Complex regulations and an aging workforce led Infrabel, the owner and overseer of Belgium’s rail infrastructure, to look
for a new planning and scheduling solution. The optimal scheduling and assignment of personnel was a vital necessity
which could not be attainted using the company’s former tools and process. Infrabel chose to implement ORTEC
Workforce Scheduling and was able to allocate the workload more evenly for over 3,500 traffic control employees
stationed in signalling boxes and traffic control centers.
Casesheet
Challenges in the world of Infrabel
	 The schedule of 3,500 employees stationed in
340 signalling boxes was drawn up by hand by
52 planners working from 13 locations.
	 This situation was no longer tenable, as
complex labor regulations inevitably caused
mistakes resulting in sub-optimal planning.
	 Sixty per cent of the company’s personnel
will reach retirement age in the next ten years
and will leave the company in the near future.
Planners had to form blended teams in order
to ensure that the knowledge and experience
at each work location could be shared.
	 All of the relevant knowledge was stored
in planners’ heads. A tool was needed to
keep schedules more accessible, clear and
manageable for everyone.
	 A number of complex health and safety
regulations must be taken into consideration
when drawing up schedules.
	 Social requirements stipulate that the
workload has to be evenly distributed over all
employees. Infrabel also wanted to introduce
the principle of ‘healthy scheduling – healthy
employees.’
How Infrabel aimed to optimize its world
	 With ORTEC Workforce Scheduling, Infrabel
purposely chose a system that was not
only capable of taking complex regulations
into consideration, but could also cater to
employee preferences.
	 Scheduling, time recording and cost allocation
is now an integrated process at Infrabel.
	 On the one hand, employee master data
with relevant training information and safety
requirements, is automatically updated
in ORTEC Workforce Scheduling using an
integration with Infrabel’s SAP ERP system.
On the other, ORTEC Workforce Scheduling
calculates costs per cost center and
automatically transfers them to SAP for
payroll and review purposes.
	 The company uses our solution’s Budget &
Control and Employee Self-service modules.
Industry
Professional and public services
About Infrabel
Infrabel is the Belgian rail infra-
structure administrator.
	 Total number of employees: 	
	12,564
	 177 signalling boxes
	 Signal and traffic control 	
	 staff work in shifts of 3 	
	 times 8 hours, 7 days on and 	
	 7 days off
Infrabel
Insights shown by this tool can
mean so much for your company
“This tool can do so much
more than you think”
Lucien De Keersmaeker
The solution
	 ORTEC Workforce Scheduling
The results
+	 Optimal distribution of the work load
+	 Less scheduling errors
+	 Better implementation and monitoring of the
	 complex HR regulations
+	 More efficient scheduling process
+	 Increased productivity
+	 Increased customer and stakeholder satisfaction
+	 Improved insight into the schedule
+	 Ability to track who attended which training courses
	 and when
+	 Policy making is supported by improved access
	 to information
+	 Balanced teams of experienced and less
	 experienced employees
Scheduling structure
ORTEC Workforce Scheduling takes workload constraints,
as well as organizational and staffing needs into account
to build a shift schedule per location. After the tasks have
been performed and recorded in the solution, the model
determining staffing levels can be adjusted as needed
to improve the overall plan. Infrabel Manager Lucien De
Keersmaeker says: “Thanks to ORTEC, we can constantly
improve our schedule. Now, supply and demand are
optimally balanced.”
Objective scheduling
With the introduction of ORTEC Workforce Scheduling,
Infrabel can not only create optimal work schedules,
but also accommodate employee preferences. “We now
have a wonderful tool to support planners and to make
their work much easier”, De Keersmaeker states. The
company is very pleased with the system.
“It’s great that we can optimally assign our personnel and
increase our productivity. But one of the most important
reasons driving this change has been to improve our
employees’ satisfaction. ORTEC Workforce Scheduling
does not only take very complex regulations into
consideration; it also accounts for employees’ preferences
and distributes the workload evenly. We can adequately
react to ad hoc disruptions with the insight that we
now have into our staff’s schedule. In addition, ORTEC
Workforce Scheduling enables us to draw up an objective
schedule.”
Safety and Situational Knowledge
Lucien De Keersmaeker adds: “ORTEC Workforce
Scheduling truly offers the right support to planners to
help them draw up a schedule and adjust it to deal with
unexpected disruptions. It is immediately apparent who
is available and who has the right competencies (and has
completed the right training) with the new system, which is
extremely important to Infrabel.”
Management analyses
“This tool can do so much more than you think”, says
Lucien De Keersmaeker. “It allows for management
analysis, gives us more insight, and makes corrections
along the way as it analyzes trends.’
Want to learn more about our solutions? Contact us at: info@ortec.com www.ortec.com

More Related Content

PDF
ORTEC Case Arkin
PPTX
ORTEC Workforce Planning & Scheduling 2015
PPTX
ORTEC Workforce Planning & Scheduling 2015
PPTX
Scheduling
PPTX
Production planning and control 2019
DOCX
The Organizing FunctionOrganizingDistributing or.docx
PPT
7 chapter 9 Short-Term Scheduling.ppt
PPT
Workforce Management & BPM Integration
ORTEC Case Arkin
ORTEC Workforce Planning & Scheduling 2015
ORTEC Workforce Planning & Scheduling 2015
Scheduling
Production planning and control 2019
The Organizing FunctionOrganizingDistributing or.docx
7 chapter 9 Short-Term Scheduling.ppt
Workforce Management & BPM Integration

Similar to ORTEC Case INFRABEL (20)

PPT
Workforce Management & BPM Integration
PDF
Heizer om10 ch15
PPTX
kevin Drakes
PPTX
Loading jobs and methods definitivo
PPTX
TSI Final Presentation
PPT
hr_om11_ch15.ppt
PDF
APM Terminals Rotterdam - Workforce planning with ORTEC
PPTX
How to Reduce Scheduling Headaches & Increase ROI
PPTX
HRM_HRP.pptx
PPT
Operation Research abcdefghijklmnopqrstuvwxyz
PPT
Unit_1introduction to OR.ppt BSJBJSBKNSKNKSNK
PPT
Topic 5 Production Sequencing and Scheduling.ppt
PPT
unit-4-4Operations Planning and Control-Scheduling.ppt
PDF
HRM_Day 5 - Job design and Recruitment.pdf
PPT
PPT
Scheduling
PDF
Operations Management | FINANCIAL MANAGEMENT
PPT
Operations Scheduling
PDF
Optimize Your World introduction | E-Book
Workforce Management & BPM Integration
Heizer om10 ch15
kevin Drakes
Loading jobs and methods definitivo
TSI Final Presentation
hr_om11_ch15.ppt
APM Terminals Rotterdam - Workforce planning with ORTEC
How to Reduce Scheduling Headaches & Increase ROI
HRM_HRP.pptx
Operation Research abcdefghijklmnopqrstuvwxyz
Unit_1introduction to OR.ppt BSJBJSBKNSKNKSNK
Topic 5 Production Sequencing and Scheduling.ppt
unit-4-4Operations Planning and Control-Scheduling.ppt
HRM_Day 5 - Job design and Recruitment.pdf
Scheduling
Operations Management | FINANCIAL MANAGEMENT
Operations Scheduling
Optimize Your World introduction | E-Book
Ad

More from Andrei Pinte (19)

PDF
ORTEC - Russian References
PDF
ORTEC Case Zorgpartners Friesland
PDF
ORTEC Case Accolade Housing Corporation
PDF
ORTEC Warehousing Brochure
PDF
ORTEC Routing and Dispatch
PDF
ORTEC SAP Solutions
PDF
ORTEC Case AQUILA
PDF
ORTEC Case Carrefour Poland
PDF
Ortec Case Maat Security
PDF
ORTEC CASE TIBA-Kraftfutter
PDF
ORTEC Customer Case Liebensteiner Kartonagenwerk GmbH
PDF
ORTEC Case - BAM Infra
PDF
Ortec case FREEZESERVE
PDF
Ortec case COLRUYT
PDF
CARGLASS
PDF
ORTEC Case - PROVIMI KLIBA SA
PDF
Transart Ad Pharma Case Study En
PDF
Transart Company Profile En 201107
PDF
Studiu Caz E Commerce B2 B Alcar Wheelbase Romania Transart Entelion
ORTEC - Russian References
ORTEC Case Zorgpartners Friesland
ORTEC Case Accolade Housing Corporation
ORTEC Warehousing Brochure
ORTEC Routing and Dispatch
ORTEC SAP Solutions
ORTEC Case AQUILA
ORTEC Case Carrefour Poland
Ortec Case Maat Security
ORTEC CASE TIBA-Kraftfutter
ORTEC Customer Case Liebensteiner Kartonagenwerk GmbH
ORTEC Case - BAM Infra
Ortec case FREEZESERVE
Ortec case COLRUYT
CARGLASS
ORTEC Case - PROVIMI KLIBA SA
Transart Ad Pharma Case Study En
Transart Company Profile En 201107
Studiu Caz E Commerce B2 B Alcar Wheelbase Romania Transart Entelion
Ad

Recently uploaded (20)

PDF
Reconciliation AND MEMORANDUM RECONCILATION
PPT
340036916-American-Literature-Literary-Period-Overview.ppt
PPTX
HR Introduction Slide (1).pptx on hr intro
PDF
COST SHEET- Tender and Quotation unit 2.pdf
PDF
Outsourced Audit & Assurance in USA Why Globus Finanza is Your Trusted Choice
DOCX
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement
PPTX
CkgxkgxydkydyldylydlydyldlyddolydyoyyU2.pptx
PDF
Digital Marketing & E-commerce Certificate Glossary.pdf.................
PDF
Roadmap Map-digital Banking feature MB,IB,AB
PPTX
Amazon (Business Studies) management studies
PPTX
Principles of Marketing, Industrial, Consumers,
PDF
MSPs in 10 Words - Created by US MSP Network
PPTX
svnfcksanfskjcsnvvjknsnvsdscnsncxasxa saccacxsax
PPTX
2025 Product Deck V1.0.pptxCATALOGTCLCIA
PPT
Data mining for business intelligence ch04 sharda
PDF
DOC-20250806-WA0002._20250806_112011_0000.pdf
PDF
A Brief Introduction About Julia Allison
PDF
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
PDF
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
DOCX
Business Management - unit 1 and 2
Reconciliation AND MEMORANDUM RECONCILATION
340036916-American-Literature-Literary-Period-Overview.ppt
HR Introduction Slide (1).pptx on hr intro
COST SHEET- Tender and Quotation unit 2.pdf
Outsourced Audit & Assurance in USA Why Globus Finanza is Your Trusted Choice
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement
CkgxkgxydkydyldylydlydyldlyddolydyoyyU2.pptx
Digital Marketing & E-commerce Certificate Glossary.pdf.................
Roadmap Map-digital Banking feature MB,IB,AB
Amazon (Business Studies) management studies
Principles of Marketing, Industrial, Consumers,
MSPs in 10 Words - Created by US MSP Network
svnfcksanfskjcsnvvjknsnvsdscnsncxasxa saccacxsax
2025 Product Deck V1.0.pptxCATALOGTCLCIA
Data mining for business intelligence ch04 sharda
DOC-20250806-WA0002._20250806_112011_0000.pdf
A Brief Introduction About Julia Allison
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
Business Management - unit 1 and 2

ORTEC Case INFRABEL

  • 1. Complex regulations and an aging workforce led Infrabel, the owner and overseer of Belgium’s rail infrastructure, to look for a new planning and scheduling solution. The optimal scheduling and assignment of personnel was a vital necessity which could not be attainted using the company’s former tools and process. Infrabel chose to implement ORTEC Workforce Scheduling and was able to allocate the workload more evenly for over 3,500 traffic control employees stationed in signalling boxes and traffic control centers. Casesheet Challenges in the world of Infrabel  The schedule of 3,500 employees stationed in 340 signalling boxes was drawn up by hand by 52 planners working from 13 locations. This situation was no longer tenable, as complex labor regulations inevitably caused mistakes resulting in sub-optimal planning.  Sixty per cent of the company’s personnel will reach retirement age in the next ten years and will leave the company in the near future. Planners had to form blended teams in order to ensure that the knowledge and experience at each work location could be shared.  All of the relevant knowledge was stored in planners’ heads. A tool was needed to keep schedules more accessible, clear and manageable for everyone.  A number of complex health and safety regulations must be taken into consideration when drawing up schedules.  Social requirements stipulate that the workload has to be evenly distributed over all employees. Infrabel also wanted to introduce the principle of ‘healthy scheduling – healthy employees.’ How Infrabel aimed to optimize its world  With ORTEC Workforce Scheduling, Infrabel purposely chose a system that was not only capable of taking complex regulations into consideration, but could also cater to employee preferences.  Scheduling, time recording and cost allocation is now an integrated process at Infrabel. On the one hand, employee master data with relevant training information and safety requirements, is automatically updated in ORTEC Workforce Scheduling using an integration with Infrabel’s SAP ERP system. On the other, ORTEC Workforce Scheduling calculates costs per cost center and automatically transfers them to SAP for payroll and review purposes.  The company uses our solution’s Budget & Control and Employee Self-service modules. Industry Professional and public services About Infrabel Infrabel is the Belgian rail infra- structure administrator.  Total number of employees: 12,564  177 signalling boxes  Signal and traffic control staff work in shifts of 3 times 8 hours, 7 days on and 7 days off Infrabel Insights shown by this tool can mean so much for your company “This tool can do so much more than you think” Lucien De Keersmaeker
  • 2. The solution  ORTEC Workforce Scheduling The results + Optimal distribution of the work load + Less scheduling errors + Better implementation and monitoring of the complex HR regulations + More efficient scheduling process + Increased productivity + Increased customer and stakeholder satisfaction + Improved insight into the schedule + Ability to track who attended which training courses and when + Policy making is supported by improved access to information + Balanced teams of experienced and less experienced employees Scheduling structure ORTEC Workforce Scheduling takes workload constraints, as well as organizational and staffing needs into account to build a shift schedule per location. After the tasks have been performed and recorded in the solution, the model determining staffing levels can be adjusted as needed to improve the overall plan. Infrabel Manager Lucien De Keersmaeker says: “Thanks to ORTEC, we can constantly improve our schedule. Now, supply and demand are optimally balanced.” Objective scheduling With the introduction of ORTEC Workforce Scheduling, Infrabel can not only create optimal work schedules, but also accommodate employee preferences. “We now have a wonderful tool to support planners and to make their work much easier”, De Keersmaeker states. The company is very pleased with the system. “It’s great that we can optimally assign our personnel and increase our productivity. But one of the most important reasons driving this change has been to improve our employees’ satisfaction. ORTEC Workforce Scheduling does not only take very complex regulations into consideration; it also accounts for employees’ preferences and distributes the workload evenly. We can adequately react to ad hoc disruptions with the insight that we now have into our staff’s schedule. In addition, ORTEC Workforce Scheduling enables us to draw up an objective schedule.” Safety and Situational Knowledge Lucien De Keersmaeker adds: “ORTEC Workforce Scheduling truly offers the right support to planners to help them draw up a schedule and adjust it to deal with unexpected disruptions. It is immediately apparent who is available and who has the right competencies (and has completed the right training) with the new system, which is extremely important to Infrabel.” Management analyses “This tool can do so much more than you think”, says Lucien De Keersmaeker. “It allows for management analysis, gives us more insight, and makes corrections along the way as it analyzes trends.’ Want to learn more about our solutions? Contact us at: info@ortec.com www.ortec.com