WATER USERS ASSOCIATION (WUA) REGISTRATION
                  DETAILS

Name of   Total CCA     No. of    Area benefited
Project    (in Ha.)     WUAs         (in Ha.)

PANAM       36405        40           12261

KARAD        6190         5            727

HADAF        5238         6           1935

Total :     47833        51           14923




                                                   1
IRRIGATION PROJECTS IN
 PANCHMAHAL DISTRICT

Panam Project Circle, Godhra

      PANAM

      HADAF

      KARAD

Kadana Project Circle, D’ Colony

      KADANA

      BHADAR (P)

      KABUTARI

Vadodara Irri. Circle, Vadodara

      DEV

      SUKHI

                                   2
Deputy Exe. Engineer &           PANAM PROJECT                  Office Superintendent
  Personal Secretary
                                 CIRCLE, GODHRA


Panam Project Division,                              Panam Irrigation Division,
                               Quality Control Sub           Godhra
       Godhra
                                Division, Godhra



    Panam Dam Sub Division,                                   Panam Irrigation Sub
         Panam Dam                                              Division, Shahera



   Panam Project Sub Division                            Panam Irrigation Sub Division
         No.2, Godhra                                        No.1, Morva (Rena)



      Irrigation Project Sub                             Panam Irrigation Sub Division
      Division No.2, Godhra                                    No.2, Veganpur



   Koliyari Sub Division No.2,                           Panam Irrigation Sub Division
         Morva (Hadaf)                                          No.3, Godhra


                                                                                         3
PANAM PROJECT CIRCLE
Panam High Level Canal Project, Command Area:
18000 ha., Estimated Cost: 200 Crore.
Dam Safety works of Panam, Hadaf & Karad
Projects
Irrigation Management and M & R of 100 km long
Panam Main Canal, 800 km Network of Distributory
& Minors.
Panam Irrigation Scheme : 36405 Ha. Command
Area
Karad Irrigation Scheme : 6190 Ha. Command Area.
Hadaf Irrigation Scheme : 5238 Ha. Command Area.
                                                   4
PANAM PROJECT CIRCLE
Santroad Weir : 2000 Ha. Command Area.

Constg. of Big & Small Checkdams on River & drains of
Panchmahal District.

Deepening of Big & Small Tanks of Panchmahals
District.

“Mahatma     Gandhi      National   Rural   Employment
Guarantee Act” works
   Desilting in Canals, Jungle Cutting, Earthwork
   Checkdam Desilting
Lift Irrigation Scheme

Restoration of Stepwells.
                                                         5
INDEX MAP   6
PANAM HIGH LEVEL CANAL PROJECT




 PANAM HIGH LEVEL CANAL – HEAD REGULATOR   7
PANAM HIGH LEVEL CANAL PROJECT




         TUNNEL ENTRANCE     8
INAUGURATION OF TUNNEL BY
HON. CHIEF MINISTER, GUJARAT
                       Dt. 25/01/2009




                                        9
10
EXCAVATION WORK   11
LEFT BANK MAIN CANAL   12
BRIDGE TYPE ROAD CROSSING   13
BOX TYPE ROAD CROSSING   14
VARIOUS OBSTRUCTIONS – HOUSES, WELLS, PROTECTED TREES




                                                    15
HARD ROCK




OVER BURDEN
                          16
PANAM DAM
Length of Masonary Dam – 189 m.
Year of Construction - 1977




10 Radial Gates – Size: 14.93 m x 11.28 m.
Max. Flood Discharge – 356000 Cusecs.
                                             17
PANAM DAM
Villages benefited - 132,

Benefited Area- 36405 Ha.

Length of Main Canal - 99.725 km

Length of Distriburoty & Minors - 800 km

Irrigation started - 1980

Canal bed Power House - 2 Mega watt

Rehabilitation of 42 effected villages
                                           18
PANAMyear 2004 : 3.56 Lacs cusecs
Max. discharge released in the
                               DAM




                                                 19
PANAMyear 2004 : 3.56 Lacs cusecs
Max. discharge released in the
                               DAM




                                                 20
PANAM DAM




INSPECTION GALLARY
                     21
PANAM DAM - DAM SAFETY WORKS
              Cleaning of Drainage Gallery




      Before...                              After...




                                                        22
HADAF DAM
Length of Masonary Dam – 89 m.       Year of Construction - 1986




                     5 Radial Gates – Size: 14.95 m x 10.64 m.
                     Max. Flood Discharge – 162000 Cusecs.
                                                                 23
HADAF DAM
Benefited villages–21, Benefited Area–5238 ha.
Rehabilitation of 582 families of 7 villages.




                                                 24
HADAF DAM




            25
KARAD DAM
Length of Earthen Dam - 1019 m.
Year of Construction - 1958
Benefited villages- 25
Benefited Area - 6190 ha.




                                  26
KARAD DAM
                      Benefited villages- 25
                      Benefited Area - 6190 ha.




માટી બંધ પર અંશતઃ માટીકામ કરવામાં આવેલ છે .
                                                  27
KARAD DAM
               Over flow on 09.09.2010




  Fuse Gates
                                         28
SANTROAD WEIR                       Length of Weir: 280 m.
                                    Year of Construction : 2008
                                    Storage Capacity : 117 Mcft.




  Benefited Area 2000 ha. of 4 villages by Lift Irrigation.
  No Land Acquisition required.
                                                                   29
PANAM PROJECT

                                        No. of
Sr.                   Taluka                       Benefited
No.     District                      benefited   Area (in Ha.)
                                       villages

                   Lunawada              28          8150

                   Shahera               47          5889
1     Panchmahal
                   Godhra                28          13264

                   Kalol                 16          4214

2      Vadodara    Savali                13          4888

                           Total ::     132          36405
                                                                  30
PLANNED CROPPING PATTERN


                            Tobacco 2%
        Tw o Season Cotton 8%
                                             Kharif Paddy 19%

   Rabi Vegetable 10%                                              Kharif   65%
                                                                     Rabi   52%

Oil Seeds/Pulses 3%                                            Two Season   13%
                                                                   TOTAL    130%


                                                     Kharif Hybrid Bajari 19%



        Rabi Wheat 27%

                                            Kharif Maize 10%
                              Kharif Jow ar 2%




                                                                                   31
MAJOR DISTRIBUTORIES OF PANAM PROJECT

Sr.       Name of       Off taking Length of    C.C.A.     Major Crops
No.      Distributory   from Main   Distry.    (in Ha.)
                        Canal (km)   (km)
1     Ladvel              31.94      11.90      2220         Paddy
2     23/R Rabadia        38.30      4.04       2017         Paddy
3     24/R Morva          52.81      8.45       3481      Paddy, Maize
4     25/R Kabirpur       54.33      14.81      4554      Paddy, Maize
5     29/R                71.80      11.14      1591      Paddy, Wheat
6     32/R.A.             82.01      14.48      5099        Tobacco,
                                                          Cotton, Wheat
7     32/R.B.             83.16      14.00      1488         Wheat
8     34/R Sansoli        92.05      5.20       1794         Maize

                                                                          32
Irrigation benefits given to affected people of
Narmada Project in Khajuri Colony under Panam Command




                                                        33
Obstructions in Irrigation Management

Main canal from Ch. 0 to 30 km flows parallel to Panam River.
Main Canal is contour canal. One side is hill & Other side Panam River
High banking of 12 to 20 m.




                                                                         34
Obstructions in Irrigation Management
Heavy seepage from Banking
Change of cropping pattern in the initial reach due to assured irrigation.




                                                                             35
Frequent sliding of Rock debris in Main canal during monsoon.
                                                                36
Removal of Rock Debris




                    After




Before




                            37
Renovation works of Canal




Panam Main Canal



                                38
Renovation works of Canal

                  Karad Main Canal


                        After




   Before
Renovation works of Canal

                  Minor No.1

                     After




   Before
Renovation works of Canal




                            41
Restoration of Structures

             Karad Main Canal Ch. 3 KM
N.R.E.G.A. Works

           Desilting work in
          Panam Main Canal




                               43
N.R.E.G.A. Works




Karad Main Canal
N.R.E.G.A. Works




Karad Canal
BIG CHECKDAM
               RAMNATH




                         46
BIG CHECKDAM
               MOKAL




                       47
SMALL CHECKDAM




     Karada      48
DEEPENING OF PONDS




                     49
DEEPENING OF PONDS
              VILLAGE - UCHET
LIFT IRRIGATION SCHEME

                BORIYAVI




                           51
LIFT IRRIGATION SCHEME
              SARADIA-DHAMNOD




                                52
TRAINING




           53
TRAINING




           54
PARTICIPATORY IRRIGATION MANAGEMENT


Sr No    Name of Scheme   Total C.C.A. (Ha.)   No. of WUAs   Area (Ha.)




 1      Panam                 36405               35         11200


 2      Karad                  6190               05           730


 3      Hadaf                  5238               06          1950


              TOTAL:          47833               46         13880

                                                                          55
PARTICIPATORY IRRIGATION MANAGEMENT




                                      56
PARTICIPATORY IRRIGATION MANAGEMENT




    Before               After




                                      57

More Related Content

PPTX
IRRIGATION ENGINEERING
PPTX
Valuation in Civil Engineering
PPTX
Lecture 4 - selection of contract forms
PPTX
Runoff and Hydrograph
PPTX
Innovative Applications of Pervious Concrete
PDF
Sardar Sarovar Dam
PPT
Water requirements of crops
PPT
Soil exploration part i
IRRIGATION ENGINEERING
Valuation in Civil Engineering
Lecture 4 - selection of contract forms
Runoff and Hydrograph
Innovative Applications of Pervious Concrete
Sardar Sarovar Dam
Water requirements of crops
Soil exploration part i

What's hot (20)

PPTX
Cofferdams
PDF
Water resources engineering of ancient india
PPT
Site Analysis
PDF
Chapter Four -4 Highway Drainage slide.pdf
PPTX
presentation on M.H.A.D.A. housing
PPT
Tendering in construction introduction
PPTX
idukki Hydro power project
PPTX
Environmental Impacts of Groundwater Control and Dewatering
PPTX
Ppt of design of dams
PDF
NOTICE INVITING TENDER
PPTX
S curve hydrograph
PDF
Lab reports transportation engineering i
PDF
Construction safety management_Construction Management (2180611) (Semester-8)...
PPTX
Design consideration Of Earth Dams
PPTX
Chapter 4.3 well foundation-final-ppt
PDF
Soil Densification is a Strategic Need for the Palm Island Development Sustai...
PDF
Irrigation
PPTX
Construction project delivery methods
PPTX
Different types of water pump
PPTX
Construction Management Introduction ppt
Cofferdams
Water resources engineering of ancient india
Site Analysis
Chapter Four -4 Highway Drainage slide.pdf
presentation on M.H.A.D.A. housing
Tendering in construction introduction
idukki Hydro power project
Environmental Impacts of Groundwater Control and Dewatering
Ppt of design of dams
NOTICE INVITING TENDER
S curve hydrograph
Lab reports transportation engineering i
Construction safety management_Construction Management (2180611) (Semester-8)...
Design consideration Of Earth Dams
Chapter 4.3 well foundation-final-ppt
Soil Densification is a Strategic Need for the Palm Island Development Sustai...
Irrigation
Construction project delivery methods
Different types of water pump
Construction Management Introduction ppt
Ad

Similar to Panam Project Presentation (20)

PDF
Recommendations of the Water Taskforce by Steve Davies, PSSP
PDF
Understanding Northern China's Water Crisis
PPTX
The Influence of Dams on Downstream Flows and the Potential Effects on Liveli...
PPT
MITRA BAIF
PPTX
Canal Irrigation
PPT
SGVK Jharkhand
PPTX
MAJOR AND MINOR IRRIGATION PROJECTS.pptx
PDF
Delineation of irrigation infrastructural, potential and land use
PPTX
River Basin Planning of Baitarani Sub-Basin
PPTX
Irrigation System Of Pakistan
PPTX
Irrigation systems of tamilnadu
PDF
Rethinking water storage for climate change adaptation in Sub-Saharan Africa
PPTX
Sardar sarovar dam
PPT
Yuva Mitra
PDF
Irrigation Project Report, CTEVT, Diploma in Civil engineering
PDF
Sri Lanka; Rain Water Harvesting for Urban Buildings in Sri Lanka
 
PPTX
Flood Control Challenges for Large Hydroelectric Reservoirs
PDF
Potential and Challenges of Indo-Ganges basin
Recommendations of the Water Taskforce by Steve Davies, PSSP
Understanding Northern China's Water Crisis
The Influence of Dams on Downstream Flows and the Potential Effects on Liveli...
MITRA BAIF
Canal Irrigation
SGVK Jharkhand
MAJOR AND MINOR IRRIGATION PROJECTS.pptx
Delineation of irrigation infrastructural, potential and land use
River Basin Planning of Baitarani Sub-Basin
Irrigation System Of Pakistan
Irrigation systems of tamilnadu
Rethinking water storage for climate change adaptation in Sub-Saharan Africa
Sardar sarovar dam
Yuva Mitra
Irrigation Project Report, CTEVT, Diploma in Civil engineering
Sri Lanka; Rain Water Harvesting for Urban Buildings in Sri Lanka
 
Flood Control Challenges for Large Hydroelectric Reservoirs
Potential and Challenges of Indo-Ganges basin
Ad

More from Tushar Dholakia (20)

PDF
Iirs rstechnologypdf
PDF
Iirs overview -Remote sensing and GIS application in Water Resources Management
PDF
Iirs lecure notes for Remote sensing –An Overview of Decision Maker
PDF
Iirs lecturers & gis for regional planning
PDF
Iirs lecture space inputs to disaster management in india
PDF
Operational Remote sensing Applications
PDF
Iirs Institutions-Geospatial services in India
PDF
Iirs Artificial Naural network based Urban growth Modeling
PDF
Iirs district plan1
PDF
Iirs remote sensing data policy (RSDP)
PDF
Iirs Role of Remote sensing and GIS in Ground water studies
PDF
Iirs gps dmc 2010
PDF
Iirs - Overview of GIS
PDF
Iirs Remote sensing and GIS application in Agricultur- Indian Experience
PDF
Iirs Remote sensing application in Urban Planning
PDF
Iirs- Opensources software solutions and Data services for Domain
PDF
effective use of consultant
PDF
Nashik photos
PDF
LARGE SCALE INSTALLATION OF SUBSURFACE DRAINAGE SYSTEM
PDF
Design Aspects of Gates of Dam
Iirs rstechnologypdf
Iirs overview -Remote sensing and GIS application in Water Resources Management
Iirs lecure notes for Remote sensing –An Overview of Decision Maker
Iirs lecturers & gis for regional planning
Iirs lecture space inputs to disaster management in india
Operational Remote sensing Applications
Iirs Institutions-Geospatial services in India
Iirs Artificial Naural network based Urban growth Modeling
Iirs district plan1
Iirs remote sensing data policy (RSDP)
Iirs Role of Remote sensing and GIS in Ground water studies
Iirs gps dmc 2010
Iirs - Overview of GIS
Iirs Remote sensing and GIS application in Agricultur- Indian Experience
Iirs Remote sensing application in Urban Planning
Iirs- Opensources software solutions and Data services for Domain
effective use of consultant
Nashik photos
LARGE SCALE INSTALLATION OF SUBSURFACE DRAINAGE SYSTEM
Design Aspects of Gates of Dam

Recently uploaded (20)

PDF
HVAC Specification 2024 according to central public works department
PPTX
What’s under the hood: Parsing standardized learning content for AI
DOCX
Cambridge-Practice-Tests-for-IELTS-12.docx
PDF
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
PDF
LIFE & LIVING TRILOGY- PART (1) WHO ARE WE.pdf
PPTX
B.Sc. DS Unit 2 Software Engineering.pptx
PDF
MICROENCAPSULATION_NDDS_BPHARMACY__SEM VII_PCI .pdf
PDF
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 1)
PPTX
Share_Module_2_Power_conflict_and_negotiation.pptx
PPTX
Introduction to pro and eukaryotes and differences.pptx
PDF
FORM 1 BIOLOGY MIND MAPS and their schemes
PDF
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
PDF
BP 505 T. PHARMACEUTICAL JURISPRUDENCE (UNIT 1).pdf
PDF
My India Quiz Book_20210205121199924.pdf
PPTX
Education and Perspectives of Education.pptx
PDF
What if we spent less time fighting change, and more time building what’s rig...
PDF
English Textual Question & Ans (12th Class).pdf
PDF
FOISHS ANNUAL IMPLEMENTATION PLAN 2025.pdf
PDF
Journal of Dental Science - UDMY (2021).pdf
PDF
Skin Care and Cosmetic Ingredients Dictionary ( PDFDrive ).pdf
HVAC Specification 2024 according to central public works department
What’s under the hood: Parsing standardized learning content for AI
Cambridge-Practice-Tests-for-IELTS-12.docx
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
LIFE & LIVING TRILOGY- PART (1) WHO ARE WE.pdf
B.Sc. DS Unit 2 Software Engineering.pptx
MICROENCAPSULATION_NDDS_BPHARMACY__SEM VII_PCI .pdf
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 1)
Share_Module_2_Power_conflict_and_negotiation.pptx
Introduction to pro and eukaryotes and differences.pptx
FORM 1 BIOLOGY MIND MAPS and their schemes
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
BP 505 T. PHARMACEUTICAL JURISPRUDENCE (UNIT 1).pdf
My India Quiz Book_20210205121199924.pdf
Education and Perspectives of Education.pptx
What if we spent less time fighting change, and more time building what’s rig...
English Textual Question & Ans (12th Class).pdf
FOISHS ANNUAL IMPLEMENTATION PLAN 2025.pdf
Journal of Dental Science - UDMY (2021).pdf
Skin Care and Cosmetic Ingredients Dictionary ( PDFDrive ).pdf

Panam Project Presentation

  • 1. WATER USERS ASSOCIATION (WUA) REGISTRATION DETAILS Name of Total CCA No. of Area benefited Project (in Ha.) WUAs (in Ha.) PANAM 36405 40 12261 KARAD 6190 5 727 HADAF 5238 6 1935 Total : 47833 51 14923 1
  • 2. IRRIGATION PROJECTS IN PANCHMAHAL DISTRICT Panam Project Circle, Godhra PANAM HADAF KARAD Kadana Project Circle, D’ Colony KADANA BHADAR (P) KABUTARI Vadodara Irri. Circle, Vadodara DEV SUKHI 2
  • 3. Deputy Exe. Engineer & PANAM PROJECT Office Superintendent Personal Secretary CIRCLE, GODHRA Panam Project Division, Panam Irrigation Division, Quality Control Sub Godhra Godhra Division, Godhra Panam Dam Sub Division, Panam Irrigation Sub Panam Dam Division, Shahera Panam Project Sub Division Panam Irrigation Sub Division No.2, Godhra No.1, Morva (Rena) Irrigation Project Sub Panam Irrigation Sub Division Division No.2, Godhra No.2, Veganpur Koliyari Sub Division No.2, Panam Irrigation Sub Division Morva (Hadaf) No.3, Godhra 3
  • 4. PANAM PROJECT CIRCLE Panam High Level Canal Project, Command Area: 18000 ha., Estimated Cost: 200 Crore. Dam Safety works of Panam, Hadaf & Karad Projects Irrigation Management and M & R of 100 km long Panam Main Canal, 800 km Network of Distributory & Minors. Panam Irrigation Scheme : 36405 Ha. Command Area Karad Irrigation Scheme : 6190 Ha. Command Area. Hadaf Irrigation Scheme : 5238 Ha. Command Area. 4
  • 5. PANAM PROJECT CIRCLE Santroad Weir : 2000 Ha. Command Area. Constg. of Big & Small Checkdams on River & drains of Panchmahal District. Deepening of Big & Small Tanks of Panchmahals District. “Mahatma Gandhi National Rural Employment Guarantee Act” works Desilting in Canals, Jungle Cutting, Earthwork Checkdam Desilting Lift Irrigation Scheme Restoration of Stepwells. 5
  • 7. PANAM HIGH LEVEL CANAL PROJECT PANAM HIGH LEVEL CANAL – HEAD REGULATOR 7
  • 8. PANAM HIGH LEVEL CANAL PROJECT TUNNEL ENTRANCE 8
  • 9. INAUGURATION OF TUNNEL BY HON. CHIEF MINISTER, GUJARAT Dt. 25/01/2009 9
  • 10. 10
  • 12. LEFT BANK MAIN CANAL 12
  • 13. BRIDGE TYPE ROAD CROSSING 13
  • 14. BOX TYPE ROAD CROSSING 14
  • 15. VARIOUS OBSTRUCTIONS – HOUSES, WELLS, PROTECTED TREES 15
  • 17. PANAM DAM Length of Masonary Dam – 189 m. Year of Construction - 1977 10 Radial Gates – Size: 14.93 m x 11.28 m. Max. Flood Discharge – 356000 Cusecs. 17
  • 18. PANAM DAM Villages benefited - 132, Benefited Area- 36405 Ha. Length of Main Canal - 99.725 km Length of Distriburoty & Minors - 800 km Irrigation started - 1980 Canal bed Power House - 2 Mega watt Rehabilitation of 42 effected villages 18
  • 19. PANAMyear 2004 : 3.56 Lacs cusecs Max. discharge released in the DAM 19
  • 20. PANAMyear 2004 : 3.56 Lacs cusecs Max. discharge released in the DAM 20
  • 22. PANAM DAM - DAM SAFETY WORKS Cleaning of Drainage Gallery Before... After... 22
  • 23. HADAF DAM Length of Masonary Dam – 89 m. Year of Construction - 1986 5 Radial Gates – Size: 14.95 m x 10.64 m. Max. Flood Discharge – 162000 Cusecs. 23
  • 24. HADAF DAM Benefited villages–21, Benefited Area–5238 ha. Rehabilitation of 582 families of 7 villages. 24
  • 25. HADAF DAM 25
  • 26. KARAD DAM Length of Earthen Dam - 1019 m. Year of Construction - 1958 Benefited villages- 25 Benefited Area - 6190 ha. 26
  • 27. KARAD DAM Benefited villages- 25 Benefited Area - 6190 ha. માટી બંધ પર અંશતઃ માટીકામ કરવામાં આવેલ છે . 27
  • 28. KARAD DAM Over flow on 09.09.2010 Fuse Gates 28
  • 29. SANTROAD WEIR Length of Weir: 280 m. Year of Construction : 2008 Storage Capacity : 117 Mcft. Benefited Area 2000 ha. of 4 villages by Lift Irrigation. No Land Acquisition required. 29
  • 30. PANAM PROJECT No. of Sr. Taluka Benefited No. District benefited Area (in Ha.) villages Lunawada 28 8150 Shahera 47 5889 1 Panchmahal Godhra 28 13264 Kalol 16 4214 2 Vadodara Savali 13 4888 Total :: 132 36405 30
  • 31. PLANNED CROPPING PATTERN Tobacco 2% Tw o Season Cotton 8% Kharif Paddy 19% Rabi Vegetable 10% Kharif 65% Rabi 52% Oil Seeds/Pulses 3% Two Season 13% TOTAL 130% Kharif Hybrid Bajari 19% Rabi Wheat 27% Kharif Maize 10% Kharif Jow ar 2% 31
  • 32. MAJOR DISTRIBUTORIES OF PANAM PROJECT Sr. Name of Off taking Length of C.C.A. Major Crops No. Distributory from Main Distry. (in Ha.) Canal (km) (km) 1 Ladvel 31.94 11.90 2220 Paddy 2 23/R Rabadia 38.30 4.04 2017 Paddy 3 24/R Morva 52.81 8.45 3481 Paddy, Maize 4 25/R Kabirpur 54.33 14.81 4554 Paddy, Maize 5 29/R 71.80 11.14 1591 Paddy, Wheat 6 32/R.A. 82.01 14.48 5099 Tobacco, Cotton, Wheat 7 32/R.B. 83.16 14.00 1488 Wheat 8 34/R Sansoli 92.05 5.20 1794 Maize 32
  • 33. Irrigation benefits given to affected people of Narmada Project in Khajuri Colony under Panam Command 33
  • 34. Obstructions in Irrigation Management Main canal from Ch. 0 to 30 km flows parallel to Panam River. Main Canal is contour canal. One side is hill & Other side Panam River High banking of 12 to 20 m. 34
  • 35. Obstructions in Irrigation Management Heavy seepage from Banking Change of cropping pattern in the initial reach due to assured irrigation. 35
  • 36. Frequent sliding of Rock debris in Main canal during monsoon. 36
  • 37. Removal of Rock Debris After Before 37
  • 38. Renovation works of Canal Panam Main Canal 38
  • 39. Renovation works of Canal Karad Main Canal After Before
  • 40. Renovation works of Canal Minor No.1 After Before
  • 42. Restoration of Structures Karad Main Canal Ch. 3 KM
  • 43. N.R.E.G.A. Works Desilting work in Panam Main Canal 43
  • 46. BIG CHECKDAM RAMNATH 46
  • 47. BIG CHECKDAM MOKAL 47
  • 48. SMALL CHECKDAM Karada 48
  • 50. DEEPENING OF PONDS VILLAGE - UCHET
  • 51. LIFT IRRIGATION SCHEME BORIYAVI 51
  • 52. LIFT IRRIGATION SCHEME SARADIA-DHAMNOD 52
  • 53. TRAINING 53
  • 54. TRAINING 54
  • 55. PARTICIPATORY IRRIGATION MANAGEMENT Sr No Name of Scheme Total C.C.A. (Ha.) No. of WUAs Area (Ha.) 1 Panam 36405 35 11200 2 Karad 6190 05 730 3 Hadaf 5238 06 1950 TOTAL: 47833 46 13880 55