SlideShare a Scribd company logo
Open Channel Hydraulics
Design of Channels
1
Hydraulics
Dr. Mohsin Siddique
Assistant Professor
Outcome of Today’s Lecture
2
After completing this lecture…
The students should be able to:
Understand the concepts of channel design
Learn about various method applied in channel design
Design channel section for both rigid boundary and erodible
channels
Open Channel Design
3
It is the process to obtain a shape, slope and geometry of
channel/canal which should not have objectionable silting and
scouring.
For example for a trapezoidal channel, it consists of determining;
(1) depth,
(2) bed width,
(3) side slope and
(4) longitudinal slope of the channel so as to produce a non-silting and
non-scouring velocity for the given discharge and sediment load.
Open Channel Design: Channel types
4
Types of channels based on material
Lined channels (Rigid boundary channels)
Unlined channels (erodible or earthen channels)
Types of channels based on shape
Circular channel
Triangular channel
Rectangular channel
Trapezoidal channel
Open Channel Design: Free Board
5
Free board is vertical distance between the design water surface and the
top of the channel bank. It is provided to account for uncertainty in design,
construction, and operation of the channel.
The US Bureau of Reclamation recommends a minimum freeboard of 0.3m
(1ft) for small channels and the following formula for estimating the
freeboard (FB) for larger channels
Where y is depth of channel in m (ft) and C is coefficient which varies from
0.7 (1.2) for small channels with capacity of 0.6 m3/s (20 ft3/s) to 0.9 (1.6)
for larger channels with a capacity of 85m3/s (3000 ft3/s) or greater
Sometime addition freeboard is required at out edge of curved section due
to centrifugal force.
yCFB =
Channel Design: Rigid Boundary-Rectangular
Channels
6
In rigid channels a layer of rigid material (e.g., Concrete, bricks and stone
etc) is used at the periphery of channel to reduce seepage, to increase
discharge capacity and prevent erosion.
Dimension of rectangular channels are based on most efficient rectangular
section. i.e (b=2y or y=b/2) where b and y are width and depths of channel
respectively.
For trapezoidal channels, side slopes varies from 1:1 for small channels to
1.5(H):1(v) for large channels.
These channels can be used for both subcritical and supercritical flows.
The design if primarily based on Manning’s Equation
Where Q is discharge, n is roughness coefficient, A is area of flow, R is
hydraulic radius, So is channel bed slope, and Co is coefficient (1 for SI unit
and 1.49 for U.S. customary units)
( )2/13/22/13/2
/ ooo
o
SCnQARSAR
n
C
Q =⇒=
7 Ref: Open channel hydraulics byVen Te Chow
Channel Design: Rigid Boundary
Channels
8
Design Procedure:
1. Select a value of roughness coefficient ,n, and bottom slope, So, for the
flow surface
2. Compute section factor from AR2/3 = nQ/(CoSo0.5),
3. Determine the channel dimensions and the flow depth for which AR2/3 is
equal to the value determined in step 2. For example, for a trapezoidal
section, select a value for the side slope, z, and compute several different
ratios of bottom width Bo and flow depth y for which AR2/3 is equal to that
determined in step 2. Select a ratio Bo/y that gives a cross section near to
the best hydraulic section
4. Check that the minimum velocity is not less than that required to carry
the sediment to prevent silting.
5.Add a suitable amount of freeboard.
6. Make a sketch providing all the dimensions.
Channel Design: Rigid Boundary
Channels
9
Example: Design a trapezoidal channel to carry a discharge of 10 m3/s.The
channel will be excavated through rock by blasting.The topography in the area is
such that a bottom slope of 1 in 4000 will be suitable.
Solution: For the blasted rock surface, n = 0.030 and let us select a value
for the side slope, z, as 1 horizontal to 4 vertical.The substitution of these
values into the Manning equation yields
Channel Design: Rigid Boundary
Channels
10
Solving this equation for y, we get
y = 2.57 m.Then, Bo = 2×2.57 = 5.14m.
For ease of construction, let us use Bo = 5 m.Then, the corresponding value
of y for which AR2/3= 18.97 is determined by trial and error as 2.64 m.
Based on Eq. of Freeboard,
FB =0.8 × (2.64)0.5 = 1.45 m.
Therefore, total depth = 2.64 + 1.45 = 4.09 =4.1 m.
The flow area for a flow depth of 2.64 m is 14.94 m2.
Therefore, the flow velocity = 10/14.94 = 0.67 m/s.
This is close to the minimum allowable flow velocity; thus, a bottom
width of 5 m and a cross section depth of 3.4 m is satisfactory.
Channel Design: Rigid Boundary
Channels
11
Make a clear sketch of channel showing all dimensions
Channel Design: Erodible Channels
12
If the channel bottom or sides are erodible, then the design requires that
the channel size and bottom slope are selected so that channel is not
eroded.
Erodible channels are designed for subcritical flow conditions with value of
Froude number less than 1.
A trapezoidal channel section is usually used for erodible channels.To
design these channels, first an appropriate value for the side slope is
elected so that the sides are stable under all conditions.
Basic Definitions
Froude’s Number (FN)
It is the ratio of inertial forces to
gravitational forces.
For a rectangular channel it may be
written as
FN= 1 Critical Flow
> 1 Super-Critical Flow
< 1 Sub-Critical Flow
gy
V
NF =
William Froude (1810-79)
Born in England and engaged
in shipbuilding. In his sixties
started the study of ship
resistance, building a boat
testing pool (approximately 75
m long) near his home. After his
death, this study was continued
by his son, Robert Edmund
Froude (1846-1924). For
similarity under conditions of
inertial and gravitational forces,
the non-dimensional number
used carries his name.
13
Channel Design: Erodible Channels
14
There are many method available but the following two methods are
discussed here.
Permissible velocity method and
Tractive force method.
Channel Design: Erodible Channels-
Permissible velocity Method
15
PermissibleVelocity Method
In permissible velocity method, channel size is selected such that mean flow
velocity for design discharge under uniform flow conditions is less than
permissible velocity.
Permissible Velocity is defined as the mean velocity at or below which
bottom and sides of channels are not eroded.
Permissible velocity depends upon:
Type of soil
Size of particles
Depth of flow
Curvature of channel
Channel Design: Erodible Channels-
Permissible velocity Method
16
Channel Design: Erodible Channels-
Permissible velocity Method
17
Design Procedure:
1. For the specified material, select value of n, side slope, z, the permissible
velocity, V, (fromTables).
2. Determine the required hydraulic radius, R, from Manning formula, and
the required flow area, A, from the continuity equation, A = Q/V.
3. Compute the wetted perimeter, P = A/R.
4. Determine the channel bottom width, Bo, and the flow depth, y, for which
the flow area A is equal to that computed in step 2 and the wetted
perimeter, P, is equal to that computed in step 3.
5. Add a suitable value for the freeboard.
6. Make a sketch providing all the dimensions.
( )
2
12 zyBP
yzyBA
o
o
++=
+=
Channel Design: Erodible Channels-
Permissible velocity Method
18
Design a channel to carry a flow of 6.91 m3/s.The channel will be excavated
through stiff clay at a channel bottom slope of 0.00318.
Solution:
For stiff clay, n = 0.025, suggested side slope, z = 1 : 1 (fromTable ), and the
permissible flow velocity (fromTable ) is 1.8 m/s.
Hence,
A = 6.91/1.8 = 3.83 m2
Substituting values for V, n, and So into Manning equation,
and solving for R, we get R = 0.713 m. Hence,
P = A/R=3.83/0.713= 5.37m
2/13/2
o
o
SAR
n
C
Q =
Channel Design: Erodible Channels-
Permissible velocity Method
19
Substitution into expressions for P and A and equating them to the values
computed above, we obtain
Eliminating Bo from these equations yields
Solution of above quadratic equation yields y=1.22m and hence Bo=1.9m
Freeboard (FB)=0.8x(1.22)0.5=0.99
Total depth of channel section=1.22+0.99=2.21m
( ) ( )
yByB
yyByyB
oo
oo
83.211237.5
.183.3
2
+=++=
+=+=
083.337.583.1 2
=+− yy
Channel Design: Erodible Channels-
Permissible velocity Method
20
Make a clear sketch of channel showing all dimensions
Channel Design: Erodible Channels-
Permissible velocity Method
21
Problem: A grass-lined drainage channel is to carry a discharge of 2000 cfs
at a maximum velocity of 4.0 fps.The side slopes of the channel will be 4:1
and the longitudinal slope of the channel will be 0.001. Design the channel
for Manning’s n values of 0.03 and 0.035.
Answer: for n=0.03, y=4.9ft, Bo=83ft and FB=3.1ft
for n=0.035, y=7.7ft, Bo=34.2ft and FB=3.9ft
Channel Design: Erodible Channels-
Tractive Force Method
22
Tractive Force Method
Scour and erosion process can be viewed in rational way by considering
forces acting on particles lying on channel bottom or sides.
The channel is eroded if resultant of forces tending to move particles is
greater than resultant of forces resisting motion. This concept is referred as
tractive force approach.
Tractive Force
The force exerted by flowing water on bottom and sides of channel is
called tractive force. In uniform flow, this force is equal to component of
weight acting in direction of flow and is given by
Where,
ooo ySRS γγτ ==
Channel Design: Erodible Channels-
Tractive Force Method
23
CriticalTractive Force
The force at which channel material begins to move from stationery
condition is called critical tractive force.
Distribution ofTractive Force
Distribution of tractive force or shear stress over channel perimeter is not
uniform. For trapezoidal channels, unit tractive force at channel bottom
may be assumed equal to (γ y So) and at channel sides equal to 0.75 γ y So
Reduction Factor for Channel Sides
Reduction factor (tractive force ratio) for critical tractive force on channel
sides is:
i.e K=Permissible Tractive force on side slope/Critical Tractive
force
Channel Design: Erodible Channels-
Tractive Force Method
24
Effect of angle of repose should be considered only for coarse non
cohesive materials and can be neglected for fine cohesive materials.
Critical shear stress for cohesive and non cohesive materials is given in the
figures.These values are for straight channels and should be reduced for
sinuous channels as below:
Slightly sinuous channels = 10%
Moderately sinuous channels = 25%
Highly sinuous channels = 40%
Basic Definitions
Channel classification
25
Straight Channel
Braided Channel
Meandering Channel
Sinuosity is ratio of actual path length
to shortest path length
Channel Design: Erodible Channels-
Tractive Force Method
26 Angles of repose for non-cohesive
material (After U.S. Bureau of Reclamation)
Channel Design: Erodible Channels-
Tractive Force Method
27
Permissible shear stress for noncohesive
materials (After U.S. Bureau of Reclamation)
Channel Design: Erodible Channels-
Tractive Force Method
28
Permissible shear stress for cohesive
materials (After U.S. Bureau of Reclamation)
Channel Design: Erodible Channels-
Tractive Force Method
29
Example: Design a straight trapezoidal channel for a design discharge of
10 m3/s.The bottom slope is 0.00025 and the channel is excavated through
fine gravel having particle size of 8 mm.Assume the particles are
moderately rounded and the water carries fine sediment at low
concentrations.
Solution:
Q = 10 m3/s;
So = 0.00025;
Material: Fine gravel, moderately rounded; and
Particle size = 8 mm.
Determine: Bo = ? And Flow depth, y = ?
30
For fine gravel,
n = 0.024 and
z = 1V:3H.
Therefore,
θ = tan−1 (1/3) = 18.4o
Practical size=8/25.4=0.315 in
From Fig., φ = 24o
Hence,
31
Critical shear stress from Fig =
0.15 lbs/ft2 = 7.18 N/m2.
Since the channel is straight,
we do not have to make a
correction for the alignment.
The permissible shear stress
for the channel side is
=7.18× 0.63 = 4.52 N/m2.
32
Now, the unit tractive force on the side = 0.76γySo
= 0.76×999×9.81y×0.00025
= 1.862y
By equating the unit tractive force to the permissible stress, we obtain
1.862y = 4.52
Or y = 2.43m
The channel bottom width, Bo, needed to carry 10 m3/s may be determined
from the Mannings’ equation
( ) ( ) QS
yzB
yzyB
yzyB
n
QSAR
n
o
o
o =








++
+
+
=
0
3/2
2
0
3/2
12
1
1
33
By substituting n = 0.024, z = 3, y = 2.43, So = 0.00025, and Q = 10 m3/s, and
solving for Bo, we obtain Bo = 8.24m
Free Board, FB, = 0.8 × (2.43)0.5 = 1.40 m.
For a selected freeboard of 1.4 m, the depth of section = 2.43 + 1.4 = 3.82
m.
For ease of construction, select a bottom width, Bo = 8.25 m.
34
Make a clear sketch of channel showing all dimensions
Thank you
Questions….
Feel free to contact:
35

More Related Content

PDF
Chapter 3 channel design
PPT
Chapter 4
PDF
design of weirs
PDF
Flow measurement
PDF
Chapter 2 open channel hydraulics
PPTX
Hydrological modelling
PDF
Technical report writing skills for civil engineers pdf
PDF
Fluid statics
Chapter 3 channel design
Chapter 4
design of weirs
Flow measurement
Chapter 2 open channel hydraulics
Hydrological modelling
Technical report writing skills for civil engineers pdf
Fluid statics

What's hot (20)

PPTX
Diversion Headworks
PPTX
Design of Lined Canal and Canal Lining
PPTX
Open channel flow
PDF
Failure of weir and barrage
PPTX
12.-Regulators.pptx
PPT
Hardy cross method of pipe network analysis
PPTX
River training method
PDF
Canal regulation works. m4pptx
PPTX
Canal outlets and modules
PDF
Chapter 6 design of irrigation channel1
PDF
09. Silt Theories [Kennedy's Theory].pdf
PPTX
Khosla theory
PDF
Diversion headwork
PPT
Kennedy's and laccy's theory
PPTX
Silt excluders
PPTX
Spillway and its types
PPTX
Irrigation Channels
PPTX
Effective stress
PDF
Chapter 7 spillway and energy dissipators
Diversion Headworks
Design of Lined Canal and Canal Lining
Open channel flow
Failure of weir and barrage
12.-Regulators.pptx
Hardy cross method of pipe network analysis
River training method
Canal regulation works. m4pptx
Canal outlets and modules
Chapter 6 design of irrigation channel1
09. Silt Theories [Kennedy's Theory].pdf
Khosla theory
Diversion headwork
Kennedy's and laccy's theory
Silt excluders
Spillway and its types
Irrigation Channels
Effective stress
Chapter 7 spillway and energy dissipators
Ad

Similar to Open channel design (20)

PPTX
3.uniform flow.pptx
PPTX
Lecture 2.pptx
PDF
PPTX
Lecture 1.pptx
PDF
Dymanics of open channel flow
PDF
(Part i)- open channels
PDF
Chapter 6 design of irrigation channel1
PDF
Lecture 2 manning
PPTX
3. Hydraulic Geometry for bridge engineering.pptx
PDF
0 open channel intro 5
PPTX
Chapter 1bbj.pptx
PDF
10. Kenedy's and Lacey's Theory (Supply).pdf
PPTX
UNIFORM FLOW OCF.pptx
PPT
Design of a channel Reach
PPTX
UNIT 1 UNIFORM FLOW.pptx
PPTX
CHAPTER 5- Water Conveynance and Control-1.pptx
PDF
Presentation on notches and weirs
PPTX
Field data 11323 34required_31.12.24.pptx
PPTX
Lined or non erodible design channel study
PPTX
Design of Lined Channels.pptx
3.uniform flow.pptx
Lecture 2.pptx
Lecture 1.pptx
Dymanics of open channel flow
(Part i)- open channels
Chapter 6 design of irrigation channel1
Lecture 2 manning
3. Hydraulic Geometry for bridge engineering.pptx
0 open channel intro 5
Chapter 1bbj.pptx
10. Kenedy's and Lacey's Theory (Supply).pdf
UNIFORM FLOW OCF.pptx
Design of a channel Reach
UNIT 1 UNIFORM FLOW.pptx
CHAPTER 5- Water Conveynance and Control-1.pptx
Presentation on notches and weirs
Field data 11323 34required_31.12.24.pptx
Lined or non erodible design channel study
Design of Lined Channels.pptx
Ad

More from Mohsin Siddique (20)

PDF
Engineering Economics: Solved exam problems [ch1-ch4]
PDF
Basics of image processing using MATLAB
PDF
Particle image velocimetry
PDF
Basics of image processing & analysis
PDF
Chapter 5 coastal structures
PDF
Chapter 4 Introduction to beach processes and management strategies
PDF
Chapter 3 linear wave theory and wave propagation
PDF
Chapter 2 wave and tides with examples
PDF
Chapter 1 introduction to coastal engineering and management strategies
PDF
Chapter 6 concrete dam engineering with examples
PDF
Chapter 5 drop sturcutures
PDF
Chapter 4 seepage theories
PDF
Chapter 1 introduction to hydraulics structures history...
PDF
Buoyancy and floatation
PDF
Fluid MechanicsVortex flow and impulse momentum
PDF
Fluid MechanicsLosses in pipes dynamics of viscous flows
PDF
Fluid dynamic
PDF
Fluid kinematics
PDF
Fluid properties
PDF
Introduction to fluid mechanics
Engineering Economics: Solved exam problems [ch1-ch4]
Basics of image processing using MATLAB
Particle image velocimetry
Basics of image processing & analysis
Chapter 5 coastal structures
Chapter 4 Introduction to beach processes and management strategies
Chapter 3 linear wave theory and wave propagation
Chapter 2 wave and tides with examples
Chapter 1 introduction to coastal engineering and management strategies
Chapter 6 concrete dam engineering with examples
Chapter 5 drop sturcutures
Chapter 4 seepage theories
Chapter 1 introduction to hydraulics structures history...
Buoyancy and floatation
Fluid MechanicsVortex flow and impulse momentum
Fluid MechanicsLosses in pipes dynamics of viscous flows
Fluid dynamic
Fluid kinematics
Fluid properties
Introduction to fluid mechanics

Recently uploaded (20)

PDF
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
PPTX
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
PDF
null (2) bgfbg bfgb bfgb fbfg bfbgf b.pdf
PDF
Visual Aids for Exploratory Data Analysis.pdf
PDF
Exploratory_Data_Analysis_Fundamentals.pdf
PPT
Total quality management ppt for engineering students
PDF
EXPLORING LEARNING ENGAGEMENT FACTORS INFLUENCING BEHAVIORAL, COGNITIVE, AND ...
PPTX
UNIT - 3 Total quality Management .pptx
PPT
A5_DistSysCh1.ppt_INTRODUCTION TO DISTRIBUTED SYSTEMS
PDF
Unit I ESSENTIAL OF DIGITAL MARKETING.pdf
PPTX
Fundamentals of safety and accident prevention -final (1).pptx
PDF
Soil Improvement Techniques Note - Rabbi
PDF
R24 SURVEYING LAB MANUAL for civil enggi
PDF
Categorization of Factors Affecting Classification Algorithms Selection
PDF
Analyzing Impact of Pakistan Economic Corridor on Import and Export in Pakist...
PPTX
introduction to high performance computing
PDF
PPT on Performance Review to get promotions
PDF
III.4.1.2_The_Space_Environment.p pdffdf
PPTX
Safety Seminar civil to be ensured for safe working.
PPTX
Fundamentals of Mechanical Engineering.pptx
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
null (2) bgfbg bfgb bfgb fbfg bfbgf b.pdf
Visual Aids for Exploratory Data Analysis.pdf
Exploratory_Data_Analysis_Fundamentals.pdf
Total quality management ppt for engineering students
EXPLORING LEARNING ENGAGEMENT FACTORS INFLUENCING BEHAVIORAL, COGNITIVE, AND ...
UNIT - 3 Total quality Management .pptx
A5_DistSysCh1.ppt_INTRODUCTION TO DISTRIBUTED SYSTEMS
Unit I ESSENTIAL OF DIGITAL MARKETING.pdf
Fundamentals of safety and accident prevention -final (1).pptx
Soil Improvement Techniques Note - Rabbi
R24 SURVEYING LAB MANUAL for civil enggi
Categorization of Factors Affecting Classification Algorithms Selection
Analyzing Impact of Pakistan Economic Corridor on Import and Export in Pakist...
introduction to high performance computing
PPT on Performance Review to get promotions
III.4.1.2_The_Space_Environment.p pdffdf
Safety Seminar civil to be ensured for safe working.
Fundamentals of Mechanical Engineering.pptx

Open channel design

  • 1. Open Channel Hydraulics Design of Channels 1 Hydraulics Dr. Mohsin Siddique Assistant Professor
  • 2. Outcome of Today’s Lecture 2 After completing this lecture… The students should be able to: Understand the concepts of channel design Learn about various method applied in channel design Design channel section for both rigid boundary and erodible channels
  • 3. Open Channel Design 3 It is the process to obtain a shape, slope and geometry of channel/canal which should not have objectionable silting and scouring. For example for a trapezoidal channel, it consists of determining; (1) depth, (2) bed width, (3) side slope and (4) longitudinal slope of the channel so as to produce a non-silting and non-scouring velocity for the given discharge and sediment load.
  • 4. Open Channel Design: Channel types 4 Types of channels based on material Lined channels (Rigid boundary channels) Unlined channels (erodible or earthen channels) Types of channels based on shape Circular channel Triangular channel Rectangular channel Trapezoidal channel
  • 5. Open Channel Design: Free Board 5 Free board is vertical distance between the design water surface and the top of the channel bank. It is provided to account for uncertainty in design, construction, and operation of the channel. The US Bureau of Reclamation recommends a minimum freeboard of 0.3m (1ft) for small channels and the following formula for estimating the freeboard (FB) for larger channels Where y is depth of channel in m (ft) and C is coefficient which varies from 0.7 (1.2) for small channels with capacity of 0.6 m3/s (20 ft3/s) to 0.9 (1.6) for larger channels with a capacity of 85m3/s (3000 ft3/s) or greater Sometime addition freeboard is required at out edge of curved section due to centrifugal force. yCFB =
  • 6. Channel Design: Rigid Boundary-Rectangular Channels 6 In rigid channels a layer of rigid material (e.g., Concrete, bricks and stone etc) is used at the periphery of channel to reduce seepage, to increase discharge capacity and prevent erosion. Dimension of rectangular channels are based on most efficient rectangular section. i.e (b=2y or y=b/2) where b and y are width and depths of channel respectively. For trapezoidal channels, side slopes varies from 1:1 for small channels to 1.5(H):1(v) for large channels. These channels can be used for both subcritical and supercritical flows. The design if primarily based on Manning’s Equation Where Q is discharge, n is roughness coefficient, A is area of flow, R is hydraulic radius, So is channel bed slope, and Co is coefficient (1 for SI unit and 1.49 for U.S. customary units) ( )2/13/22/13/2 / ooo o SCnQARSAR n C Q =⇒=
  • 7. 7 Ref: Open channel hydraulics byVen Te Chow
  • 8. Channel Design: Rigid Boundary Channels 8 Design Procedure: 1. Select a value of roughness coefficient ,n, and bottom slope, So, for the flow surface 2. Compute section factor from AR2/3 = nQ/(CoSo0.5), 3. Determine the channel dimensions and the flow depth for which AR2/3 is equal to the value determined in step 2. For example, for a trapezoidal section, select a value for the side slope, z, and compute several different ratios of bottom width Bo and flow depth y for which AR2/3 is equal to that determined in step 2. Select a ratio Bo/y that gives a cross section near to the best hydraulic section 4. Check that the minimum velocity is not less than that required to carry the sediment to prevent silting. 5.Add a suitable amount of freeboard. 6. Make a sketch providing all the dimensions.
  • 9. Channel Design: Rigid Boundary Channels 9 Example: Design a trapezoidal channel to carry a discharge of 10 m3/s.The channel will be excavated through rock by blasting.The topography in the area is such that a bottom slope of 1 in 4000 will be suitable. Solution: For the blasted rock surface, n = 0.030 and let us select a value for the side slope, z, as 1 horizontal to 4 vertical.The substitution of these values into the Manning equation yields
  • 10. Channel Design: Rigid Boundary Channels 10 Solving this equation for y, we get y = 2.57 m.Then, Bo = 2×2.57 = 5.14m. For ease of construction, let us use Bo = 5 m.Then, the corresponding value of y for which AR2/3= 18.97 is determined by trial and error as 2.64 m. Based on Eq. of Freeboard, FB =0.8 × (2.64)0.5 = 1.45 m. Therefore, total depth = 2.64 + 1.45 = 4.09 =4.1 m. The flow area for a flow depth of 2.64 m is 14.94 m2. Therefore, the flow velocity = 10/14.94 = 0.67 m/s. This is close to the minimum allowable flow velocity; thus, a bottom width of 5 m and a cross section depth of 3.4 m is satisfactory.
  • 11. Channel Design: Rigid Boundary Channels 11 Make a clear sketch of channel showing all dimensions
  • 12. Channel Design: Erodible Channels 12 If the channel bottom or sides are erodible, then the design requires that the channel size and bottom slope are selected so that channel is not eroded. Erodible channels are designed for subcritical flow conditions with value of Froude number less than 1. A trapezoidal channel section is usually used for erodible channels.To design these channels, first an appropriate value for the side slope is elected so that the sides are stable under all conditions.
  • 13. Basic Definitions Froude’s Number (FN) It is the ratio of inertial forces to gravitational forces. For a rectangular channel it may be written as FN= 1 Critical Flow > 1 Super-Critical Flow < 1 Sub-Critical Flow gy V NF = William Froude (1810-79) Born in England and engaged in shipbuilding. In his sixties started the study of ship resistance, building a boat testing pool (approximately 75 m long) near his home. After his death, this study was continued by his son, Robert Edmund Froude (1846-1924). For similarity under conditions of inertial and gravitational forces, the non-dimensional number used carries his name. 13
  • 14. Channel Design: Erodible Channels 14 There are many method available but the following two methods are discussed here. Permissible velocity method and Tractive force method.
  • 15. Channel Design: Erodible Channels- Permissible velocity Method 15 PermissibleVelocity Method In permissible velocity method, channel size is selected such that mean flow velocity for design discharge under uniform flow conditions is less than permissible velocity. Permissible Velocity is defined as the mean velocity at or below which bottom and sides of channels are not eroded. Permissible velocity depends upon: Type of soil Size of particles Depth of flow Curvature of channel
  • 16. Channel Design: Erodible Channels- Permissible velocity Method 16
  • 17. Channel Design: Erodible Channels- Permissible velocity Method 17 Design Procedure: 1. For the specified material, select value of n, side slope, z, the permissible velocity, V, (fromTables). 2. Determine the required hydraulic radius, R, from Manning formula, and the required flow area, A, from the continuity equation, A = Q/V. 3. Compute the wetted perimeter, P = A/R. 4. Determine the channel bottom width, Bo, and the flow depth, y, for which the flow area A is equal to that computed in step 2 and the wetted perimeter, P, is equal to that computed in step 3. 5. Add a suitable value for the freeboard. 6. Make a sketch providing all the dimensions. ( ) 2 12 zyBP yzyBA o o ++= +=
  • 18. Channel Design: Erodible Channels- Permissible velocity Method 18 Design a channel to carry a flow of 6.91 m3/s.The channel will be excavated through stiff clay at a channel bottom slope of 0.00318. Solution: For stiff clay, n = 0.025, suggested side slope, z = 1 : 1 (fromTable ), and the permissible flow velocity (fromTable ) is 1.8 m/s. Hence, A = 6.91/1.8 = 3.83 m2 Substituting values for V, n, and So into Manning equation, and solving for R, we get R = 0.713 m. Hence, P = A/R=3.83/0.713= 5.37m 2/13/2 o o SAR n C Q =
  • 19. Channel Design: Erodible Channels- Permissible velocity Method 19 Substitution into expressions for P and A and equating them to the values computed above, we obtain Eliminating Bo from these equations yields Solution of above quadratic equation yields y=1.22m and hence Bo=1.9m Freeboard (FB)=0.8x(1.22)0.5=0.99 Total depth of channel section=1.22+0.99=2.21m ( ) ( ) yByB yyByyB oo oo 83.211237.5 .183.3 2 +=++= +=+= 083.337.583.1 2 =+− yy
  • 20. Channel Design: Erodible Channels- Permissible velocity Method 20 Make a clear sketch of channel showing all dimensions
  • 21. Channel Design: Erodible Channels- Permissible velocity Method 21 Problem: A grass-lined drainage channel is to carry a discharge of 2000 cfs at a maximum velocity of 4.0 fps.The side slopes of the channel will be 4:1 and the longitudinal slope of the channel will be 0.001. Design the channel for Manning’s n values of 0.03 and 0.035. Answer: for n=0.03, y=4.9ft, Bo=83ft and FB=3.1ft for n=0.035, y=7.7ft, Bo=34.2ft and FB=3.9ft
  • 22. Channel Design: Erodible Channels- Tractive Force Method 22 Tractive Force Method Scour and erosion process can be viewed in rational way by considering forces acting on particles lying on channel bottom or sides. The channel is eroded if resultant of forces tending to move particles is greater than resultant of forces resisting motion. This concept is referred as tractive force approach. Tractive Force The force exerted by flowing water on bottom and sides of channel is called tractive force. In uniform flow, this force is equal to component of weight acting in direction of flow and is given by Where, ooo ySRS γγτ ==
  • 23. Channel Design: Erodible Channels- Tractive Force Method 23 CriticalTractive Force The force at which channel material begins to move from stationery condition is called critical tractive force. Distribution ofTractive Force Distribution of tractive force or shear stress over channel perimeter is not uniform. For trapezoidal channels, unit tractive force at channel bottom may be assumed equal to (γ y So) and at channel sides equal to 0.75 γ y So Reduction Factor for Channel Sides Reduction factor (tractive force ratio) for critical tractive force on channel sides is: i.e K=Permissible Tractive force on side slope/Critical Tractive force
  • 24. Channel Design: Erodible Channels- Tractive Force Method 24 Effect of angle of repose should be considered only for coarse non cohesive materials and can be neglected for fine cohesive materials. Critical shear stress for cohesive and non cohesive materials is given in the figures.These values are for straight channels and should be reduced for sinuous channels as below: Slightly sinuous channels = 10% Moderately sinuous channels = 25% Highly sinuous channels = 40%
  • 25. Basic Definitions Channel classification 25 Straight Channel Braided Channel Meandering Channel Sinuosity is ratio of actual path length to shortest path length
  • 26. Channel Design: Erodible Channels- Tractive Force Method 26 Angles of repose for non-cohesive material (After U.S. Bureau of Reclamation)
  • 27. Channel Design: Erodible Channels- Tractive Force Method 27 Permissible shear stress for noncohesive materials (After U.S. Bureau of Reclamation)
  • 28. Channel Design: Erodible Channels- Tractive Force Method 28 Permissible shear stress for cohesive materials (After U.S. Bureau of Reclamation)
  • 29. Channel Design: Erodible Channels- Tractive Force Method 29 Example: Design a straight trapezoidal channel for a design discharge of 10 m3/s.The bottom slope is 0.00025 and the channel is excavated through fine gravel having particle size of 8 mm.Assume the particles are moderately rounded and the water carries fine sediment at low concentrations. Solution: Q = 10 m3/s; So = 0.00025; Material: Fine gravel, moderately rounded; and Particle size = 8 mm. Determine: Bo = ? And Flow depth, y = ?
  • 30. 30 For fine gravel, n = 0.024 and z = 1V:3H. Therefore, θ = tan−1 (1/3) = 18.4o Practical size=8/25.4=0.315 in From Fig., φ = 24o Hence,
  • 31. 31 Critical shear stress from Fig = 0.15 lbs/ft2 = 7.18 N/m2. Since the channel is straight, we do not have to make a correction for the alignment. The permissible shear stress for the channel side is =7.18× 0.63 = 4.52 N/m2.
  • 32. 32 Now, the unit tractive force on the side = 0.76γySo = 0.76×999×9.81y×0.00025 = 1.862y By equating the unit tractive force to the permissible stress, we obtain 1.862y = 4.52 Or y = 2.43m The channel bottom width, Bo, needed to carry 10 m3/s may be determined from the Mannings’ equation ( ) ( ) QS yzB yzyB yzyB n QSAR n o o o =         ++ + + = 0 3/2 2 0 3/2 12 1 1
  • 33. 33 By substituting n = 0.024, z = 3, y = 2.43, So = 0.00025, and Q = 10 m3/s, and solving for Bo, we obtain Bo = 8.24m Free Board, FB, = 0.8 × (2.43)0.5 = 1.40 m. For a selected freeboard of 1.4 m, the depth of section = 2.43 + 1.4 = 3.82 m. For ease of construction, select a bottom width, Bo = 8.25 m.