SlideShare a Scribd company logo
Net Zero Cities

Fort Collins, October2013

Greenlys, a System-View Pilot Project for Smart Grids

grenoble-isere-france
AEPI, Invest in Grenoble-Isere, France Agency
•

Economic promotion and image-building for the Grenoble-Isère area in
France and abroad.

•

Prospection, reception and relocation of new business, from France and
abroad, to maintain and develop the area’s economic fabric.

•

Working locally with technical partners & clusters (such as Tenerrdis in the
case of Net Zero Cities) as well as policy makers

•

Reaching out globally to connect business and clusters to the relevant
international partners

grenoble-isere-france
Grenoble-Isère

…in the heart of the RhoneAlps region
 2nd-largest economy in
France

 Isère: 1,2M people
Grenoble area: 732,800 inhabitants
in a territory equal to 3x the size of
Luxembourg

 7th-largest regional
economy in the European
Union

 Strong presence of foreign-owned
companies in the industry:
40% in Grenoble–Isere
25% in France
 Top investors: USA, Germany, UK

 2nd-favorite place for
executives in France
LONDON

BERLIN
BRUSSELS

 Grenoble has the 2nd-largest
English- speaking community in
France

GENEVA
PARIS
GRENOBLE
ROMA

 Largest American community in
France

 Among the top five travel
destinations in Europe
 Easy access to
international destinations
through major airports
(Lyon, Geneva) and rail

MADRID

 Population:
young, qualified, innovative, with
strong scientific focus

AEPI Grenoble - Isère

grenoble-isere-france
2013
Where Clean Energy started!
Aristide Bergès

Hydroelectric power, started in our valley
at the end of the 19th century
… This in turn led to the start of many activities such
as:

• Electricity production and supply: EDF, Gaz Electricité de
Grenoble,

• Manufacture of turbines, penstocks, cable, electrical

equipment, etc.: Alstom, Prysmian, Schneider Electric, etc.

• Electrometallurgy: Pechiney, Ascometal, etc.
• The start of many subcontractors in metal-working, boilermaking, safety, etc. in parallel with specialist engineering
firms: Artelia, Atos, etc.

grenoble-isere-france
GreenLys in Grenoble,

a System View Pilot Project for Smart Grids

- Call for demo project
from ADEME / French government
- Pilot project proposal in two cities: Grenoble & Lyon
Goal : Implement a technological show case, by
developing two experimental technology platforms, in
Lyon and Grenoble, by 2016, in order to prepare a
widespread deployment

grenoble-isere-france
The Consortium: 11 partners
-

Academics & research centers

-

Electrical chain

-

Technology providers

• Grenoble INP technological university
• LEPII Grenoble university for economics
• CEA LITEN R&D center

• RTE TSO
• Core partners: ERDF nationwide DSO project coordinator, Gaz electricite de
Grenoble local utility, GDF SUEZ national suppliers, HESPUL distributed
producers association, Rhonalpenergie local communities association
• Energy technology providers: Schneider Electric, Alstom
• ICT technology provider : ATOS world Grid

grenoble-isere-france
1 - A consortium involving different types of smart grid
stakeholders
•
•
•
•

Covering the whole value chain of the electrical system:
DSO, TSO, suppliers, technology providers (energy systems, ICT)
Universities and R&D centers
End-users, local communities, producers associations

2 - A project to build up a systemic vision
Coupling an advanced distribution network with a management of a complete
DER portfolio (distributed generation, flexible loads and electrical vehicles)
through AMI, including the LINKY smart meter

grenoble-isere-france
3 - A demonstrator to experiment the Smart Grid at a real and
significant scale
4 districts within 2 cities, representatives of a diversified population
An ambition which could reach 2,000 residential end-users (1,000 in each city)
Two complementary sites:
Nationwide DSO (ErDF – Lyon) and Integrated local DSO (GEG Grenoble)
Complementary experimentations (technological options, regulated or not
tariff)

4 - Expected results
Analysis of the added value chain for market development
Analysis of the transitions for larger scale smart grid deployment

grenoble-isere-france
Demonstrators in the City:
2 districts in Grenoble
Caserne de Bonne,
a former military garrison site

« Presqu’ile » science park
grenoble-isere-france
The Aggregator => new actor in the Smart Grid
system

The operator who manages load curtailment and
decentralized power productions, according to the needs
of the electrical network

Using an operational control command chain in interaction with
the other actors in the system: network
operators, producers, providers, consumers
With the requirement to maintain the users’ comfort

grenoble-isere-france
The Aggregator => experimental results of curtailment
Progression:
• More than 20,000 curtailments carried out during the two last
heating seasons
• Data acquisition in order to build predictive models
• Technical characterization of curtailment: rebound and payback
effects
• An analysis of the impact of these curtailment on users comfort
• Flexibility forecasting and curtailment optimization algorithms
• First interaction tests with the Distribution Network Operator

grenoble-isere-france
A Wiser Solution => a connected solution providing
innovative services to residential customers
• Easy to install
• User-centered

OFFERING:

• Control of consumption,
• Optimized comfort.
• Intuitive
• Allowing consumer choice

ENSURING:

• Curtailment implementation with
respect to comfort parameters

grenoble-isere-france
Energy Management on Tertiary Sites
=> preserving comfort for occupants
Objective: develop a DR system for tertiary
sites, triggered by the aggregator
Progression: 1st prototype of a full-scale
curtailment system on a site located on
Schneider Electric GIANT (38TEC) Presqu’ile
- Experimental results complemented with a
numerical model
- 3 other sites will be instrumented in 2014
- Load shed without impacting the comfort of
the 150 occupants of two office buildings
(3,600m2)

grenoble-isere-france
Advanced Network Functions => facilitate the flexibility
In Lyon
Curtailment simulation with real
data from the experimental area (Vaise
Substation)
Decentralized resources flexibility
use, driven out of the purchase
obligation
Promote the PV integration
• local voltage regulation
• development of the DER predictive
system PrevERDF

In Grenoble
Simulations with real data from the
experimental area
Centralized productions flexibility
use, driven out of the purchase
obligation
Optimization of the EV loading
• Linked with the PV production
• Minimizing impact on the whole
system
Promote PV integration
• Controlling reactive power
• Working on a predictive model
grenoble-isere-france
The DSO:=> optimal network operation
DSO objectives :

Progression :

• Serve as facilitator for aggregator
curtailment offers
• Define curtailment impact on the
distribution network
• Ensure the security and safety of
network operations

• DSO associated in the loop of
flexibility
programs certification
• Creation of algorithms for flexibility
programs certification
• Advise the aggregator on the
location of curtailment

grenoble-isere-france
Highlighting Models of Value Creation
Final
customer

A flexible
& reconfigurable grid

Reduce electricity
bill and manage
carbon footprint

Provider &
producer
Means of mobilization
& control downstream
meters

Aggregation
tools

DSO
& TSO
Community

Variety in billing
offers and
opportunities for
investment
optimization
Management and
investment
optimization, DER
integration, grid
reliability

Achievement of DER
objectives and conservation of
energy, with optimum global
economies

grenoble-isere-france
Specifying & Managing Transitions-Technical Steps
Today’s power
system

Still highly centralized
Quality and reliability
Equal access to energy
Competitive cost of energy

Transition scenarios
Structured steps
Technological transitions
IC Technologies
Power/energy technologies
Regulatory transitions
DG integration & grid access
System functions / grid services
Balancing mechanisms, etc.
Economical transitions
Cost of system operations
Investments
Asset management…

Tomorrow
- Power grid with enforced
intelligence
- Increased integration,
diffuse storage,
- PHEV Charging
management, DR (BI)

Quality and reliability
Equal access to energy
Competitive cost of energy

METHODOLOGICAL TOOLS TRANSFER 4 LARGE
LONG-TERM
4 GRID TRANSITION
SCALE DEPLOYMENT TRANSITIONS
grenoble-isere-france
•
•
•
•
•

The largest Smart Grid pilot project demo in France
€40M (Smart Meters/AMI not incl.–already funded)
High expectations and foreseen difficulties
A solid and engaged consortium
Ramping up with engaged end-users

• Next steps: recruit more end-users & LINKY
customers, more B2B users, ramp up EV
infrastructure, & further develop advanced
grenoble-isere-france
functions, e.g. self-healing
Thanks for your attention!
Your contact
Veronique PEQUIGNAT
v.pequignat(at)grenobleisere.com
+33 (0) 476 709 704

grenoble-isere-france

More Related Content

PDF
European Utility Week (2/2) | Paris - 12 au 14 novembre 2019
PDF
Heat in the City | Bruxelles - 10 décembre 2019
PDF
Webinaire : Comment optimiser la performance, la maintenance et la durée de v...
PDF
Webinar : What's the impact of regulation on energy communities? Cases from B...
PDF
2nd OTS - 50000&1SEAPs : Anette Jahn, EASME
PDF
Remida energy agency of la ribera - gorizia 13.5.2015
PDF
Webinar - Energy Communities - technologies and digital tools
PDF
2nd OTS - 50000&1SEAPs : Pierre Crepaux, Lorient (FR)
European Utility Week (2/2) | Paris - 12 au 14 novembre 2019
Heat in the City | Bruxelles - 10 décembre 2019
Webinaire : Comment optimiser la performance, la maintenance et la durée de v...
Webinar : What's the impact of regulation on energy communities? Cases from B...
2nd OTS - 50000&1SEAPs : Anette Jahn, EASME
Remida energy agency of la ribera - gorizia 13.5.2015
Webinar - Energy Communities - technologies and digital tools
2nd OTS - 50000&1SEAPs : Pierre Crepaux, Lorient (FR)

What's hot (20)

PDF
Enercon, Nordex, Siemens Wind Power and Gamesa on overcoming the challenges o...
PDF
Antonis Kokossis - NTUA
PDF
Il ruolo cruciale del "fattore umano" nella transizione energetica
PDF
Smart City : innovative strategy for sustainable development
PDF
Professor Isam Shahrour Summer Course « Smart and Sustainable City » Chapter...
PDF
Antonis Kokosis - NTUA
PDF
Webinar - Which technologies & digital tools do we need to implement an energ...
PPT
4 front energy
PDF
European commission _greenexpo
PDF
Wallonia Meets Energy Campus Nürnberg | LLN - 09 décembre 2019
PPTX
Electric Vehicles Readiness and Charging at Multi-Unit Dwellings by Eric Huang
PDF
IRIS Webinar: Vehicle 2 Grid (V2G) technology
PDF
Workshop : business cases for Energy Communities - 30/03/21
PDF
Séminaire « Green Integrated Energy » @ Engie Laborelec - 26/11
PDF
Webinaire - Meet some of the Belgian hardware frontrunners SME’s for energy c...
PDF
Professor Isam Shahrour Summer Course « Smart and Sustainable City » Chapter...
PDF
Good practices and tools in Barcelona - Fontbernat
PDF
Stockage & flexibilité de l'énergie - zoom sur les projets Estor-Lux & PEPS -...
PDF
Webinar - Meet the Belgian players : innovation & knowhow for the implementat...
PDF
Éco-quartiers et réseaux de chaleur : une solution pour les villes de demain ...
Enercon, Nordex, Siemens Wind Power and Gamesa on overcoming the challenges o...
Antonis Kokossis - NTUA
Il ruolo cruciale del "fattore umano" nella transizione energetica
Smart City : innovative strategy for sustainable development
Professor Isam Shahrour Summer Course « Smart and Sustainable City » Chapter...
Antonis Kokosis - NTUA
Webinar - Which technologies & digital tools do we need to implement an energ...
4 front energy
European commission _greenexpo
Wallonia Meets Energy Campus Nürnberg | LLN - 09 décembre 2019
Electric Vehicles Readiness and Charging at Multi-Unit Dwellings by Eric Huang
IRIS Webinar: Vehicle 2 Grid (V2G) technology
Workshop : business cases for Energy Communities - 30/03/21
Séminaire « Green Integrated Energy » @ Engie Laborelec - 26/11
Webinaire - Meet some of the Belgian hardware frontrunners SME’s for energy c...
Professor Isam Shahrour Summer Course « Smart and Sustainable City » Chapter...
Good practices and tools in Barcelona - Fontbernat
Stockage & flexibilité de l'énergie - zoom sur les projets Estor-Lux & PEPS -...
Webinar - Meet the Belgian players : innovation & knowhow for the implementat...
Éco-quartiers et réseaux de chaleur : une solution pour les villes de demain ...
Ad

Similar to NZC - AEPI Grenoble (20)

PDF
Jean-Baptiste GALLAND the Director Strategy at ERDF (Atoms for the Future 2013)
PPTX
Set plan action-4-smart-networks
PDF
PDF
Photonics market data on sensors, date centers, detectors, lighting (LED and ...
PPTX
Wf storage 2018 presentation_ores v1_may 18th 2018
PPTX
Présentation smart grid
PDF
European research experience and needs on smart metering
PDF
Regulatory Innovation Zones for Smart Energy Networks
PPTX
sustentación tesis maestria Smart Grids.pptx
PDF
Households are happy to join together and provide power flexibility for clima...
PDF
A Case study on encouraging electric car usage
 
PPTX
NZC - Milcent Icn Tenerrdis
PDF
Innovation Summit 2015 - 02 - Sogexi - outdoor smart lighting - clermont-ferrand
PDF
Lille Smart water demo site of the european project SmartWatr4Europe, Aquatec...
PDF
NRB Sap Day 03/10/2019 - Energy digital platform - David Dewe
 
PPTX
Gabrielle Gauthey - Alcatel Lucent - 20140508 inca-transform digital confere...
PDF
enCOMPASS at GIoT 2017
PPT
Agrion smart meter conference 11 december 2013 slideshare version
PDF
FIWARE Global Summit - The View of the European Commission
PDF
Intelligence Artificielle et performances énergétiques | Axis Parc (LLN) - 27...
Jean-Baptiste GALLAND the Director Strategy at ERDF (Atoms for the Future 2013)
Set plan action-4-smart-networks
Photonics market data on sensors, date centers, detectors, lighting (LED and ...
Wf storage 2018 presentation_ores v1_may 18th 2018
Présentation smart grid
European research experience and needs on smart metering
Regulatory Innovation Zones for Smart Energy Networks
sustentación tesis maestria Smart Grids.pptx
Households are happy to join together and provide power flexibility for clima...
A Case study on encouraging electric car usage
 
NZC - Milcent Icn Tenerrdis
Innovation Summit 2015 - 02 - Sogexi - outdoor smart lighting - clermont-ferrand
Lille Smart water demo site of the european project SmartWatr4Europe, Aquatec...
NRB Sap Day 03/10/2019 - Energy digital platform - David Dewe
 
Gabrielle Gauthey - Alcatel Lucent - 20140508 inca-transform digital confere...
enCOMPASS at GIoT 2017
Agrion smart meter conference 11 december 2013 slideshare version
FIWARE Global Summit - The View of the European Commission
Intelligence Artificielle et performances énergétiques | Axis Parc (LLN) - 27...
Ad

More from WRONG PERSON (20)

PPTX
Claussen
PPTX
Colorado's Oil Industry
PPTX
Colorado Banking Trends
PPTX
Fall Real Estate Conference 2013 - Steve
PPTX
Fall Real Estate Conference 2013 - Jason Elliot
PPTX
Fall Real Estate Conference 2013 - Remax
PPTX
Fall Real Estate Conference 2013 - Gibbons
PPTX
Fall Real Estate Conference 2013 - Shinneman
PPT
Fall Real Estate Conference 2013 - Patterson
PPTX
Fall Real Estate Conference 2013 - Driskell
PPTX
Fall Real Estate Conference 2013 - De Jong
PPT
Fall Real Estate Conference 2013 - Power
PPTX
NZC - Plenary Slide
PPTX
NZC - Sylvester Colorado Cleantech
PPTX
NZC - Ben Taube
PPTX
NZC - Thompson
PPTX
Lankao csu october 2013
PPTX
NZC - Cateura
PPTX
Pulse - Revolutionary Mindset
PPTX
Pulse - Sponsor Reel
Claussen
Colorado's Oil Industry
Colorado Banking Trends
Fall Real Estate Conference 2013 - Steve
Fall Real Estate Conference 2013 - Jason Elliot
Fall Real Estate Conference 2013 - Remax
Fall Real Estate Conference 2013 - Gibbons
Fall Real Estate Conference 2013 - Shinneman
Fall Real Estate Conference 2013 - Patterson
Fall Real Estate Conference 2013 - Driskell
Fall Real Estate Conference 2013 - De Jong
Fall Real Estate Conference 2013 - Power
NZC - Plenary Slide
NZC - Sylvester Colorado Cleantech
NZC - Ben Taube
NZC - Thompson
Lankao csu october 2013
NZC - Cateura
Pulse - Revolutionary Mindset
Pulse - Sponsor Reel

Recently uploaded (20)

PDF
Encapsulation theory and applications.pdf
PPTX
Big Data Technologies - Introduction.pptx
PPTX
Spectroscopy.pptx food analysis technology
PPTX
20250228 LYD VKU AI Blended-Learning.pptx
PDF
Approach and Philosophy of On baking technology
PDF
Accuracy of neural networks in brain wave diagnosis of schizophrenia
PDF
Network Security Unit 5.pdf for BCA BBA.
PPTX
Digital-Transformation-Roadmap-for-Companies.pptx
PPTX
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
PDF
TokAI - TikTok AI Agent : The First AI Application That Analyzes 10,000+ Vira...
PDF
Electronic commerce courselecture one. Pdf
PPTX
Group 1 Presentation -Planning and Decision Making .pptx
PDF
Unlocking AI with Model Context Protocol (MCP)
PDF
Spectral efficient network and resource selection model in 5G networks
PDF
Getting Started with Data Integration: FME Form 101
PDF
Profit Center Accounting in SAP S/4HANA, S4F28 Col11
PDF
Video forgery: An extensive analysis of inter-and intra-frame manipulation al...
PPTX
1. Introduction to Computer Programming.pptx
PDF
Blue Purple Modern Animated Computer Science Presentation.pdf.pdf
PDF
A comparative analysis of optical character recognition models for extracting...
Encapsulation theory and applications.pdf
Big Data Technologies - Introduction.pptx
Spectroscopy.pptx food analysis technology
20250228 LYD VKU AI Blended-Learning.pptx
Approach and Philosophy of On baking technology
Accuracy of neural networks in brain wave diagnosis of schizophrenia
Network Security Unit 5.pdf for BCA BBA.
Digital-Transformation-Roadmap-for-Companies.pptx
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
TokAI - TikTok AI Agent : The First AI Application That Analyzes 10,000+ Vira...
Electronic commerce courselecture one. Pdf
Group 1 Presentation -Planning and Decision Making .pptx
Unlocking AI with Model Context Protocol (MCP)
Spectral efficient network and resource selection model in 5G networks
Getting Started with Data Integration: FME Form 101
Profit Center Accounting in SAP S/4HANA, S4F28 Col11
Video forgery: An extensive analysis of inter-and intra-frame manipulation al...
1. Introduction to Computer Programming.pptx
Blue Purple Modern Animated Computer Science Presentation.pdf.pdf
A comparative analysis of optical character recognition models for extracting...

NZC - AEPI Grenoble

  • 1. Net Zero Cities Fort Collins, October2013 Greenlys, a System-View Pilot Project for Smart Grids grenoble-isere-france
  • 2. AEPI, Invest in Grenoble-Isere, France Agency • Economic promotion and image-building for the Grenoble-Isère area in France and abroad. • Prospection, reception and relocation of new business, from France and abroad, to maintain and develop the area’s economic fabric. • Working locally with technical partners & clusters (such as Tenerrdis in the case of Net Zero Cities) as well as policy makers • Reaching out globally to connect business and clusters to the relevant international partners grenoble-isere-france
  • 3. Grenoble-Isère …in the heart of the RhoneAlps region  2nd-largest economy in France  Isère: 1,2M people Grenoble area: 732,800 inhabitants in a territory equal to 3x the size of Luxembourg  7th-largest regional economy in the European Union  Strong presence of foreign-owned companies in the industry: 40% in Grenoble–Isere 25% in France  Top investors: USA, Germany, UK  2nd-favorite place for executives in France LONDON BERLIN BRUSSELS  Grenoble has the 2nd-largest English- speaking community in France GENEVA PARIS GRENOBLE ROMA  Largest American community in France  Among the top five travel destinations in Europe  Easy access to international destinations through major airports (Lyon, Geneva) and rail MADRID  Population: young, qualified, innovative, with strong scientific focus AEPI Grenoble - Isère grenoble-isere-france 2013
  • 4. Where Clean Energy started! Aristide Bergès Hydroelectric power, started in our valley at the end of the 19th century … This in turn led to the start of many activities such as: • Electricity production and supply: EDF, Gaz Electricité de Grenoble, • Manufacture of turbines, penstocks, cable, electrical equipment, etc.: Alstom, Prysmian, Schneider Electric, etc. • Electrometallurgy: Pechiney, Ascometal, etc. • The start of many subcontractors in metal-working, boilermaking, safety, etc. in parallel with specialist engineering firms: Artelia, Atos, etc. grenoble-isere-france
  • 5. GreenLys in Grenoble, a System View Pilot Project for Smart Grids - Call for demo project from ADEME / French government - Pilot project proposal in two cities: Grenoble & Lyon Goal : Implement a technological show case, by developing two experimental technology platforms, in Lyon and Grenoble, by 2016, in order to prepare a widespread deployment grenoble-isere-france
  • 6. The Consortium: 11 partners - Academics & research centers - Electrical chain - Technology providers • Grenoble INP technological university • LEPII Grenoble university for economics • CEA LITEN R&D center • RTE TSO • Core partners: ERDF nationwide DSO project coordinator, Gaz electricite de Grenoble local utility, GDF SUEZ national suppliers, HESPUL distributed producers association, Rhonalpenergie local communities association • Energy technology providers: Schneider Electric, Alstom • ICT technology provider : ATOS world Grid grenoble-isere-france
  • 7. 1 - A consortium involving different types of smart grid stakeholders • • • • Covering the whole value chain of the electrical system: DSO, TSO, suppliers, technology providers (energy systems, ICT) Universities and R&D centers End-users, local communities, producers associations 2 - A project to build up a systemic vision Coupling an advanced distribution network with a management of a complete DER portfolio (distributed generation, flexible loads and electrical vehicles) through AMI, including the LINKY smart meter grenoble-isere-france
  • 8. 3 - A demonstrator to experiment the Smart Grid at a real and significant scale 4 districts within 2 cities, representatives of a diversified population An ambition which could reach 2,000 residential end-users (1,000 in each city) Two complementary sites: Nationwide DSO (ErDF – Lyon) and Integrated local DSO (GEG Grenoble) Complementary experimentations (technological options, regulated or not tariff) 4 - Expected results Analysis of the added value chain for market development Analysis of the transitions for larger scale smart grid deployment grenoble-isere-france
  • 9. Demonstrators in the City: 2 districts in Grenoble Caserne de Bonne, a former military garrison site « Presqu’ile » science park grenoble-isere-france
  • 10. The Aggregator => new actor in the Smart Grid system The operator who manages load curtailment and decentralized power productions, according to the needs of the electrical network Using an operational control command chain in interaction with the other actors in the system: network operators, producers, providers, consumers With the requirement to maintain the users’ comfort grenoble-isere-france
  • 11. The Aggregator => experimental results of curtailment Progression: • More than 20,000 curtailments carried out during the two last heating seasons • Data acquisition in order to build predictive models • Technical characterization of curtailment: rebound and payback effects • An analysis of the impact of these curtailment on users comfort • Flexibility forecasting and curtailment optimization algorithms • First interaction tests with the Distribution Network Operator grenoble-isere-france
  • 12. A Wiser Solution => a connected solution providing innovative services to residential customers • Easy to install • User-centered OFFERING: • Control of consumption, • Optimized comfort. • Intuitive • Allowing consumer choice ENSURING: • Curtailment implementation with respect to comfort parameters grenoble-isere-france
  • 13. Energy Management on Tertiary Sites => preserving comfort for occupants Objective: develop a DR system for tertiary sites, triggered by the aggregator Progression: 1st prototype of a full-scale curtailment system on a site located on Schneider Electric GIANT (38TEC) Presqu’ile - Experimental results complemented with a numerical model - 3 other sites will be instrumented in 2014 - Load shed without impacting the comfort of the 150 occupants of two office buildings (3,600m2) grenoble-isere-france
  • 14. Advanced Network Functions => facilitate the flexibility In Lyon Curtailment simulation with real data from the experimental area (Vaise Substation) Decentralized resources flexibility use, driven out of the purchase obligation Promote the PV integration • local voltage regulation • development of the DER predictive system PrevERDF In Grenoble Simulations with real data from the experimental area Centralized productions flexibility use, driven out of the purchase obligation Optimization of the EV loading • Linked with the PV production • Minimizing impact on the whole system Promote PV integration • Controlling reactive power • Working on a predictive model grenoble-isere-france
  • 15. The DSO:=> optimal network operation DSO objectives : Progression : • Serve as facilitator for aggregator curtailment offers • Define curtailment impact on the distribution network • Ensure the security and safety of network operations • DSO associated in the loop of flexibility programs certification • Creation of algorithms for flexibility programs certification • Advise the aggregator on the location of curtailment grenoble-isere-france
  • 16. Highlighting Models of Value Creation Final customer A flexible & reconfigurable grid Reduce electricity bill and manage carbon footprint Provider & producer Means of mobilization & control downstream meters Aggregation tools DSO & TSO Community Variety in billing offers and opportunities for investment optimization Management and investment optimization, DER integration, grid reliability Achievement of DER objectives and conservation of energy, with optimum global economies grenoble-isere-france
  • 17. Specifying & Managing Transitions-Technical Steps Today’s power system Still highly centralized Quality and reliability Equal access to energy Competitive cost of energy Transition scenarios Structured steps Technological transitions IC Technologies Power/energy technologies Regulatory transitions DG integration & grid access System functions / grid services Balancing mechanisms, etc. Economical transitions Cost of system operations Investments Asset management… Tomorrow - Power grid with enforced intelligence - Increased integration, diffuse storage, - PHEV Charging management, DR (BI) Quality and reliability Equal access to energy Competitive cost of energy METHODOLOGICAL TOOLS TRANSFER 4 LARGE LONG-TERM 4 GRID TRANSITION SCALE DEPLOYMENT TRANSITIONS grenoble-isere-france
  • 18. • • • • • The largest Smart Grid pilot project demo in France €40M (Smart Meters/AMI not incl.–already funded) High expectations and foreseen difficulties A solid and engaged consortium Ramping up with engaged end-users • Next steps: recruit more end-users & LINKY customers, more B2B users, ramp up EV infrastructure, & further develop advanced grenoble-isere-france functions, e.g. self-healing
  • 19. Thanks for your attention! Your contact Veronique PEQUIGNAT v.pequignat(at)grenobleisere.com +33 (0) 476 709 704 grenoble-isere-france