DISCLAIMERS
○ Personal experiences and opinions only, not those of the Open-IX Association, working
groups, or any employer.
○ Not intended as legal advice. Datacenter contracts are extremely complex and require
review by counsel.
○ Datacenters presented are completely fictitious. Any resemblances, living or dead, are
coincidental.
WHY DATACENTERS
MATTER○ Significant operational expenditure, often exceeding cost of IP transit or
interconnection.
○ Often selected by the “network person” or “vendor negotiator” (hence, this audience)
○ Can be a major source of downtime if planned poorly.
○ Power, Plumbing, and Ping is not an “attractive” topic like “cloud” or “SDN”, though it
underpins it; therefore not often discussed around these parts.
○ Lack of best-practice sharing among operators. Not a germane topic for a NANOG,
etc.
WHEN YOU’RE NOT
ALIGNED
CENSORED
WHEN YOU’RE NOT
ALIGNED: SANDY EDITION
Force majeure, or poor site selection by the
customer?
WHEN YOU’RE ALIGNED
VENDOR POSITIONING
RETAIL WHOLESALE
CHARACTERISTICS OF RETAIL
DATACENTER OR MMR
WHOLESALE
○ Power is billed at a fixed MRC, based on breakered (or capped) capacity.
○ Common increments of space are RUs, racks, or private cages.
○ Diverse meet-me room, with access to dozens of IP, lit services, dark fiber providers.
○ Cross-connection is a large profit center for the operator, and may carry significant MRC.
○ Access to 24 x7 remote hands for basic troubleshooting, rack & stack, managed services.
○ Limited options for power redundancy beyond N or N+1; so called “primary” and “redundant” power
feeds may terminate on common infrastructure.
CHARACTERISTICS OF
WHOLESALE DATACENTER
WHOLESALE
○ Power is metered and billed based upon consumption (KW/hr or mean KW/month).
○ Common increments of space are private cages or partitioned suites.
○ Limited providers on-site, but should connect to one or more dark fiber provider(s) with entrance
diversity. Tethering is common. May also offer extended cross-connect service to nearby MMR(s).
○ Cross-connection is not a profit center for the operator; commonly NRC to cover time & materials.
○ Access to remote hands may be limited. Clients typically provide their own operational staffing.
○ Greater options for power diversity (e.g. 2N[+n] designs). Some customization on power, cooling, and
rack designs to meet customer’s needs.
SCOPE OF THIS TALK
WHOLESALE
○ Most relevant to wholesale colocation, in the hundreds of KWs and larger.
○ Some elements are applicable to retail colocation, e.g. a cage, though you’re probably wasting your
and your account rep’s time if you’re using this method to quote out a single cabinet. 
○ Some elements are applicable to larger wholesale suites/pods in the MWs range, however further due
diligence may be helpful.
○ We’re not discussing greenfield construction, though the TCO comparatives may help.
RFP: INTRO AND BASICS
WHOLESALE
○ RFP should be short and sweet, while explaining your requirements. Should not exceed several
pages of core requirements.
○ Should be conducive to vendor providing concise, binary, responses, without the hassle of flowery
marketing narratives.
○ Should clearly state nature of customer’s business and use case; establish expectations for a
response and go-live date.
○ Should clearly establish search radius, leave no room for interpretation as to whether or not a
particular location is in-scope for consideration.
RFP: BUILD AND POWER
WHOLESALE
○ Explain clearly what type of equipment racks or cabinets you need to place, and quantity. Floor plan
and rack layout can be helpful as attachments. Establish provider’s “sweet spot” for density (W/ft^2 or
KW/cabinet) so you can tweak your layouts appropriately.
○ Establish “day one” and future (12mo, 24mo, …) power requirements, in terms of both base commit
and ceiling. Negotiate a ramp beneficial to both parties, if you’re not using all power initially.
○ Establish how power is metered and invoiced; base commitments vs. variable.
○ Establish mean Power Usage Effectiveness (PUE) for facility, and its impact on how power is billed.
○ Establish costs for installing incremental cabinets, NEMA receptacles.
RFP: COMMERCIAL TERMS
WHOLESALE
○ Establish term length. Long terms (>= 5 years) ensure stability and cost predictability for the
purchaser, as well as certainty for the vendor.
○ Establish YoY escalations, if applicable. Solidify language for additional pricing increases, e.g. notice
period, commensurate to increased costs from power utility.
○ Establish “look back” period for incorrect billings. Ensure it’s bilateral; same period for billing disputes
initiated by customer, and billing corrections issued by vendor…
RFP: CABLING
WHOLESALE
○ Establish rates (NRC and MRC) for all common types of cross-connections: Cat5e, SMF; are
increases permitted during the contract term?
○ Establish policies for running your own data connections inside your datacenter space, using your own
materials and labor.
○ Establish facility’s policy on unionized labor. Is there any type of non-electrical work (e.g. bolting of
cabinets, intra-suite data cabling) that you’re not allowed to perform by yourself?
○ Develop with the facility a mutually agreeable plan for wire tray placement, rack placement, cable
plant, etc.
RFP: COMMUNICATIONS
WHOLESALE
○ “Provider ABC is on-net” is, itself, not a complete answer:
○ Develop list of on-site IP and telco providers you’re looking to purchase from.
○ Drill down to determine which building entrance[s] are utilized; underlying dark fiber providers and
routes are into the street. Also look for convergence points further away.
○ Vendor KMZ files overlayed into Google Earth are your friends. Some vendors have commissioned
reports to help with this planning, also.
○ Discuss relative strengths and weaknesses of aerial vs. buried fiber.
RFP: OIX-2 CERTIFICATION
WHOLESALE
○ My employer (Packet) asks this of all RFP respondents.
○ We view OIX-2 as a good indicator of transparency in operations, willingness to promote a diverse
carrier/interconnection ecosystem.
○ We understand that certifying every single site in a provider’s portfolio won’t happen overnight,
however [un]willingness to certify a particular site is a telling conversation.
RFP: OTHER IDEAS
WHOLESALE
○ Review history of planned maintenance events for past 12+ months, and upcoming 3+ months.
○ Review history of unplanned site outages for past 24+ months.
○ Establish access methods/controls into the datacenter, and private cage or suite; multiple “factors”.
○ Review policy on CCTV placement, retention, customer access. Discuss placement of your own
cameras, to augment the provider’s systems.
○ Confirm that temperature and RH will be maintained in accordance with (e.g. ASHRAE) norms.
○ Review SLA threshold and remedies for loss of power or cooling.
FLOOD MAPS
Source: FEMA MSC
SUBJECTIVE ANALYSIS
WHOLESALE
SUBJECTIVE ANALYSIS (2)
WHOLESALE
Documents are here:
RFP: http://baremet.al/packet-dc-
rfp
TCO Model:
http://baremet.al/packet-dc-tco
Questions or comments:
asr@packet.net

More Related Content

PDF
Let's Talk about Packet
PDF
How we built Packet's bare metal cloud platform
PDF
OpenNebulaConf2019 - Image Backups in OpenNebula - Momčilo Medić - ITAF
PDF
Introduction to the Container Networking and Security
PDF
OpenNebulaConf2019 - CORD and Edge computing with OpenNebula - Alfonso Aureli...
PDF
Webinar - Relying on Bare Metal to manage your workloads
PPTX
Simple, Scalable and Secure Networking for Data Centers with Project Calico
PPTX
Lessons learned from global telecom operators' cloud journeys - Zeev Likworni...
Let's Talk about Packet
How we built Packet's bare metal cloud platform
OpenNebulaConf2019 - Image Backups in OpenNebula - Momčilo Medić - ITAF
Introduction to the Container Networking and Security
OpenNebulaConf2019 - CORD and Edge computing with OpenNebula - Alfonso Aureli...
Webinar - Relying on Bare Metal to manage your workloads
Simple, Scalable and Secure Networking for Data Centers with Project Calico
Lessons learned from global telecom operators' cloud journeys - Zeev Likworni...

What's hot (20)

PPTX
Intro to Project Calico: a pure layer 3 approach to scale-out networking
PDF
Metaswitch Project Calico
PDF
Replacing vCloud with OpenNebula
PDF
NetApp Hybrid Cloud with OpenNebula
PDF
OpenNebulaConf2019 - Welcome and Project Update - Ignacio M. Llorente, Rubén ...
PPTX
Onug lunch talk may 12 2015 no video
PDF
KURMA - A Containerized Container Platform - KubeCon 2016
PDF
Policy driven SDN in CloudStack
PDF
CloudStack IPv6 in production
PPTX
Delivering Composable NFV Services for Business, Residential and Mobile Edge
PPTX
OpenStack Telco Cloud Challenges, David Fick, Oracle
PDF
Our journey with CloudStack
PDF
Open contrailmeetup
PPTX
Container Networking Meetup March 31 2016
PDF
OpenNebula from the Perspective of an ISP
PPTX
You Can Build Your OpenStack and Consume it Too
PPTX
Why nfv and digital transformation projects fail!
PPTX
Metaswitch and Intel: A Systematic Approach to NFV
PDF
Deploying NGINX in Cloud Native Kubernetes
PDF
Interop2018 contrail ContrailEnterpriseMulticloud
Intro to Project Calico: a pure layer 3 approach to scale-out networking
Metaswitch Project Calico
Replacing vCloud with OpenNebula
NetApp Hybrid Cloud with OpenNebula
OpenNebulaConf2019 - Welcome and Project Update - Ignacio M. Llorente, Rubén ...
Onug lunch talk may 12 2015 no video
KURMA - A Containerized Container Platform - KubeCon 2016
Policy driven SDN in CloudStack
CloudStack IPv6 in production
Delivering Composable NFV Services for Business, Residential and Mobile Edge
OpenStack Telco Cloud Challenges, David Fick, Oracle
Our journey with CloudStack
Open contrailmeetup
Container Networking Meetup March 31 2016
OpenNebula from the Perspective of an ISP
You Can Build Your OpenStack and Consume it Too
Why nfv and digital transformation projects fail!
Metaswitch and Intel: A Systematic Approach to NFV
Deploying NGINX in Cloud Native Kubernetes
Interop2018 contrail ContrailEnterpriseMulticloud
Ad

Similar to Open-IX Presentation: Datacenter Selection by Adam Rothschild (20)

PDF
2015 Gartner Magic Quadrant Cloud Enabled Managed Hosting
PDF
Tips To Find the Best Colocation Hosting Provider | Shared Hosting Providers ...
PPTX
BSN Security and Wireless presentation Feb 2019
PDF
Liam Macintyre - APM Scotland Branch Conference 2023: Net Zero Nation and Sus...
PDF
Liam Macintyre - APM Scotland Branch Conference 2023: Net Zero Nation and Sus...
PDF
Moving to cloud a checklist of top tips to help you migrate to the cloud © ...
PDF
SD-WAN: the Savings are in the Details
PDF
Arcus Advisors Report_Quality of Service
PPTX
Cloudonomics in Advanced Cloud Computing
PDF
Strategies for migration to public cloud
PDF
das-level-2-training-resource-pdf1
PDF
Small Commercial Solar: Grow Your Business With This Untapped Sector
PDF
Oracle Systems _ Kevin Mcisaac _ The IT Landscape has changes - have you_.pdf
PDF
How to reduce the cost of your WAN
PPT
Understanding And Evaluating Colocation Data Centers
PPTX
Retrofit, build, or go cloud/colo? Choosing your best direction
PPTX
Retrofit, build, or go cloud/colo? Choosing your best direction
PPTX
Morgan Hill presentation Tayor Wessing Cambridge
PDF
CF-Chapitre1.pdf
PDF
Distributor magazine
2015 Gartner Magic Quadrant Cloud Enabled Managed Hosting
Tips To Find the Best Colocation Hosting Provider | Shared Hosting Providers ...
BSN Security and Wireless presentation Feb 2019
Liam Macintyre - APM Scotland Branch Conference 2023: Net Zero Nation and Sus...
Liam Macintyre - APM Scotland Branch Conference 2023: Net Zero Nation and Sus...
Moving to cloud a checklist of top tips to help you migrate to the cloud © ...
SD-WAN: the Savings are in the Details
Arcus Advisors Report_Quality of Service
Cloudonomics in Advanced Cloud Computing
Strategies for migration to public cloud
das-level-2-training-resource-pdf1
Small Commercial Solar: Grow Your Business With This Untapped Sector
Oracle Systems _ Kevin Mcisaac _ The IT Landscape has changes - have you_.pdf
How to reduce the cost of your WAN
Understanding And Evaluating Colocation Data Centers
Retrofit, build, or go cloud/colo? Choosing your best direction
Retrofit, build, or go cloud/colo? Choosing your best direction
Morgan Hill presentation Tayor Wessing Cambridge
CF-Chapitre1.pdf
Distributor magazine
Ad

Recently uploaded (20)

PPTX
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
PPT
Mechanical Engineering MATERIALS Selection
PDF
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
PPTX
IOT PPTs Week 10 Lecture Material.pptx of NPTEL Smart Cities contd
PDF
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
PDF
composite construction of structures.pdf
PPTX
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
PDF
PRIZ Academy - 9 Windows Thinking Where to Invest Today to Win Tomorrow.pdf
PPTX
Internet of Things (IOT) - A guide to understanding
PDF
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
PPTX
OOP with Java - Java Introduction (Basics)
PDF
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
PPT
Project quality management in manufacturing
PPTX
bas. eng. economics group 4 presentation 1.pptx
PDF
Embodied AI: Ushering in the Next Era of Intelligent Systems
PPTX
UNIT 4 Total Quality Management .pptx
PPTX
CYBER-CRIMES AND SECURITY A guide to understanding
PPTX
Sustainable Sites - Green Building Construction
PPTX
Geodesy 1.pptx...............................................
PPTX
Strings in CPP - Strings in C++ are sequences of characters used to store and...
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
Mechanical Engineering MATERIALS Selection
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
IOT PPTs Week 10 Lecture Material.pptx of NPTEL Smart Cities contd
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
composite construction of structures.pdf
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
PRIZ Academy - 9 Windows Thinking Where to Invest Today to Win Tomorrow.pdf
Internet of Things (IOT) - A guide to understanding
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
OOP with Java - Java Introduction (Basics)
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
Project quality management in manufacturing
bas. eng. economics group 4 presentation 1.pptx
Embodied AI: Ushering in the Next Era of Intelligent Systems
UNIT 4 Total Quality Management .pptx
CYBER-CRIMES AND SECURITY A guide to understanding
Sustainable Sites - Green Building Construction
Geodesy 1.pptx...............................................
Strings in CPP - Strings in C++ are sequences of characters used to store and...

Open-IX Presentation: Datacenter Selection by Adam Rothschild

  • 1. Datacenter Selection Adam Rothschild <asr@packet.net> Open-IX - Americas Interconnection Summit San Diego, CA - April 2015
  • 2. DISCLAIMERS ○ Personal experiences and opinions only, not those of the Open-IX Association, working groups, or any employer. ○ Not intended as legal advice. Datacenter contracts are extremely complex and require review by counsel. ○ Datacenters presented are completely fictitious. Any resemblances, living or dead, are coincidental.
  • 3. WHY DATACENTERS MATTER○ Significant operational expenditure, often exceeding cost of IP transit or interconnection. ○ Often selected by the “network person” or “vendor negotiator” (hence, this audience) ○ Can be a major source of downtime if planned poorly. ○ Power, Plumbing, and Ping is not an “attractive” topic like “cloud” or “SDN”, though it underpins it; therefore not often discussed around these parts. ○ Lack of best-practice sharing among operators. Not a germane topic for a NANOG, etc.
  • 5. WHEN YOU’RE NOT ALIGNED: SANDY EDITION Force majeure, or poor site selection by the customer?
  • 8. CHARACTERISTICS OF RETAIL DATACENTER OR MMR WHOLESALE ○ Power is billed at a fixed MRC, based on breakered (or capped) capacity. ○ Common increments of space are RUs, racks, or private cages. ○ Diverse meet-me room, with access to dozens of IP, lit services, dark fiber providers. ○ Cross-connection is a large profit center for the operator, and may carry significant MRC. ○ Access to 24 x7 remote hands for basic troubleshooting, rack & stack, managed services. ○ Limited options for power redundancy beyond N or N+1; so called “primary” and “redundant” power feeds may terminate on common infrastructure.
  • 9. CHARACTERISTICS OF WHOLESALE DATACENTER WHOLESALE ○ Power is metered and billed based upon consumption (KW/hr or mean KW/month). ○ Common increments of space are private cages or partitioned suites. ○ Limited providers on-site, but should connect to one or more dark fiber provider(s) with entrance diversity. Tethering is common. May also offer extended cross-connect service to nearby MMR(s). ○ Cross-connection is not a profit center for the operator; commonly NRC to cover time & materials. ○ Access to remote hands may be limited. Clients typically provide their own operational staffing. ○ Greater options for power diversity (e.g. 2N[+n] designs). Some customization on power, cooling, and rack designs to meet customer’s needs.
  • 10. SCOPE OF THIS TALK WHOLESALE ○ Most relevant to wholesale colocation, in the hundreds of KWs and larger. ○ Some elements are applicable to retail colocation, e.g. a cage, though you’re probably wasting your and your account rep’s time if you’re using this method to quote out a single cabinet.  ○ Some elements are applicable to larger wholesale suites/pods in the MWs range, however further due diligence may be helpful. ○ We’re not discussing greenfield construction, though the TCO comparatives may help.
  • 11. RFP: INTRO AND BASICS WHOLESALE ○ RFP should be short and sweet, while explaining your requirements. Should not exceed several pages of core requirements. ○ Should be conducive to vendor providing concise, binary, responses, without the hassle of flowery marketing narratives. ○ Should clearly state nature of customer’s business and use case; establish expectations for a response and go-live date. ○ Should clearly establish search radius, leave no room for interpretation as to whether or not a particular location is in-scope for consideration.
  • 12. RFP: BUILD AND POWER WHOLESALE ○ Explain clearly what type of equipment racks or cabinets you need to place, and quantity. Floor plan and rack layout can be helpful as attachments. Establish provider’s “sweet spot” for density (W/ft^2 or KW/cabinet) so you can tweak your layouts appropriately. ○ Establish “day one” and future (12mo, 24mo, …) power requirements, in terms of both base commit and ceiling. Negotiate a ramp beneficial to both parties, if you’re not using all power initially. ○ Establish how power is metered and invoiced; base commitments vs. variable. ○ Establish mean Power Usage Effectiveness (PUE) for facility, and its impact on how power is billed. ○ Establish costs for installing incremental cabinets, NEMA receptacles.
  • 13. RFP: COMMERCIAL TERMS WHOLESALE ○ Establish term length. Long terms (>= 5 years) ensure stability and cost predictability for the purchaser, as well as certainty for the vendor. ○ Establish YoY escalations, if applicable. Solidify language for additional pricing increases, e.g. notice period, commensurate to increased costs from power utility. ○ Establish “look back” period for incorrect billings. Ensure it’s bilateral; same period for billing disputes initiated by customer, and billing corrections issued by vendor…
  • 14. RFP: CABLING WHOLESALE ○ Establish rates (NRC and MRC) for all common types of cross-connections: Cat5e, SMF; are increases permitted during the contract term? ○ Establish policies for running your own data connections inside your datacenter space, using your own materials and labor. ○ Establish facility’s policy on unionized labor. Is there any type of non-electrical work (e.g. bolting of cabinets, intra-suite data cabling) that you’re not allowed to perform by yourself? ○ Develop with the facility a mutually agreeable plan for wire tray placement, rack placement, cable plant, etc.
  • 15. RFP: COMMUNICATIONS WHOLESALE ○ “Provider ABC is on-net” is, itself, not a complete answer: ○ Develop list of on-site IP and telco providers you’re looking to purchase from. ○ Drill down to determine which building entrance[s] are utilized; underlying dark fiber providers and routes are into the street. Also look for convergence points further away. ○ Vendor KMZ files overlayed into Google Earth are your friends. Some vendors have commissioned reports to help with this planning, also. ○ Discuss relative strengths and weaknesses of aerial vs. buried fiber.
  • 16. RFP: OIX-2 CERTIFICATION WHOLESALE ○ My employer (Packet) asks this of all RFP respondents. ○ We view OIX-2 as a good indicator of transparency in operations, willingness to promote a diverse carrier/interconnection ecosystem. ○ We understand that certifying every single site in a provider’s portfolio won’t happen overnight, however [un]willingness to certify a particular site is a telling conversation.
  • 17. RFP: OTHER IDEAS WHOLESALE ○ Review history of planned maintenance events for past 12+ months, and upcoming 3+ months. ○ Review history of unplanned site outages for past 24+ months. ○ Establish access methods/controls into the datacenter, and private cage or suite; multiple “factors”. ○ Review policy on CCTV placement, retention, customer access. Discuss placement of your own cameras, to augment the provider’s systems. ○ Confirm that temperature and RH will be maintained in accordance with (e.g. ASHRAE) norms. ○ Review SLA threshold and remedies for loss of power or cooling.
  • 21. Documents are here: RFP: http://baremet.al/packet-dc- rfp TCO Model: http://baremet.al/packet-dc-tco Questions or comments: asr@packet.net