SlideShare a Scribd company logo
PJM6125 Project Evaluation: Change Control Process
Overview and Rationale
For this assignment, you will create an integrated change
control process.
Program and Course Outcomes
This assignment is directly linked to the following key learning
outcomes from the course syllabus:
L09: Create an integrated change control plan describing
and illustrating the integrated change control process
throughout the lifecycle of a project
In addition to these key learning outcomes, you will also have
the opportunity to evidence the following skills through
completing this assignment:
· Critical thinking and analysis
· Problem solving
Essential Components & Instructions
This assignment is completed in two parts.
Part 1: Description of Your Integrated Change Control Process:
Your assignment should describe an integrated change control
process. Imagine that you have completed evaluating the
project, and it is clear that a change to the scope or budget or
schedule is needed, describe the process for drafting the change
request, gaining approval for the change, and what should
happen once the change is approved. The latter is where you
focus on integration. Once the change is approved, what will
need to be updated as part of the project plan and
documentation?
For this section, think specifically about who should be
involved, who reviews it, who approves it, and who implements
it and monitors the change. Consider creating a simple process
map as a way to visually show the process.
Part 2: Change Request Template:
For the second part of the assignment, include a change request
template. You may have one from a previous class or from a
past project, or you can search for one. Make sure that it takes
into account all the aspects of the process you describe above,
so you will most likely need to modify it a bit. Also, make sure
you cite your sources.
Consider incorporating instructions and/or examples to guide
users in completing a change request.
Be sure to rely on the readings from this lesson as a source of
information. You will also find some material in the Gray &
Larson text, as well as The PMBOK Guide.
Format
Below are some key guidelines you will want to ensure you
follow in both elements of this assignment. Think of this short
list as a quality control checklist, along with the attached
grading rubric.
· Part 1 and Part 2 (description and template) should be
submitted as a single file (MsWord or .pdf)
· You should include a cover page
· You should format the documents professionally
· You should provide a clear description of the change control
process
· You should provide a change request template that aligns to
the process (remember to modify to fit your description and cite
any sources)
· The document should be free and clear of grammatical and
typographical errors
Please be sure to review the attached rubric. It along with these
assignment instructions will ensure you have a solid
understanding of the assignment requirements.
Rubric(s)
Assessment Element
Above Standard
(100-95%)
Meets Standards
(94.9 – 84%)
Approaching Standards
(83.9 – 77%)
Below Standard
(76.9 – 70%)
Not Evident
(69.9 – 0%)
Change Control Process
(35%)
The integrated change control process describes the process for
drafting a change request (text and visual), reviewing and/or
gaining approval, and actions to take based on the reviewers’
decision. Additionally, the description of the change control
process shows a high degree of understanding and integration to
other project management knowledge areas.
The integrated change control process clearly describes the
process for drafting a change request (text and visual),
reviewing and/or gaining approval, and actions to take based on
the reviewers’ decision. Additionally, the description of the
change control process shows relevance to other project
management knowledge areas.
The integrated change control process describes the process for
drafting a change request (contains either text or visual but not
both), reviewing and/or gaining approval, and actions to take
based on the reviewers’ decision. Additionally, the description
of the change control process is vague and shows little
relevance to other project management knowledge areas.
The integrated change control process begins to describe, but
does not contain all the required elements (the process for
drafting a change request, reviewing and/or gaining approval,
and actions to take based on the reviewers’ decision).
Additionally, the description of the change control process does
not take into account the relevance to other project management
knowledge areas.
The submission fails in a significant manner to describe the
integrated change control process and the relevance to other
project management knowledge areas.
Change Request Template
(35%)
Change Request template includes all required elements
describe in the change control process. Additionally, the
template provides specific instructions and examples for
completing each section.
Change Request template includes all required elements
describe in the change control process. Additionally, the
template may provide general instructions and notes.
Change Request template includes all required elements
describe in the change control process, but does not contain
instructions, notes, or examples within the template.
Change Request template includes some of the required
elements describe in the change control process or contains
elements from an existing template not relevant to the
assignment. Additionally, no instructions, notes, or examples
are provided with the template.
The submission fails in a significant manner to include elements
described in the change control process.
Critical Thinking
(15%)
Professional insights into depth and breadth of assignment -
goes WELL beyond assignment requirements to explore
performance evaluation and appropriate change control
procedures.
Showcases a comprehensive understanding of the performance
issues related to the project environment and evidences a strong
analysis of the change control process.
Showcases a base understanding of the performance issues
related to the project environment and evidences a less than
thorough analysis of the change control process.
Does not evidence a base understanding of the performance
issues related to the project environment and evidences a weak
analysis of the change control process.
Evidences a very poor understanding of the change control
process.
Grammar & Clarity
(15%)
All work grammatically correct with no misspellings or
grammatical mistakes. Expresses ideas and opinions clearly and
concisely in a manner appropriate to the assignment.
All work grammatically correct with rare misspellings.
Minimal errors in spelling, grammar, sentence structure and/or
other writing conventions but the reader is able to understand
what the writer meant.
Frequent errors in spelling, grammar, sentence structure, and/or
other writing conventions that distract the reader.
Writing contains numerous errors in spelling, grammar,
sentence structure, etc. that interfere with comprehension. The
reader is unable to understand some of the intended meaning.
PJM6125 Project Evaluation Change Control ProcessOverview and.docx

More Related Content

DOCX
NUR 350 Journal Guidelines and Rubric Journal ac.docx
DOCX
Quality management procedures
PDF
Do it, sf state project lifecycle management (plm) v1.19 091012
DOCX
PJM6125 Project Evaluation Stakeholder Analysis & Eval.docx
PDF
Paper-Milestone_met_what_next_1.0
DOCX
Project Management Plan TemplateThis Project Management Plan.docx
DOCX
PJM6125 Project Evaluation Stakeholder Analysis & Eval.docx
DOCX
Control is the last element of your project. Add a summary about som.docx
NUR 350 Journal Guidelines and Rubric Journal ac.docx
Quality management procedures
Do it, sf state project lifecycle management (plm) v1.19 091012
PJM6125 Project Evaluation Stakeholder Analysis & Eval.docx
Paper-Milestone_met_what_next_1.0
Project Management Plan TemplateThis Project Management Plan.docx
PJM6125 Project Evaluation Stakeholder Analysis & Eval.docx
Control is the last element of your project. Add a summary about som.docx

Similar to PJM6125 Project Evaluation Change Control ProcessOverview and.docx (20)

DOC
Change Management Plan
PPT
3&4. project scope management at project.ppt
PDF
4 integration
DOCX
Quality management in projects
PDF
Prepare for the PK0-005 Project+ Exam with Certifiedumps: Trusted Dumps, Real...
PPTX
Is your project not going well this will help you get it back on track
PPTX
SPM PPT.pptx
PDF
ITIL Process Assessment - Service Design (XLS)
PPTX
Quality Control
PPTX
Project Management: Business Case
DOCX
Plan_QualityManagement
PPTX
Pm audit and assessment approach final
DOCX
Quality management strategy template
PPTX
Project Scope Management.pptxUnderstand the importance of project schedules a...
DOC
06 template test plan
PPTX
harisjaswal_1132_17052_1_Lecture 03 - 06th March2021.pptx
DOCX
Quality management checklist
DOCX
Quality management forms
DOCX
PJM 6005 - Individual Assignment - Project Scope Lessons Learned a.docx
DOCX
PJM 6005 - Individual Assignment - Project Scope Lessons Learned a.docx
Change Management Plan
3&4. project scope management at project.ppt
4 integration
Quality management in projects
Prepare for the PK0-005 Project+ Exam with Certifiedumps: Trusted Dumps, Real...
Is your project not going well this will help you get it back on track
SPM PPT.pptx
ITIL Process Assessment - Service Design (XLS)
Quality Control
Project Management: Business Case
Plan_QualityManagement
Pm audit and assessment approach final
Quality management strategy template
Project Scope Management.pptxUnderstand the importance of project schedules a...
06 template test plan
harisjaswal_1132_17052_1_Lecture 03 - 06th March2021.pptx
Quality management checklist
Quality management forms
PJM 6005 - Individual Assignment - Project Scope Lessons Learned a.docx
PJM 6005 - Individual Assignment - Project Scope Lessons Learned a.docx

More from stilliegeorgiana (20)

DOCX
1. The Incident Command System (ICS) is a tool forA. Co.docx
DOCX
1. The Thirteenth Amendment effectively brought an end to slaver.docx
DOCX
1. The Thirteenth Amendment effectively brought an end to slavery in.docx
DOCX
1. The Fight for a True Democracyhttpswww.nytimes.com201.docx
DOCX
1. The article for week 8 described hip hop as a weapon. This weeks.docx
DOCX
1. The Hatch Act defines prohibited activities of public employees. .docx
DOCX
1. The Case for Reparations” by Ta-Nehisi Coates (604-19) in Rere.docx
DOCX
1. Some people say that chatbots are inferior for chatting.Others di.docx
DOCX
1. Some people say that chatbots are inferior for chatting.Other.docx
DOCX
1. Some people say that chatbots are inferior for chatting. Others d.docx
DOCX
1. Tell us about yourself and your personal journey that has to .docx
DOCX
1. Tell us what characteristics of Loma Linda University are particu.docx
DOCX
1. Tell us about yourself and your personal journey that has lea.docx
DOCX
1. The Research paper will come in five parts. The instructions are.docx
DOCX
1. The minutiae points located on a fingerprint will help determine .docx
DOCX
1. The initial post is to be posted first and have 300-500 words.docx
DOCX
1. The key elements of supplier measurement are quality, delivery, a.docx
DOCX
1. Search the Internet and locate an article that relates to the top.docx
DOCX
1. Text mining – Text mining or text data mining is a process to e.docx
DOCX
1. Students need to review 3 different social media platforms that a.docx
1. The Incident Command System (ICS) is a tool forA. Co.docx
1. The Thirteenth Amendment effectively brought an end to slaver.docx
1. The Thirteenth Amendment effectively brought an end to slavery in.docx
1. The Fight for a True Democracyhttpswww.nytimes.com201.docx
1. The article for week 8 described hip hop as a weapon. This weeks.docx
1. The Hatch Act defines prohibited activities of public employees. .docx
1. The Case for Reparations” by Ta-Nehisi Coates (604-19) in Rere.docx
1. Some people say that chatbots are inferior for chatting.Others di.docx
1. Some people say that chatbots are inferior for chatting.Other.docx
1. Some people say that chatbots are inferior for chatting. Others d.docx
1. Tell us about yourself and your personal journey that has to .docx
1. Tell us what characteristics of Loma Linda University are particu.docx
1. Tell us about yourself and your personal journey that has lea.docx
1. The Research paper will come in five parts. The instructions are.docx
1. The minutiae points located on a fingerprint will help determine .docx
1. The initial post is to be posted first and have 300-500 words.docx
1. The key elements of supplier measurement are quality, delivery, a.docx
1. Search the Internet and locate an article that relates to the top.docx
1. Text mining – Text mining or text data mining is a process to e.docx
1. Students need to review 3 different social media platforms that a.docx

Recently uploaded (20)

PPTX
UV-Visible spectroscopy..pptx UV-Visible Spectroscopy – Electronic Transition...
PPTX
A powerpoint presentation on the Revised K-10 Science Shaping Paper
PDF
RTP_AR_KS1_Tutor's Guide_English [FOR REPRODUCTION].pdf
PDF
IGGE1 Understanding the Self1234567891011
PDF
Practical Manual AGRO-233 Principles and Practices of Natural Farming
PDF
A systematic review of self-coping strategies used by university students to ...
PPTX
Chinmaya Tiranga Azadi Quiz (Class 7-8 )
PDF
Complications of Minimal Access Surgery at WLH
PDF
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
PPTX
Unit 4 Skeletal System.ppt.pptxopresentatiom
DOC
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
PPTX
History, Philosophy and sociology of education (1).pptx
PDF
Computing-Curriculum for Schools in Ghana
PPTX
Final Presentation General Medicine 03-08-2024.pptx
PPTX
Radiologic_Anatomy_of_the_Brachial_plexus [final].pptx
PDF
Empowerment Technology for Senior High School Guide
PPTX
CHAPTER IV. MAN AND BIOSPHERE AND ITS TOTALITY.pptx
PPTX
Cell Types and Its function , kingdom of life
PPTX
1st Inaugural Professorial Lecture held on 19th February 2020 (Governance and...
PPTX
Introduction-to-Literarature-and-Literary-Studies-week-Prelim-coverage.pptx
UV-Visible spectroscopy..pptx UV-Visible Spectroscopy – Electronic Transition...
A powerpoint presentation on the Revised K-10 Science Shaping Paper
RTP_AR_KS1_Tutor's Guide_English [FOR REPRODUCTION].pdf
IGGE1 Understanding the Self1234567891011
Practical Manual AGRO-233 Principles and Practices of Natural Farming
A systematic review of self-coping strategies used by university students to ...
Chinmaya Tiranga Azadi Quiz (Class 7-8 )
Complications of Minimal Access Surgery at WLH
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
Unit 4 Skeletal System.ppt.pptxopresentatiom
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
History, Philosophy and sociology of education (1).pptx
Computing-Curriculum for Schools in Ghana
Final Presentation General Medicine 03-08-2024.pptx
Radiologic_Anatomy_of_the_Brachial_plexus [final].pptx
Empowerment Technology for Senior High School Guide
CHAPTER IV. MAN AND BIOSPHERE AND ITS TOTALITY.pptx
Cell Types and Its function , kingdom of life
1st Inaugural Professorial Lecture held on 19th February 2020 (Governance and...
Introduction-to-Literarature-and-Literary-Studies-week-Prelim-coverage.pptx

PJM6125 Project Evaluation Change Control ProcessOverview and.docx

  • 1. PJM6125 Project Evaluation: Change Control Process Overview and Rationale For this assignment, you will create an integrated change control process. Program and Course Outcomes This assignment is directly linked to the following key learning outcomes from the course syllabus: L09: Create an integrated change control plan describing and illustrating the integrated change control process throughout the lifecycle of a project In addition to these key learning outcomes, you will also have the opportunity to evidence the following skills through completing this assignment: · Critical thinking and analysis · Problem solving Essential Components & Instructions This assignment is completed in two parts. Part 1: Description of Your Integrated Change Control Process: Your assignment should describe an integrated change control process. Imagine that you have completed evaluating the project, and it is clear that a change to the scope or budget or schedule is needed, describe the process for drafting the change request, gaining approval for the change, and what should happen once the change is approved. The latter is where you focus on integration. Once the change is approved, what will need to be updated as part of the project plan and documentation? For this section, think specifically about who should be involved, who reviews it, who approves it, and who implements it and monitors the change. Consider creating a simple process map as a way to visually show the process. Part 2: Change Request Template:
  • 2. For the second part of the assignment, include a change request template. You may have one from a previous class or from a past project, or you can search for one. Make sure that it takes into account all the aspects of the process you describe above, so you will most likely need to modify it a bit. Also, make sure you cite your sources. Consider incorporating instructions and/or examples to guide users in completing a change request. Be sure to rely on the readings from this lesson as a source of information. You will also find some material in the Gray & Larson text, as well as The PMBOK Guide. Format Below are some key guidelines you will want to ensure you follow in both elements of this assignment. Think of this short list as a quality control checklist, along with the attached grading rubric. · Part 1 and Part 2 (description and template) should be submitted as a single file (MsWord or .pdf) · You should include a cover page · You should format the documents professionally · You should provide a clear description of the change control process · You should provide a change request template that aligns to the process (remember to modify to fit your description and cite any sources) · The document should be free and clear of grammatical and typographical errors Please be sure to review the attached rubric. It along with these assignment instructions will ensure you have a solid understanding of the assignment requirements.
  • 3. Rubric(s) Assessment Element Above Standard (100-95%) Meets Standards (94.9 – 84%) Approaching Standards (83.9 – 77%) Below Standard (76.9 – 70%) Not Evident (69.9 – 0%) Change Control Process (35%) The integrated change control process describes the process for drafting a change request (text and visual), reviewing and/or gaining approval, and actions to take based on the reviewers’ decision. Additionally, the description of the change control process shows a high degree of understanding and integration to other project management knowledge areas. The integrated change control process clearly describes the process for drafting a change request (text and visual), reviewing and/or gaining approval, and actions to take based on the reviewers’ decision. Additionally, the description of the change control process shows relevance to other project management knowledge areas. The integrated change control process describes the process for drafting a change request (contains either text or visual but not both), reviewing and/or gaining approval, and actions to take
  • 4. based on the reviewers’ decision. Additionally, the description of the change control process is vague and shows little relevance to other project management knowledge areas. The integrated change control process begins to describe, but does not contain all the required elements (the process for drafting a change request, reviewing and/or gaining approval, and actions to take based on the reviewers’ decision). Additionally, the description of the change control process does not take into account the relevance to other project management knowledge areas. The submission fails in a significant manner to describe the integrated change control process and the relevance to other project management knowledge areas. Change Request Template (35%) Change Request template includes all required elements describe in the change control process. Additionally, the template provides specific instructions and examples for completing each section. Change Request template includes all required elements describe in the change control process. Additionally, the template may provide general instructions and notes. Change Request template includes all required elements describe in the change control process, but does not contain instructions, notes, or examples within the template. Change Request template includes some of the required elements describe in the change control process or contains elements from an existing template not relevant to the assignment. Additionally, no instructions, notes, or examples are provided with the template. The submission fails in a significant manner to include elements described in the change control process. Critical Thinking
  • 5. (15%) Professional insights into depth and breadth of assignment - goes WELL beyond assignment requirements to explore performance evaluation and appropriate change control procedures. Showcases a comprehensive understanding of the performance issues related to the project environment and evidences a strong analysis of the change control process. Showcases a base understanding of the performance issues related to the project environment and evidences a less than thorough analysis of the change control process. Does not evidence a base understanding of the performance issues related to the project environment and evidences a weak analysis of the change control process. Evidences a very poor understanding of the change control process. Grammar & Clarity (15%) All work grammatically correct with no misspellings or grammatical mistakes. Expresses ideas and opinions clearly and concisely in a manner appropriate to the assignment. All work grammatically correct with rare misspellings. Minimal errors in spelling, grammar, sentence structure and/or other writing conventions but the reader is able to understand what the writer meant. Frequent errors in spelling, grammar, sentence structure, and/or other writing conventions that distract the reader. Writing contains numerous errors in spelling, grammar, sentence structure, etc. that interfere with comprehension. The reader is unable to understand some of the intended meaning.