5. New Patient is identified off of CT scan schedule 6. New Patient is brought into CT scan room 7. Patient identification is verified 8. CT Scan procedure is explained to patient 9. Type of Scan is verified from Physician Orders 10. IV is started on new Patient 11. Patient is placed on CT scan bed 12. CT Scan machine is turned on and scan begins Adapted from “A Lean Guide to Transforming Healthcare”, Zidel, 2006 UNCLASSIFIED / FOUO 10
  • 11. UNCLASSIFIED / FOUO Improvement Steps 1. Identify activities and document the process. 2. Separate Internal from External activity 3. Convert Internal to External UNCLASSIFIED / FOUO 11
  • 12. UNCLASSIFIED / FOUO Converting Internal to External  Prepare operating conditions prior to changeover  Preheat molds or dies  Prepare Patient or Care-givers  Prepare service materials or providers  Pre-adjust parts  Use intermediary sets  Preset tools  Position dies  Standardize necessary functions  Change the fewest parts possible  Minimize or eliminate adjustments UNCLASSIFIED / FOUO 12
  • 13. UNCLASSIFIED / FOUO Improvement Steps 1. Identify activities and document the process. 2. Separate Internal from External activity 3. Convert Internal to External 4. Reduce all remaining activities. UNCLASSIFIED / FOUO 13
  • 14. UNCLASSIFIED / FOUO Reduce All Remaining Activities  Perform Parallel Operations  Improve Clamping Mechanisms  One turn clamps  One motion methods  Eliminate all adjustments  Numerical Settings vs. “Feel”  Automate activities where appropriate UNCLASSIFIED / FOUO 14
  • 15. UNCLASSIFIED / FOUO Pit Stop Photo Team with Pre-assigned Tasks Placement Clearly Defined Quick Connect & Tools Properly Positioned Prior Disconnect Devices to Arrival UNCLASSIFIED / FOUO 15
  • 16. UNCLASSIFIED / FOUO Takeaways  Remember Safety at all times!!!  Change internal to external then reduce all activities  Standards are standards, they are not flexible  Standardize all changeover operations UNCLASSIFIED / FOUO 16
  • 17. UNCLASSIFIED / FOUO What other comments or questions do you have? UNCLASSIFIED / FOUO 17