PROPOSED KAPITI COAST EXPRESSWAY
                        OVERVIEW OF PROCESS


ROADS OF NATIONAL SIGNIFICANCE

The Minister of Transport has developed and issued a Government Policy
Statement (GPS) on Land Transport Funding 2009/10 – 2018/19 under the Land
Transport Management Act 2003.

Under the GPS the Government has listed seven initial Roads of National
Significance as a statement of national road development priorities. This
statement serves as a focus for investment to achieve economic growth and
productivity. The seven roads listed include the Wellington Northern Corridor
(Levin to Wellington) – State Highway 1.

According to the GPS, these listed roads are seven of New Zealand’s most
essential routes that require significant development to reduce congestion,
improve safety and support economic growth. The purpose of listing roads as
nationally significant is to ensure these priority roading developments are taken
fully into account when the NZTA develops the National Land Transport
Programme.

The GPS also states that planning for the future development of the land
transport network should reflect the importance of these roads from a national
perspective and the need to advance them quickly. The National Land Transport
Fund can be used for the future development of the Roads of National
Significance. Roads of National Significance will be part of the National
Infrastructure Plan.

PROPOSED EXPRESSWAY

The New Zealand Transport Agency (NZTA) have published proposals for
achieving a 4-lane 100kmh limited access expressway through the Kapiti District
from McKays Crossing to north of Otaki as part of the Wellington Northern
Corridor.

Two concept options have been presented, and NZTA are consulting on these
and have invited public submissions.

PROCESS

The proposed expressway is a significant public work that involves major
administrative and legal processes in addition to the investigation, design and
construction phases. In total the project could extend for many years.

Processes include:
2.



       DESIGNATIONS

       RESOURCE CONSENTS

       HERITAGE PROTECTION

       LAND ACQUISITION

The principal statutes that are involved are:

       THE RESOURCE MANAGEMENT ACT 1991

       THE PUBLIC WORKS ACT 1981

       THE HISTORIC PLACES ACT 1993

       GOVERNMENT ROADING POWERS ACT 1989

DESIGNATIONS (Resource Management Act 1991)

By designating land in a District Plan for a Public Work the ordinary provisions of
the District Plan are set aside in favour of the particular provisions of the
Designation.

Designations can be included in a District Plan in two ways:

1.     By a Requiring Authority issuing a Notice of Requirement (NOR) to the
       Local Authority

2.     By a Requiring Authority requesting that the Designation be included in
       at the time of a review of the District Plan.

The key matters of process for a NOR are:

       (a)    A NOR that includes:

              •    a full description of the proposed work

              •    the effects on the environment

              •    the alternatives considered

              •    a statement as to work/designation being reasonably
                   necessary to meet the objectives of the requiring authority
3.


       (b)    Public Notification and submissions

       (c)    A Hearing by the Council of the NOR and submissions

              Matters of enquiry at a hearing include:

                   •       Whether adequate consideration has been given to
                           alternative sites, routes, or methods of undertaking the
                           work

                   •       Whether the work and designation are reasonably
                           necessary for achieving the objectives of the requiring
                           authority for which the designation is sought

                   •       Any other matter the Council considers reasonably
                           necessary in order to make a recommendation on the
                           requirement.

       (d)    A recommendation by the Council to the Requiring Authority to:

                       •    confirm the NOR, or

                       •    modify the NOR, or

                       •    impose conditions, or

                       •    withdraw the NOR.

       (e)    Acceptance or rejection by the Requiring Authority of the Council’s
                    recommendation

       (f)    Appeal rights

Inclusion in a District Plan

A Council has an obligation when preparing or reviewing a district plan to ask
requiring authorities for any proposed designations.

A Council has a discretion to include a requirement in a Proposed District Plan if
it is notifying that plan within 40 working days of receipt of the requirement.

Current thinking on the District Plan Review is that it could be notified between
2011 and 2012.
4.


CALL IN POWERS

A Notice of Requirement can be CALLED IN by the Minister if it relates to matters
of National Importance.

These powers currently exist but are being strengthened and made more formal
under the proposed amendments to the Resource Management Act 1991.

The attached flow charts show the existing and proposed processes.

The key points about a call in (as proposed) are:

      •     The Minister can refer application to either the Environment Court or
            a Board of Enquiry

      •     Board of Enquiry has a 9-18 month maximum time frame depending
            on the initial referral

      •     Environment court has no time frame

      •     The Local Authority has a limited role basically that of a submitter
            although it has the role of preparing a report on “key planning
            issues”.

      •     Board of Enquiry or the Environment Court may waive the
            requirement for an outline plan - further potential for less Council
            involvement.

      •     Council is required to implement final decision

RESOURCE CONSENTS (Resource Management Act 1991)

The proposed expressway could be the subject of an application for resource
consent but this is extremely unlikely given the advantages to the Crown of the
designation process.

It should be noted that the designation does not cover resource consents that are
required under any regional plans for example earthworks, discharges,
diversions/piping of water courses etc.

However, it is expected that these regional consents would be “called in” along
with the NOR so that the “one stop shop” principle was applied.
5.


HERITAGE PROTECTION (Historic Place At 1993)

The Historic Places Act 1993 is an Act to promote the identification, protection,
preservation, and conservation of the historical and cultural heritage of New
Zealand.

All pre-1900 archaeological sites remain protected in designated land and an
authority from the New Zealand Historic Places Trust (NZHPT) is required to
destroy, damage or modify any archaeological site under the Historic Places Act
1993.

Applications for authority to destroy, damage or modify any archaeological site
are made to the NZHPT and are separate from applications for resource or
designations.

NZHPT advise that:

      “Requiring authorities should be encouraged to seek essential
      designations outside of, and sufficiently distant from, sensitive historic
      heritage areas.

      Where land must be designated over, or near, historic heritage, particular
      attention should be paid to the extent of the area involved, the specific
      location, and the nature of activity involved, so that adverse impacts on
      historic heritage are minimised to the greatest practical extent. This will
      require a heritage impact assessment (and normally an archaeological
      assessment).”

LAND ACQUISITION (Public Works Act 1981)

The Minister (in this case) must make all reasonable endeavours to negotiate in
good faith with the owners of land to be acquired in an attempt to reach
agreements for the acquisition of the land within 3 months.

Where voluntary agreement cannot be reached on the purchase of land for a
public work, the Public Works Act provides for compulsory acquisition by the
Crown through the Minister of Lands.

If the Crown intends to compulsorily acquire land the land owners have the right
of objection to the Environment Court.

If the Environment Court disallows an objection, subject to appeals on points of
law only, construction may begin.

The right of objection to the Environment Court relates to the taking only not any
compensation which, in the absence of agreement, is determined by the Land
Valuation Tribunal.
6.


LIMITED ACCESS ROAD (Government Roading Powers Act 1989)

Sections 88 -98 of the Government Roading Powers Act 1989 provide for the
creation and maintenance of Limited Access Roads (LAR). Properties fronting
such roads once they are declared that do not have an alternative access are
entitled to one only crossing place.

However on new LAR’s the roading agency usually ensures that all properties
have alternate access such that no access to or from the LAR is necessary or
permitted.

LAR’s are not legal road for the purpose of subdivision.

There is no right of objection or appeal against their creation but owners who are
adversely affected are entitled to compensation under the Public Works Act
1981.

PROCESS ISSUES – WESTERN OPTION

Although the NZTA report suggests that using part of the WLR designation
makes the process shorter and less onerous, that is not necessarily the case.

Even assuming that the Council was prepared to transfer the designation to the
Crown, the current designation would not be able to be used because:

      •     the designation is not for a Limited Access Road;

      •     it does not meet expressway design standards;

      •     the noise mitigation measures may not be appropriate for a high
            speed four land road;

      •     additional land is required to accommodate an expressway.

It is most likely that a new designation would need to be obtained.

Significant opposition could be anticipated to a designation for a road with any
greater dimensions or different geometry than the existing designation,
particularly in the proximity of the Waikanae River crossing and because of the
potential for significant dislocation of the local roading network.
7.



TIMELINES

                                                             Time in Months     0
                                                                       Total Time
                                   DESIGNATION
1.   Investigation and Design                                       24           24
2.   Notification, further information submissions                   6           30
3.   Board of Enquiry/Environment Court decision                     9           39
4.   Appeal to High Court                                            6           45
                                 LAND ACQUISITION
5.   Good Faith Negotiations                                         3           48
6.   Objection determined by Environment Court                      12           60
                                  CONSTRUCTION
     Minimum construction period                                    60          120

Notes:

1.       Lead time for investigation and design is estimate – could be longer

2.       Times assume “fast track” call in

3.       Land acquisition commences when designation is certain. To do so earlier
         create high risk.




Stuart Kinnear Consultancy Limited
3 September 2009

More Related Content

PDF
Long Range Property Management Plan
PDF
Final EIS Appendix I
PDF
Public Comments on Zoning Bylaw Amendment - 1620 and 1636 maple grove road
PPT
2-2_2. master plans bulgaria 2012
PPTX
PDF
PPT
UK Nuclear New Build Power Stations - Nationally Significant Infrastructure P...
Long Range Property Management Plan
Final EIS Appendix I
Public Comments on Zoning Bylaw Amendment - 1620 and 1636 maple grove road
2-2_2. master plans bulgaria 2012
UK Nuclear New Build Power Stations - Nationally Significant Infrastructure P...

What's hot (18)

PDF
FERC Approval for ESNG's White Oak Mainline Expansion Project
PDF
FERC Approval for ESNG's System Reliability Project
PPT
Chatham rolling knolls_3-15-10
PPTX
Keynote & on stage interview (carbo)
PDF
Planning Process. Nairobi City County
PDF
NEXUS Gas Transmission FERC Pre-Filing, Dec 30, 2014
PDF
Preliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdf
PDF
Kitsap draft smp conforming w highlights-1
PDF
Zippin_HCPs_Wetlands_03-04-16
PDF
2014 AB-SP-Masterplan_Final-Outcome
PPT
City Council March 1 - Planning Presentation
PDF
Golden Rock Products Inc. v. British Columbia 2014 BCSC 1355, 2014 BCSC 2236
PDF
A Unique Opportunity: Quebec’s Plan Nord
PDF
Dedicated tax system
PDF
Community Revitalization Planning Implementation Best Practice
PDF
Loganlea Neighbourhood Plan Planning Report October 2011 Final Excluding Appe...
PPTX
M9 presentation to president 1 6-12
PPTX
EDPP Legislative Update by Jeremy Browner
FERC Approval for ESNG's White Oak Mainline Expansion Project
FERC Approval for ESNG's System Reliability Project
Chatham rolling knolls_3-15-10
Keynote & on stage interview (carbo)
Planning Process. Nairobi City County
NEXUS Gas Transmission FERC Pre-Filing, Dec 30, 2014
Preliminary_Design_Report_Upper_Fintry_Valley_of_the_Sun___TRUE_2010.pdf
Kitsap draft smp conforming w highlights-1
Zippin_HCPs_Wetlands_03-04-16
2014 AB-SP-Masterplan_Final-Outcome
City Council March 1 - Planning Presentation
Golden Rock Products Inc. v. British Columbia 2014 BCSC 1355, 2014 BCSC 2236
A Unique Opportunity: Quebec’s Plan Nord
Dedicated tax system
Community Revitalization Planning Implementation Best Practice
Loganlea Neighbourhood Plan Planning Report October 2011 Final Excluding Appe...
M9 presentation to president 1 6-12
EDPP Legislative Update by Jeremy Browner
Ad

Viewers also liked (11)

PPS
Seguridad Vial: Espejo
PPTX
Product advice from a dubious source
PPTX
AIESEC Explore Program at a Glance
PDF
Camelot & Greendale Q&A with Nathan Guy
PDF
Aromcom - Cars Air Fresheners Catalog
PDF
Niche Konsult Limited Section By Section Analysis Of Cyber Security And Infor...
PPT
Cardiovascular system presentation.bert
PPS
Teléfono Celular Mata a la Gente
PPTX
AIESEC Explore Program at a Glance
PDF
Hipoglucemia junio 2015
Seguridad Vial: Espejo
Product advice from a dubious source
AIESEC Explore Program at a Glance
Camelot & Greendale Q&A with Nathan Guy
Aromcom - Cars Air Fresheners Catalog
Niche Konsult Limited Section By Section Analysis Of Cyber Security And Infor...
Cardiovascular system presentation.bert
Teléfono Celular Mata a la Gente
AIESEC Explore Program at a Glance
Hipoglucemia junio 2015
Ad

Similar to Overview Of Process (20)

PPTX
Part 1 of 3.3 & 3.6 booklet
PPTX
Planning act seminar
PPT
Section 106 Considerations for Electric Infrastructure Projects
PPT
2012 ceqa presentation for ce class
PDF
Post pn-173
PDF
Uic Nepa
PDF
Shreveport Louisiana Retrofit Narrative
PPTX
Exploring the UK Policy and Its Impact on Archaeology
PDF
Strengthening Our Union
PDF
JBA Consulting Guide to Environmental Assessment
PDF
A guide to planning and logistics - Babergh
PDF
How To Control Development_Russ Stevenson presentation
DOCX
EIA Consultancy
PPT
Our New Transportation Legislation
PPT
New Zealand Green Plan
PPT
An introduction to planning (July 2013)
PPT
Plan preparation techniques
PPTX
Investigations – General Overview
PPTX
Shine Webinar, National Planning, 25 April
PDF
nationally significant Infrastructure projects Jan2015
Part 1 of 3.3 & 3.6 booklet
Planning act seminar
Section 106 Considerations for Electric Infrastructure Projects
2012 ceqa presentation for ce class
Post pn-173
Uic Nepa
Shreveport Louisiana Retrofit Narrative
Exploring the UK Policy and Its Impact on Archaeology
Strengthening Our Union
JBA Consulting Guide to Environmental Assessment
A guide to planning and logistics - Babergh
How To Control Development_Russ Stevenson presentation
EIA Consultancy
Our New Transportation Legislation
New Zealand Green Plan
An introduction to planning (July 2013)
Plan preparation techniques
Investigations – General Overview
Shine Webinar, National Planning, 25 April
nationally significant Infrastructure projects Jan2015

Recently uploaded (20)

PDF
DASA ADMISSION 2024_FirstRound_FirstRank_LastRank.pdf
PPTX
The various Industrial Revolutions .pptx
PDF
Developing a website for English-speaking practice to English as a foreign la...
PDF
NewMind AI Weekly Chronicles - August'25-Week II
PPTX
TechTalks-8-2019-Service-Management-ITIL-Refresh-ITIL-4-Framework-Supports-Ou...
PDF
1 - Historical Antecedents, Social Consideration.pdf
PPTX
O2C Customer Invoices to Receipt V15A.pptx
PDF
A novel scalable deep ensemble learning framework for big data classification...
PDF
Univ-Connecticut-ChatGPT-Presentaion.pdf
PPTX
Modernising the Digital Integration Hub
PDF
Getting started with AI Agents and Multi-Agent Systems
PPTX
TLE Review Electricity (Electricity).pptx
PPTX
observCloud-Native Containerability and monitoring.pptx
PPTX
OMC Textile Division Presentation 2021.pptx
PDF
Enhancing emotion recognition model for a student engagement use case through...
PPTX
Chapter 5: Probability Theory and Statistics
PDF
ENT215_Completing-a-large-scale-migration-and-modernization-with-AWS.pdf
PDF
Getting Started with Data Integration: FME Form 101
PDF
Assigned Numbers - 2025 - Bluetooth® Document
PPT
What is a Computer? Input Devices /output devices
DASA ADMISSION 2024_FirstRound_FirstRank_LastRank.pdf
The various Industrial Revolutions .pptx
Developing a website for English-speaking practice to English as a foreign la...
NewMind AI Weekly Chronicles - August'25-Week II
TechTalks-8-2019-Service-Management-ITIL-Refresh-ITIL-4-Framework-Supports-Ou...
1 - Historical Antecedents, Social Consideration.pdf
O2C Customer Invoices to Receipt V15A.pptx
A novel scalable deep ensemble learning framework for big data classification...
Univ-Connecticut-ChatGPT-Presentaion.pdf
Modernising the Digital Integration Hub
Getting started with AI Agents and Multi-Agent Systems
TLE Review Electricity (Electricity).pptx
observCloud-Native Containerability and monitoring.pptx
OMC Textile Division Presentation 2021.pptx
Enhancing emotion recognition model for a student engagement use case through...
Chapter 5: Probability Theory and Statistics
ENT215_Completing-a-large-scale-migration-and-modernization-with-AWS.pdf
Getting Started with Data Integration: FME Form 101
Assigned Numbers - 2025 - Bluetooth® Document
What is a Computer? Input Devices /output devices

Overview Of Process

  • 1. PROPOSED KAPITI COAST EXPRESSWAY OVERVIEW OF PROCESS ROADS OF NATIONAL SIGNIFICANCE The Minister of Transport has developed and issued a Government Policy Statement (GPS) on Land Transport Funding 2009/10 – 2018/19 under the Land Transport Management Act 2003. Under the GPS the Government has listed seven initial Roads of National Significance as a statement of national road development priorities. This statement serves as a focus for investment to achieve economic growth and productivity. The seven roads listed include the Wellington Northern Corridor (Levin to Wellington) – State Highway 1. According to the GPS, these listed roads are seven of New Zealand’s most essential routes that require significant development to reduce congestion, improve safety and support economic growth. The purpose of listing roads as nationally significant is to ensure these priority roading developments are taken fully into account when the NZTA develops the National Land Transport Programme. The GPS also states that planning for the future development of the land transport network should reflect the importance of these roads from a national perspective and the need to advance them quickly. The National Land Transport Fund can be used for the future development of the Roads of National Significance. Roads of National Significance will be part of the National Infrastructure Plan. PROPOSED EXPRESSWAY The New Zealand Transport Agency (NZTA) have published proposals for achieving a 4-lane 100kmh limited access expressway through the Kapiti District from McKays Crossing to north of Otaki as part of the Wellington Northern Corridor. Two concept options have been presented, and NZTA are consulting on these and have invited public submissions. PROCESS The proposed expressway is a significant public work that involves major administrative and legal processes in addition to the investigation, design and construction phases. In total the project could extend for many years. Processes include:
  • 2. 2. DESIGNATIONS RESOURCE CONSENTS HERITAGE PROTECTION LAND ACQUISITION The principal statutes that are involved are: THE RESOURCE MANAGEMENT ACT 1991 THE PUBLIC WORKS ACT 1981 THE HISTORIC PLACES ACT 1993 GOVERNMENT ROADING POWERS ACT 1989 DESIGNATIONS (Resource Management Act 1991) By designating land in a District Plan for a Public Work the ordinary provisions of the District Plan are set aside in favour of the particular provisions of the Designation. Designations can be included in a District Plan in two ways: 1. By a Requiring Authority issuing a Notice of Requirement (NOR) to the Local Authority 2. By a Requiring Authority requesting that the Designation be included in at the time of a review of the District Plan. The key matters of process for a NOR are: (a) A NOR that includes: • a full description of the proposed work • the effects on the environment • the alternatives considered • a statement as to work/designation being reasonably necessary to meet the objectives of the requiring authority
  • 3. 3. (b) Public Notification and submissions (c) A Hearing by the Council of the NOR and submissions Matters of enquiry at a hearing include: • Whether adequate consideration has been given to alternative sites, routes, or methods of undertaking the work • Whether the work and designation are reasonably necessary for achieving the objectives of the requiring authority for which the designation is sought • Any other matter the Council considers reasonably necessary in order to make a recommendation on the requirement. (d) A recommendation by the Council to the Requiring Authority to: • confirm the NOR, or • modify the NOR, or • impose conditions, or • withdraw the NOR. (e) Acceptance or rejection by the Requiring Authority of the Council’s recommendation (f) Appeal rights Inclusion in a District Plan A Council has an obligation when preparing or reviewing a district plan to ask requiring authorities for any proposed designations. A Council has a discretion to include a requirement in a Proposed District Plan if it is notifying that plan within 40 working days of receipt of the requirement. Current thinking on the District Plan Review is that it could be notified between 2011 and 2012.
  • 4. 4. CALL IN POWERS A Notice of Requirement can be CALLED IN by the Minister if it relates to matters of National Importance. These powers currently exist but are being strengthened and made more formal under the proposed amendments to the Resource Management Act 1991. The attached flow charts show the existing and proposed processes. The key points about a call in (as proposed) are: • The Minister can refer application to either the Environment Court or a Board of Enquiry • Board of Enquiry has a 9-18 month maximum time frame depending on the initial referral • Environment court has no time frame • The Local Authority has a limited role basically that of a submitter although it has the role of preparing a report on “key planning issues”. • Board of Enquiry or the Environment Court may waive the requirement for an outline plan - further potential for less Council involvement. • Council is required to implement final decision RESOURCE CONSENTS (Resource Management Act 1991) The proposed expressway could be the subject of an application for resource consent but this is extremely unlikely given the advantages to the Crown of the designation process. It should be noted that the designation does not cover resource consents that are required under any regional plans for example earthworks, discharges, diversions/piping of water courses etc. However, it is expected that these regional consents would be “called in” along with the NOR so that the “one stop shop” principle was applied.
  • 5. 5. HERITAGE PROTECTION (Historic Place At 1993) The Historic Places Act 1993 is an Act to promote the identification, protection, preservation, and conservation of the historical and cultural heritage of New Zealand. All pre-1900 archaeological sites remain protected in designated land and an authority from the New Zealand Historic Places Trust (NZHPT) is required to destroy, damage or modify any archaeological site under the Historic Places Act 1993. Applications for authority to destroy, damage or modify any archaeological site are made to the NZHPT and are separate from applications for resource or designations. NZHPT advise that: “Requiring authorities should be encouraged to seek essential designations outside of, and sufficiently distant from, sensitive historic heritage areas. Where land must be designated over, or near, historic heritage, particular attention should be paid to the extent of the area involved, the specific location, and the nature of activity involved, so that adverse impacts on historic heritage are minimised to the greatest practical extent. This will require a heritage impact assessment (and normally an archaeological assessment).” LAND ACQUISITION (Public Works Act 1981) The Minister (in this case) must make all reasonable endeavours to negotiate in good faith with the owners of land to be acquired in an attempt to reach agreements for the acquisition of the land within 3 months. Where voluntary agreement cannot be reached on the purchase of land for a public work, the Public Works Act provides for compulsory acquisition by the Crown through the Minister of Lands. If the Crown intends to compulsorily acquire land the land owners have the right of objection to the Environment Court. If the Environment Court disallows an objection, subject to appeals on points of law only, construction may begin. The right of objection to the Environment Court relates to the taking only not any compensation which, in the absence of agreement, is determined by the Land Valuation Tribunal.
  • 6. 6. LIMITED ACCESS ROAD (Government Roading Powers Act 1989) Sections 88 -98 of the Government Roading Powers Act 1989 provide for the creation and maintenance of Limited Access Roads (LAR). Properties fronting such roads once they are declared that do not have an alternative access are entitled to one only crossing place. However on new LAR’s the roading agency usually ensures that all properties have alternate access such that no access to or from the LAR is necessary or permitted. LAR’s are not legal road for the purpose of subdivision. There is no right of objection or appeal against their creation but owners who are adversely affected are entitled to compensation under the Public Works Act 1981. PROCESS ISSUES – WESTERN OPTION Although the NZTA report suggests that using part of the WLR designation makes the process shorter and less onerous, that is not necessarily the case. Even assuming that the Council was prepared to transfer the designation to the Crown, the current designation would not be able to be used because: • the designation is not for a Limited Access Road; • it does not meet expressway design standards; • the noise mitigation measures may not be appropriate for a high speed four land road; • additional land is required to accommodate an expressway. It is most likely that a new designation would need to be obtained. Significant opposition could be anticipated to a designation for a road with any greater dimensions or different geometry than the existing designation, particularly in the proximity of the Waikanae River crossing and because of the potential for significant dislocation of the local roading network.
  • 7. 7. TIMELINES Time in Months 0 Total Time DESIGNATION 1. Investigation and Design 24 24 2. Notification, further information submissions 6 30 3. Board of Enquiry/Environment Court decision 9 39 4. Appeal to High Court 6 45 LAND ACQUISITION 5. Good Faith Negotiations 3 48 6. Objection determined by Environment Court 12 60 CONSTRUCTION Minimum construction period 60 120 Notes: 1. Lead time for investigation and design is estimate – could be longer 2. Times assume “fast track” call in 3. Land acquisition commences when designation is certain. To do so earlier create high risk. Stuart Kinnear Consultancy Limited 3 September 2009