SlideShare a Scribd company logo
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




  Project Sarthak




                                  Table of Content.
Last changed on:   Last changed by:                       Version:     Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        1 of 241
End User Manual

                                 Title: SAP PM
                                   Module:                   PLANT MAINTENANCE
                                   Release:                  ECC 6.0
                                   Created by:               RAVINDER KUMAR
                                   Created on:               23 Nov‟10




S.No.                                                                                                                               Page No.

1.          Introduction ............................................................................................................ 4
2.          Getting Started ....................................................................................................... 6
3.          Master Data .......................................................................................................... 18
     3.1        Functional Location ................................................................................................................... 18
     3.2        Equipment .................................................................................................................................. 29
     3.3        Equipment Bill of Material ........................................................................................................ 43
     3.4        General maintenance Task lists .................................................................................................. 50
     3.5        Work Permit ............................................................................................................................... 59
     3.6        Characteristic ............................................................................................................................. 67
     3.7        Measuring Points ....................................................................................................................... 71
     3.8        Work Center ............................................................................................................................... 80
     3.9        Maintenance Planning ................................................................................................................ 85
     3.10       Maintenance Plan Scheduling .................................................................................................... 92
4.          Maintenance Processing .................................................................................... 102
     4.1        Measuring documents .............................................................................................................. 102
     4.2        Breakdown Maintenance Process: ........................................................................................... 123
     4.3        Preventive Maintenance ........................................................................................................... 160
     4.4        Regular Maintenance : ............................................................................................................. 203
     4.5        Calibration Process: ................................................................................................................. 209
5.          Plant Maintenance Information System .......................................................... 217
     5.1        Standard Reports ...................................................................................................................... 217




Last changed on:                  Last changed by:                                                 Version:                                                         Page:

(23/11/2010)                      RAVINDER KUMAR                                                   1.0                                                            2 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




Last changed on:   Last changed by:                       Version:     Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        3 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




1. Introduction

SAP R/3 is an “integrated and industry-independent standard software” which
covers integrates and connects all functional areas in a business. SAP AG defines
integration as "defined communication". Although R/3 is designed for complete
integration, it can also be used for a couple of business areas.


SAP is the abbreviation for “Systems Applications and Products in Data
Processing”.




The purpose of this document is to provide an overview of SAP PM Functionality and
the details of how the transactions are carried out in SAP R/3.


The document has been organized as follows;


 Master data maintenance required for PM module is covered first. Master data
    maintenance is the most important aspect as these data affects all the transaction
    where that Master data is used. It is very much controlled by authorizations as per
    the policy of the company.
 As a PM user, you will be using various transactions to replicate day-to-day work
    in SAP R/3. So all the transactions, which are relevant to you for carrying out
    Plant Maintenance activities, are covered in this.




Last changed on:   Last changed by:                       Version:                      Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                         4 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




Master data maintenance and transaction processes are explained with the help of
SAP screen Shots. This will help you in executing the same perfectly.




Last changed on:   Last changed by:                       Version:                 Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                  5 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




2. Getting Started

    LOG ON:


    Select SAP Log in Icon




    On PC Desktop & press enter key or double click,


    Or follow the menu path as shown in following screen:




Last changed on:   Last changed by:                       Version:     Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        6 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




    The following screen will appear.




Last changed on:   Last changed by:                       Version:     Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        7 of 241
End User Manual

                       Title: SAP PM
                        Module:           PLANT MAINTENANCE
                        Release:          ECC 6.0
                        Created by:       RAVINDER KUMAR
                        Created on:       23 Nov‟10




    Select Server and click on Log on icon


         Logging onto the SAP R/3 system


                  Sap R/3 systems are client systems. The client enables you to run
                   several business operations at the same time in one SAP R/3 system.
                  Client is, in organizational terms, an independent unit in the system.
                   Clients have their own data environment and therefore their own user
                   master and transaction data, assigned user master records and chart
                   off accounts and specific customizing parameters.
                  So that you log on to SAP R/3 system, you must have a master record
                   created for you for corresponding client. For reasons of access

Last changed on:       Last changed by:                       Version:                        Page:

(23/11/2010)           RAVINDER KUMAR                         1.0                           8 of 241
End User Manual

                       Title: SAP PM
                        Module:           PLANT MAINTENANCE
                        Release:          ECC 6.0
                        Created by:       RAVINDER KUMAR
                        Created on:       23 Nov‟10




                   protection, you must enter a password when you log onto the sap
                   system. The system does not display the password you enter.
                  SAP R/3 system is available in several languages. Use the language
                   input field to select the logon language for each session.




Elements of the screen layout


                  Command Field: Use command field (hidden as default) to go to
                   applications directly by entering the transaction code.
                  Standard Tool Bar: the push buttons in the standard tool bar are found
                   on every screen in an SAP R/3 system. Any push buttons that cannot
                   be used in a particular application are grayed out. If you place your

Last changed on:       Last changed by:                       Version:                       Page:

(23/11/2010)           RAVINDER KUMAR                         1.0                          9 of 241
End User Manual

                       Title: SAP PM
                           Module:         PLANT MAINTENANCE
                           Release:        ECC 6.0
                           Created by:     RAVINDER KUMAR
                           Created on:     23 Nov‟10




                   cursor on a push button for a while the system displays a quick info text
                   that explains the push button function.
                  The Application Tool bar: shows which functions are available in the
                   current application.
                  A Tab page: provides a clearer overview of several information screens
                  Status bar: the status bar displays information on the current system
                   status, for example. Warning or error messages
                  Menu bar: the menus shown here depend on which application you are
                   working in.
                  Title bar: the title bar displays the functions that are available for the
                   user.
                  Checkboxes: checkboxes enable you to select several options
                   simultaneously within a group.
                  Radio Buttons: allow you to choose exactly one item form a selection.




Last changed on:        Last changed by:                       Version:                         Page:

(23/11/2010)            RAVINDER KUMAR                         1.0                         10 of 241
End User Manual

                       Title: SAP PM
                        Module:           PLANT MAINTENANCE
                        Release:          ECC 6.0
                        Created by:       RAVINDER KUMAR
                        Created on:       23 Nov‟10




The below shown screen gives you a detail explanation.

                                                   Menu
                                                   bar                       Standard
                                                                             toolbar
                                                       Title bar
                   Command
                                                                                Application
                                                                                toolbar

                                      Tab Page




                                                                    Input Fields
                                                                    Check
                                                                    boxes,
                                                                    Radio
                                                                    Buttons




                                                                         Status
                                                                         bar




SAP Easy Access


                  Sap easy access is the standard entry screen displayed after the logon.
                   You navigate through the system using the tree structure.




Last changed on:       Last changed by:                       Version:                           Page:

(23/11/2010)           RAVINDER KUMAR                         1.0                             11 of 241
End User Manual

                       Title: SAP PM
                        Module:           PLANT MAINTENANCE
                        Release:          ECC 6.0
                        Created by:       RAVINDER KUMAR
                        Created on:       23 Nov‟10




                                      You are greeted by your
                                      logo in the right-hand
                                      part of the window




         Selecting Functions
                  You can call functions in the system as follows
                      o Menu Option
                      o Favourites
                      o Entry in the SAP easy Access menu
                  “/n” ends the current session
                  “/i” delets the current session
                  “/oCV01N” opens a new session and branches out to the transaction
                   specified (CV01N)



Last changed on:       Last changed by:                       Version:                 Page:

(23/11/2010)           RAVINDER KUMAR                         1.0                 12 of 241
End User Manual

                       Title: SAP PM
                        Module:           PLANT MAINTENANCE
                        Release:          ECC 6.0
                        Created by:       RAVINDER KUMAR
                        Created on:       23 Nov‟10




                  By entering “ search_sap_menu” in the command field, you can
                   display menu paths for the desired SAP transaction.




   Command Field




                                              Menu

 SAP easy Access and Favorite
 List



Field help : F1 and F4


                  Use F1 to display an explanation of fields, menus, functions and
                   messages.
                  F1 Help also provides technical information on the relevant field.




Last changed on:       Last changed by:                       Version:                     Page:

(23/11/2010)           RAVINDER KUMAR                         1.0                       13 of 241
End User Manual

                       Title: SAP PM
                        Module:            PLANT MAINTENANCE
                        Release:           ECC 6.0
                        Created by:        RAVINDER KUMAR
                        Created on:        23 Nov‟10




                                                 F1 Help




                  Use F4 to display possible inputs . you can also access F4 help for a
                   selected field using the button immediately to the right of that field.




Last changed on:        Last changed by:                       Version:                         Page:

(23/11/2010)            RAVINDER KUMAR                         1.0                           14 of 241
End User Manual

                       Title: SAP PM
                        Module:           PLANT MAINTENANCE
                        Release:          ECC 6.0
                        Created by:       RAVINDER KUMAR
                        Created on:       23 Nov‟10




                             F4 help




User – Specific Personalization


                  The end user has many possibilities for personalizing the system. For
                   example as shown in the screen below.




Last changed on:       Last changed by:                       Version:                     Page:

(23/11/2010)           RAVINDER KUMAR                         1.0                    15 of 241
End User Manual

                      Title: SAP PM
                       Module:           PLANT MAINTENANCE
                       Release:          ECC 6.0
                       Created by:       RAVINDER KUMAR
                       Created on:       23 Nov‟10




SAP – Symbols or icons


           Keyboard                                        Keyboard
Button                     Description            Button                      Description
           Shortcut                                        Shortcut

                                                           Ctrl     +    Page First page
           Enter Key       Enter/Continue
                                                           Up

                           Save              to
           Ctrl + S                                        Page Up            Previous page
                           database


Last changed on:      Last changed by:                            Version:                       Page:

(23/11/2010)          RAVINDER KUMAR                              1.0                         16 of 241
End User Manual

                      Title: SAP PM
                        Module:          PLANT MAINTENANCE
                        Release:         ECC 6.0
                        Created by:      RAVINDER KUMAR
                        Created on:      23 Nov‟10




                                                                             Next page
           F3               Back                        Page Down

                            Exit         System         Ctrl     +    Page
           Shift + F3                                                        Last page
                            Task                        Down
                                                                             Create       New
           F12              Cancel                      None                 session


                                                                             Create    shortcut
           Ctrl + P         Print                       None
                                                                             on Desktop
                                                                             F1 Help
           Ctrl + F         Find                        F1

                                                                             Customize Local
           Ctrl + G         Find next                   Alt + F12
                                                                             Layout




Last changed on:      Last changed by:                         Version:                           Page:

(23/11/2010)          RAVINDER KUMAR                           1.0                            17 of 241
End User Manual

                      Title: SAP PM
                       Module:           PLANT MAINTENANCE
                       Release:          ECC 6.0
                       Created by:       RAVINDER KUMAR
                       Created on:       23 Nov‟10




3. Master Data
3.1 Functional Location
 Functional locations are elements of a technical structure (for example, functional
 units within a system). Functional locations can be created according to the
 hierarchy, and can be structured based on the following criteria:

        Functional

        Process-related

        Spatial


 Each functional location is managed independently in the system, to :

        Manage individual data from a maintenance perspective for the object

        Perform individual maintenance tasks for the object

        Keep a record of the maintenance tasks performed for the object

        Collect and evaluate data over a long period of time for the object



Trigger:
Functional locations need to be structured according to functional, process-related or
spatial criteria. Whenever any new location identified we need to create Functional
location.


                      BUSINESS PROCESS PROCEDURE OVERVIEW
A functional location is an organizational unit to structure the maintenance objects of a
company according to functional, process-related or spatial criteria.

Last changed on:      Last changed by:                       Version:                  Page:

(23/11/2010)          RAVINDER KUMAR                         1.0                  18 of 241
End User Manual

                    Title: SAP PM
                     Module:             PLANT MAINTENANCE
                     Release:            ECC 6.0
                     Created by:         RAVINDER KUMAR
                     Created on:         23 Nov‟10




                     BUSINESS PROCESS PROCEDURE OVERVIEW
A functional location represents the place at which equipment(s) can be installed and a
maintenance task is to be performed.




Output – Results                                                    Comments
Functional location created



Procedural Steps


       ID: PM                           Title: Maintaining of Master data – functional
                                        location
       Business process:                Functional Location
       Transaction       code: Menu                path:   Logistics     Plant   maintenance
       IL01, IL02                       Management of Technical Objects  functional
                                        location  Create (IL01)




Last changed on:     Last changed by:                         Version:                      Page:

(23/11/2010)         RAVINDER KUMAR                           1.0                        19 of 241
End User Manual

                    Title: SAP PM
                     Module:           PLANT MAINTENANCE
                     Release:          ECC 6.0
                     Created by:       RAVINDER KUMAR
                     Created on:       23 Nov‟10




     Description:
     Use this transaction for creating structured location
     Double CLICK on selected line or press Enter to get following screen




Last changed on:    Last changed by:                       Version:            Page:

(23/11/2010)        RAVINDER KUMAR                         1.0              20 of 241
End User Manual

                     Title: SAP PM
                         Module:        PLANT MAINTENANCE
                         Release:       ECC 6.0
                         Created by:    RAVINDER KUMAR
                         Created on:    23 Nov‟10




     Instructions
     In the initial screen, enter the values in the following fields:


       Field name                 Required User action and allowed values
                                  /
                                  Optional
       Functional location              R     Functional location code is to be entered as per
                                              the structure
       Structure indicator              R     Structure of func. With hierarchy level
       Fuct. loc. cat.                  R     Type of fictional loc.




“Press enter key“ or click on icon


Last changed on:     Last changed by:                       Version:                       Page:

(23/11/2010)         RAVINDER KUMAR                         1.0                         21 of 241
End User Manual

                    Title: SAP PM
                     Module:           PLANT MAINTENANCE
                     Release:          ECC 6.0
                     Created by:       RAVINDER KUMAR
                     Created on:       23 Nov‟10




Field name             Required User action and allowed values
                       /
                       Optional
Description                R            Functional Location. Name is to be entered
                                        (40characters). If the name exceeds, use long
                                        text.




Ensure General data screen is open or click on GENERAL TAB




       Field name              Required User action and allowed values
                               /

Last changed on:    Last changed by:                       Version:                     Page:

(23/11/2010)        RAVINDER KUMAR                         1.0                      22 of 241
End User Manual

                   Title: SAP PM
                       Module:            PLANT MAINTENANCE
                       Release:           ECC 6.0
                       Created by:        RAVINDER KUMAR
                       Created on:        23 Nov‟10




                                  Optional


       Weight                        O          Weight of the Functional Location
       Size                          O          Size of the Functional Location
       Start up date                 O          Actual start date of usage
       Acquisition value             O          Value of the Functional Location at the time of
                                                acquiring
       Acquisition date              O          Date on which the Functional Location was
                                                acquired
       Manufacturer                  O          Manufacturer of the Functional Location
       Manufacturing                 O          Country, where the Functional Location was
       country                                  manufactured
       Model number                  O          Model number of the Functional Location
                                                supplied by the manufacturer
       Constr. Yr/mth                O          Year    and    month     of   Functional   Location
                                                constructed
       Manuf Part No.                O          Part number of the Functional Location as
                                                supplied by the manufacturer
       Manuf Serial No.              O          Serial number of the Functional Location as
                                                supplied by the manufacturer




After entering required data click on LOCATION TAB




Last changed on:       Last changed by:                       Version:                          Page:

(23/11/2010)           RAVINDER KUMAR                         1.0                            23 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




Field name            Required User action and allowed values
                      /
                      Optional
Maintenance plant         O            Maintenance        plant,       where   the   Functional
                                       Location is located
Location                  O            Location of the Functional Location, for ex:
                                       Building where it is installed.




Last changed on:   Last changed by:                         Version:                              Page:

(23/11/2010)       RAVINDER KUMAR                           1.0                               24 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




Field name            Required User action and allowed values
                      /
                      Optional
Plant section             O            Further low level identification of location.
Work center               O            Production work center, for blocking from
                                       production during maintenance work.
ABC Indic                 O            As detailed below :




After entering required data click on ORGANISATION TAB




TO GET FOLLOWING SCREEN :




Last changed on:   Last changed by:                       Version:                        Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                          25 of 241
End User Manual

                    Title: SAP PM
                     Module:            PLANT MAINTENANCE
                     Release:           ECC 6.0
                     Created by:        RAVINDER KUMAR
                     Created on:        23 Nov‟10




Field name              Required User action and allowed values
                        /
                        Optional
Company code                R            R/3 will copy the respective company of the
                                         maintenance plant.
Business area               O            For viewing profit and loss statement/area wise
                                         costing.
Asset                       O            Appropriate asset number should be assigned
                                         to the Functional Location.
Cost center                 O            All the costs incurred at the Functional Location
                                         level are collected at these cost centers level.
Planning Plant              O            Maintenance planning plant, defaulted as that of
                                         maintenance plant.
Planner group               O            Planner    groups      as      per   the   maintenance
                                         planning activities.
Maintenance        work O                Maintenance work center, currently represents
center                                   the departments like ME, EE, IE, CE & SE
Catalog profile             O            For Functional Location history generation all
                                         the codes are maintained in a catalog profile.




Last changed on:     Last changed by:                        Version:                             Page:

(23/11/2010)         RAVINDER KUMAR                          1.0                              26 of 241
End User Manual

                    Title: SAP PM
                     Module:           PLANT MAINTENANCE
                     Release:          ECC 6.0
                     Created by:       RAVINDER KUMAR
                     Created on:       23 Nov‟10




After entering required data click on STRUCTURE TAB
You will reach the following screen




       Field name              Required User action and allowed values
                               /
                               Optional
       Functional Location         O         Functional location under which the Functional
                                             Location is functioning.
       Superior Functional O                 Superior Functional Location under which the
       Location                              Functional Location is functioning.
       Tech Ident. no              O         Technical     identification   number   of      the
                                             Functional Location.
       Const Type                  O         Material of construction.




Last changed on:    Last changed by:                       Version:                          Page:

(23/11/2010)        RAVINDER KUMAR                         1.0                            27 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




Click on                              to Save and following message will be given by
the system




The Functional Location is saved.


Through transaction code IL02, required functional location can be opened for
editing


If Functional location installation is to be changed, click on icon
                                      on structure tab, to get the following screen




Last changed on:   Last changed by:                       Version:                       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                         28 of 241
End User Manual

                    Title: SAP PM
                      Module:          PLANT MAINTENANCE
                      Release:         ECC 6.0
                      Created by:      RAVINDER KUMAR
                      Created on:      23 Nov‟10




First dismantle the already existing installation and then input / select new


installation location and click on                    Enter / Continue icon



Click on                                  to    Save the changes made and following
message will be given by the system.


3.2 Equipment
A piece of equipment is an individual object that is to be maintained independently.
Each piece of equipment is managed independently in the system, so that you can:

        Manage individual data from a maintenance perspective for the object

        Perform individual maintenance tasks for the object

        Keep a record of the maintenance tasks performed for the object

        Collect and evaluate data over a long period of time for the object

Pieces of equipment can be installed and dismantled at functional locations. The
usage times for a piece of equipment at a functional location are documented over
the course of time.



Trigger:
Maintenance history needs to be captured for a physical technical object.Whenever
any new Machine/Computer etc. Purchased we need to create Equipment Master.
Correct Equipment Type has to be choosen always for proper functioning.


                     BUSINESS PROCESS PROCEDURE OVERVIEW

Last changed on:    Last changed by:                       Version:                    Page:

(23/11/2010)        RAVINDER KUMAR                         1.0                     29 of 241
End User Manual

                   Title: SAP PM
                     Module:             PLANT MAINTENANCE
                     Release:            ECC 6.0
                     Created by:         RAVINDER KUMAR
                     Created on:         23 Nov‟10




                     BUSINESS PROCESS PROCEDURE OVERVIEW
This document describes how to create Equipment for use in PM functions. Equipment
are master data to manage physical objects in PM and Customer Service. An
Equipment master data object must be created here before it may be associated with a
Functional Location object.




Output - Results                                                   Comments
Equipment Master created




       ID: PM                           Title: Maintaining of Master data - Equipment
       Transaction       code: Menu             path:   Logistics       Plant   maintenance
       IE01, IE02, IE03,                Management of Technical Objects  Equipment 
                                        Create (IE01)




Last changed on:     Last changed by:                        Version:                      Page:

(23/11/2010)         RAVINDER KUMAR                          1.0                        30 of 241
End User Manual

                    Title: SAP PM
                     Module:           PLANT MAINTENANCE
                     Release:          ECC 6.0
                     Created by:       RAVINDER KUMAR
                     Created on:       23 Nov‟10




     Description:
     Use this transaction for creating & maintaining Equipment
     Double click or press Enter Key to reach the following screen




Last changed on:    Last changed by:                       Version:      Page:

(23/11/2010)        RAVINDER KUMAR                         1.0        31 of 241
End User Manual

                    Title: SAP PM
                     Module:           PLANT MAINTENANCE
                     Release:          ECC 6.0
                     Created by:       RAVINDER KUMAR
                     Created on:       23 Nov‟10




     Instructions
     In the initial screen, enter the values in the following fields:




Last changed on:    Last changed by:                       Version:        Page:

(23/11/2010)        RAVINDER KUMAR                         1.0          32 of 241
End User Manual

                    Title: SAP PM
                     Module:           PLANT MAINTENANCE
                     Release:          ECC 6.0
                     Created by:       RAVINDER KUMAR
                     Created on:       23 Nov‟10




       Field name              Required User action and allowed values
                               /
                               Optional
       Equipment                             No in put is required as system creates an
                                             internal no,
       Valid on                    R         By default system proposes current date, one
                                             can change to the appropriate valid from date.
       Equipment category R                  Appropriate equipment category to be selected
                                             from the list




       REFERENCE

       Equipment                   O         Already existing equipment can be used to copy
                                             the data
       Material                              Not   applicable           this   is   required   when     a
                                             material/equipment link is required




Last changed on:    Last changed by:                         Version:                                 Page:

(23/11/2010)        RAVINDER KUMAR                           1.0                                 33 of 241
End User Manual

                     Title: SAP PM
                      Module:           PLANT MAINTENANCE
                      Release:          ECC 6.0
                      Created by:       RAVINDER KUMAR
                      Created on:       23 Nov‟10




     Press Enter key or click on                Enter / Continue icon to reach the following
screen




     Enter the parameters as detailed below: in „General‟ screen
     Screen fields data entry instruction:
       Field name               Required User action and allowed values
                                /
                                Optional
       Description                  R         Equipment       Name     is   to   be    entered
                                              (40characters). If the name exceeds, use long
                                              text.
       Object type                  O         Type of machine ex: “select from list”




Last changed on:     Last changed by:                       Version:                       Page:

(23/11/2010)         RAVINDER KUMAR                         1.0                         34 of 241
End User Manual

                    Title: SAP PM
                       Module:            PLANT MAINTENANCE
                       Release:           ECC 6.0
                       Created by:        RAVINDER KUMAR
                       Created on:        23 Nov‟10




       Field name                 Required User action and allowed values
                                  /
                                  Optional




       Weight                         O         Weight of the equipment
       Size                           O         Size of the equipment
       Start up date                  O         Actual start date of usage
       Acquisition value              O         Value of the equipment at the time of acquiring
       Acquisition date               O         Date on which the equipment was acquired
       Manufacturer                   O         Manufacturer of the equipment
       Manufacturing                  O         Country,      where      the   equipment     was
       country                                  manufactured
       Model number                   O         Model number of the equipment supplied by the

Last changed on:       Last changed by:                       Version:                        Page:

(23/11/2010)           RAVINDER KUMAR                         1.0                          35 of 241
End User Manual

                    Title: SAP PM
                     Module:           PLANT MAINTENANCE
                     Release:          ECC 6.0
                     Created by:       RAVINDER KUMAR
                     Created on:       23 Nov‟10




       Field name              Required User action and allowed values
                               /
                               Optional
                                             manufacturer
       Constr. Yr/mth              O         Year and month of equipment constructed
       Manuf Part No.              O         Part number of the equipment as supplied by
                                             the manufacturer
       Manuf Serial No.            O         Serial number of the equipment as supplied by
                                             the manufacturer




Click on                                                   Location Tab to get the following
screen




Last changed on:    Last changed by:                       Version:                       Page:

(23/11/2010)        RAVINDER KUMAR                         1.0                         36 of 241
End User Manual

                     Title: SAP PM
                       Module:            PLANT MAINTENANCE
                       Release:           ECC 6.0
                       Created by:        RAVINDER KUMAR
                       Created on:        23 Nov‟10




       Field name                 Required User action and allowed values
                                  /
                                  Optional
       Maintenance plant              R         Maintenance plant, where the equipment is
                                                located
       Location                       O         Location of the equipment, for ex: Building
                                                where it is installed.


       Plant section                  R         Further low level identification of location.
       Work center                    O         Production work center, for blocking from
                                                production during maintenance work.
       ABCD                           O         As detailed below:


       Indicator           Strategy
               A   Critical
               B   Important
               C   Non-critical




Now Click on                                            Organization tab to get the following
screen




Last changed on:       Last changed by:                       Version:                             Page:

(23/11/2010)           RAVINDER KUMAR                         1.0                               37 of 241
End User Manual

                     Title: SAP PM
                      Module:           PLANT MAINTENANCE
                      Release:          ECC 6.0
                      Created by:       RAVINDER KUMAR
                      Created on:       23 Nov‟10




       Field name               Required User action and allowed values
                                /
                                Optional
       Company code                 R         R/3 will copy the respective company of the
                                              maintenance plant.
       Business area                O         For viewing profit and loss statement/area wise
                                              costing.
       Asset                        O         Appropriate asset number should be assigned
                                              to the equipment.
       Cost center                  R         All the costs incurred at the equipment level are
                                              collected at these cost centers level.
       Planning Plant               O         Maintenance planning plant, defaulted as that of
                                              maintenance plant.


Last changed on:     Last changed by:                       Version:                        Page:

(23/11/2010)         RAVINDER KUMAR                         1.0                          38 of 241
End User Manual

                      Title: SAP PM
                          Module:           PLANT MAINTENANCE
                          Release:          ECC 6.0
                          Created by:       RAVINDER KUMAR
                          Created on:       23 Nov‟10




       Field name                  Required User action and allowed values
                                   /
                                   Optional
       Planner group                    O         Planner       groups       as   per   the   maintenance
                                                  planning activities.
       Maintenance          work O                Maintenance work center, currently represents
       center                                     the departments like ME, EE, IE, CE & SE
       Catalog profile                  O         For equipment history generation all the codes
                                                  are maintained in a catalog profile.




Now Click on                                      Structure tab to get the following screen




         Click here for
         Installation
         at functional
         location




Last changed on:      Last changed by:                            Version:                             Page:

(23/11/2010)          RAVINDER KUMAR                              1.0                               39 of 241
End User Manual

                    Title: SAP PM
                     Module:           PLANT MAINTENANCE
                     Release:          ECC 6.0
                     Created by:       RAVINDER KUMAR
                     Created on:       23 Nov‟10




       Field name              Required User action and allowed values
                               /
                               Optional
       Functional Location         O         Functional location under which the equipment
                                             is functioning.
       Superior Equipment O                  Superior equipment under which the equipment
                                             is functioning.
       Tech Ident. no              O         Technical     identification   number   of      the
                                             equipment.
       Const Type                  O         Material of construction.


The field in the Function location blank, so it is to be selected for the Hierarchy
Icon.




Click on icon                                       on structure tab, to get the following
screen




Last changed on:    Last changed by:                       Version:                          Page:

(23/11/2010)        RAVINDER KUMAR                         1.0                            40 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




First dismantle the already existing installation and then input / select new


installation location and click on                   Enter / Continue icon


If you select the Superior Equipment Instead of Functional Location then that
Equipment will be called SubEquipment.




Last changed on:   Last changed by:                       Version:              Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                41 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




                                            WARRANTY
                                            END DATE




                                                   WARRANTY START DATE




Click on                               to   Save the Equipment and following message
will be given by the system




Warranty is the commitment of the manufacturer, vendor, or retailer to guarantee
services to a customer either free-of-charge or only charged in part, over a certain
period of time.


Warranty details of equipment can be incorporated during equipment creation or can
be done in equipment data change transaction and can be viewed through display
mode


Whenever we try to create a notification or order, SAP system will alert with a
warning message with warranty details if the equipment is still under warranty [period
Last changed on:   Last changed by:                       Version:                  Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                    42 of 241
End User Manual

                    Title: SAP PM
                      Module:           PLANT MAINTENANCE
                      Release:          ECC 6.0
                      Created by:       RAVINDER KUMAR
                      Created on:       23 Nov‟10




To accommodate different warranty conditions against different warranty services, a
separate master warranty is to be created and the same is to be assigned to the
equipment master data


       Field name              Required User action and allowed values
                               /
                               Optional
       Master Warranty              O         N.A
       Begin guarantee              O         Start date of warranty
       Warranty end                 O         End date of warranty



3.3 Equipment Bill of Material
A “Bill Of Material” (BOM) is a complete, formally structured list of the components
making up a technical object or an assembly. The list contains the object numbers of
the individual components together with their quantity and unit of measure. The
components can be stock or non-stock spares or assemblies, which in turn can be
described using maintenance BOMs.

BOMs are primarily used for the following purposes:

        Structure description

    BOM describes the structure of a technical object or material. Using maintenance
    BOMs maintenance tasks can be planned

        Assignment of spare parts

    BOM is used in plant maintenance to assign spares for a technical object or
    material. This is shown in the figure below:

Last changed on:    Last changed by:                        Version:                   Page:

(23/11/2010)        RAVINDER KUMAR                          1.0                   43 of 241
End User Manual

                   Title: SAP PM
                     Module:              PLANT MAINTENANCE
                     Release:             ECC 6.0
                     Created by:          RAVINDER KUMAR
                     Created on:          23 Nov‟10




Trigger:
A piece of maintenance equipment requires a bill of material for maintenance
purposes.Whenever any Equipment created we can create its BOM for Structuring.
But Before creating Equipment BOM we need to create Material Master.


                     BUSINESS PROCESS PROCEDURE OVERVIEW
Create a bill of material for a piece of maintenance equipment to describe the
equipment components, maintenance requirements or the assignment of spare parts.




Output - Results                                                      Comments
Equipment BOM created




       ID: PM                           Title: Maintaining of Master data – Equipment
       Business process:                Bill of Material
       Transaction                      Menu     path:     Logistics       Plant   maintenance
       code:IB01, IB02                  Management         of   Technical     Objects   Bill    of
                                        materialEquipment BOMIB01 create




Last changed on:     Last changed by:                           Version:                        Page:

(23/11/2010)         RAVINDER KUMAR                             1.0                         44 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




Description:
     Use this transaction for creating & maintaining Equipment bill of material


Press Enter key or use mouse double click to get following screen




Last changed on:   Last changed by:                       Version:                   Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                     45 of 241
End User Manual

                    Title: SAP PM
                     Module:           PLANT MAINTENANCE
                     Release:          ECC 6.0
                     Created by:       RAVINDER KUMAR
                     Created on:       23 Nov‟10




                               Equipment no




                      Plant

BOM
USAGE




     Press enter key
     In the initial screen, enter the values in the following fields:
       Field name             Required User action and allowed values
                              /
                              Optional
       Equipment                   R         Select Equipment for which BoM     is being
                                             created
       Plant                      R          Enter plant
       BOM usage                  R          Select – 4 for Plant Maintenance




Press Enter Key or Click on                    Enter / Continue icon
To get the following screen


Last changed on:    Last changed by:                       Version:                   Page:

(23/11/2010)        RAVINDER KUMAR                         1.0                     46 of 241
End User Manual

                    Title: SAP PM
                       Module:           PLANT MAINTENANCE
                       Release:          ECC 6.0
                       Created by:       RAVINDER KUMAR
                       Created on:       23 Nov‟10




     Enter the parameters as detailed below : in „Material‟ screen
     Screen fields data entry instruction:
       Field name               Required User action and allowed values
                                /
                                Optional
       Item category                 R         Select Item Category




Last changed on:    Last changed by:                         Version:        Page:

(23/11/2010)        RAVINDER KUMAR                           1.0          47 of 241
End User Manual

                    Title: SAP PM
                     Module:           PLANT MAINTENANCE
                     Release:          ECC 6.0
                     Created by:       RAVINDER KUMAR
                     Created on:       23 Nov‟10




       Field name              Required User action and allowed values
                               /
                               Optional




       Component                   R         Select item code




Last changed on:    Last changed by:                       Version:         Page:

(23/11/2010)        RAVINDER KUMAR                         1.0           48 of 241
End User Manual

                     Title: SAP PM
                      Module:           PLANT MAINTENANCE
                      Release:          ECC 6.0
                      Created by:       RAVINDER KUMAR
                      Created on:       23 Nov‟10




       Field name               Required User action and allowed values
                                /
                                Optional




       Component                    R         System        defaults     description   of   selected
       description                            component
       Quantity                     R         Enter installed quantity
       Units                        R         System defaults UOM of selected component

Click on                     to save the entered data

Last changed on:     Last changed by:                         Version:                           Page:

(23/11/2010)         RAVINDER KUMAR                           1.0                             49 of 241
End User Manual

                    Title: SAP PM
                     Module:            PLANT MAINTENANCE
                     Release:           ECC 6.0
                     Created by:        RAVINDER KUMAR
                     Created on:        23 Nov‟10




3.4 General maintenance Task lists
Task Lists.
Task list is defined as the set of work instructions that will help a maintenance
planner schedule his day-to-day job in a predefined manner

Maintenance task lists describe a sequence of individual maintenance activities,
which must be performed repeatedly within a company. Task lists are used to
standardize these recurring work sequences and to plan them more effectively.

Task lists can be grouped, for example in to two groups -              "Inspection" and
"Mechanical Repairs".

The individual maintenance task lists within the group "Mechanical Repairs" and are
identified by the task list counter numbers 01 and 02 as shown in following fig.

General Maintenance Task List

         This type of task list is generic in nature i.e. the same general task list can be
used both for       equipment and functional location and also for more than one
equipment or functional location of the same type or different types.

Similar general task lists can be grouped and several individual general maintenance
task lists can be created.

General task lists can be used to reduce the time spent creating individual functional
location/equipment task lists.

Trigger:
Need to prepare a sequence of activities that must be repeatedly performed within a
company.


                     BUSINESS PROCESS PROCEDURE OVERVIEW

Last changed on:     Last changed by:                       Version:                         Page:

(23/11/2010)         RAVINDER KUMAR                         1.0                           50 of 241
End User Manual

                   Title: SAP PM
                     Module:             PLANT MAINTENANCE
                     Release:            ECC 6.0
                     Created by:         RAVINDER KUMAR
                     Created on:         23 Nov‟10




                     BUSINESS PROCESS PROCEDURE OVERVIEW
Maintenance task lists describe a sequence of individual maintenance activities which
must be repeatedly performed within a company. They are used to standardize
repetitive work processes, to plan them more effectively, and to save time when
creating maintenance orders and maintenance plans.



Output – Results                                                    Comments
General Task List created


For General Task Lists
       ID: PM                           Title: Maintaining of Master data - Functional
                                        location
       Business process:                General Task List
       Transaction       code: Menu                   path:              Logistics      Plant
       IA05                             maintenancepreventive            maintenance   Work
                                        schedulingtask listGeneral maintenance Task
                                        lists  Create (IA05)




Last changed on:     Last changed by:                         Version:                      Page:

(23/11/2010)         RAVINDER KUMAR                           1.0                        51 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




Description:
     Use this transaction for creating & maintaining General task list
     Press Enter Key to get the following screen




Last changed on:   Last changed by:                       Version:          Page:

(23/11/2010)       RAVINDER KUMAR                         1.0            52 of 241
End User Manual

                    Title: SAP PM
                     Module:           PLANT MAINTENANCE
                     Release:          ECC 6.0
                     Created by:       RAVINDER KUMAR
                     Created on:       23 Nov‟10




       Field name              Required User action and allowed values
                               /
                               Optional
       Group                       R         Enter a group name (8 characters only)
       Profile                     R         PDIL
       Key date                    R         Date from which the task list is to be used




Last changed on:    Last changed by:                       Version:                           Page:

(23/11/2010)        RAVINDER KUMAR                         1.0                             53 of 241
End User Manual

                    Title: SAP PM
                     Module:           PLANT MAINTENANCE
                     Release:          ECC 6.0
                     Created by:       RAVINDER KUMAR
                     Created on:       23 Nov‟10




     Enter the field value according to the following table
       Field name              Required User action and allowed values
                               /
                               Optional
       Group CNTR                  R         System defaults grp cntr is to be entered




Last changed on:    Last changed by:                       Version:                         Page:

(23/11/2010)        RAVINDER KUMAR                         1.0                           54 of 241
End User Manual

                     Title: SAP PM
                      Module:           PLANT MAINTENANCE
                      Release:          ECC 6.0
                      Created by:       RAVINDER KUMAR
                      Created on:       23 Nov‟10




       Work Center              O             Select responsible work center from the list




       Usage                    O             Select 4 for plant maintenance




                                R             Select 4 for plant maintenance
       Status




Last changed on:     Last changed by:                       Version:                         Page:

(23/11/2010)         RAVINDER KUMAR                         1.0                          55 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




     Click on operation tab




     Following screen can be viewed




Last changed on:   Last changed by:                       Version:      Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        56 of 241
End User Manual

                     Title: SAP PM
                      Module:           PLANT MAINTENANCE
                      Release:          ECC 6.0
                      Created by:       RAVINDER KUMAR
                      Created on:       23 Nov‟10




     In the initial screen, enter the values in the following fields:


       Field name               Required User action and allowed values
                                /
                                Optional
       Work center              R             Select work center




Last changed on:     Last changed by:                       Version:         Page:

(23/11/2010)         RAVINDER KUMAR                         1.0           57 of 241
End User Manual

                     Title: SAP PM
                      Module:           PLANT MAINTENANCE
                      Release:          ECC 6.0
                      Created by:       RAVINDER KUMAR
                      Created on:       23 Nov‟10




       Plant code               R             Define plant code like for Noida Engineering=
                                              1100


       Ctrl key                 R             Pm 01 for internal operations & PM 03 for
                                              external operations
       Operation                O             Describe the operation to be carried out
       description
       Work                     O             System        will    automatically    calculate     by
                                              calculation key
       UN                       O             Unit of measurement for mh
       NO                       O             No of persons required to perform the activity
       Duration                 O             Duration of Operation
       Unit                     O             Unit of measurement for duration
       C                        O             Calculation key –2         ( for calculating duration )


     Repeat the same above operation for required no of activities


     Select components tab for allotting spares required for that activity.




Last changed on:     Last changed by:                         Version:                            Page:

(23/11/2010)         RAVINDER KUMAR                           1.0                              58 of 241
End User Manual

                    Title: SAP PM
                     Module:           PLANT MAINTENANCE
                     Release:          ECC 6.0
                     Created by:       RAVINDER KUMAR
                     Created on:       23 Nov‟10




        Material               O             Select required item code
        Qty                    O             Enter the required qty



Click on                    to save the task list.



3.5 Work Permit
Permits are to ensure that special approval must be obtained before maintenance
orders are executed.



   Permits can be assigned to the following objects:

        Technical objects (functional locations and equipments)

        Maintenance orders



   Different types of work permit are required
Last changed on:    Last changed by:                       Version:          Page:

(23/11/2010)        RAVINDER KUMAR                         1.0            59 of 241
End User Manual

                    Title: SAP PM
                     Module:           PLANT MAINTENANCE
                     Release:          ECC 6.0
                     Created by:       RAVINDER KUMAR
                     Created on:       23 Nov‟10




   Permits can be grouped into permit categories, like
        Work permit – General jobs

        Hot work permit - Hot job

        Confined space work permit - permit to work at confined areas

        High reach work permit-Permit to work at elevated places



Trigger:
   A regulation or condition needing to be observed when maintenance work is being
   performed.


                    BUSINESS PROCESS PROCEDURE OVERVIEW
   A permit is a regulation or condition that must be observed when maintenance work
   is to be performed on a technical object. The creation of the permit master record is
   covered in this procedure.
   The permit can be attached to a Functional Location, Equipment master, or directly to
   a work order.
   The requirement can be observed at the release or the completion of a work order.
   The permit can only be for reference, provide a warning, or cause an error message
   unless issued.



Output – Results                                                 Comments
Permit master created                   Master record can be viewed again by selecting row
                                        and choosing details.




Last changed on:    Last changed by:                       Version:                     Page:

(23/11/2010)        RAVINDER KUMAR                         1.0                       60 of 241
End User Manual

                   Title: SAP PM
                     Module:            PLANT MAINTENANCE
                     Release:           ECC 6.0
                     Created by:        RAVINDER KUMAR
                     Created on:        23 Nov‟10




       ID: PM                           Title: Maintaining of Master data – Work Permits
       Business process:                Work permits
       Transaction          code: Menu path: Logistics Management of tech.
       IPMD                             objects Environment  IPMD permits




Select the transaction as shown in the following screen




     Press enter key or double click to reach the following screen

Last changed on:     Last changed by:                       Version:                       Page:

(23/11/2010)         RAVINDER KUMAR                         1.0                      61 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




     To view the next screen press Enter key or click on icon




                                          AND THEN ON




     to view the following screen :

Last changed on:   Last changed by:                       Version:      Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        62 of 241
End User Manual

                    Title: SAP PM
                     Module:           PLANT MAINTENANCE
                     Release:          ECC 6.0
                     Created by:       RAVINDER KUMAR
                     Created on:       23 Nov‟10




     Enter the filed values as explained in following table :


       Field name              Required User action and allowed values
                               /
                               Optional
       Permit                      R         Enter permit name
       Text                        R         Enter description of the permit

       Category                    R         Select category of permit from the list




Last changed on:    Last changed by:                       Version:                       Page:

(23/11/2010)        RAVINDER KUMAR                         1.0                         63 of 241
End User Manual

                    Title: SAP PM
                       Module:           PLANT MAINTENANCE
                       Release:          ECC 6.0
                       Created by:       RAVINDER KUMAR
                       Created on:       23 Nov‟10




       Field name               Required User action and allowed values
                                /
                                Optional




       Order release                 O         Select required control on order releasing from
                                               the drop down list




                                               1 – while releasing order system will only warn


Last changed on:    Last changed by:                         Version:                      Page:

(23/11/2010)        RAVINDER KUMAR                           1.0                        64 of 241
End User Manual

                    Title: SAP PM
                     Module:           PLANT MAINTENANCE
                     Release:          ECC 6.0
                     Created by:       RAVINDER KUMAR
                     Created on:       23 Nov‟10




       Field name              Required User action and allowed values
                               /
                               Optional
                                             about the issue of assigned permit to the order


                                             2 – Order release is possible after issuing the
                                             permit only


                                             (Blank) – No need for issue of Permit




       Order Completn              O         Select required control on order releasing from
                                             the drop down list




                                             1 – while completing order system will only

Last changed on:    Last changed by:                       Version:                       Page:

(23/11/2010)        RAVINDER KUMAR                         1.0                         65 of 241
End User Manual

                      Title: SAP PM
                       Module:           PLANT MAINTENANCE
                       Release:          ECC 6.0
                       Created by:       RAVINDER KUMAR
                       Created on:       23 Nov‟10




       Field name                Required User action and allowed values
                                 /
                                 Optional
                                               warn about the issue of assigned permit to the
                                               order


                                               2 – Order completion is possible after issuing
                                               the permit only


                                               (Blank) – No need for issue of Permit
       Permit class                  R         System defaults Permit class
       Print                         O         Select the Print
       Not modifiable                O         N.A




     Click on


     If you want to write some more thing about the permit. You can use the
Long Text.



     Maintain required permit instructions and click on ICON




       Click on save button                                        to save the Permit.


Last changed on:      Last changed by:                       Version:                       Page:

(23/11/2010)          RAVINDER KUMAR                         1.0                         66 of 241
End User Manual

                   Title: SAP PM
                    Module:            PLANT MAINTENANCE
                    Release:           ECC 6.0
                    Created by:        RAVINDER KUMAR
                    Created on:        23 Nov‟10




3.6 Characteristic
The pre-requisite for creating a Measuring Point is characteristic.


Creation of a Characteristic:
The Pre-requisite for creating a characteristic is “Unit of Measurement”, and almost
all standard “units of measurement” are available in the system. If a standard Unit of
Measurement is not available, contact administrator for creation of the same.

Trigger:
Format need for characteristic values and the need to display characteristics when
classifying master data


Output – Results                                                 Comments
List of characteristics                 Used to classify and identify objects




Last changed on:    Last changed by:                       Version:                 Page:

(23/11/2010)        RAVINDER KUMAR                         1.0                   67 of 241
End User Manual

                    Title: SAP PM
                     Module:           PLANT MAINTENANCE
                     Release:          ECC 6.0
                     Created by:       RAVINDER KUMAR
                     Created on:       23 Nov‟10




     Double click or press Enter Key to reach the following screen




     In the initial screen, enter the values in the following fields:


       Field name              Required User action and allowed values
                               /
                               Optional
       Characteristics             R         Select characteristics & characteristic screen
                                             appear & (If you want to change a Existing
                                             Charecteristic) Select find by group & click. The
                                             next screen appears & select plant maint. From
                                             drop down list. If you want to create a new
                                             characteristic      please   enter   the     new
                                             characteristic name and then go to the menu
                                             bar “Charecteristic” and click on “new”




Last changed on:    Last changed by:                       Version:                        Page:

(23/11/2010)        RAVINDER KUMAR                         1.0                          68 of 241
End User Manual

                    Title: SAP PM
                     Module:           PLANT MAINTENANCE
                     Release:          ECC 6.0
                     Created by:       RAVINDER KUMAR
                     Created on:       23 Nov‟10




       Field name              Required User action and allowed values
                               /
                               Optional




Last changed on:    Last changed by:                       Version:         Page:

(23/11/2010)        RAVINDER KUMAR                         1.0           69 of 241
End User Manual

                    Title: SAP PM
                     Module:           PLANT MAINTENANCE
                     Release:          ECC 6.0
                     Created by:       RAVINDER KUMAR
                     Created on:       23 Nov‟10




       Field name              Required User action and allowed values
                               /
                               Optional




                                             After selecting the above screen double click
                                             you get the following screen. Then select the
                                             required characteristic & double click


       Change no                   O         If require fill
       Validity                    O         Select the date of validity from the calendar




Last changed on:    Last changed by:                           Version:                      Page:

(23/11/2010)        RAVINDER KUMAR                             1.0                      70 of 241
End User Manual

                    Title: SAP PM
                     Module:           PLANT MAINTENANCE
                     Release:          ECC 6.0
                     Created by:       RAVINDER KUMAR
                     Created on:       23 Nov‟10




       Field name              Required User action and allowed values
                               /
                               Optional




     If the values are of standard type , values can be entered e.g., Speed of pumps
 1500 RPM, 3000 RPM, 1000 RPM, 750 RPM etc.,


     OR


     If Make is a characteristic, the values could be  Akay, KSB. Maag etc.,



        Click on


     The Characteristic is saved.

3.7 Measuring Points

Last changed on:    Last changed by:                       Version:                Page:

(23/11/2010)        RAVINDER KUMAR                         1.0                  71 of 241
End User Manual

                   Title: SAP PM
                     Module:          PLANT MAINTENANCE
                     Release:         ECC 6.0
                     Created by:      RAVINDER KUMAR
                     Created on:      23 Nov‟10




  Measuring Points:

  Measuring points in MY SAP ERP System describe the physical and/or logical
  locations at which a condition is described (for example, the feed water temperature
  of a boiler, or the number of run hours of a machine)

  In Plant Maintenance, measuring points are located on technical objects, in other
  words, on pieces of equipment or functional locations.

  Measuring points are classified into:

  Measuring points

  Normal inspection points like temperature, pressure readings

  Counters

  Counter is a provision in my SAP ERP to represent the wear and tear of an object,
  consumption, or the reduction of an object‟s useful life

  Counters can be used to accumulate the readings like equipment run hours,
Energy
  Consumption readings, etc.


Trigger:
A measurement or counter reading for any Equipment/ Functional location to capture
its current condition.


                          Business Process Procedure Overview
Measurement will be at a measuring point or a counter.




Last changed on:   Last changed by:                       Version:                    Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                    72 of 241
End User Manual

                   Title: SAP PM
                     Module:             PLANT MAINTENANCE
                     Release:            ECC 6.0
                     Created by:         RAVINDER KUMAR
                     Created on:         23 Nov‟10




Output – Results                                                        Comments
Measurement Point created




     Creation of Measuring Point :
     Measuring Points can be created for Functional location and Equipment.


       ID: PM                           Title: Maintaining of Master data - Equipment
       Business process:                6.4.1.7 – Measuring Points
       Transaction                      Menu    path:   Logistics            Plant   maintenance
       code:IK01                        Management           of         Technical     Objects        
                                        EnvironmentMeasuring pointCreate (IK01)




Last changed on:     Last changed by:                             Version:                         Page:

(23/11/2010)         RAVINDER KUMAR                               1.0                           73 of 241
End User Manual

                    Title: SAP PM
                     Module:           PLANT MAINTENANCE
                     Release:          ECC 6.0
                     Created by:       RAVINDER KUMAR
                     Created on:       23 Nov‟10




     Case 1 : Normal Measuring Point


     As shown in the following screen, Select the transaction


     Double click or press Enter Key to reach the following screen




                                               Meas. Point category




     Screen fields data entry instruction:
       Field name              Required User action and allowed values
                               /
                               Optional
       Measurement                 R         Select IEQ for equipment /IFL for Functional
       Object                                Location. Now press enter key if corresponding
                                             field is not displayed as per IEQ or IFL

Last changed on:    Last changed by:                       Version:                        Page:

(23/11/2010)        RAVINDER KUMAR                         1.0                          74 of 241
End User Manual

                    Title: SAP PM
                      Module:           PLANT MAINTENANCE
                      Release:          ECC 6.0
                      Created by:       RAVINDER KUMAR
                      Created on:       23 Nov‟10




       Field name              Required User action and allowed values
                               /
                               Optional
       Equipment / fuct.loc         R         Equip/Flo code is to be selected
       Meas Pnt Cat                 R         Select required cato. Or use gen cato.
       Measuring       point O                Select if measuring point is counter or leave
       counter check box                      blank




     Press Enter Key or click on                      Details icon to reach the following
screen




     Screen fields data entry instruction:

Last changed on:    Last changed by:                        Version:                      Page:

(23/11/2010)        RAVINDER KUMAR                          1.0                        75 of 241
End User Manual

                    Title: SAP PM
                        Module:           PLANT MAINTENANCE
                        Release:          ECC 6.0
                        Created by:       RAVINDER KUMAR
                        Created on:       23 Nov‟10




       Field name                Required User action and allowed values
                                 /
                                 Optional
       Measurement                    O         Position      of     the      measuring   point   on   the
       Position                                 equipment or functional location.
       Characteristic                 R         Characteristic for Unit of Measurement
       Name
       Description of the R                     Detailed description of the measuring point
       measuring point
       Target Value                   O         Normal operating value should be entered:
                                                Example: 10.0kg/cm2
       Text                           O         Text can be entered: Example: Pressure under
                                                ambient condition.


If measuring point is normal measuring point and if data like max. and min. range is
to be given then click on Additional data tab. This data will determine for automatic
generation of notification whenever entered reading is beyond extreme limits.




Last changed on:      Last changed by:                             Version:                            Page:

(23/11/2010)          RAVINDER KUMAR                               1.0                             76 of 241
End User Manual

                    Title: SAP PM
                     Module:           PLANT MAINTENANCE
                     Release:          ECC 6.0
                     Created by:       RAVINDER KUMAR
                     Created on:       23 Nov‟10




                     Additional data TAB




Go to : Additional data for entering Maximum and Minimum Values :


     Screen fields data entry instruction:
       Field name              Required User action and allowed values
                               /
                               Optional
       Upper Range Limit           O         The Maximum pressure condition
       Lower Range Limit           O         The Minimum pressure condition



       Click on


       The Measuring Point is saved.
Last changed on:    Last changed by:                       Version:              Page:

(23/11/2010)        RAVINDER KUMAR                         1.0                77 of 241
End User Manual

                    Title: SAP PM
                      Module:           PLANT MAINTENANCE
                      Release:          ECC 6.0
                      Created by:       RAVINDER KUMAR
                      Created on:       23 Nov‟10




     Case 2 : Measuring Point as Counter




                       Check this box         if the
                       measuring  point         is a
                       counter




     Screen fields data entry instruction:
       Field name              Required User action and allowed values
                               /
                               Optional
       Measurement                  R         Select IEQ for equipment /IFL for Functional
       Object                                 Location. Now press enter key if corresponding
                                              field is not displayed as per IEQ or IFL
       Equipment / fuct.loc         R         Equip/Flo code is to be selected
       Meas Pnt Cat                 R         Select required cato. Or use gen cato.
       Measuring       point R                Select Check box

Last changed on:    Last changed by:                        Version:                        Page:

(23/11/2010)        RAVINDER KUMAR                          1.0                          78 of 241
End User Manual

                    Title: SAP PM
                     Module:           PLANT MAINTENANCE
                     Release:          ECC 6.0
                     Created by:       RAVINDER KUMAR
                     Created on:       23 Nov‟10




       Field name              Required User action and allowed values
                               /
                               Optional
       counter check box


     Press Enter Key to view the following screen




                                           Counter over reading /
                                           Reset value


                                                   Annual Estimate
                                                   Note : This is required for
                                                   Counter based planning




     Screen fields data entry instruction:




Last changed on:    Last changed by:                       Version:                 Page:

(23/11/2010)        RAVINDER KUMAR                         1.0                   79 of 241
End User Manual

                    Title: SAP PM
                        Module:           PLANT MAINTENANCE
                        Release:          ECC 6.0
                        Created by:       RAVINDER KUMAR
                        Created on:       23 Nov‟10




       Field name                Required User action and allowed values
                                 /
                                 Optional
       Measurement                    O         Position      of     the      measuring   point   on   the
       Position                                 equipment or functional location.
       Characteristic                 R         Characteristic for Unit of Measurement
       Name
       Description of the O                     Detailed description of the measuring point
       measuring point
       Counter Reading                O         Max displayable reading of the counter


       Annual Estimate                O         Annual Estimate of readings



       Click on
       The Measuring Point (Counter) is saved.

3.8 Work Center
Trigger:
Need identified for a new Work Center within a plant.


                            Business Process Description Overview
A work center is an organizational unit that defines where and when an operation
should be carried out within a plant. A work center is unique within a plant. Work
centers can be machines, people or production lines. Operations that need to be
executed are defined on a task list and executed at the corresponding user assigned
work center. This transaction enables the user to create basic data, set defaults,
assignments, and define capacities and scheduling data pertinent to a work center.

Last changed on:    Last changed by:                               Version:                            Page:

(23/11/2010)        RAVINDER KUMAR                                 1.0                             80 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




Work centers contain default values that are copied or referenced in operations at the
time of task list creation. They also contain costing, scheduling and capacity data
required for leadtime scheduling and capacity planning.




Output – Results                                                Comments
New work center within a plant




Last changed on:   Last changed by:                       Version:                       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                         81 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




Last changed on:   Last changed by:                       Version:      Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        82 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




Last changed on:   Last changed by:                       Version:      Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        83 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




Last changed on:   Last changed by:                       Version:      Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        84 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




3.9 Maintenance Planning


  Maintenance Plan (Single Cycle):

  Single cycle plan allows only one cycle frequency, whereas strategy plan allows
  multiple frequencies.

  Single cycle maintenance plan adopts exactly one time-based or performance
  based maintenance cycle, with interval at which the maintenance plan should be
  executed.



Trigger:
To plan maintenance events to occur in a regular, periodic manner, based on one
cycle parameter.


                          Business Process Procedure Overview
Maintenance plans merge the records of specific strategies, task lists, items and
measuring points (when necessary) to generate a recurring maintenance schedule for
the resultant orders which are copied from the task lists.
In addition, they can be used for condition-based maintenance which can generate
notifications or orders based on pre-established performance parameters.
There can be multiple maintenance items in a maintenance plan. A separate order will
generated from the plan for each item.




Output – Results                                                Comments
Maintenance plan is created.           The outputs of all three types of maintenance plans

Last changed on:   Last changed by:                       Version:                       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                         85 of 241
End User Manual

                   Title: SAP PM
                     Module:            PLANT MAINTENANCE
                     Release:           ECC 6.0
                     Created by:        RAVINDER KUMAR
                     Created on:        23 Nov‟10




                                         are work orders (and notifications) automatically
                                         created based on pre-established work requirements
                                         and planning parameters. In addition, the upcoming
                                         maintenance can be budgeted. You will be able to
                                         look at what orders are coming due in up to the next
                                         several days, months or years (scheduled calls). In
                                         addition, you can use date monitoring to create the
                                         orders as far in advance as necessary.
                                         In this case, all the maintenance events produced
                                         from this type of plan will be due with at the same time
                                         and in the same frequency.
                                         Refer to business process procedure „Display
                                         Maintenance Plan‟ to verify results.




       ID: PM                      Title: PREVENTIVE MAINTENANCE –SINGLE CYCLE
                                   PLAN
       Business process:           6.4.2.2 – Single cycle Maintenance Plan
       Transaction      code: Menu            path:    Logistics       Plant   maintenance
       IP41                        Preventive maintenance  Maintenance Planning 
                                   Maintenance Plans Create  Single Cycle Plan
                                   (IP41)




Last changed on:     Last changed by:                       Version:                         Page:

(23/11/2010)         RAVINDER KUMAR                         1.0                           86 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




     Select the transaction and Double click or            press Enter Key   to reach the
following screen




     In the initial screen, enter the values in the following fields:




Last changed on:   Last changed by:                       Version:                     Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                       87 of 241
End User Manual

                    Title: SAP PM
                     Module:            PLANT MAINTENANCE
                     Release:           ECC 6.0
                     Created by:        RAVINDER KUMAR
                     Created on:        23 Nov‟10




       Field name               Required User action and allowed values
                                /
                                Optional
       Maintenance      Plan R                Choose        the     Maintenance   Plan   Category:
       Category                               “Maintenance Order”


       Press Enter to get the following screen




     In the screen, enter the values in the following fields:


       Field name               Required User action and allowed values
                                /
                                Optional
       Maintenance      plan R                Enter     appropriate       description    for      the

Last changed on:     Last changed by:                         Version:                            Page:

(23/11/2010)         RAVINDER KUMAR                           1.0                              88 of 241
End User Manual

                     Title: SAP PM
                      Module:           PLANT MAINTENANCE
                      Release:          ECC 6.0
                      Created by:       RAVINDER KUMAR
                      Created on:       23 Nov‟10




       Field name               Required User action and allowed values
                                /
                                Optional
       description                            maintenance plan. Ex: “Periodic shutdown plan
                                              for BI/BWM/01 SOP:BI0003”
       Cycle/unit                   R         The maintenance period and the unit of period
                                              should be entered. Ex: 2 mon, 30 day etc.
       Cycle text                   O         Enter proper text to describe the cycle duration.
       Offset/unit                  O         The time period by which the first scheduled call
                                              object should be postponed.
       Counter                      O         If the maintenance activity is performance
                                              based, counter should be used. Example
                                              “Number of operations/hrs a motor is run” etc.
       Reference     object: O/R              Reference object on which the maintenance
       Functional Location                    activity should be carried out.
       Reference     object: O/R              Reference object on which the maintenance
       Equipment                              activity should be carried out. After selecting
                                              equip press enter key so that system selects
                                              data from master
       Planning plant               R         Planning plant
       Order type                   R         Enter maintenance order type: Ex: PM02 on
                                              which the maintenance call objects will be
                                              created.
       Main Work Center             R         Main Work Center
       Business Area                R         Business Area
       Task list                    O         Assign a task list either general, equipment of


Last changed on:     Last changed by:                       Version:                         Page:

(23/11/2010)         RAVINDER KUMAR                         1.0                           89 of 241
End User Manual

                    Title: SAP PM
                     Module:            PLANT MAINTENANCE
                     Release:           ECC 6.0
                     Created by:        RAVINDER KUMAR
                     Created on:        23 Nov‟10




       Field name               Required User action and allowed values
                                /
                                Optional
                                              functional location task list.



     Click on icon                                          to reach the following screen




Last changed on:     Last changed by:                        Version:                          Page:

(23/11/2010)         RAVINDER KUMAR                          1.0                            90 of 241
End User Manual

                      Title: SAP PM
                        Module:            PLANT MAINTENANCE
                        Release:           ECC 6.0
                        Created by:        RAVINDER KUMAR
                        Created on:        23 Nov‟10




     In the screen, enter the values in the following fields:


       Field name                  Required User action and allowed values
                                   /
                                   Optional
       Call horizon                    O         %    of    scheduling      period   that    should    be
                                                 considered in planning. If nothing is mentioned
                                                 100% will be considered.
       Scheduling period               O         Planning period during which call objects will be
                                                 created as per the cycle duration”.
       Start of cycle                  O         Enter the date on which the planning cycle
                                                 should start.
       Scheduling                      O         If a day of a month is critical and cycle period is
       indicator                                 in months choose Time-key date other wise
                                                 choose Time. If only the working days are to be
                                                 considered, choose time-factory calendar.
       Equipments                      O         New equipments or functional locations that are
                                                 to be added in the same plan should be created
                                                 and added in the same plan.
       Completion                      O         If the fresh maintenance order to be created by
       requirement                               the system after successful completion of the
                                                 previous      maintenance      order,      then   check
                                                 completion requirement check box.


     In item overview all the maintenance items that are considered in the current
plan are displayed.
     To add a counter for performance based preventive maintenance:

Last changed on:        Last changed by:                         Version:                             Page:

(23/11/2010)            RAVINDER KUMAR                           1.0                               91 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




     Enter required counter no. in “Counter” Field

     (Counter no. can also be searched using icon                    )




After entering all the planning data click on                            to save the plan

3.10 Maintenance Plan Scheduling
  Maintenance Scheduling:

  Scheduling for maintenance jobs as per prepared maintenance plans

  During a schedule run, system schedules the planned dates and the call dates

  Call date is the advance date of order generation by the system (as defined in
  maintenance scheduling parameters) to facilitate maintenance planner to arrange
  for execution of maintenance activity on planned date.

  The call date is the date on which a maintenance order is created in the system.
  This is determined by the call horizon of the maintenance plan.



Trigger:
To schedule the maintenance plan and monitor its progress, including making
scheduling modifications as necessary.


Last changed on:   Last changed by:                       Version:                      Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                        92 of 241
End User Manual

                   Title: SAP PM
                     Module:           PLANT MAINTENANCE
                     Release:          ECC 6.0
                     Created by:       RAVINDER KUMAR
                     Created on:       23 Nov‟10




                          Business Process Procedure Overview
Maintenance plans in SAP are designed to automatically generate calls for orders,
notifications, or service requests when the parameters attached to the item are met.
When an order is created, a request for the resources outlined in the order is made.
However, they are not reserved until the order is released. Once released an order may
have goods, labor, and services charged to it. Releasing a work order gives the others
the authority to reserve its resources, purchase additional ones, and start charging
costs. If you decide not to do this work you can release and technically complete the
order immediately.


Note:
The plan is constantly adjusting itself to keep consistent with the cycle lengths linked to
the items. Thus, each time a call is closed outside the cycle length and the associated
tolerances, the plan is adjusted accordingly. If this is a recurring practice, future
planned call dates will be fluctuate sporadically and could be difficult to keep track of.




Output – Results                                                 Comments
A view of the scheduled calls
for a maintenance plan




       ID: PM                         Title: PREVENTIVE MAINTENANCE–MAINTENANCE
                                      PLANNING

Last changed on:   Last changed by:                        Version:                        Page:

(23/11/2010)       RAVINDER KUMAR                          1.0                          93 of 241
End User Manual

                   Title: SAP PM
                     Module:             PLANT MAINTENANCE
                     Release:            ECC 6.0
                     Created by:         RAVINDER KUMAR
                     Created on:         23 Nov‟10




       Business process:                Maintenance Scheduling
       Transaction       code: Menu              path:   Logistics      Plant   maintenance
       IP10                             Preventive maintenance  Maintenance Planning
                                        Scheduling for Maintenance Plans  Schedule
                                        (IP10)




      Select the transaction and Double click or press Enter Key to reach the following
screen




Last changed on:     Last changed by:                        Version:                      Page:

(23/11/2010)         RAVINDER KUMAR                          1.0                        94 of 241
End User Manual

                    Title: SAP PM
                     Module:           PLANT MAINTENANCE
                     Release:          ECC 6.0
                     Created by:       RAVINDER KUMAR
                     Created on:       23 Nov‟10




     In the initial screen, enter the values in the following fields:
       Field name              Required User action and allowed values
                               /
                               Optional
       Maintenance Plan            R         Select the Maintenance Plan from the list




Press Enter key or click on              Enter / Continue icon to get the following screen
and then Click on the “Start” or the “start in cycle” Push button as per Requirement.




Last changed on:    Last changed by:                       Version:                         Page:

(23/11/2010)        RAVINDER KUMAR                         1.0                           95 of 241
End User Manual

                    Title: SAP PM
                     Module:           PLANT MAINTENANCE
                     Release:          ECC 6.0
                     Created by:       RAVINDER KUMAR
                     Created on:       23 Nov‟10




The plan is ready for a schedule run. Press start button to Run Scheduling from the
Start. If you want to Start the Plan from within the Cycle then one needs to use “Start
in Cycle‟.




       Use “Start” when                 Use “Start in Cycle”
       you need to start                when you need to
       the Plan from the                start the Plan from
       Start of the Cycle.              with in the cycle.




     The Following Screen appears.


Last changed on:    Last changed by:                           Version:              Page:

(23/11/2010)        RAVINDER KUMAR                             1.0                96 of 241
End User Manual

                    Title: SAP PM
                     Module:           PLANT MAINTENANCE
                     Release:          ECC 6.0
                     Created by:       RAVINDER KUMAR
                     Created on:       23 Nov‟10




                                                                      Click on “Scheduling
                                                                      Overview.




     The scheduled call object will be displayed as above. If the overview list is to be
analyzed click on
     Scheduling overview list. Release the scheduled plan for creating the
maintenance orders. The
     Overview will appear as below




Last changed on:    Last changed by:                       Version:                    Page:

(23/11/2010)        RAVINDER KUMAR                         1.0                      97 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




     For list displays of schedule plans and call objects:


     Use the following transactions for various list displays;

Trigger:
To list the scheduled calls for a maintenance plan or group of plans


                         Business Process Procedure Overview
To view the scheduled calls for a maintenance plan in a list format




Output – Results                                                Comments
List of scheduled calls for
review




Last changed on:   Last changed by:                       Version:            Page:

(23/11/2010)       RAVINDER KUMAR                         1.0              98 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




     For viewing plan / execution status select transaction IP24 and press Enter
key to reach the
     Following screen




Last changed on:   Last changed by:                       Version:            Page:

(23/11/2010)       RAVINDER KUMAR                         1.0              99 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




     Select by maint plan category as PM (or use the available fields for
different search criteria)




       click on                           to view the following screen




Last changed on:   Last changed by:                       Version:           Page:

(23/11/2010)       RAVINDER KUMAR                         1.0            100 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




     Calibration process is as same as Preventive maintenance in PDIL Case.
So Kindly follow the same Process.( Only maintenane Order type, Planner
Group, Work Center will be changed as per the Calibration)




Last changed on:   Last changed by:                       Version:        Page:

(23/11/2010)       RAVINDER KUMAR                         1.0         101 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




4. Maintenance Processing
4.1 Measuring documents
  Measurement readings are to be taken at measuring points in particular
  measurement units at particular intervals. (For example, the feed water temperature
  in degrees Celsius of the boiler daily at 6.00 am)

  Measurement readings describe a condition at a measuring point at a particular
  point in time, and represent the transaction data for measuring points in the MY
  SAP ERP System. They are documented in the form of measurement documents.

  An optimum value for a particular measuring point to which the device concerned is
  calibrated can be maintained as a target value for the measuring point.



Creation of Measuring Document:
Measuring documents can be created for Functional location & equipment measuring
points.


Trigger:
A measurement or counter reading from a measurement point needs to be entered
into the system.


                         Business Process Procedure Overview
After a measurement has been taken at a measuring point or a counter, the data needs
to be entered into the system. A measurement document comprises the data entered in
the system


Output - Results                                                Comments

Last changed on:   Last changed by:                       Version:                   Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                    102 of 241
End User Manual

                   Title: SAP PM
                    Module:            PLANT MAINTENANCE
                    Release:           ECC 6.0
                    Created by:        RAVINDER KUMAR
                    Created on:        23 Nov‟10




Measurement Document                    Document may be verified by running transaction IK13
created                                 (display measurement document). Refer to business
                                        process procedure „Display Measurement Document‟
                                        to verify results.


Case 1 : Normal Measuring Point


Transaction        code: Menu           path:     Logistics        Plant   maintenance
IK11                         Management of Technical Objects functional
                             location/equipment measuring document  create
                             (IK11).




     Double click or press Enter Key to reach the following screen




Last changed on:    Last changed by:                         Version:                      Page:

(23/11/2010)        RAVINDER KUMAR                           1.0                      103 of 241
End User Manual

                    Title: SAP PM
                     Module:           PLANT MAINTENANCE
                     Release:          ECC 6.0
                     Created by:       RAVINDER KUMAR
                     Created on:       23 Nov‟10




     In the initial screen, enter the values in the following fields:


       Field name              Required User action and allowed values
                               /
                               Optional
       Measurement point           R         Select the measuring point on which the
                                             measuring point to be entered


Last changed on:    Last changed by:                       Version:               Page:

(23/11/2010)        RAVINDER KUMAR                         1.0                104 of 241
End User Manual

                    Title: SAP PM
                     Module:           PLANT MAINTENANCE
                     Release:          ECC 6.0
                     Created by:       RAVINDER KUMAR
                     Created on:       23 Nov‟10




       Field name              Required User action and allowed values
                               /
                               Optional




       Measurement time            R         Enter date & time when measurement is taken
Read by                            R         Enter the name of person who has taken
                                             reading .


     Press Enter Key


     Case 1- if the measuring point is a counter following screen will appear as
below




Last changed on:    Last changed by:                       Version:                    Page:

(23/11/2010)        RAVINDER KUMAR                         1.0                     105 of 241
End User Manual

                    Title: SAP PM
                     Module:           PLANT MAINTENANCE
                     Release:          ECC 6.0
                     Created by:       RAVINDER KUMAR
                     Created on:       23 Nov‟10




     Screen fields data entry instruction:
       Field name              Required User action and allowed values
                               /
                               Optional
       Counter reading             R         Either counter or difference reading has to be
                                             entered to calculate the second parameter
                                             Enter the display reading of counter if the
                                             physical counter is maintained press enter to
                                             calculate difference of reading in the system


Last changed on:    Last changed by:                       Version:                          Page:

(23/11/2010)        RAVINDER KUMAR                         1.0                         106 of 241
End User Manual

                     Title: SAP PM
                      Module:           PLANT MAINTENANCE
                      Release:          ECC 6.0
                      Created by:       RAVINDER KUMAR
                      Created on:       23 Nov‟10




       Field name               Required User action and allowed values
                                /
                                Optional
       Counter reading              R         Either counter or difference reading has to be
                                              entered to calculate the second parameter
                                              Enter the display reading of counter if the
                                              physical counter is maintained press enter to
                                              calculate difference of reading in the system
        difference                  R         Either counter or difference reading has to be
                                              entered to calculate the second parameter
                                              Enter the difference of reading & press enter
                                              the system will calculate counter reading



       Click on                         to save the readings
Case 2- if the measuring point is not a counter following screen will appear




Last changed on:     Last changed by:                       Version:                          Page:

(23/11/2010)         RAVINDER KUMAR                         1.0                           107 of 241
End User Manual

                    Title: SAP PM
                     Module:           PLANT MAINTENANCE
                     Release:          ECC 6.0
                     Created by:       RAVINDER KUMAR
                     Created on:       23 Nov‟10




Screen fields data entry instruction:


       Field name              Required User action and allowed values
                               /
                               Optional
        Meas rdg                   R         Enter the reading of measurement



Click on                    to save the readings


Last changed on:    Last changed by:                       Version:                 Page:

(23/11/2010)        RAVINDER KUMAR                         1.0                  108 of 241
End User Manual

                   Title: SAP PM
                     Module:             PLANT MAINTENANCE
                     Release:            ECC 6.0
                     Created by:         RAVINDER KUMAR
                     Created on:         23 Nov‟10




MEASURING POINT ENTRY LIST
Trigger:
A measurement or counter reading from a measurement point needs to be entered
into the system.


                           Business Process Procedure Overview
After a measurement has been taken at a measuring point or a counter, the data needs
to be entered into the system. A measurement document comprises the data entered in
the system




Output - Results                                                      Comments
Measurement Document                       Document may be verified by running transaction IK13
created                                    (display measurement document). Refer to business
                                           process procedure „Display Measurement Document‟
                                           to verify results.


Creating Entry List
       Transaction       code: Menu               path:   Logistics        Plant   maintenance
       IK31                             Management of Technical Objects Environment
                                        measuring points  measuring reading entry list
                                        (IK31).




Last changed on:     Last changed by:                           Version:                       Page:

(23/11/2010)         RAVINDER KUMAR                             1.0                        109 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




Double click or press Enter Key to reach the following screen




Last changed on:   Last changed by:                       Version:       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        110 of 241
End User Manual

                   Title: SAP PM
                    Module:            PLANT MAINTENANCE
                    Release:           ECC 6.0
                    Created by:        RAVINDER KUMAR
                    Created on:        23 Nov‟10




                                      Type entry list name




Type entry list name & press Enter key or click on                      Enter / Continue icon


To reach the following screen




Last changed on:   Last changed by:                          Version:                           Page:

(23/11/2010)       RAVINDER KUMAR                            1.0                          111 of 241
End User Manual

                    Title: SAP PM
                     Module:           PLANT MAINTENANCE
                     Release:          ECC 6.0
                     Created by:       RAVINDER KUMAR
                     Created on:       23 Nov‟10




     In the initial screen, enter the values in the following fields:


       Field name              Required User action and allowed values
                               /
                               Optional
       MeasPoint/ Counter R                  Select the measuring point on which the
                                             measuring point to be entered




Last changed on:    Last changed by:                       Version:               Page:

(23/11/2010)        RAVINDER KUMAR                         1.0                112 of 241
End User Manual

                    Title: SAP PM
                     Module:            PLANT MAINTENANCE
                     Release:           ECC 6.0
                     Created by:        RAVINDER KUMAR
                     Created on:        23 Nov‟10




       Field name               Required User action and allowed values
                                /
                                Optional




       Measu point     short R                System defaults from master data
       text

       Meas Position                O         System defaults from master data



       Click on


       Following message will appear on the screen




Measurement readings entry through Measurement readings Entry
List



Last changed on:     Last changed by:                       Version:                 Page:

(23/11/2010)         RAVINDER KUMAR                         1.0                  113 of 241
End User Manual

                   Title: SAP PM
                     Module:             PLANT MAINTENANCE
                     Release:            ECC 6.0
                     Created by:         RAVINDER KUMAR
                     Created on:         23 Nov‟10




       Transaction       code: Menu                   path:              Logistics        Plant
       IK34                             maintenanceMaintenance                       Processing
                                        completion          confirmation           measurement
                                        documents  collective entry  with entry list
                                        (IK34).




Press Enter Key or Double click on selection
To reach the following screen




Last changed on:     Last changed by:                         Version:                         Page:

(23/11/2010)         RAVINDER KUMAR                           1.0                          114 of 241
End User Manual

                    Title: SAP PM
                     Module:           PLANT MAINTENANCE
                     Release:          ECC 6.0
                     Created by:       RAVINDER KUMAR
                     Created on:       23 Nov‟10




     In the initial screen, enter the values in the following fields:
       Field name              Required User action and allowed values
                               /
                               Optional
       Entry list                  R         Enter the entry list number or select from the
                                             drop down list


       Measurement time            R         Enter date & time when measurement is taken
       Read by                     R         Enter the name of person who has taken
                                             reading.
Press Enter Key or Click on tab




To reach the following screen
Last changed on:    Last changed by:                       Version:                     Page:

(23/11/2010)        RAVINDER KUMAR                         1.0                      115 of 241
End User Manual

                     Title: SAP PM
                      Module:           PLANT MAINTENANCE
                      Release:          ECC 6.0
                      Created by:       RAVINDER KUMAR
                      Created on:       23 Nov‟10




       Reading/Counter          Required For measuring point enter read value or
       reading                  /              For counter either counter reading or
                                Optional      difference reading has to be entered to
                                              calculate the second parameter by the
                                              system


                                              (Enter the display reading of counter if the
                                              physical counter is maintained press enter
                                              to calculate difference of reading in the
                                              system)
        Difference        (for R              Either counter or difference reading has to
       counters)                              be    entered       to   calculate   the   second


Last changed on:     Last changed by:                       Version:                         Page:

(23/11/2010)         RAVINDER KUMAR                         1.0                          116 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




       Reading/Counter        Required For measuring point enter read value or
       reading                /              For counter either counter reading or
                              Optional      difference reading has to be entered to
                                            calculate the second parameter by the
                                            system


                                            (Enter the display reading of counter if the
                                            physical counter is maintained press enter
                                            to calculate difference of reading in the
                                            system)
                                            parameter
                                            Enter the difference of reading & press enter
                                            the system will calculate counter reading



Click on                   to save the data



Notifications

Notification is a means, by which internal company notifications like equipment
malfunctions; breakdowns, maintenance requests or activity reports etc are entered
and managed in Plant Maintenance.

Notifications can be created on Equipment and Functional locations.


Trigger:
An internal problem or maintenance request needs to be logged for problem
reporting and technical resolution.

Last changed on:   Last changed by:                       Version:                          Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                           117 of 241
End User Manual

                   Title: SAP PM
                     Module:             PLANT MAINTENANCE
                     Release:            ECC 6.0
                     Created by:         RAVINDER KUMAR
                     Created on:         23 Nov‟10




                           Business Process Procedure Overview
This document describes how to create a PM notification for any notification type. A
notification is used to capture technical information and assign tasks that do not involve
the tracking of costs. The user can create a maintenance order or a quality notification
from the PM notification.
Note: With this transaction, the screen layout will differ based on the notification type as
defined in customizing. Refer to Business Procedure document for Create Maintenance
Request, Create PM Malfunction Report and Create PM Activity Report.




Output – Results                                                    Comments
Creation of a notification                Refer to Business Process Procedure „Display PM
                                          Notification', to verify this result.




       ID: PM                           Title: CREATING NOTIFICATION
       Business process:                6.4.3.1 - Maintenance Processing - Notifications
       Transaction       code: Menu              path:     Logistics       Plant   maintenance
       IW21                             Maintenance Processing  Notification  create
                                        (IW21)




Last changed on:     Last changed by:                         Version:                       Page:

(23/11/2010)         RAVINDER KUMAR                           1.0                        118 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




Use this transaction for creating Notifications on Functional Locations and
Equipment.


As technical objects like buildings are installed as Functional locations, all jobs that
are required to be carried for buildings are to be created on Functional Locations.


Maintenance Request (M1)
Maintenance requests are notifications used to request the maintenance department
to perform an activity. Unlike malfunctions reports, maintenance requests are not
used in the event of malfunctions. They are typically used in conjunction with
investments, reconstruction or replacement.


Malfunction Report (M2)
A malfunction report describes a malfunction of an object, which restricts the
performance of that object in some way. A user can use a malfunction report to
inform the maintenance department that a system is not functioning correctly, is not
Last changed on:   Last changed by:                       Version:                    Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                     119 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




working at all, or is producing poor results. Malfunction reports are intended to
prompt the maintenance department to carry out a maintenance task to restore the
target condition of the object.


Activity Report (M3)
An activity report describes a maintenance activity that has already been carried out
and was not necessitated by a malfunction, problem or damage. An activity report is
a technical document and is used to verify which activities were carried out when,
and for what reason, as well as the result of these activities. Typical examples of
activity reports include inspection or maintenance findings. These documents all the
results of an inspection, or the technical values of an object determined during or
after regular preventive maintenance work. Inspection tasks are not requested
explicitly via a malfunction report and are usually based on inspection orders.
Preventive maintenance work is carried out to preserve the target condition of the
object, and is based on preventive maintenance plans.


IT Report (IT)
An IT report describes a malfunction of an object, which restricts the performance of
that object in some way. A user can use a malfunction report to inform the
maintenance department that a system is not functioning correctly, is not working at
all, or is producing poor results. Malfunction reports are intended to prompt the
maintenance department to carry out a maintenance task to restore the target
condition of the object.


After selecting the transaction, press Enter key or double click to reach the following
screen



Last changed on:   Last changed by:                       Version:                   Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                    120 of 241
End User Manual

                        Title: SAP PM
                         Module:           PLANT MAINTENANCE
                         Release:          ECC 6.0
                         Created by:       RAVINDER KUMAR
                         Created on:       23 Nov‟10




In the Initial screen , you can select the type of Notification and press ENTER key or

click on           Enter / Continue icon to reach the next screen
 Type Of Notification:




Maintenance Orders


To carry out internal maintenance jobs or external services as per the maintenance
requests or according to day to day observations and for preventive maintenance
activities, a       maintenance order is to be prepared to plan for material, manpower
and services requirement.

On the basis of maintenance orders only, maintenance jobs costing, reservation for
material and manpower planning can be done.

Maintenance Orders are to be created by Maintenance dept on:
Last changed on:        Last changed by:                       Version:               Page:

(23/11/2010)            RAVINDER KUMAR                         1.0                121 of 241
End User Manual

                      Title: SAP PM
                       Module:           PLANT MAINTENANCE
                       Release:          ECC 6.0
                       Created by:       RAVINDER KUMAR
                       Created on:       23 Nov‟10




    Functional Locations
    Equipments


Maintenance Orders can be created against:
      Notifications
      Direct/Adhoc


Maintenance plans (thro. maintenance plans and schedules)


Maintenance Orders are to be created on the following conditions:
    When a material is to be drawn from the storage location
    When External Services are required.
   When history of activities are need to be captured.


The different types of Maintenance Orders configured in the system are as follows:


       Type        Description


       PM01        Breakdown/malfunction maintenance order
       PM02        Preventive Maintenance order
       PM05        Calibration order
       PM07        Regular Maintenance


Please use appropriate type of order, for capturing the data under various categories.




Last changed on:      Last changed by:                       Version:                Page:

(23/11/2010)          RAVINDER KUMAR                         1.0                122 of 241
End User Manual

                      Title: SAP PM
                       Module:           PLANT MAINTENANCE
                       Release:          ECC 6.0
                       Created by:       RAVINDER KUMAR
                       Created on:       23 Nov‟10




As technical objects like buildings are installed as Functional locations, for jobs that
are required to be carried out, Maintenance orders are to be created on Functional
Locations.



4.2 Breakdown Maintenance Process:


Malfunction Report (M2)
A malfunction report describes a malfunction of an object, which restricts the
performance of that object in some way. A user can use a malfunction report to
inform the maintenance department that a system is not functioning correctly, is not
working at all, or is producing poor results. Malfunction reports are intended to
prompt the maintenance department to carry out a maintenance task to restore the
target condition of the object.


    i) Create Notification for reporting Machinery malfunctions/Breakdown
               (M2)




Last changed on:      Last changed by:                       Version:                 Page:

(23/11/2010)          RAVINDER KUMAR                         1.0                  123 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




>Fill the Description of the Problem


>Fill/Select Functional location & Equipment


>Fill the Reported BY


>Press ENTER


>WE find this screen which show last 3 activities status on that particular equipment


Notification Header




Last changed on:   Last changed by:                       Version:                   Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                    124 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




                             Click     /    Press
                             ENTER




Last changed on:   Last changed by:                       Version:       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        125 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




                                                                Notification Description




                                                            >For M2 type Notification
                                                            >we have to click in box
                                                            of Breakdown
                                                            > In this screen we can
                                                            correct the date/time of
                                                            Malfunctioning start
                                                            >Click/Press ENTER




Last changed on:   Last changed by:                       Version:                             Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                              126 of 241
End User Manual

                      Title: SAP PM
                       Module:           PLANT MAINTENANCE
                       Release:          ECC 6.0
                       Created by:       RAVINDER KUMAR
                       Created on:       23 Nov‟10




                                                              Here we can see Warranty
                                                              Status of Equipment




                                                                    Long Text Can be Written
                                                                    at this place




       Field name                Required User action and allowed values
                                 /
                                 Optional
       Notification                  R         Description of activity to be carried out
       Description
       Functional location/ O                  Select from the List of Equipment.
       Equipment
       Required start                O         System copies the present date, a different date
                                               and time also can be entered, as required.
       Priority                      O         Select the priority as required
       Required End                  O         Enter the date and time on which the job to be
                                               completed


Last changed on:      Last changed by:                       Version:                              Page:

(23/11/2010)          RAVINDER KUMAR                         1.0                               127 of 241
End User Manual

                     Title: SAP PM
                      Module:           PLANT MAINTENANCE
                      Release:          ECC 6.0
                      Created by:       RAVINDER KUMAR
                      Created on:       23 Nov‟10




       Field name               Required User action and allowed values
                                /
                                Optional
       Planner group                O         Planner       groups       as   per   the    maintenance
                                              planning activities.
       Maintenance      work O                Maintenance work center, currently represents
       center                                 the departments
       Reported by                  R         Mention       the     Name      of    the    Person,      for
                                              identification Purpose
       Malfunction start            O         Time of Malfunction
       Malfunction end              O         Time of end of malfunction.
       Cause text                   O         Give reason for failure
       Long text                    O         Mention required details


IMPORTANT : If it is a Breakdown, checkbox „Breakdown to be selected.



After entering all the required values, click on                                      to    save      the
Notification.


    ii) Notification Processing
Initially Notification will have the status “OSNO” when it is created,
Notification is to be released for changing the status as “NOPR” and after completing
the notification, status will change to “NOCO”, if any order is assigned to this
notification, status “ORAS” will be there.


Different Notification Status codes are shown below

Last changed on:     Last changed by:                         Version:                                 Page:

(23/11/2010)         RAVINDER KUMAR                           1.0                                  128 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




After entering all the required values, click on                     to   save      the
Notification. And following message will appear on the screen




If NO cost is involve we can document all work in Notification Only.There is no need
to create Maintenance Order.


Notification – Put in process :




Last changed on:   Last changed by:                       Version:                   Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                    129 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




                                                                Check for status
                                                                change     from
                                                                OSNO to NOPR




    iii) Notification Completion
Notification is to be selected by using transaction codes IW22 / IW28 to reach the
following screen




Last changed on:   Last changed by:                       Version:                     Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                      130 of 241
End User Manual

                      Title: SAP PM
                        Module:           PLANT MAINTENANCE
                        Release:          ECC 6.0
                        Created by:       RAVINDER KUMAR
                        Created on:       23 Nov‟10




Enter the notification number in Notification box or select from the list
Press Enter key or click on “Notification” to reach the following screen

               Click completion flag to get
               the completion screen




Enter completion details as explained in following table


       Field name                 Required User action and allowed values
                                  /
                                  Optional
       Malfunction start              R         Time of malfunction begin
       Malfunction end                R         Time of end of malfunction


Complete the notification by clicking on                 Complete Flag.
Observe status change from NOPR to NOCO (Notification completion.)


Last changed on:       Last changed by:                       Version:           Page:

(23/11/2010)           RAVINDER KUMAR                         1.0            131 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




The Notification is completed, If the activity is unsatisfactory, the notification can
again be opened and again put into operation.


With reference to this notification, If Maintenance order is to be created for carrying
out the above work,



then click on                                                        create Icon.


                                                     Click here




Or go to menu path PM Notification -> Order -> Create -> Direct as shown in the
following screen




Last changed on:   Last changed by:                       Version:                      Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                       132 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




You will reach the following screen




Enter / check Order Type, Main work center and click on              Enter / Continue
icon
To reach the following screen




Last changed on:   Last changed by:                       Version:                  Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                   133 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




For planning in terms of manpower and material and for further processing of order,


After entering required details, save the order and following message will
appear on the screen.




    iv) Maintenance Order Creation/Change


Trigger:
Internal work hours and costs need to be captured and transferred to other cost
objects for maintenance / service work.
Last changed on:   Last changed by:                       Version:                 Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                  134 of 241
End User Manual

                   Title: SAP PM
                    Module:            PLANT MAINTENANCE
                    Release:           ECC 6.0
                    Created by:        RAVINDER KUMAR
                    Created on:        23 Nov‟10




                          Business Process Procedure Overview
A detailed work planning document which holds details on resources, components,
costs, and labor required to complete specific maintenance work. Can be created with
or without a notification.
The costs are settled to other cost objects, such as cost center.




Output - Results                                                 Comments
Creation of a PM Order                  Refer to Business Process Procedure „Display PM
                                        Order to verify this result




 Observe the system status, during creation and order processing :
         CRTD - Order created
Last changed on:    Last changed by:                       Version:                    Page:

(23/11/2010)        RAVINDER KUMAR                         1.0                     135 of 241
End User Manual

                       Title: SAP PM
                        Module:           PLANT MAINTENANCE
                        Release:          ECC 6.0
                        Created by:       RAVINDER KUMAR
                        Created on:       23 Nov‟10




         MANC - Material availability not checked
         NTUP - Dates Not updated
         NMAT - No Material components
         PRC - Order Precosted
         SETC - Settlement Rule created
         TECO - Technical Completion
         CNF - Complete confirmation
         REL       - Order released
         CLSD - Order Closed
           PCNF - Partial confirmation


  Enter the field values in different tabs like



   as explained in following table


       Field name                 Required User action and allowed values
                                  /
                                  Optional
       Header data :
       Planner Group                  O         Default is copied from the system by Master
                                                data
       Maint .work center             R         Default is copied from the Equipment, but it can
                                                be changed , if required. This is required for
                                                tracking purpose.
       Costs                          O         The approx. cost can be given


Last changed on:       Last changed by:                       Version:                       Page:

(23/11/2010)           RAVINDER KUMAR                         1.0                        136 of 241
End User Manual

                      Title: SAP PM
                       Module:           PLANT MAINTENANCE
                       Release:          ECC 6.0
                       Created by:       RAVINDER KUMAR
                       Created on:       23 Nov‟10




       Field name                Required User action and allowed values
                                 /
                                 Optional
       PM Activity type              O         Activity type can be selected from the drop
                                               down list.
       System condition              O         This activity is to be carried out when the
                                               Equipment/System is          in operation or to be
                                               stopped
       Basic start                   O         Enter the proposed date of start
       Basic Finish                  O         Enter the proposed date of end
       Priority                      O         Copied form the system, if already given.
       Revision                      O         Revision is to be selected form the drop down
                                               list (Pl see the Notes.#1)
       Reference object              R         The functional location or Equipment is copied
                                               form the initial screen
       First Operation
       Operation                     R         Name of the operation




       Work Center                   R         Work center
       Control key                   R         To be mentioned whether „PM01‟ or „PM03‟ –
                                               PM01 indicates the job to be done internally,

Last changed on:      Last changed by:                       Version:                          Page:

(23/11/2010)          RAVINDER KUMAR                         1.0                           137 of 241
End User Manual

                     Title: SAP PM
                      Module:            PLANT MAINTENANCE
                      Release:           ECC 6.0
                      Created by:        RAVINDER KUMAR
                      Created on:        23 Nov‟10




       Field name                Required User action and allowed values
                                 /
                                 Optional
                                               PM03 - if the job to be carried out externally


       Work         duration, O                Depending on the calculation key, enter any 2
       Number, Operation                       or 3 values, so that the 3rd value will be
       duration                                calculated automatically / manually.
       Calculation key               O         Select from the drop down list




 Notes:




          If the operations are more than one operation, use the operation tab strip,
           and enter as many operations as required.
          The work centers for different operations can be different. (If required).
          Control Key PM01 Denotes – Work done by Own Employee & PM03 denotes
           work done by External Vendor. For PM03 Purchase Requisition will be
           created automatically. Which will go for Release Process & then Purchase
Last changed on:      Last changed by:                       Version:                           Page:

(23/11/2010)          RAVINDER KUMAR                         1.0                          138 of 241
End User Manual

                     Title: SAP PM
                      Module:           PLANT MAINTENANCE
                      Release:          ECC 6.0
                      Created by:       RAVINDER KUMAR
                      Created on:       23 Nov‟10




           Order will be created.This is MM Module Process, can be viewd in MM User
           Manual.




 Fill the Material Group,Purchasing Group,Requisitioner name,Tracking No.

 Then Click on this




Last changed on:     Last changed by:                       Version:              Page:

(23/11/2010)         RAVINDER KUMAR                         1.0               139 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




 Purchase Requisition Number Genrated.




Last changed on:   Last changed by:                       Version:       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        140 of 241
End User Manual

                     Title: SAP PM
                      Module:           PLANT MAINTENANCE
                      Release:          ECC 6.0
                      Created by:       RAVINDER KUMAR
                      Created on:       23 Nov‟10




        Field name              Required User action and allowed values
                                /
                                Optional
       Component                    R         Indicate Material code of the component.




       Requirement Qty              O         Indicate the quantity of the components
       Description       and O                Automatically copied from the system.
       UM
       I Category                   R         Indicate whether it is stockable or Non-
                                              stockable, „L‟ or „N‟
       S LOC                        O         Stock can be checked thro. this.


 Notes :
         Item category - significance of „L‟ and „N‟ .


         L – Generally stockable item, when a component is               selected „L‟     -    a
reservation is created .


         Reservation creation is irrespective of material stock. (Means, even if the
material is not available in the
          storage Location, reservation will be created.).



Last changed on:     Last changed by:                       Version:                          Page:

(23/11/2010)         RAVINDER KUMAR                         1.0                          141 of 241
End User Manual

                    Title: SAP PM
                     Module:           PLANT MAINTENANCE
                     Release:          ECC 6.0
                     Created by:       RAVINDER KUMAR
                     Created on:       23 Nov‟10




         N – means Non-stockable, but coded item. – Even if stock is available , „N‟ can
be indicated.
         The system will create a PR for the Items for which „N‟ is indicated.




Reservation Number Generated for Stock Item. Material Issue against Reservation
process can be viewd in MM End User Manual as it is MM Process.



Click on                    to save the Order


v) PROCESSING THE ORDER
1.RELEASING THE ORDER


ORDER CAN BE RELEASED WHILE CREATING OR AFTER CREATION ALSO.
RELEASING WHILE CREATING

Last changed on:    Last changed by:                       Version:                   Page:

(23/11/2010)        RAVINDER KUMAR                         1.0                    142 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




CLICK ON RELEASE FLAG                          , THE SYSTEM STATUS WILL CHANGE
FROM “CRTD” TO “REL”




    RELEASE
    FLAG




RELEASING AFTER CREATION and then SAVE the Order.




SELECT THE ORDER WHICH IS TO BE RELEASED BY TRANS CODE “IW32”




Last changed on:   Last changed by:                       Version:            Page:

(23/11/2010)       RAVINDER KUMAR                         1.0             143 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




Last changed on:   Last changed by:                       Version:       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        144 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




ENTER THE ORDER NO OR SELECT FROM THE DROP DOWN LIST


Select the Release Button                  to release the order


The order will be released., Check status as below..




Last changed on:   Last changed by:                       Version:       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        145 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




                             Check    for   status
                             changed to REL




    v) COMPLETION CONFIRMATION


A.TIME CONFIRMATION
Trigger:
Actual hours worked and materials used need to be recorded and posted to the PM
order.
                         Business Process Procedure Overview
The actual hours worked per operation are recorded/posted to the PM/CS order via time
confirmation.
Any materials used may be posted at this time.
Technical reporting to the notification may also be performed at this time.




Last changed on:   Last changed by:                       Version:                Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                 146 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




Output – Results                                                Comments
Time confirmed to PM order             Refer to Business Process Procedure 'Display PM
                                       Order' (and view cost report) or 'Display PM Order
                                       Confirmation' to verify results. The document flow on
                                       the PM order will also show any time confirmations
                                       posted.




Press Enter key or double click (with mouse Left key) to reach the following
screen;




Last changed on:   Last changed by:                       Version:                       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                        147 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




                            ENTER   ORDER    NO      OR
                            SELECT FROM LIST




PRESS ENTER KEY TO REACH THE FOLLOWING SCREEN
SELECT THE OPERATIONS TO BE CONFIRMED
AND FOLLOW THE MENU PATH SHOWN IN THE NEXT SCREEN




Last changed on:   Last changed by:                       Version:       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        148 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




DOUBLE CLICK ON THE ACTUAL DATA
FOLLOWING SCREEN WILL APPEAR
Last changed on:   Last changed by:                       Version:       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        149 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




                                                FOR     NEXT
                                                OPERATION




ENTER THE OPERATION
ENTER THE START & END DATE WITH TIME
CONFIRM ACTUAL MAN HOURS
IF WE ARE DOING FINAL CONFIRMATION SELECT THE FINAL CONFIRMATION
BOX
CLICK ON CLEAR OPEN RES. IF NO MORE MATERIALS ARE REQUIRED
AGAINST THE RESERVATION.
IF THERE IS NO REMAINING JOBS TICK THE NO REMAIN WORK BOX
CLICK ON RIGHT ARROW KEY FOR NEXT OPERATION

SAVE THE CONFIRMATION BY CLICKING ON


AND FOLLOWING MESSAGE WILL APPEAR ON THE SCREEN



Last changed on:   Last changed by:                       Version:       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        150 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




    vi) SERVICE ENTRY SHEET
SERVICE ENTRY SHEET HAS TO BE FILLED FOR CLEARING THE INVOICE.

Trigger:
Requirement for recording services performed by service provider


                        Business Process Description Overview
This document describes the procedure for creating a service entry sheet.             Within
purchasing, this service entry sheet document is designed for the recording of the
services that have been performed by the service provider. The service entry sheet is a
list of all planned services that have actually been performed. It can also be used to
lust and specify unplanned services that have been performed and whose precise
scope and nature were unknown at time of planning phase.




         Output – Results                                       Comments
Service Entry Sheet




Menu Path
Via Menus                                 Logistics> Plant Maintenance> Maintenance
                                          Processing> Completion Confirmation> Services


Via Transaction Code                   ML81n




Last changed on:   Last changed by:                       Version:                     Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                     151 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




or use transaction code “ML81N” to reach the following screen




         Click

Last changed on:   Last changed by:                       Version:       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        152 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




select Purchase order number as shown in next screen




click on the         Enter / Continue icon




Last changed on:   Last changed by:                       Version:       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        153 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




                                             Click on This tab       create
                                             service entry sheet




Click on the service selection tab




                                                SERVICE
                                                SELECTION
                                                TAB




Last changed on:   Last changed by:                       Version:                Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                 154 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




Following screen will appear




Following screen will appear




Last changed on:   Last changed by:                       Version:       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        155 of 241
End User Manual

                     Title: SAP PM
                      Module:           PLANT MAINTENANCE
                      Release:          ECC 6.0
                      Created by:       RAVINDER KUMAR
                      Created on:       23 Nov‟10




        Click here




                                              then click on Services
                                              Push button




                             Click to     Select
                             line item




The following screen will appear
ACCEPTING SERVICE ENTRY SHEET
Last changed on:     Last changed by:                       Version:       Page:

(23/11/2010)         RAVINDER KUMAR                         1.0        156 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




                                            3. Click on this
                                            flag for accepting


                                                                     2. Service Entry
                                                                        sheet Number




                                                                               2. Confirm the
                                                                               required quantity




Click on the green flag for accepting the services.
Save the transaction clicking save button


Following message will appear



B.GOODS ISSUE Part will be taken care in MM User manual.




    vii)       ORDER TECHNICAL COMPLETION


SELECT THE ORDER FROM MENU PATH


Last changed on:   Last changed by:                       Version:                                 Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                                157 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




Complete the order by clicking on             Complete Flag.




Last changed on:   Last changed by:                       Version:       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        158 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Click on Tech.
                                         Nov‟10
                                        Completion flag




WHILE COMPLETING TECHNICALLY SYSTEM DEFAULTS CURRENT DATE &
TIME BUT STILL IT CAN BE CHANGED FOR PAST CONFIRMATIONS


Check status – TECO


    viii) Order Settlement
Order settlement is used to control costs and to identify where maximum costs are
being incurred for maintenance. Costs associated with the maintenance work are
assigned to Cost centres. Costs arising out of executing an order are initially
collected on the order. These costs are then transferred to a receiver, for e.g. Cost
centre. The receiver of costs are specified in the order and settlement carried out at
regular intervals by FI.




Last changed on:   Last changed by:                       Version:                  Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                   159 of 241
End User Manual

                   Title: SAP PM
                      Module:         PLANT MAINTENANCE
                      Release:        ECC 6.0
                      Created by:     RAVINDER KUMAR
                      Created on:     23 Nov‟10




    ix) Business Completion
The business completion of an order is usually performed when no further costs are
expected to be posted to the order.
An order can only have business completion when:
It has been technically completed
It has been settled and the order balance is 0
No outstanding purchase orders (commitments) exist for it
All data that refers to the reference object of the maintenance order is available and
correct
All relevant data in the operations and sub-operations is available and correct
The business completion function for an order defines the following information for
the order:
The order obtains the status Completed. It is indicated as fully completed.
The order cannot receive any more postings, even for posting of costs. It is locked for
all collective-processing changes.
Business completion can be performed for
An individual order
Several orders using collective processing
Business completion of the order can also be cancelled.



4.3 Preventive Maintenance

To ensure higher equipment availability and reliability, preventive maintenance plans
are required for critical equipments and systems.
The preventive maintenance plans can generate PM order/Notification /service
Entry Sheet as per the pre-defined schedules, based on time elapsed or any other

Last changed on:   Last changed by:                       Version:                    Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                     160 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




performance criteria.



    i) Maintenance task lists

Maintenance task lists describe a sequence of individual maintenance activities,
which must be performed repeatedly within a company. In PDIL we are using only
one maintenance task list: i.e. General Maintenance Task List

Tcode :IA05




Last changed on:   Last changed by:                       Version:            Page:

(23/11/2010)       RAVINDER KUMAR                         1.0             161 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




    ii) Maintenance Plan
Maintenance plan describes the maintenance and inspection tasks to be performed
at maintenance objects with the dates and scope of the tasks.


Time-Based maintenance Plans
In time-based maintenance planning maintenance is performed in specific cycles, for
example, every two months or every six months.


Maintenance Planning:

Last changed on:   Last changed by:                       Version:               Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                162 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




Maintenance planning is done to describe the dates and scope of corrective
maintenance and inspection activities at technical objects. This ensures that the
technical objects are maintained on time and thereby function optimally.


Based on analysis by the maintenance personnel, equipments are identified, where
planned maintenance needs to be carried out.                    Apart from the experience,
maintenance person may refer manufactures‟ recommendations and the history of
the equipment to define the basis.


The maintenance planner also needs to identify the units for the maintenance plans -
time (weekly, monthly, yearly, etc.) or performance (every 100 running hours, every
10,000 shots etc.). For performance based maintenance plans, relevant measuring
counter needs to be defined for the technical object and measurement readings need
to be updated regularly.


The maintenance planner decides the maintenance call objects for the plan. The call
object can be maintenance order, notification or service entry sheet. Based on the
selection, system generates a call object for a maintenance plan, when a
maintenance call is due. The maintenance planner decides initially which call object
is required.


As mentioned earlier, maintenance plans can be single cycle, strategy based or
multiple counters, as per the requirement of each equipment / functional location.


Maintenance task lists shall be prepared for equipments / functional location, as per
the requirement. The task lists contains detailed sequence of activities to be
performed, spares and estimated time required for completing the job.

Last changed on:   Last changed by:                       Version:                       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                        163 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




For the activities, which are common amongst group of equipments, a general task
list may be prepared.


A maintenance plan includes the task list, maintenance strategy along with other
scheduling parameters.


Tcode :IP01




                                            Fill here maintenance plan
                                            category- Maintenance Order.




Last changed on:   Last changed by:                       Version:             Page:

(23/11/2010)       RAVINDER KUMAR                         1.0              164 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




                                                          Fill the maintenance plan cycle with its
                                                          unit i.e. when we require the Maintenance
                                                          order to be generated.
                                                          As we select yearly cycle then the order
                                                          will generate every year.




                                                                 Here fill the detail of maintenance
                                                                 item on which the Maintenance Order
                                                                 will generate.




Last changed on:   Last changed by:                        Version:                              Page:

(23/11/2010)       RAVINDER KUMAR                          1.0                               165 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




                                                                     Here fill the detail of
                                                                     calibration task list.
                                                                     As its type & its no.




Last changed on:   Last changed by:                       Version:                               Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                                166 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




                                                           Call horizon – here fill percentage
                                                           when the call to be come for
                                                           maintenance. Exp.-
                                                           If cycle = 100 days, & call horizon
                                                           =90%, means at 90th day we will
                                                           receive the order, for planning the
                                                           man & material required to complete
                                                           the maintenance order.
                                                           Scheduling Period Now we fill the
                                                           maintenance        plan    scheduling
                                                           parameters i.e. the time for which we
                                                           will schedule this plan.
                                                           If we take sch. Period 10 year then
                                                           total 10 Nos. maintenance orders will
                                                           generate with yearly cycle.
                                                           & then Save




    iii) Maintenance Plan Scheduling
Once the maintenance plans are created, then these plans are scheduled. It is
important to input “Start date” or “Starting counter reading” in the individual
maintenance plan. This date or counter reading decides the schedule dates.


Scheduling can be done manually as well as by system. It is recommended to do the
scheduling by system to avoid manual errors.


Whenever a schedule falls due, the system creates a maintenance order, notification

Last changed on:   Last changed by:                       Version:                            Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                             167 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




or service entry sheet depending on definition of the call object of the plan.


The maintenance planner shall schedule the maintenance plan. Before the call
objects are created by the system, maintenance planner may manually call the job or
skip the job, depending on the situation.


If the call object is a maintenance order, then maintenance planner shall release it
manually after checking the order.


There is provision in the system to shift the next scheduled maintenance date of a
maintenance plan, if there is considerable delay in completing the order or the orders
are completed much ahead of the schedule. These tolerance ranges for shifting can
be decided while defining maintenance plan by the maintenance planner depending
on the nature of the job.




Last changed on:   Last changed by:                       Version:                   Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                    168 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




Tcode:IP10




Last changed on:   Last changed by:                       Version:       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        169 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




Last changed on:   Last changed by:                       Version:       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        170 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




Last changed on:   Last changed by:                       Version:       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        171 of 241
End User Manual

                    Title: SAP PM
                     Module:           PLANT MAINTENANCE
                     Release:          ECC 6.0
                     Created by:       RAVINDER KUMAR
                     Created on:       23 Nov‟10




Tcode : IW39




    iv) Maintenance Order Processing

The maintenance order is a detailed planning assistance for maintenance tasks to be
performed. The order is used to:

        Add tasks (if required) in Task List attached in Preventive Maintenance Order
         with detail regard to type, scope, dates and resources
        Monitor the execution of tasks (operations)
        Define rules for account assignment, settlement and budgets
        Enter, assign and settle the costs which arise from tasks
Last changed on:    Last changed by:                       Version:                 Page:

(23/11/2010)        RAVINDER KUMAR                         1.0                  172 of 241
End User Manual

                        Title: SAP PM
                         Module:           PLANT MAINTENANCE
                         Release:          ECC 6.0
                         Created by:       RAVINDER KUMAR
                         Created on:       23 Nov‟10




The order can be processed internally by own employees, or can be processed
externally, that is, assign it to another company for processing.

An order consists of:

     Order header
     Object list
     Operations
     Material list
     Settlement rule
     Costs


    Observe the system status, during creation and order processing :
         CRTD - Order created
         MANC - Material availability not checked
         NTUP - Dates Not updated
         NMAT - No Material components
         PRC - Order Precosted
         SETC - Settlement Rule created
         TECO - Technical Completion
         CNF - Complete confirmation
         REL        - Order released
         CLSD - Order Closed
           PCNF - Partial confirmation




Order Release


Last changed on:        Last changed by:                       Version:       Page:

(23/11/2010)            RAVINDER KUMAR                         1.0        173 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




Preventive Maintenance orders will be already released. If order has been released
and subsequently additional operations are entered for it, these are automatically
released.

Following activities can only be performed when order is released:

   Printing shop papers

   Withdrawing material

   Posting goods receipts

   Entering time completion confirmations




Last changed on:   Last changed by:                       Version:              Page:

(23/11/2010)       RAVINDER KUMAR                         1.0               174 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




Tcode:IW32




Last changed on:   Last changed by:                       Version:       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        175 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




Last changed on:   Last changed by:                       Version:       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        176 of 241
End User Manual

                     Title: SAP PM
                      Module:           PLANT MAINTENANCE
                      Release:          ECC 6.0
                      Created by:       RAVINDER KUMAR
                      Created on:       23 Nov‟10




 Fill the Material Group,Purchasing Group,Requisitioner name,Tracking No.

Then Click on this




Last changed on:     Last changed by:                       Version:            Page:

(23/11/2010)         RAVINDER KUMAR                         1.0             177 of 241
End User Manual

                    Title: SAP PM
                     Module:            PLANT MAINTENANCE
                     Release:           ECC 6.0
                     Created by:        RAVINDER KUMAR
                     Created on:        23 Nov‟10




                                   Fill the various components /spares with
                                   No. (From component list) & quantity
                                   required for completing the work.




 Notes :


         Item category - significance of „L‟ and „N‟ .


         L – Generally stockable item, when a component is                    selected „L‟    -    a
reservation is created .


         Reservation creation is irrespective of material stock. (Means, even if the
material is not available in the

Last changed on:     Last changed by:                       Version:                              Page:

(23/11/2010)         RAVINDER KUMAR                         1.0                              178 of 241
End User Manual

                    Title: SAP PM
                     Module:            PLANT MAINTENANCE
                     Release:           ECC 6.0
                     Created by:        RAVINDER KUMAR
                     Created on:        23 Nov‟10




          storage Location, reservation will be created.).


         N – means Non-stockable, but coded item. – Even if stock is available , „N‟ can
be indicated.
         The system will create a PR for the Items for which „N‟ is indicated.




Reservation Number Generated for Stock Item. Material Issue against Reservation
process can be viewd in MM End User Manual as it is MM Process.



Last changed on:     Last changed by:                       Version:                  Page:

(23/11/2010)         RAVINDER KUMAR                         1.0                   179 of 241
End User Manual

                     Title: SAP PM
                      Module:           PLANT MAINTENANCE
                      Release:          ECC 6.0
                      Created by:       RAVINDER KUMAR
                      Created on:       23 Nov‟10




       Field name               Required User action and allowed values
                                /
                                Optional
       Component                    R         Indicate Material code of the component.




       Requirement Qty              O         Indicate the quantity of the components
       Description       and O                Automatically copied from the system.
       UM
       I Category                   R         Indicate whether it is stockable or Non-
                                              stockable, „L‟ or „N‟
       S LOC                        O         Stock can be checked thro. this.




Last changed on:     Last changed by:                       Version:                         Page:

(23/11/2010)         RAVINDER KUMAR                         1.0                          180 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




Last changed on:   Last changed by:                       Version:       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        181 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




Change of Purchase Requisition (Tcode : ME52N)




                                                                We Need to fill the
                                                                DOP Clause & Pre
                                                                Qualification    for
                                                                each PR.




Creation of PO & Material Issue is covered under MM Module.


    v) SERVICE ENTRY SHEET
SERVICE ENTRY SHEET HAS TO BE FILLED FOR CLEARING THE INVOICE.



Trigger:
Requirement for recording services performed by service provider


Last changed on:   Last changed by:                       Version:                         Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                          182 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




                        Business Process Description Overview
This document describes the procedure for creating a service entry sheet.             Within
purchasing, this service entry sheet document is designed for the recording of the
services that have been performed by the service provider. The service entry sheet is a
list of all planned services that have actually been performed. It can also be used to
lust and specify unplanned services that have been performed and whose precise
scope and nature were unknown at time of planning phase.




         Output – Results                                       Comments
Service Entry Sheet




Menu Path
Via Menus                                 Logistics> Plant Maintenance> Maintenance
                                          Processing> Completion Confirmation> Services


Via Transaction Code                   ML81n




Last changed on:   Last changed by:                       Version:                     Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                     183 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




or use transaction code “ML81N” to reach the following screen




Last changed on:   Last changed by:                       Version:       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        184 of 241
End User Manual

                       Title: SAP PM
                        Module:           PLANT MAINTENANCE
                        Release:          ECC 6.0
                        Created by:       RAVINDER KUMAR
                        Created on:       23 Nov‟10




               Click




select Purchase order number as shown in next screen




Last changed on:       Last changed by:                       Version:       Page:

(23/11/2010)           RAVINDER KUMAR                         1.0        185 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




click on the         Enter / Continue icon




Last changed on:   Last changed by:                       Version:       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        186 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




Click on the service selection tab




                                                SERVICE
                                                SELECTION
                                                TAB




Last changed on:   Last changed by:                       Version:       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        187 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




                                                    then click on Services
                                                    Push button




                               Click to    Select
                               line item




The following screen will appear
ACCEPTING SERVICE ENTRY SHEET




Last changed on:   Last changed by:                           Version:           Page:

(23/11/2010)       RAVINDER KUMAR                             1.0            188 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




                                                                     1. Service Entry
                                                                        sheet Number




                                                                               2. Confirm the
                                                                               required quantity




Last changed on:   Last changed by:                       Version:                                 Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                                189 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




Only Authorized person can release the Service Entry Sheet.




Last changed on:   Last changed by:                       Version:       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        190 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




                                                  3. Save




Tcode ML85 or ML81n Can be used to release the Service Entry Sheet with proper
autherization.




Last changed on:   Last changed by:                         Version:         Page:

(23/11/2010)       RAVINDER KUMAR                           1.0          191 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




                                                    Fill the     release
                                                    code &       release
                                                    Group           then
                                                    Execute




Last changed on:   Last changed by:                       Version:             Page:

(23/11/2010)       RAVINDER KUMAR                         1.0              192 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




                            2. Release




                                         1.Select the Line




Last changed on:   Last changed by:                          Version:       Page:

(23/11/2010)       RAVINDER KUMAR                            1.0        193 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




Last changed on:   Last changed by:                       Version:       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        194 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




                                           Released Saved




    vi) COMPLETION CONFIRMATION


A.TIME CONFIRMATION

Trigger:
Actual hours worked and materials used need to be recorded and posted to the PM
order.


                         Business Process Procedure Overview
The actual hours worked per operation are recorded/posted to the PM/CS order via time
confirmation.
Any materials used may be posted at this time.
Technical reporting to the notification may also be performed at this time.



Last changed on:   Last changed by:                         Version:              Page:

(23/11/2010)       RAVINDER KUMAR                           1.0               195 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




Output – Results                                                Comments
Time confirmed to PM order             Refer to Business Process Procedure 'Display PM
                                       Order' (and view cost report) or 'Display PM Order
                                       Confirmation' to verify results. The document flow on
                                       the PM order will also show any time confirmations
                                       posted.




Press Enter key or double click (with mouse Left key) to reach the following
screen;




Last changed on:   Last changed by:                       Version:                       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                        196 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




                                        ENTER   ORDER    NO      OR
                                        SELECT FROM LIST




PRESS ENTER KEY TO REACH THE FOLLOWING SCREEN


SELECT THE OPERATIONS TO BE CONFIRMED


AND FOLLOW THE MENU PATH SHOWN IN THE NEXT SCREEN




Last changed on:   Last changed by:                       Version:        Page:

(23/11/2010)       RAVINDER KUMAR                         1.0         197 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




CLICK ON THE ACTUAL DATA
FOLLOWING SCREEN WILL APPEAR




Last changed on:   Last changed by:                       Version:       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        198 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




                                                FOR     NEXT
                                                OPERATION




ENTER THE OPERATION
ENTER THE START & END DATE WITH TIME
CONFIRM ACTUAL MAN HOURS
IF WE ARE DOING FINAL CONFIRMATION SELECT THE FINAL CONFIRMATION
BOX
CLICK ON CLEAR OPEN RES. IF NO MORE MATERIALS ARE REQUIRED
AGAINST THE RESERVATION.
IF THERE IS NO REMAINING JOBS TICK THE NO REMAIN WORK BOX
CLICK ON RIGHT ARROW KEY FOR NEXT OPERATION

SAVE THE CONFIRMATION BY CLICKING ON


AND FOLLOWING MESSAGE WILL APPEAR ON THE SCREEN



Last changed on:   Last changed by:                       Version:       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        199 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




    vii)       ORDER TECHNICAL COMPLETION


SELECT THE ORDER FROM MENU PATH




Last changed on:   Last changed by:                       Version:       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        200 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




Complete the order by clicking on             Complete Flag




Last changed on:   Last changed by:                       Version:       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        201 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




WHILE COMPLETING TECHNICALLY SYSTEM DEFAULTS CURRENT DATE &
TIME BUT STILL IT CAN BE CHANGED FOR PAST CONFIRMATIONS


Check status – TECO


    viii) Order Settlement
Order settlement is used to control costs and to identify where maximum costs are
being incurred for maintenance. Costs associated with the maintenance work are
assigned to Cost centres. Costs arising out of executing an order are initially
collected on the order. These costs are then transferred to a receiver, for e.g. Cost
centre. The receiver of costs are specified in the order and settlement carried out at
regular intervals by FI.




Last changed on:   Last changed by:                       Version:                  Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                   202 of 241
End User Manual

                   Title: SAP PM
                      Module:         PLANT MAINTENANCE
                      Release:        ECC 6.0
                      Created by:     RAVINDER KUMAR
                      Created on:     23 Nov‟10




    ix) Business Completion
The business completion of an order is usually performed when no further costs are
expected to be posted to the order.
An order can only have business completion when:
It has been technically completed
It has been settled and the order balance is 0
No outstanding purchase orders (commitments) exist for it
All data that refers to the reference object of the maintenance order is available and
correct
All relevant data in the operations and sub-operations is available and correct
The business completion function for an order defines the following information for
the order:
The order obtains the status Completed. It is indicated as fully completed.
The order cannot receive any more postings, even for posting of costs. It is locked for
all collective-processing changes.
Business completion can be performed for
An individual order
Several orders using collective processing
Business completion of the order can also be cancelled.




4.4 Regular Maintenance :


    i) Notification Creation:
Notification for new Requirement/or any kind of Modification request.


Last changed on:   Last changed by:                       Version:                    Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                     203 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




>Fill the Description of the Request/Modification


>Fill/Select Functional location & Equipment


>Fill the Reported BY


>Press ENTER




Last changed on:   Last changed by:                       Version:       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        204 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




                                                      Click     /    Press
                                                      ENTER




>WE find this screen which show last 3 activities status on that particular equipment
& then Save notification.




Last changed on:   Last changed by:                       Version:                 Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                  205 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




Notification number generated.
You can see the list of Notifications through Tcode :IW29




Last changed on:   Last changed by:                       Version:       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        206 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




Select the Desired Notification & create the Regular maintenance Order
(Type:PM07).




Last changed on:   Last changed by:                       Version:       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        207 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




Last changed on:   Last changed by:                       Version:       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        208 of 241
End User Manual

                   Title: SAP PM
                     Module:            PLANT MAINTENANCE
                     Release:           ECC 6.0
                     Created by:        RAVINDER KUMAR
                     Created on:        23 Nov‟10




    ii) Maintenance Order
Do your Planning in Regular Maintenance Order. Tcode:IW32




After that whole Process is same as Breakdown Maintenance Process. So Kindly
follow the Breakdown process( mentioned Above).



4.5 Calibration Process:


Test equipment is used for performing quality inspections. In order to ensure that the
test equipment used always fulfils the defined performance criteria, we have to
regularly test and calibrate these test equipment.
Using the functions in the component Test Equipment Management, we can manage
equipment data, plan and schedule inspections, and perform calibration inspections
for the equipment.

Last changed on:     Last changed by:                       Version:                Page:

(23/11/2010)         RAVINDER KUMAR                         1.0                 209 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




    i) Task List for Calibration

Calibration task lists describe a sequence of individual calibration activities, which
must be performed repeatedly within a company.

Creation of Task List                                Transaction code – IA05




                                                          Fill the External AlphaNumeric
                                                          Number for Calibration TaskList &
                                                          the in Profile fill -PDIL
                                                          And press enter.




Last changed on:   Last changed by:                       Version:                            Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                            210 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




                                                  Fill the header data for the Calibration task list.
                                                  As
                                                  Usage-4, Status-4, System condition-0, Work
                                                  Center, planner Goup
                                                  And
                                                  Now click on operations.




                                                                Fill the operations required to
                                                                carry out the calibration
                                                                process with estimated time
                                                                & manpower required.




Last changed on:   Last changed by:                       Version:                                Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                                 211 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




                                            Calibration Task list is
                                            saved     with  number
                                            generated.




    ii) Creation of Calibration Plan
    Tcode :IP01




Last changed on:   Last changed by:                       Version:         Page:

(23/11/2010)       RAVINDER KUMAR                         1.0          212 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




                                          Fill here maintenance plan
                                          category- Maintenance Order.




                                                                 Fill the maintenance plan cycle with its
                                                                 unit i.e. when we require the Maintenance
                                                                 order to be generated.
                                                                 As we select yearly cycle then the order
                                                                 will generate every year.




                                                                     Here fill the detail of maintenance
                                                                     item on which the Maintenance Order
                                                                     will generate.




Last changed on:   Last changed by:                       Version:                              Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                               213 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




                                                                     Here fill the detail of maintenance
                                                                     item on which the Maintenance Order
                                                                     will   generate.    Order   Type  of
                                                                     Calibration Order should be PM05.


                                                                           Here fill the detail of
                                                                           calibration task list.
                                                                           As its type & its no.




Last changed on:   Last changed by:                       Version:                                 Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                               214 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




                                                                      Call horizon – here fill percentage
                                                                      when the call to be come for
                                                                      maintenance. Exp.-
                                                                      If cycle = 100 days, & call horizon
                                                                      =90%, means at 90th day we will
                                                                      receive the order, for planning the
                                                                      man & material required to complete
                                                                      the maintenance order.
                                                                      Now we fill the maintenance plan
                                                                      scheduling parameters i.e. the time
                                                                      for which we will schedule this plan.
                                                                      If we take sch. Period 10 year then
                                                                      total 10 Nos. maintenance orders will
                                                                      generate with yearly cycle.




                                        Now save the maintenance
                                        plan. Number displays here.




Last changed on:   Last changed by:                       Version:                           Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                            215 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




After Wards Calibration Process is same as Prevntive Maintenance. So Kindly Follow
Preventive Maintenance Cycle.




Last changed on:   Last changed by:                       Version:              Page:

(23/11/2010)       RAVINDER KUMAR                         1.0               216 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




5. Plant Maintenance Information System
5.1 Standard Reports
     There are so many Standard Reports in PM.




     Some of the UseFul reports are shown below:

     Transaction code : IK17



Last changed on:   Last changed by:                       Version:       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        217 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




Trigger:
Need to display measurement documents with similar characteristics.


                          Business Process Procedure Overview
Search for measurement documents by various search criteria to compile a list of
measurement documents to display. You may search for a measurement document
whose number is unknown or perform collective processing for measurement
documents that have particular characteristics in common.




Output – Results                                                Comments
One or many measurement
documents selected for display
Input – Required Fields                Field Value/Comments




Procedural Steps
Via Menus                              Logistics  Plant Maintenance  Maintenance
                                       Processing  Completion Confirmation 
                                       Measurement Document  List Editing  Display


Via Transaction Code                   IK17


     Select the transaction as shown in following screen




Last changed on:   Last changed by:                       Version:                   Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                    218 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




     on double click you will reach the following screen




Last changed on:   Last changed by:                       Version:       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        219 of 241
End User Manual

                    Title: SAP PM
                     Module:           PLANT MAINTENANCE
                     Release:          ECC 6.0
                     Created by:       RAVINDER KUMAR
                     Created on:       23 Nov‟10




     Input data for selection , you can get the report based on the input data like
     Measuring points
     Equipment
     Functional location etc.,


      After the entry of required data click on
     to execute the transaction and you will get the following report




Last changed on:    Last changed by:                       Version:                       Page:

(23/11/2010)        RAVINDER KUMAR                         1.0                        220 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




     Spares and consumables consumption Report
     Transaction code : MB51


Trigger:
User wishes to search for material movements by material.


                        Business Process Description Overview
This process describes the method to search for and display the material movements
by material.




Last changed on:   Last changed by:                       Version:               Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                221 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




Output – Results                                                Comments
Materials with the associated
movement types.




Procedural Steps
Via Menus                              (a) Logistics > Materials Management > Inventory
                                          Management > Environment > List Displays >
                                          Material Documents
                                       Logistics > Materials Management > Physical
                                       Inventory >Environment > Mat. Doc. For Material


Via Transaction Code                   MB51


     Select the transaction as shown in following screen




Last changed on:   Last changed by:                       Version:                        Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                        222 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




     on double click you will reach the following screen




Last changed on:   Last changed by:                       Version:       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        223 of 241
End User Manual

                    Title: SAP PM
                     Module:           PLANT MAINTENANCE
                     Release:          ECC 6.0
                     Created by:       RAVINDER KUMAR
                     Created on:       23 Nov‟10




     Enter required data like Plant, Storage Location, Movement type etc., as per your
     report requirement


      After the entry of required data click on
     to execute the transaction and you will get the following report




     Report of spares consumption against Maintenance Orders
     Transaction code : IW3M


     Reach the selection screen with help of following menu




Last changed on:    Last changed by:                       Version:                 Page:

(23/11/2010)        RAVINDER KUMAR                         1.0                  224 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




     Selection screen




Last changed on:   Last changed by:                       Version:       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        225 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




     Enter required selection filed values like Order no, Material, storage location as
     per your requirement


     requirement and click on click on                               to   execute      the
     transaction and you will get the report




Last changed on:   Last changed by:                       Version:                      Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                       226 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




     Status Report of Notifications
     Transaction codes : IW28 / IW29
     Reach the selection screen with help of following menu




Last changed on:   Last changed by:                       Version:       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        227 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




     Selection screen

                               Status check boxes




                                                            Enter Plant




     Enter the selection screen values like Maint. Plants, Start & end dates,
     Notification no., Equipment or Function locations and select required check
     boxes according to the status.


     Click on                           to execute the transaction and you will get the
     following report

Last changed on:   Last changed by:                       Version:                   Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                    228 of 241
End User Manual

                    Title: SAP PM
                     Module:           PLANT MAINTENANCE
                     Release:          ECC 6.0
                     Created by:       RAVINDER KUMAR
                     Created on:       23 Nov‟10




     Status Report of Maintenance Orders
     Transaction codes : IW38 / IW39


Trigger:
To review a list of maintenance orders and make any necessary changes


                          Business Process Procedure Overview
To generate a work list of maintenance orders to modify.




Output – Results                                                 Comments
A list of orders.                       Orders will be displayed based on the selection
                                        criteria.

Last changed on:    Last changed by:                       Version:                       Page:

(23/11/2010)        RAVINDER KUMAR                         1.0                        229 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




Procedural Steps
Via Menus                              A: Logistics  Plant Maintenance  Maintenance
                                       Processing  Order  Order List Change
                                       B: Logistics  Plant Maintenance  Maintenance
                                       Processing  History  List of Orders Change
Via Transaction Code                   IW38


     Reach the selection screen with help of following menu




     Selection screen




Last changed on:   Last changed by:                       Version:                   Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                    230 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




                                  Status check boxes




     Enter the selection screen values like Start & end dates, Notification no.,
     Equipment aor Function locations and select required check boxes according to
     the status.


     Click on                           to execute the transaction and you will get the
     following report




Last changed on:   Last changed by:                       Version:                   Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                    231 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




     Display (Multi Level) : List of Orders
     Transaction code : IW40


Trigger:
To review a list of PM orders and associated documents and master records
                         Business Process Procedure Overview
This transaction allows the planner to review a specific order along with several
selected master records and documents associated with the notification.


Output – Results                                                Comments
A list of orders with associated
documents and master records



Last changed on:   Last changed by:                       Version:              Page:

(23/11/2010)       RAVINDER KUMAR                         1.0               232 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




Procedural Steps
Via Menus                                     Logistics  Plant Maintenance  Maintenance
                                              Processing  Order  List of Orders 
                                              Display (Multi-level)


Via Transaction Code                   IW40


     Reach the selection screen with help of following menu




     Selection Screen




Last changed on:   Last changed by:                       Version:                    Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                     233 of 241
End User Manual

                    Title: SAP PM
                     Module:           PLANT MAINTENANCE
                     Release:          ECC 6.0
                     Created by:       RAVINDER KUMAR
                     Created on:       23 Nov‟10




     Select Required Order type, Enter period dates and select different parameters
     for the multilevel display


     Now click on                            to execute the transaction and you will get the
     following report




Last changed on:    Last changed by:                       Version:                       Page:

(23/11/2010)        RAVINDER KUMAR                         1.0                        234 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




Functional Location List
Transaction code : IH06
Trigger:
Need to look up Functional Locations.
                         Business Process Procedure Overview
You wish to search for Functional Locations by various search criteria. You may search
for a location whose label is unknown, compile a list of locations that have particular
characteristics in common.


Output – Results                                                Comments
List of Functional Locations


Procedural Steps

Last changed on:   Last changed by:                       Version:                 Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                  235 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




Via Menus                              Logistics  Plant Maintenance  Technical Objects
                                        Functional location  List editing  Display
Via Transaction Code                   IH06


     Reach the selection screen with help of following menu




     Selection Screen




Last changed on:   Last changed by:                       Version:                      Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                       236 of 241
End User Manual

                    Title: SAP PM
                     Module:           PLANT MAINTENANCE
                     Release:          ECC 6.0
                     Created by:       RAVINDER KUMAR
                     Created on:       23 Nov‟10




     Select Required Planning Plant, Maintenenace Plant, Planner Gorup etc.
     different parameters for the display


     Now click on                            to execute the transaction and you will get the
     following report




Last changed on:    Last changed by:                       Version:                       Page:

(23/11/2010)        RAVINDER KUMAR                         1.0                        237 of 241
End User Manual

                    Title: SAP PM
                     Module:            PLANT MAINTENANCE
                     Release:           ECC 6.0
                     Created by:        RAVINDER KUMAR
                     Created on:        23 Nov‟10




     Equipment List
     Transaction code : IH08


Trigger:
To display a list of equipment by certain selection criteria.
                           Business Process Procedure Overview
This report is used to output a list of equipment. Equipment data comprises general
data, serial number data, location data, maintenance data and sales/distribution data.
You can use an equipment list to:
        Search for a piece of equipment whose number you do not know
        Compile a list of equipment based on particular criteria
        Perform collective processing for pieces of equipment with particular
         characteristics

Last changed on:     Last changed by:                       Version:                 Page:

(23/11/2010)         RAVINDER KUMAR                         1.0                  238 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




Output – Results                                                Comments
A list of equipment records




Procedural Steps
Access transaction by:
Via Menus                              A. Logistics  Plant Maintenance  Information
                                          System  Report Selection Management of
                                          Technical Objects  Display Equipment
                                       B. Logistics  Plant Maintenance  Planned
                                          Maintenance  Maintenance Task Lists 
                                          Environment  Engineering  Environment 
                                          Technical Objects  Equipment  List Editing 
                                          Display


Via Transaction Code                   IH08


     Reach the selection screen with help of following menu




Last changed on:   Last changed by:                       Version:                      Page:

(23/11/2010)       RAVINDER KUMAR                         1.0                       239 of 241
End User Manual

                   Title: SAP PM
                    Module:           PLANT MAINTENANCE
                    Release:          ECC 6.0
                    Created by:       RAVINDER KUMAR
                    Created on:       23 Nov‟10




     Selection Screen




Last changed on:   Last changed by:                       Version:       Page:

(23/11/2010)       RAVINDER KUMAR                         1.0        240 of 241
End User Manual

                    Title: SAP PM
                     Module:           PLANT MAINTENANCE
                     Release:          ECC 6.0
                     Created by:       RAVINDER KUMAR
                     Created on:       23 Nov‟10




     Select Required Planning Plant, Maintenenace Plant, Planner Gorup etc.
     different parameters for the display


     Now click on                            to execute the transaction and you will get the
     following report.




Last changed on:    Last changed by:                       Version:                       Page:

(23/11/2010)        RAVINDER KUMAR                         1.0                        241 of 241

More Related Content

PPTX
SAP BASED PLANT MAINTENANCE
PDF
SAP Plant Maintenance Training Material | www.sapdocs.info
PDF
Emotional Intelligence for Leaders
PDF
SAP PM Master Data Training Guide
PPTX
SAP Plant Maintenance.pptx
PPTX
Sap plant maintenance
PPT
SAP PM Plant Maintenance Training
PDF
Etm equipment and_tools management
SAP BASED PLANT MAINTENANCE
SAP Plant Maintenance Training Material | www.sapdocs.info
Emotional Intelligence for Leaders
SAP PM Master Data Training Guide
SAP Plant Maintenance.pptx
Sap plant maintenance
SAP PM Plant Maintenance Training
Etm equipment and_tools management

What's hot (20)

DOCX
SAP PM: Test Equipment Management/Calibration process
PDF
SAP ECC 6.0 PM Configuration Manual - www.sapdocs.info
PDF
SAP PM Training Manual - www.sapdocs.info
PDF
Pm end-user-manual
PDF
SAP PM Plant Maintenance Overview
DOCX
FS for FICO
PPTX
SAP EAM/PM Organization Structure
PPT
Sap Customer Service In Manufacturing Industry1
PDF
SAP SD Variant configuration-training-document 2
PPT
Sap S4 HANA PM Online training +918660816919
PPTX
Framework Of Sap Material Management Blueprint
PDF
Sap plant-maintenance-pm-business-blueprint-bbp2
DOC
Sap MM-configuration-step-by-step-guide
PDF
SAP Configuration Guide for Functional Modules (Based on IDES)
DOCX
SAP SD Business Blue Print E1 Sales Template
PPTX
Sap plant maintenance
DOCX
BPD Design Template
PDF
S4 HANA Business Partner Configuration@Ganesh Tarlana
DOCX
Sap mrp-configuration-pp
PPTX
SAP PM: Test Equipment Management/Calibration process
SAP ECC 6.0 PM Configuration Manual - www.sapdocs.info
SAP PM Training Manual - www.sapdocs.info
Pm end-user-manual
SAP PM Plant Maintenance Overview
FS for FICO
SAP EAM/PM Organization Structure
Sap Customer Service In Manufacturing Industry1
SAP SD Variant configuration-training-document 2
Sap S4 HANA PM Online training +918660816919
Framework Of Sap Material Management Blueprint
Sap plant-maintenance-pm-business-blueprint-bbp2
Sap MM-configuration-step-by-step-guide
SAP Configuration Guide for Functional Modules (Based on IDES)
SAP SD Business Blue Print E1 Sales Template
Sap plant maintenance
BPD Design Template
S4 HANA Business Partner Configuration@Ganesh Tarlana
Sap mrp-configuration-pp
Ad

Similar to Pm end-user-manual (20)

PDF
Pm imp. book
PDF
Camunda-BPM-Loan-Assessment-Process-Lab-v1.0.pdf
PDF
Sap hana installation_guide_en
PDF
Sap hana master guide
PDF
Sap Solman Instguide Initial Customizing
PDF
Camunda BPM 7.12 Release Webinar
PDF
R12 common-features
DOC
W2 k3 ad_integration-how_to
PDF
Code in the Cloud 1st Edition Mark C. Chu-Carroll
PDF
Code in the Cloud 1st Edition Mark C. Chu-Carroll
PDF
Pivotal Cloud Foundry 2.6: A First Look
PDF
SAP_Enable_Now_Master_Guide_en-US.pdf
DOC
Web sphere application server performance tuning workshop
PPTX
Camunda BPM 7.13 Webinar
PDF
Bslsg131en 1
PDF
Oracle Analytics Server Infrastructure Tuning guide v2.pdf
PDF
Sap hana master_guide_en
PDF
CRM EHP3 landscape guide
PDF
Sqlref
PDF
IBM Service Management Suite V1.3.0 Update Guide
Pm imp. book
Camunda-BPM-Loan-Assessment-Process-Lab-v1.0.pdf
Sap hana installation_guide_en
Sap hana master guide
Sap Solman Instguide Initial Customizing
Camunda BPM 7.12 Release Webinar
R12 common-features
W2 k3 ad_integration-how_to
Code in the Cloud 1st Edition Mark C. Chu-Carroll
Code in the Cloud 1st Edition Mark C. Chu-Carroll
Pivotal Cloud Foundry 2.6: A First Look
SAP_Enable_Now_Master_Guide_en-US.pdf
Web sphere application server performance tuning workshop
Camunda BPM 7.13 Webinar
Bslsg131en 1
Oracle Analytics Server Infrastructure Tuning guide v2.pdf
Sap hana master_guide_en
CRM EHP3 landscape guide
Sqlref
IBM Service Management Suite V1.3.0 Update Guide
Ad

Recently uploaded (20)

PPT
“AI and Expert System Decision Support & Business Intelligence Systems”
PDF
cuic standard and advanced reporting.pdf
DOCX
The AUB Centre for AI in Media Proposal.docx
PDF
Optimiser vos workloads AI/ML sur Amazon EC2 et AWS Graviton
PDF
Machine learning based COVID-19 study performance prediction
PDF
Mobile App Security Testing_ A Comprehensive Guide.pdf
PPTX
Programs and apps: productivity, graphics, security and other tools
PDF
Reach Out and Touch Someone: Haptics and Empathic Computing
PDF
Network Security Unit 5.pdf for BCA BBA.
PPTX
sap open course for s4hana steps from ECC to s4
PPTX
MYSQL Presentation for SQL database connectivity
PDF
Dropbox Q2 2025 Financial Results & Investor Presentation
PDF
Building Integrated photovoltaic BIPV_UPV.pdf
PDF
Encapsulation theory and applications.pdf
PPTX
Digital-Transformation-Roadmap-for-Companies.pptx
PDF
Per capita expenditure prediction using model stacking based on satellite ima...
PDF
Architecting across the Boundaries of two Complex Domains - Healthcare & Tech...
PPTX
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
PDF
TokAI - TikTok AI Agent : The First AI Application That Analyzes 10,000+ Vira...
PPTX
20250228 LYD VKU AI Blended-Learning.pptx
“AI and Expert System Decision Support & Business Intelligence Systems”
cuic standard and advanced reporting.pdf
The AUB Centre for AI in Media Proposal.docx
Optimiser vos workloads AI/ML sur Amazon EC2 et AWS Graviton
Machine learning based COVID-19 study performance prediction
Mobile App Security Testing_ A Comprehensive Guide.pdf
Programs and apps: productivity, graphics, security and other tools
Reach Out and Touch Someone: Haptics and Empathic Computing
Network Security Unit 5.pdf for BCA BBA.
sap open course for s4hana steps from ECC to s4
MYSQL Presentation for SQL database connectivity
Dropbox Q2 2025 Financial Results & Investor Presentation
Building Integrated photovoltaic BIPV_UPV.pdf
Encapsulation theory and applications.pdf
Digital-Transformation-Roadmap-for-Companies.pptx
Per capita expenditure prediction using model stacking based on satellite ima...
Architecting across the Boundaries of two Complex Domains - Healthcare & Tech...
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
TokAI - TikTok AI Agent : The First AI Application That Analyzes 10,000+ Vira...
20250228 LYD VKU AI Blended-Learning.pptx

Pm end-user-manual

  • 1. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Project Sarthak Table of Content. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 1 of 241
  • 2. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 S.No. Page No. 1. Introduction ............................................................................................................ 4 2. Getting Started ....................................................................................................... 6 3. Master Data .......................................................................................................... 18 3.1 Functional Location ................................................................................................................... 18 3.2 Equipment .................................................................................................................................. 29 3.3 Equipment Bill of Material ........................................................................................................ 43 3.4 General maintenance Task lists .................................................................................................. 50 3.5 Work Permit ............................................................................................................................... 59 3.6 Characteristic ............................................................................................................................. 67 3.7 Measuring Points ....................................................................................................................... 71 3.8 Work Center ............................................................................................................................... 80 3.9 Maintenance Planning ................................................................................................................ 85 3.10 Maintenance Plan Scheduling .................................................................................................... 92 4. Maintenance Processing .................................................................................... 102 4.1 Measuring documents .............................................................................................................. 102 4.2 Breakdown Maintenance Process: ........................................................................................... 123 4.3 Preventive Maintenance ........................................................................................................... 160 4.4 Regular Maintenance : ............................................................................................................. 203 4.5 Calibration Process: ................................................................................................................. 209 5. Plant Maintenance Information System .......................................................... 217 5.1 Standard Reports ...................................................................................................................... 217 Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 2 of 241
  • 3. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 3 of 241
  • 4. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 1. Introduction SAP R/3 is an “integrated and industry-independent standard software” which covers integrates and connects all functional areas in a business. SAP AG defines integration as "defined communication". Although R/3 is designed for complete integration, it can also be used for a couple of business areas. SAP is the abbreviation for “Systems Applications and Products in Data Processing”. The purpose of this document is to provide an overview of SAP PM Functionality and the details of how the transactions are carried out in SAP R/3. The document has been organized as follows;  Master data maintenance required for PM module is covered first. Master data maintenance is the most important aspect as these data affects all the transaction where that Master data is used. It is very much controlled by authorizations as per the policy of the company.  As a PM user, you will be using various transactions to replicate day-to-day work in SAP R/3. So all the transactions, which are relevant to you for carrying out Plant Maintenance activities, are covered in this. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 4 of 241
  • 5. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Master data maintenance and transaction processes are explained with the help of SAP screen Shots. This will help you in executing the same perfectly. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 5 of 241
  • 6. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 2. Getting Started LOG ON: Select SAP Log in Icon On PC Desktop & press enter key or double click, Or follow the menu path as shown in following screen: Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 6 of 241
  • 7. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 The following screen will appear. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 7 of 241
  • 8. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Select Server and click on Log on icon Logging onto the SAP R/3 system  Sap R/3 systems are client systems. The client enables you to run several business operations at the same time in one SAP R/3 system.  Client is, in organizational terms, an independent unit in the system. Clients have their own data environment and therefore their own user master and transaction data, assigned user master records and chart off accounts and specific customizing parameters.  So that you log on to SAP R/3 system, you must have a master record created for you for corresponding client. For reasons of access Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 8 of 241
  • 9. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 protection, you must enter a password when you log onto the sap system. The system does not display the password you enter.  SAP R/3 system is available in several languages. Use the language input field to select the logon language for each session. Elements of the screen layout  Command Field: Use command field (hidden as default) to go to applications directly by entering the transaction code.  Standard Tool Bar: the push buttons in the standard tool bar are found on every screen in an SAP R/3 system. Any push buttons that cannot be used in a particular application are grayed out. If you place your Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 9 of 241
  • 10. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 cursor on a push button for a while the system displays a quick info text that explains the push button function.  The Application Tool bar: shows which functions are available in the current application.  A Tab page: provides a clearer overview of several information screens  Status bar: the status bar displays information on the current system status, for example. Warning or error messages  Menu bar: the menus shown here depend on which application you are working in.  Title bar: the title bar displays the functions that are available for the user.  Checkboxes: checkboxes enable you to select several options simultaneously within a group.  Radio Buttons: allow you to choose exactly one item form a selection. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 10 of 241
  • 11. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 The below shown screen gives you a detail explanation. Menu bar Standard toolbar Title bar Command Application toolbar Tab Page Input Fields Check boxes, Radio Buttons Status bar SAP Easy Access  Sap easy access is the standard entry screen displayed after the logon. You navigate through the system using the tree structure. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 11 of 241
  • 12. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 You are greeted by your logo in the right-hand part of the window Selecting Functions  You can call functions in the system as follows o Menu Option o Favourites o Entry in the SAP easy Access menu  “/n” ends the current session  “/i” delets the current session  “/oCV01N” opens a new session and branches out to the transaction specified (CV01N) Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 12 of 241
  • 13. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10  By entering “ search_sap_menu” in the command field, you can display menu paths for the desired SAP transaction. Command Field Menu SAP easy Access and Favorite List Field help : F1 and F4  Use F1 to display an explanation of fields, menus, functions and messages.  F1 Help also provides technical information on the relevant field. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 13 of 241
  • 14. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 F1 Help  Use F4 to display possible inputs . you can also access F4 help for a selected field using the button immediately to the right of that field. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 14 of 241
  • 15. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 F4 help User – Specific Personalization  The end user has many possibilities for personalizing the system. For example as shown in the screen below. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 15 of 241
  • 16. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 SAP – Symbols or icons Keyboard Keyboard Button Description Button Description Shortcut Shortcut Ctrl + Page First page Enter Key Enter/Continue Up Save to Ctrl + S Page Up Previous page database Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 16 of 241
  • 17. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Next page F3 Back Page Down Exit System Ctrl + Page Shift + F3 Last page Task Down Create New F12 Cancel None session Create shortcut Ctrl + P Print None on Desktop F1 Help Ctrl + F Find F1 Customize Local Ctrl + G Find next Alt + F12 Layout Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 17 of 241
  • 18. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 3. Master Data 3.1 Functional Location Functional locations are elements of a technical structure (for example, functional units within a system). Functional locations can be created according to the hierarchy, and can be structured based on the following criteria:  Functional  Process-related  Spatial Each functional location is managed independently in the system, to :  Manage individual data from a maintenance perspective for the object  Perform individual maintenance tasks for the object  Keep a record of the maintenance tasks performed for the object  Collect and evaluate data over a long period of time for the object Trigger: Functional locations need to be structured according to functional, process-related or spatial criteria. Whenever any new location identified we need to create Functional location. BUSINESS PROCESS PROCEDURE OVERVIEW A functional location is an organizational unit to structure the maintenance objects of a company according to functional, process-related or spatial criteria. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 18 of 241
  • 19. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 BUSINESS PROCESS PROCEDURE OVERVIEW A functional location represents the place at which equipment(s) can be installed and a maintenance task is to be performed. Output – Results Comments Functional location created Procedural Steps ID: PM Title: Maintaining of Master data – functional location Business process: Functional Location Transaction code: Menu path: Logistics Plant maintenance IL01, IL02 Management of Technical Objects  functional location  Create (IL01) Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 19 of 241
  • 20. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Description: Use this transaction for creating structured location Double CLICK on selected line or press Enter to get following screen Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 20 of 241
  • 21. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Instructions In the initial screen, enter the values in the following fields: Field name Required User action and allowed values / Optional Functional location R Functional location code is to be entered as per the structure Structure indicator R Structure of func. With hierarchy level Fuct. loc. cat. R Type of fictional loc. “Press enter key“ or click on icon Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 21 of 241
  • 22. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Field name Required User action and allowed values / Optional Description R Functional Location. Name is to be entered (40characters). If the name exceeds, use long text. Ensure General data screen is open or click on GENERAL TAB Field name Required User action and allowed values / Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 22 of 241
  • 23. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Optional Weight O Weight of the Functional Location Size O Size of the Functional Location Start up date O Actual start date of usage Acquisition value O Value of the Functional Location at the time of acquiring Acquisition date O Date on which the Functional Location was acquired Manufacturer O Manufacturer of the Functional Location Manufacturing O Country, where the Functional Location was country manufactured Model number O Model number of the Functional Location supplied by the manufacturer Constr. Yr/mth O Year and month of Functional Location constructed Manuf Part No. O Part number of the Functional Location as supplied by the manufacturer Manuf Serial No. O Serial number of the Functional Location as supplied by the manufacturer After entering required data click on LOCATION TAB Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 23 of 241
  • 24. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Field name Required User action and allowed values / Optional Maintenance plant O Maintenance plant, where the Functional Location is located Location O Location of the Functional Location, for ex: Building where it is installed. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 24 of 241
  • 25. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Field name Required User action and allowed values / Optional Plant section O Further low level identification of location. Work center O Production work center, for blocking from production during maintenance work. ABC Indic O As detailed below : After entering required data click on ORGANISATION TAB TO GET FOLLOWING SCREEN : Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 25 of 241
  • 26. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Field name Required User action and allowed values / Optional Company code R R/3 will copy the respective company of the maintenance plant. Business area O For viewing profit and loss statement/area wise costing. Asset O Appropriate asset number should be assigned to the Functional Location. Cost center O All the costs incurred at the Functional Location level are collected at these cost centers level. Planning Plant O Maintenance planning plant, defaulted as that of maintenance plant. Planner group O Planner groups as per the maintenance planning activities. Maintenance work O Maintenance work center, currently represents center the departments like ME, EE, IE, CE & SE Catalog profile O For Functional Location history generation all the codes are maintained in a catalog profile. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 26 of 241
  • 27. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 After entering required data click on STRUCTURE TAB You will reach the following screen Field name Required User action and allowed values / Optional Functional Location O Functional location under which the Functional Location is functioning. Superior Functional O Superior Functional Location under which the Location Functional Location is functioning. Tech Ident. no O Technical identification number of the Functional Location. Const Type O Material of construction. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 27 of 241
  • 28. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Click on to Save and following message will be given by the system The Functional Location is saved. Through transaction code IL02, required functional location can be opened for editing If Functional location installation is to be changed, click on icon on structure tab, to get the following screen Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 28 of 241
  • 29. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 First dismantle the already existing installation and then input / select new installation location and click on Enter / Continue icon Click on to Save the changes made and following message will be given by the system. 3.2 Equipment A piece of equipment is an individual object that is to be maintained independently. Each piece of equipment is managed independently in the system, so that you can:  Manage individual data from a maintenance perspective for the object  Perform individual maintenance tasks for the object  Keep a record of the maintenance tasks performed for the object  Collect and evaluate data over a long period of time for the object Pieces of equipment can be installed and dismantled at functional locations. The usage times for a piece of equipment at a functional location are documented over the course of time. Trigger: Maintenance history needs to be captured for a physical technical object.Whenever any new Machine/Computer etc. Purchased we need to create Equipment Master. Correct Equipment Type has to be choosen always for proper functioning. BUSINESS PROCESS PROCEDURE OVERVIEW Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 29 of 241
  • 30. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 BUSINESS PROCESS PROCEDURE OVERVIEW This document describes how to create Equipment for use in PM functions. Equipment are master data to manage physical objects in PM and Customer Service. An Equipment master data object must be created here before it may be associated with a Functional Location object. Output - Results Comments Equipment Master created ID: PM Title: Maintaining of Master data - Equipment Transaction code: Menu path: Logistics Plant maintenance IE01, IE02, IE03, Management of Technical Objects  Equipment  Create (IE01) Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 30 of 241
  • 31. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Description: Use this transaction for creating & maintaining Equipment Double click or press Enter Key to reach the following screen Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 31 of 241
  • 32. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Instructions In the initial screen, enter the values in the following fields: Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 32 of 241
  • 33. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Field name Required User action and allowed values / Optional Equipment No in put is required as system creates an internal no, Valid on R By default system proposes current date, one can change to the appropriate valid from date. Equipment category R Appropriate equipment category to be selected from the list REFERENCE Equipment O Already existing equipment can be used to copy the data Material Not applicable this is required when a material/equipment link is required Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 33 of 241
  • 34. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Press Enter key or click on Enter / Continue icon to reach the following screen Enter the parameters as detailed below: in „General‟ screen Screen fields data entry instruction: Field name Required User action and allowed values / Optional Description R Equipment Name is to be entered (40characters). If the name exceeds, use long text. Object type O Type of machine ex: “select from list” Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 34 of 241
  • 35. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Field name Required User action and allowed values / Optional Weight O Weight of the equipment Size O Size of the equipment Start up date O Actual start date of usage Acquisition value O Value of the equipment at the time of acquiring Acquisition date O Date on which the equipment was acquired Manufacturer O Manufacturer of the equipment Manufacturing O Country, where the equipment was country manufactured Model number O Model number of the equipment supplied by the Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 35 of 241
  • 36. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Field name Required User action and allowed values / Optional manufacturer Constr. Yr/mth O Year and month of equipment constructed Manuf Part No. O Part number of the equipment as supplied by the manufacturer Manuf Serial No. O Serial number of the equipment as supplied by the manufacturer Click on Location Tab to get the following screen Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 36 of 241
  • 37. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Field name Required User action and allowed values / Optional Maintenance plant R Maintenance plant, where the equipment is located Location O Location of the equipment, for ex: Building where it is installed. Plant section R Further low level identification of location. Work center O Production work center, for blocking from production during maintenance work. ABCD O As detailed below: Indicator Strategy A Critical B Important C Non-critical Now Click on Organization tab to get the following screen Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 37 of 241
  • 38. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Field name Required User action and allowed values / Optional Company code R R/3 will copy the respective company of the maintenance plant. Business area O For viewing profit and loss statement/area wise costing. Asset O Appropriate asset number should be assigned to the equipment. Cost center R All the costs incurred at the equipment level are collected at these cost centers level. Planning Plant O Maintenance planning plant, defaulted as that of maintenance plant. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 38 of 241
  • 39. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Field name Required User action and allowed values / Optional Planner group O Planner groups as per the maintenance planning activities. Maintenance work O Maintenance work center, currently represents center the departments like ME, EE, IE, CE & SE Catalog profile O For equipment history generation all the codes are maintained in a catalog profile. Now Click on Structure tab to get the following screen Click here for Installation at functional location Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 39 of 241
  • 40. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Field name Required User action and allowed values / Optional Functional Location O Functional location under which the equipment is functioning. Superior Equipment O Superior equipment under which the equipment is functioning. Tech Ident. no O Technical identification number of the equipment. Const Type O Material of construction. The field in the Function location blank, so it is to be selected for the Hierarchy Icon. Click on icon on structure tab, to get the following screen Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 40 of 241
  • 41. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 First dismantle the already existing installation and then input / select new installation location and click on Enter / Continue icon If you select the Superior Equipment Instead of Functional Location then that Equipment will be called SubEquipment. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 41 of 241
  • 42. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 WARRANTY END DATE WARRANTY START DATE Click on to Save the Equipment and following message will be given by the system Warranty is the commitment of the manufacturer, vendor, or retailer to guarantee services to a customer either free-of-charge or only charged in part, over a certain period of time. Warranty details of equipment can be incorporated during equipment creation or can be done in equipment data change transaction and can be viewed through display mode Whenever we try to create a notification or order, SAP system will alert with a warning message with warranty details if the equipment is still under warranty [period Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 42 of 241
  • 43. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 To accommodate different warranty conditions against different warranty services, a separate master warranty is to be created and the same is to be assigned to the equipment master data Field name Required User action and allowed values / Optional Master Warranty O N.A Begin guarantee O Start date of warranty Warranty end O End date of warranty 3.3 Equipment Bill of Material A “Bill Of Material” (BOM) is a complete, formally structured list of the components making up a technical object or an assembly. The list contains the object numbers of the individual components together with their quantity and unit of measure. The components can be stock or non-stock spares or assemblies, which in turn can be described using maintenance BOMs. BOMs are primarily used for the following purposes:  Structure description BOM describes the structure of a technical object or material. Using maintenance BOMs maintenance tasks can be planned  Assignment of spare parts BOM is used in plant maintenance to assign spares for a technical object or material. This is shown in the figure below: Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 43 of 241
  • 44. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Trigger: A piece of maintenance equipment requires a bill of material for maintenance purposes.Whenever any Equipment created we can create its BOM for Structuring. But Before creating Equipment BOM we need to create Material Master. BUSINESS PROCESS PROCEDURE OVERVIEW Create a bill of material for a piece of maintenance equipment to describe the equipment components, maintenance requirements or the assignment of spare parts. Output - Results Comments Equipment BOM created ID: PM Title: Maintaining of Master data – Equipment Business process: Bill of Material Transaction Menu path: Logistics Plant maintenance code:IB01, IB02 Management of Technical Objects Bill of materialEquipment BOMIB01 create Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 44 of 241
  • 45. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Description: Use this transaction for creating & maintaining Equipment bill of material Press Enter key or use mouse double click to get following screen Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 45 of 241
  • 46. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Equipment no Plant BOM USAGE Press enter key In the initial screen, enter the values in the following fields: Field name Required User action and allowed values / Optional Equipment R Select Equipment for which BoM is being created Plant R Enter plant BOM usage R Select – 4 for Plant Maintenance Press Enter Key or Click on Enter / Continue icon To get the following screen Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 46 of 241
  • 47. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Enter the parameters as detailed below : in „Material‟ screen Screen fields data entry instruction: Field name Required User action and allowed values / Optional Item category R Select Item Category Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 47 of 241
  • 48. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Field name Required User action and allowed values / Optional Component R Select item code Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 48 of 241
  • 49. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Field name Required User action and allowed values / Optional Component R System defaults description of selected description component Quantity R Enter installed quantity Units R System defaults UOM of selected component Click on to save the entered data Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 49 of 241
  • 50. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 3.4 General maintenance Task lists Task Lists. Task list is defined as the set of work instructions that will help a maintenance planner schedule his day-to-day job in a predefined manner Maintenance task lists describe a sequence of individual maintenance activities, which must be performed repeatedly within a company. Task lists are used to standardize these recurring work sequences and to plan them more effectively. Task lists can be grouped, for example in to two groups - "Inspection" and "Mechanical Repairs". The individual maintenance task lists within the group "Mechanical Repairs" and are identified by the task list counter numbers 01 and 02 as shown in following fig. General Maintenance Task List This type of task list is generic in nature i.e. the same general task list can be used both for equipment and functional location and also for more than one equipment or functional location of the same type or different types. Similar general task lists can be grouped and several individual general maintenance task lists can be created. General task lists can be used to reduce the time spent creating individual functional location/equipment task lists. Trigger: Need to prepare a sequence of activities that must be repeatedly performed within a company. BUSINESS PROCESS PROCEDURE OVERVIEW Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 50 of 241
  • 51. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 BUSINESS PROCESS PROCEDURE OVERVIEW Maintenance task lists describe a sequence of individual maintenance activities which must be repeatedly performed within a company. They are used to standardize repetitive work processes, to plan them more effectively, and to save time when creating maintenance orders and maintenance plans. Output – Results Comments General Task List created For General Task Lists ID: PM Title: Maintaining of Master data - Functional location Business process: General Task List Transaction code: Menu path: Logistics Plant IA05 maintenancepreventive maintenance Work schedulingtask listGeneral maintenance Task lists  Create (IA05) Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 51 of 241
  • 52. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Description: Use this transaction for creating & maintaining General task list Press Enter Key to get the following screen Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 52 of 241
  • 53. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Field name Required User action and allowed values / Optional Group R Enter a group name (8 characters only) Profile R PDIL Key date R Date from which the task list is to be used Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 53 of 241
  • 54. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Enter the field value according to the following table Field name Required User action and allowed values / Optional Group CNTR R System defaults grp cntr is to be entered Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 54 of 241
  • 55. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Work Center O Select responsible work center from the list Usage O Select 4 for plant maintenance R Select 4 for plant maintenance Status Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 55 of 241
  • 56. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Click on operation tab Following screen can be viewed Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 56 of 241
  • 57. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 In the initial screen, enter the values in the following fields: Field name Required User action and allowed values / Optional Work center R Select work center Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 57 of 241
  • 58. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Plant code R Define plant code like for Noida Engineering= 1100 Ctrl key R Pm 01 for internal operations & PM 03 for external operations Operation O Describe the operation to be carried out description Work O System will automatically calculate by calculation key UN O Unit of measurement for mh NO O No of persons required to perform the activity Duration O Duration of Operation Unit O Unit of measurement for duration C O Calculation key –2 ( for calculating duration ) Repeat the same above operation for required no of activities Select components tab for allotting spares required for that activity. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 58 of 241
  • 59. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Material O Select required item code Qty O Enter the required qty Click on to save the task list. 3.5 Work Permit Permits are to ensure that special approval must be obtained before maintenance orders are executed. Permits can be assigned to the following objects:  Technical objects (functional locations and equipments)  Maintenance orders Different types of work permit are required Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 59 of 241
  • 60. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Permits can be grouped into permit categories, like  Work permit – General jobs  Hot work permit - Hot job  Confined space work permit - permit to work at confined areas  High reach work permit-Permit to work at elevated places Trigger: A regulation or condition needing to be observed when maintenance work is being performed. BUSINESS PROCESS PROCEDURE OVERVIEW A permit is a regulation or condition that must be observed when maintenance work is to be performed on a technical object. The creation of the permit master record is covered in this procedure. The permit can be attached to a Functional Location, Equipment master, or directly to a work order. The requirement can be observed at the release or the completion of a work order. The permit can only be for reference, provide a warning, or cause an error message unless issued. Output – Results Comments Permit master created Master record can be viewed again by selecting row and choosing details. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 60 of 241
  • 61. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 ID: PM Title: Maintaining of Master data – Work Permits Business process: Work permits Transaction code: Menu path: Logistics Management of tech. IPMD objects Environment  IPMD permits Select the transaction as shown in the following screen Press enter key or double click to reach the following screen Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 61 of 241
  • 62. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 To view the next screen press Enter key or click on icon AND THEN ON to view the following screen : Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 62 of 241
  • 63. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Enter the filed values as explained in following table : Field name Required User action and allowed values / Optional Permit R Enter permit name Text R Enter description of the permit Category R Select category of permit from the list Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 63 of 241
  • 64. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Field name Required User action and allowed values / Optional Order release O Select required control on order releasing from the drop down list 1 – while releasing order system will only warn Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 64 of 241
  • 65. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Field name Required User action and allowed values / Optional about the issue of assigned permit to the order 2 – Order release is possible after issuing the permit only (Blank) – No need for issue of Permit Order Completn O Select required control on order releasing from the drop down list 1 – while completing order system will only Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 65 of 241
  • 66. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Field name Required User action and allowed values / Optional warn about the issue of assigned permit to the order 2 – Order completion is possible after issuing the permit only (Blank) – No need for issue of Permit Permit class R System defaults Permit class Print O Select the Print Not modifiable O N.A Click on If you want to write some more thing about the permit. You can use the Long Text. Maintain required permit instructions and click on ICON Click on save button to save the Permit. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 66 of 241
  • 67. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 3.6 Characteristic The pre-requisite for creating a Measuring Point is characteristic. Creation of a Characteristic: The Pre-requisite for creating a characteristic is “Unit of Measurement”, and almost all standard “units of measurement” are available in the system. If a standard Unit of Measurement is not available, contact administrator for creation of the same. Trigger: Format need for characteristic values and the need to display characteristics when classifying master data Output – Results Comments List of characteristics Used to classify and identify objects Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 67 of 241
  • 68. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Double click or press Enter Key to reach the following screen In the initial screen, enter the values in the following fields: Field name Required User action and allowed values / Optional Characteristics R Select characteristics & characteristic screen appear & (If you want to change a Existing Charecteristic) Select find by group & click. The next screen appears & select plant maint. From drop down list. If you want to create a new characteristic please enter the new characteristic name and then go to the menu bar “Charecteristic” and click on “new” Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 68 of 241
  • 69. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Field name Required User action and allowed values / Optional Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 69 of 241
  • 70. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Field name Required User action and allowed values / Optional After selecting the above screen double click you get the following screen. Then select the required characteristic & double click Change no O If require fill Validity O Select the date of validity from the calendar Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 70 of 241
  • 71. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Field name Required User action and allowed values / Optional If the values are of standard type , values can be entered e.g., Speed of pumps  1500 RPM, 3000 RPM, 1000 RPM, 750 RPM etc., OR If Make is a characteristic, the values could be  Akay, KSB. Maag etc., Click on The Characteristic is saved. 3.7 Measuring Points Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 71 of 241
  • 72. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Measuring Points: Measuring points in MY SAP ERP System describe the physical and/or logical locations at which a condition is described (for example, the feed water temperature of a boiler, or the number of run hours of a machine) In Plant Maintenance, measuring points are located on technical objects, in other words, on pieces of equipment or functional locations. Measuring points are classified into: Measuring points Normal inspection points like temperature, pressure readings Counters Counter is a provision in my SAP ERP to represent the wear and tear of an object, consumption, or the reduction of an object‟s useful life Counters can be used to accumulate the readings like equipment run hours, Energy Consumption readings, etc. Trigger: A measurement or counter reading for any Equipment/ Functional location to capture its current condition. Business Process Procedure Overview Measurement will be at a measuring point or a counter. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 72 of 241
  • 73. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Output – Results Comments Measurement Point created Creation of Measuring Point : Measuring Points can be created for Functional location and Equipment. ID: PM Title: Maintaining of Master data - Equipment Business process: 6.4.1.7 – Measuring Points Transaction Menu path: Logistics Plant maintenance code:IK01 Management of Technical Objects  EnvironmentMeasuring pointCreate (IK01) Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 73 of 241
  • 74. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Case 1 : Normal Measuring Point As shown in the following screen, Select the transaction Double click or press Enter Key to reach the following screen Meas. Point category Screen fields data entry instruction: Field name Required User action and allowed values / Optional Measurement R Select IEQ for equipment /IFL for Functional Object Location. Now press enter key if corresponding field is not displayed as per IEQ or IFL Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 74 of 241
  • 75. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Field name Required User action and allowed values / Optional Equipment / fuct.loc R Equip/Flo code is to be selected Meas Pnt Cat R Select required cato. Or use gen cato. Measuring point O Select if measuring point is counter or leave counter check box blank Press Enter Key or click on Details icon to reach the following screen Screen fields data entry instruction: Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 75 of 241
  • 76. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Field name Required User action and allowed values / Optional Measurement O Position of the measuring point on the Position equipment or functional location. Characteristic R Characteristic for Unit of Measurement Name Description of the R Detailed description of the measuring point measuring point Target Value O Normal operating value should be entered: Example: 10.0kg/cm2 Text O Text can be entered: Example: Pressure under ambient condition. If measuring point is normal measuring point and if data like max. and min. range is to be given then click on Additional data tab. This data will determine for automatic generation of notification whenever entered reading is beyond extreme limits. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 76 of 241
  • 77. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Additional data TAB Go to : Additional data for entering Maximum and Minimum Values : Screen fields data entry instruction: Field name Required User action and allowed values / Optional Upper Range Limit O The Maximum pressure condition Lower Range Limit O The Minimum pressure condition Click on The Measuring Point is saved. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 77 of 241
  • 78. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Case 2 : Measuring Point as Counter Check this box if the measuring point is a counter Screen fields data entry instruction: Field name Required User action and allowed values / Optional Measurement R Select IEQ for equipment /IFL for Functional Object Location. Now press enter key if corresponding field is not displayed as per IEQ or IFL Equipment / fuct.loc R Equip/Flo code is to be selected Meas Pnt Cat R Select required cato. Or use gen cato. Measuring point R Select Check box Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 78 of 241
  • 79. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Field name Required User action and allowed values / Optional counter check box Press Enter Key to view the following screen Counter over reading / Reset value Annual Estimate Note : This is required for Counter based planning Screen fields data entry instruction: Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 79 of 241
  • 80. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Field name Required User action and allowed values / Optional Measurement O Position of the measuring point on the Position equipment or functional location. Characteristic R Characteristic for Unit of Measurement Name Description of the O Detailed description of the measuring point measuring point Counter Reading O Max displayable reading of the counter Annual Estimate O Annual Estimate of readings Click on The Measuring Point (Counter) is saved. 3.8 Work Center Trigger: Need identified for a new Work Center within a plant. Business Process Description Overview A work center is an organizational unit that defines where and when an operation should be carried out within a plant. A work center is unique within a plant. Work centers can be machines, people or production lines. Operations that need to be executed are defined on a task list and executed at the corresponding user assigned work center. This transaction enables the user to create basic data, set defaults, assignments, and define capacities and scheduling data pertinent to a work center. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 80 of 241
  • 81. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Work centers contain default values that are copied or referenced in operations at the time of task list creation. They also contain costing, scheduling and capacity data required for leadtime scheduling and capacity planning. Output – Results Comments New work center within a plant Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 81 of 241
  • 82. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 82 of 241
  • 83. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 83 of 241
  • 84. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 84 of 241
  • 85. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 3.9 Maintenance Planning Maintenance Plan (Single Cycle): Single cycle plan allows only one cycle frequency, whereas strategy plan allows multiple frequencies. Single cycle maintenance plan adopts exactly one time-based or performance based maintenance cycle, with interval at which the maintenance plan should be executed. Trigger: To plan maintenance events to occur in a regular, periodic manner, based on one cycle parameter. Business Process Procedure Overview Maintenance plans merge the records of specific strategies, task lists, items and measuring points (when necessary) to generate a recurring maintenance schedule for the resultant orders which are copied from the task lists. In addition, they can be used for condition-based maintenance which can generate notifications or orders based on pre-established performance parameters. There can be multiple maintenance items in a maintenance plan. A separate order will generated from the plan for each item. Output – Results Comments Maintenance plan is created. The outputs of all three types of maintenance plans Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 85 of 241
  • 86. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 are work orders (and notifications) automatically created based on pre-established work requirements and planning parameters. In addition, the upcoming maintenance can be budgeted. You will be able to look at what orders are coming due in up to the next several days, months or years (scheduled calls). In addition, you can use date monitoring to create the orders as far in advance as necessary. In this case, all the maintenance events produced from this type of plan will be due with at the same time and in the same frequency. Refer to business process procedure „Display Maintenance Plan‟ to verify results. ID: PM Title: PREVENTIVE MAINTENANCE –SINGLE CYCLE PLAN Business process: 6.4.2.2 – Single cycle Maintenance Plan Transaction code: Menu path: Logistics Plant maintenance IP41 Preventive maintenance  Maintenance Planning  Maintenance Plans Create  Single Cycle Plan (IP41) Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 86 of 241
  • 87. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Select the transaction and Double click or press Enter Key to reach the following screen In the initial screen, enter the values in the following fields: Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 87 of 241
  • 88. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Field name Required User action and allowed values / Optional Maintenance Plan R Choose the Maintenance Plan Category: Category “Maintenance Order” Press Enter to get the following screen In the screen, enter the values in the following fields: Field name Required User action and allowed values / Optional Maintenance plan R Enter appropriate description for the Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 88 of 241
  • 89. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Field name Required User action and allowed values / Optional description maintenance plan. Ex: “Periodic shutdown plan for BI/BWM/01 SOP:BI0003” Cycle/unit R The maintenance period and the unit of period should be entered. Ex: 2 mon, 30 day etc. Cycle text O Enter proper text to describe the cycle duration. Offset/unit O The time period by which the first scheduled call object should be postponed. Counter O If the maintenance activity is performance based, counter should be used. Example “Number of operations/hrs a motor is run” etc. Reference object: O/R Reference object on which the maintenance Functional Location activity should be carried out. Reference object: O/R Reference object on which the maintenance Equipment activity should be carried out. After selecting equip press enter key so that system selects data from master Planning plant R Planning plant Order type R Enter maintenance order type: Ex: PM02 on which the maintenance call objects will be created. Main Work Center R Main Work Center Business Area R Business Area Task list O Assign a task list either general, equipment of Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 89 of 241
  • 90. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Field name Required User action and allowed values / Optional functional location task list. Click on icon to reach the following screen Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 90 of 241
  • 91. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 In the screen, enter the values in the following fields: Field name Required User action and allowed values / Optional Call horizon O % of scheduling period that should be considered in planning. If nothing is mentioned 100% will be considered. Scheduling period O Planning period during which call objects will be created as per the cycle duration”. Start of cycle O Enter the date on which the planning cycle should start. Scheduling O If a day of a month is critical and cycle period is indicator in months choose Time-key date other wise choose Time. If only the working days are to be considered, choose time-factory calendar. Equipments O New equipments or functional locations that are to be added in the same plan should be created and added in the same plan. Completion O If the fresh maintenance order to be created by requirement the system after successful completion of the previous maintenance order, then check completion requirement check box. In item overview all the maintenance items that are considered in the current plan are displayed. To add a counter for performance based preventive maintenance: Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 91 of 241
  • 92. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Enter required counter no. in “Counter” Field (Counter no. can also be searched using icon ) After entering all the planning data click on to save the plan 3.10 Maintenance Plan Scheduling Maintenance Scheduling: Scheduling for maintenance jobs as per prepared maintenance plans During a schedule run, system schedules the planned dates and the call dates Call date is the advance date of order generation by the system (as defined in maintenance scheduling parameters) to facilitate maintenance planner to arrange for execution of maintenance activity on planned date. The call date is the date on which a maintenance order is created in the system. This is determined by the call horizon of the maintenance plan. Trigger: To schedule the maintenance plan and monitor its progress, including making scheduling modifications as necessary. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 92 of 241
  • 93. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Business Process Procedure Overview Maintenance plans in SAP are designed to automatically generate calls for orders, notifications, or service requests when the parameters attached to the item are met. When an order is created, a request for the resources outlined in the order is made. However, they are not reserved until the order is released. Once released an order may have goods, labor, and services charged to it. Releasing a work order gives the others the authority to reserve its resources, purchase additional ones, and start charging costs. If you decide not to do this work you can release and technically complete the order immediately. Note: The plan is constantly adjusting itself to keep consistent with the cycle lengths linked to the items. Thus, each time a call is closed outside the cycle length and the associated tolerances, the plan is adjusted accordingly. If this is a recurring practice, future planned call dates will be fluctuate sporadically and could be difficult to keep track of. Output – Results Comments A view of the scheduled calls for a maintenance plan ID: PM Title: PREVENTIVE MAINTENANCE–MAINTENANCE PLANNING Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 93 of 241
  • 94. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Business process: Maintenance Scheduling Transaction code: Menu path: Logistics Plant maintenance IP10 Preventive maintenance  Maintenance Planning Scheduling for Maintenance Plans  Schedule (IP10) Select the transaction and Double click or press Enter Key to reach the following screen Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 94 of 241
  • 95. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 In the initial screen, enter the values in the following fields: Field name Required User action and allowed values / Optional Maintenance Plan R Select the Maintenance Plan from the list Press Enter key or click on Enter / Continue icon to get the following screen and then Click on the “Start” or the “start in cycle” Push button as per Requirement. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 95 of 241
  • 96. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 The plan is ready for a schedule run. Press start button to Run Scheduling from the Start. If you want to Start the Plan from within the Cycle then one needs to use “Start in Cycle‟. Use “Start” when Use “Start in Cycle” you need to start when you need to the Plan from the start the Plan from Start of the Cycle. with in the cycle. The Following Screen appears. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 96 of 241
  • 97. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Click on “Scheduling Overview. The scheduled call object will be displayed as above. If the overview list is to be analyzed click on Scheduling overview list. Release the scheduled plan for creating the maintenance orders. The Overview will appear as below Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 97 of 241
  • 98. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 For list displays of schedule plans and call objects: Use the following transactions for various list displays; Trigger: To list the scheduled calls for a maintenance plan or group of plans Business Process Procedure Overview To view the scheduled calls for a maintenance plan in a list format Output – Results Comments List of scheduled calls for review Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 98 of 241
  • 99. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 For viewing plan / execution status select transaction IP24 and press Enter key to reach the Following screen Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 99 of 241
  • 100. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Select by maint plan category as PM (or use the available fields for different search criteria) click on to view the following screen Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 100 of 241
  • 101. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Calibration process is as same as Preventive maintenance in PDIL Case. So Kindly follow the same Process.( Only maintenane Order type, Planner Group, Work Center will be changed as per the Calibration) Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 101 of 241
  • 102. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 4. Maintenance Processing 4.1 Measuring documents Measurement readings are to be taken at measuring points in particular measurement units at particular intervals. (For example, the feed water temperature in degrees Celsius of the boiler daily at 6.00 am) Measurement readings describe a condition at a measuring point at a particular point in time, and represent the transaction data for measuring points in the MY SAP ERP System. They are documented in the form of measurement documents. An optimum value for a particular measuring point to which the device concerned is calibrated can be maintained as a target value for the measuring point. Creation of Measuring Document: Measuring documents can be created for Functional location & equipment measuring points. Trigger: A measurement or counter reading from a measurement point needs to be entered into the system. Business Process Procedure Overview After a measurement has been taken at a measuring point or a counter, the data needs to be entered into the system. A measurement document comprises the data entered in the system Output - Results Comments Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 102 of 241
  • 103. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Measurement Document Document may be verified by running transaction IK13 created (display measurement document). Refer to business process procedure „Display Measurement Document‟ to verify results. Case 1 : Normal Measuring Point Transaction code: Menu path: Logistics Plant maintenance IK11 Management of Technical Objects functional location/equipment measuring document  create (IK11). Double click or press Enter Key to reach the following screen Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 103 of 241
  • 104. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 In the initial screen, enter the values in the following fields: Field name Required User action and allowed values / Optional Measurement point R Select the measuring point on which the measuring point to be entered Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 104 of 241
  • 105. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Field name Required User action and allowed values / Optional Measurement time R Enter date & time when measurement is taken Read by R Enter the name of person who has taken reading . Press Enter Key Case 1- if the measuring point is a counter following screen will appear as below Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 105 of 241
  • 106. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Screen fields data entry instruction: Field name Required User action and allowed values / Optional Counter reading R Either counter or difference reading has to be entered to calculate the second parameter Enter the display reading of counter if the physical counter is maintained press enter to calculate difference of reading in the system Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 106 of 241
  • 107. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Field name Required User action and allowed values / Optional Counter reading R Either counter or difference reading has to be entered to calculate the second parameter Enter the display reading of counter if the physical counter is maintained press enter to calculate difference of reading in the system difference R Either counter or difference reading has to be entered to calculate the second parameter Enter the difference of reading & press enter the system will calculate counter reading Click on to save the readings Case 2- if the measuring point is not a counter following screen will appear Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 107 of 241
  • 108. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Screen fields data entry instruction: Field name Required User action and allowed values / Optional Meas rdg R Enter the reading of measurement Click on to save the readings Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 108 of 241
  • 109. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 MEASURING POINT ENTRY LIST Trigger: A measurement or counter reading from a measurement point needs to be entered into the system. Business Process Procedure Overview After a measurement has been taken at a measuring point or a counter, the data needs to be entered into the system. A measurement document comprises the data entered in the system Output - Results Comments Measurement Document Document may be verified by running transaction IK13 created (display measurement document). Refer to business process procedure „Display Measurement Document‟ to verify results. Creating Entry List Transaction code: Menu path: Logistics Plant maintenance IK31 Management of Technical Objects Environment measuring points  measuring reading entry list (IK31). Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 109 of 241
  • 110. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Double click or press Enter Key to reach the following screen Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 110 of 241
  • 111. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Type entry list name Type entry list name & press Enter key or click on Enter / Continue icon To reach the following screen Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 111 of 241
  • 112. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 In the initial screen, enter the values in the following fields: Field name Required User action and allowed values / Optional MeasPoint/ Counter R Select the measuring point on which the measuring point to be entered Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 112 of 241
  • 113. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Field name Required User action and allowed values / Optional Measu point short R System defaults from master data text Meas Position O System defaults from master data Click on Following message will appear on the screen Measurement readings entry through Measurement readings Entry List Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 113 of 241
  • 114. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Transaction code: Menu path: Logistics Plant IK34 maintenanceMaintenance Processing completion confirmation measurement documents  collective entry  with entry list (IK34). Press Enter Key or Double click on selection To reach the following screen Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 114 of 241
  • 115. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 In the initial screen, enter the values in the following fields: Field name Required User action and allowed values / Optional Entry list R Enter the entry list number or select from the drop down list Measurement time R Enter date & time when measurement is taken Read by R Enter the name of person who has taken reading. Press Enter Key or Click on tab To reach the following screen Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 115 of 241
  • 116. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Reading/Counter Required For measuring point enter read value or reading / For counter either counter reading or Optional difference reading has to be entered to calculate the second parameter by the system (Enter the display reading of counter if the physical counter is maintained press enter to calculate difference of reading in the system) Difference (for R Either counter or difference reading has to counters) be entered to calculate the second Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 116 of 241
  • 117. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Reading/Counter Required For measuring point enter read value or reading / For counter either counter reading or Optional difference reading has to be entered to calculate the second parameter by the system (Enter the display reading of counter if the physical counter is maintained press enter to calculate difference of reading in the system) parameter Enter the difference of reading & press enter the system will calculate counter reading Click on to save the data Notifications Notification is a means, by which internal company notifications like equipment malfunctions; breakdowns, maintenance requests or activity reports etc are entered and managed in Plant Maintenance. Notifications can be created on Equipment and Functional locations. Trigger: An internal problem or maintenance request needs to be logged for problem reporting and technical resolution. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 117 of 241
  • 118. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Business Process Procedure Overview This document describes how to create a PM notification for any notification type. A notification is used to capture technical information and assign tasks that do not involve the tracking of costs. The user can create a maintenance order or a quality notification from the PM notification. Note: With this transaction, the screen layout will differ based on the notification type as defined in customizing. Refer to Business Procedure document for Create Maintenance Request, Create PM Malfunction Report and Create PM Activity Report. Output – Results Comments Creation of a notification Refer to Business Process Procedure „Display PM Notification', to verify this result. ID: PM Title: CREATING NOTIFICATION Business process: 6.4.3.1 - Maintenance Processing - Notifications Transaction code: Menu path: Logistics Plant maintenance IW21 Maintenance Processing  Notification  create (IW21) Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 118 of 241
  • 119. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Use this transaction for creating Notifications on Functional Locations and Equipment. As technical objects like buildings are installed as Functional locations, all jobs that are required to be carried for buildings are to be created on Functional Locations. Maintenance Request (M1) Maintenance requests are notifications used to request the maintenance department to perform an activity. Unlike malfunctions reports, maintenance requests are not used in the event of malfunctions. They are typically used in conjunction with investments, reconstruction or replacement. Malfunction Report (M2) A malfunction report describes a malfunction of an object, which restricts the performance of that object in some way. A user can use a malfunction report to inform the maintenance department that a system is not functioning correctly, is not Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 119 of 241
  • 120. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 working at all, or is producing poor results. Malfunction reports are intended to prompt the maintenance department to carry out a maintenance task to restore the target condition of the object. Activity Report (M3) An activity report describes a maintenance activity that has already been carried out and was not necessitated by a malfunction, problem or damage. An activity report is a technical document and is used to verify which activities were carried out when, and for what reason, as well as the result of these activities. Typical examples of activity reports include inspection or maintenance findings. These documents all the results of an inspection, or the technical values of an object determined during or after regular preventive maintenance work. Inspection tasks are not requested explicitly via a malfunction report and are usually based on inspection orders. Preventive maintenance work is carried out to preserve the target condition of the object, and is based on preventive maintenance plans. IT Report (IT) An IT report describes a malfunction of an object, which restricts the performance of that object in some way. A user can use a malfunction report to inform the maintenance department that a system is not functioning correctly, is not working at all, or is producing poor results. Malfunction reports are intended to prompt the maintenance department to carry out a maintenance task to restore the target condition of the object. After selecting the transaction, press Enter key or double click to reach the following screen Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 120 of 241
  • 121. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 In the Initial screen , you can select the type of Notification and press ENTER key or click on Enter / Continue icon to reach the next screen Type Of Notification: Maintenance Orders To carry out internal maintenance jobs or external services as per the maintenance requests or according to day to day observations and for preventive maintenance activities, a maintenance order is to be prepared to plan for material, manpower and services requirement. On the basis of maintenance orders only, maintenance jobs costing, reservation for material and manpower planning can be done. Maintenance Orders are to be created by Maintenance dept on: Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 121 of 241
  • 122. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Functional Locations Equipments Maintenance Orders can be created against: Notifications Direct/Adhoc Maintenance plans (thro. maintenance plans and schedules) Maintenance Orders are to be created on the following conditions: When a material is to be drawn from the storage location When External Services are required. When history of activities are need to be captured. The different types of Maintenance Orders configured in the system are as follows: Type Description PM01 Breakdown/malfunction maintenance order PM02 Preventive Maintenance order PM05 Calibration order PM07 Regular Maintenance Please use appropriate type of order, for capturing the data under various categories. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 122 of 241
  • 123. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 As technical objects like buildings are installed as Functional locations, for jobs that are required to be carried out, Maintenance orders are to be created on Functional Locations. 4.2 Breakdown Maintenance Process: Malfunction Report (M2) A malfunction report describes a malfunction of an object, which restricts the performance of that object in some way. A user can use a malfunction report to inform the maintenance department that a system is not functioning correctly, is not working at all, or is producing poor results. Malfunction reports are intended to prompt the maintenance department to carry out a maintenance task to restore the target condition of the object. i) Create Notification for reporting Machinery malfunctions/Breakdown (M2) Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 123 of 241
  • 124. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 >Fill the Description of the Problem >Fill/Select Functional location & Equipment >Fill the Reported BY >Press ENTER >WE find this screen which show last 3 activities status on that particular equipment Notification Header Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 124 of 241
  • 125. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Click / Press ENTER Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 125 of 241
  • 126. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Notification Description >For M2 type Notification >we have to click in box of Breakdown > In this screen we can correct the date/time of Malfunctioning start >Click/Press ENTER Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 126 of 241
  • 127. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Here we can see Warranty Status of Equipment Long Text Can be Written at this place Field name Required User action and allowed values / Optional Notification R Description of activity to be carried out Description Functional location/ O Select from the List of Equipment. Equipment Required start O System copies the present date, a different date and time also can be entered, as required. Priority O Select the priority as required Required End O Enter the date and time on which the job to be completed Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 127 of 241
  • 128. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Field name Required User action and allowed values / Optional Planner group O Planner groups as per the maintenance planning activities. Maintenance work O Maintenance work center, currently represents center the departments Reported by R Mention the Name of the Person, for identification Purpose Malfunction start O Time of Malfunction Malfunction end O Time of end of malfunction. Cause text O Give reason for failure Long text O Mention required details IMPORTANT : If it is a Breakdown, checkbox „Breakdown to be selected. After entering all the required values, click on to save the Notification. ii) Notification Processing Initially Notification will have the status “OSNO” when it is created, Notification is to be released for changing the status as “NOPR” and after completing the notification, status will change to “NOCO”, if any order is assigned to this notification, status “ORAS” will be there. Different Notification Status codes are shown below Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 128 of 241
  • 129. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 After entering all the required values, click on to save the Notification. And following message will appear on the screen If NO cost is involve we can document all work in Notification Only.There is no need to create Maintenance Order. Notification – Put in process : Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 129 of 241
  • 130. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Check for status change from OSNO to NOPR iii) Notification Completion Notification is to be selected by using transaction codes IW22 / IW28 to reach the following screen Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 130 of 241
  • 131. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Enter the notification number in Notification box or select from the list Press Enter key or click on “Notification” to reach the following screen Click completion flag to get the completion screen Enter completion details as explained in following table Field name Required User action and allowed values / Optional Malfunction start R Time of malfunction begin Malfunction end R Time of end of malfunction Complete the notification by clicking on Complete Flag. Observe status change from NOPR to NOCO (Notification completion.) Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 131 of 241
  • 132. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 The Notification is completed, If the activity is unsatisfactory, the notification can again be opened and again put into operation. With reference to this notification, If Maintenance order is to be created for carrying out the above work, then click on create Icon. Click here Or go to menu path PM Notification -> Order -> Create -> Direct as shown in the following screen Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 132 of 241
  • 133. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 You will reach the following screen Enter / check Order Type, Main work center and click on Enter / Continue icon To reach the following screen Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 133 of 241
  • 134. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 For planning in terms of manpower and material and for further processing of order, After entering required details, save the order and following message will appear on the screen. iv) Maintenance Order Creation/Change Trigger: Internal work hours and costs need to be captured and transferred to other cost objects for maintenance / service work. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 134 of 241
  • 135. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Business Process Procedure Overview A detailed work planning document which holds details on resources, components, costs, and labor required to complete specific maintenance work. Can be created with or without a notification. The costs are settled to other cost objects, such as cost center. Output - Results Comments Creation of a PM Order Refer to Business Process Procedure „Display PM Order to verify this result Observe the system status, during creation and order processing : CRTD - Order created Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 135 of 241
  • 136. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 MANC - Material availability not checked NTUP - Dates Not updated NMAT - No Material components PRC - Order Precosted SETC - Settlement Rule created TECO - Technical Completion CNF - Complete confirmation REL - Order released CLSD - Order Closed PCNF - Partial confirmation Enter the field values in different tabs like as explained in following table Field name Required User action and allowed values / Optional Header data : Planner Group O Default is copied from the system by Master data Maint .work center R Default is copied from the Equipment, but it can be changed , if required. This is required for tracking purpose. Costs O The approx. cost can be given Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 136 of 241
  • 137. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Field name Required User action and allowed values / Optional PM Activity type O Activity type can be selected from the drop down list. System condition O This activity is to be carried out when the Equipment/System is in operation or to be stopped Basic start O Enter the proposed date of start Basic Finish O Enter the proposed date of end Priority O Copied form the system, if already given. Revision O Revision is to be selected form the drop down list (Pl see the Notes.#1) Reference object R The functional location or Equipment is copied form the initial screen First Operation Operation R Name of the operation Work Center R Work center Control key R To be mentioned whether „PM01‟ or „PM03‟ – PM01 indicates the job to be done internally, Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 137 of 241
  • 138. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Field name Required User action and allowed values / Optional PM03 - if the job to be carried out externally Work duration, O Depending on the calculation key, enter any 2 Number, Operation or 3 values, so that the 3rd value will be duration calculated automatically / manually. Calculation key O Select from the drop down list Notes:  If the operations are more than one operation, use the operation tab strip, and enter as many operations as required.  The work centers for different operations can be different. (If required).  Control Key PM01 Denotes – Work done by Own Employee & PM03 denotes work done by External Vendor. For PM03 Purchase Requisition will be created automatically. Which will go for Release Process & then Purchase Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 138 of 241
  • 139. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Order will be created.This is MM Module Process, can be viewd in MM User Manual. Fill the Material Group,Purchasing Group,Requisitioner name,Tracking No. Then Click on this Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 139 of 241
  • 140. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Purchase Requisition Number Genrated. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 140 of 241
  • 141. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Field name Required User action and allowed values / Optional Component R Indicate Material code of the component. Requirement Qty O Indicate the quantity of the components Description and O Automatically copied from the system. UM I Category R Indicate whether it is stockable or Non- stockable, „L‟ or „N‟ S LOC O Stock can be checked thro. this. Notes : Item category - significance of „L‟ and „N‟ . L – Generally stockable item, when a component is selected „L‟ - a reservation is created . Reservation creation is irrespective of material stock. (Means, even if the material is not available in the storage Location, reservation will be created.). Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 141 of 241
  • 142. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 N – means Non-stockable, but coded item. – Even if stock is available , „N‟ can be indicated. The system will create a PR for the Items for which „N‟ is indicated. Reservation Number Generated for Stock Item. Material Issue against Reservation process can be viewd in MM End User Manual as it is MM Process. Click on to save the Order v) PROCESSING THE ORDER 1.RELEASING THE ORDER ORDER CAN BE RELEASED WHILE CREATING OR AFTER CREATION ALSO. RELEASING WHILE CREATING Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 142 of 241
  • 143. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 CLICK ON RELEASE FLAG , THE SYSTEM STATUS WILL CHANGE FROM “CRTD” TO “REL” RELEASE FLAG RELEASING AFTER CREATION and then SAVE the Order. SELECT THE ORDER WHICH IS TO BE RELEASED BY TRANS CODE “IW32” Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 143 of 241
  • 144. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 144 of 241
  • 145. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 ENTER THE ORDER NO OR SELECT FROM THE DROP DOWN LIST Select the Release Button to release the order The order will be released., Check status as below.. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 145 of 241
  • 146. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Check for status changed to REL v) COMPLETION CONFIRMATION A.TIME CONFIRMATION Trigger: Actual hours worked and materials used need to be recorded and posted to the PM order. Business Process Procedure Overview The actual hours worked per operation are recorded/posted to the PM/CS order via time confirmation. Any materials used may be posted at this time. Technical reporting to the notification may also be performed at this time. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 146 of 241
  • 147. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Output – Results Comments Time confirmed to PM order Refer to Business Process Procedure 'Display PM Order' (and view cost report) or 'Display PM Order Confirmation' to verify results. The document flow on the PM order will also show any time confirmations posted. Press Enter key or double click (with mouse Left key) to reach the following screen; Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 147 of 241
  • 148. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 ENTER ORDER NO OR SELECT FROM LIST PRESS ENTER KEY TO REACH THE FOLLOWING SCREEN SELECT THE OPERATIONS TO BE CONFIRMED AND FOLLOW THE MENU PATH SHOWN IN THE NEXT SCREEN Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 148 of 241
  • 149. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 DOUBLE CLICK ON THE ACTUAL DATA FOLLOWING SCREEN WILL APPEAR Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 149 of 241
  • 150. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 FOR NEXT OPERATION ENTER THE OPERATION ENTER THE START & END DATE WITH TIME CONFIRM ACTUAL MAN HOURS IF WE ARE DOING FINAL CONFIRMATION SELECT THE FINAL CONFIRMATION BOX CLICK ON CLEAR OPEN RES. IF NO MORE MATERIALS ARE REQUIRED AGAINST THE RESERVATION. IF THERE IS NO REMAINING JOBS TICK THE NO REMAIN WORK BOX CLICK ON RIGHT ARROW KEY FOR NEXT OPERATION SAVE THE CONFIRMATION BY CLICKING ON AND FOLLOWING MESSAGE WILL APPEAR ON THE SCREEN Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 150 of 241
  • 151. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 vi) SERVICE ENTRY SHEET SERVICE ENTRY SHEET HAS TO BE FILLED FOR CLEARING THE INVOICE. Trigger: Requirement for recording services performed by service provider Business Process Description Overview This document describes the procedure for creating a service entry sheet. Within purchasing, this service entry sheet document is designed for the recording of the services that have been performed by the service provider. The service entry sheet is a list of all planned services that have actually been performed. It can also be used to lust and specify unplanned services that have been performed and whose precise scope and nature were unknown at time of planning phase. Output – Results Comments Service Entry Sheet Menu Path Via Menus Logistics> Plant Maintenance> Maintenance Processing> Completion Confirmation> Services Via Transaction Code ML81n Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 151 of 241
  • 152. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 or use transaction code “ML81N” to reach the following screen Click Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 152 of 241
  • 153. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 select Purchase order number as shown in next screen click on the Enter / Continue icon Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 153 of 241
  • 154. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Click on This tab create service entry sheet Click on the service selection tab SERVICE SELECTION TAB Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 154 of 241
  • 155. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Following screen will appear Following screen will appear Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 155 of 241
  • 156. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Click here then click on Services Push button Click to Select line item The following screen will appear ACCEPTING SERVICE ENTRY SHEET Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 156 of 241
  • 157. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 3. Click on this flag for accepting 2. Service Entry sheet Number 2. Confirm the required quantity Click on the green flag for accepting the services. Save the transaction clicking save button Following message will appear B.GOODS ISSUE Part will be taken care in MM User manual. vii) ORDER TECHNICAL COMPLETION SELECT THE ORDER FROM MENU PATH Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 157 of 241
  • 158. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Complete the order by clicking on Complete Flag. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 158 of 241
  • 159. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Click on Tech. Nov‟10 Completion flag WHILE COMPLETING TECHNICALLY SYSTEM DEFAULTS CURRENT DATE & TIME BUT STILL IT CAN BE CHANGED FOR PAST CONFIRMATIONS Check status – TECO viii) Order Settlement Order settlement is used to control costs and to identify where maximum costs are being incurred for maintenance. Costs associated with the maintenance work are assigned to Cost centres. Costs arising out of executing an order are initially collected on the order. These costs are then transferred to a receiver, for e.g. Cost centre. The receiver of costs are specified in the order and settlement carried out at regular intervals by FI. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 159 of 241
  • 160. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 ix) Business Completion The business completion of an order is usually performed when no further costs are expected to be posted to the order. An order can only have business completion when: It has been technically completed It has been settled and the order balance is 0 No outstanding purchase orders (commitments) exist for it All data that refers to the reference object of the maintenance order is available and correct All relevant data in the operations and sub-operations is available and correct The business completion function for an order defines the following information for the order: The order obtains the status Completed. It is indicated as fully completed. The order cannot receive any more postings, even for posting of costs. It is locked for all collective-processing changes. Business completion can be performed for An individual order Several orders using collective processing Business completion of the order can also be cancelled. 4.3 Preventive Maintenance To ensure higher equipment availability and reliability, preventive maintenance plans are required for critical equipments and systems. The preventive maintenance plans can generate PM order/Notification /service Entry Sheet as per the pre-defined schedules, based on time elapsed or any other Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 160 of 241
  • 161. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 performance criteria. i) Maintenance task lists Maintenance task lists describe a sequence of individual maintenance activities, which must be performed repeatedly within a company. In PDIL we are using only one maintenance task list: i.e. General Maintenance Task List Tcode :IA05 Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 161 of 241
  • 162. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 ii) Maintenance Plan Maintenance plan describes the maintenance and inspection tasks to be performed at maintenance objects with the dates and scope of the tasks. Time-Based maintenance Plans In time-based maintenance planning maintenance is performed in specific cycles, for example, every two months or every six months. Maintenance Planning: Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 162 of 241
  • 163. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Maintenance planning is done to describe the dates and scope of corrective maintenance and inspection activities at technical objects. This ensures that the technical objects are maintained on time and thereby function optimally. Based on analysis by the maintenance personnel, equipments are identified, where planned maintenance needs to be carried out. Apart from the experience, maintenance person may refer manufactures‟ recommendations and the history of the equipment to define the basis. The maintenance planner also needs to identify the units for the maintenance plans - time (weekly, monthly, yearly, etc.) or performance (every 100 running hours, every 10,000 shots etc.). For performance based maintenance plans, relevant measuring counter needs to be defined for the technical object and measurement readings need to be updated regularly. The maintenance planner decides the maintenance call objects for the plan. The call object can be maintenance order, notification or service entry sheet. Based on the selection, system generates a call object for a maintenance plan, when a maintenance call is due. The maintenance planner decides initially which call object is required. As mentioned earlier, maintenance plans can be single cycle, strategy based or multiple counters, as per the requirement of each equipment / functional location. Maintenance task lists shall be prepared for equipments / functional location, as per the requirement. The task lists contains detailed sequence of activities to be performed, spares and estimated time required for completing the job. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 163 of 241
  • 164. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 For the activities, which are common amongst group of equipments, a general task list may be prepared. A maintenance plan includes the task list, maintenance strategy along with other scheduling parameters. Tcode :IP01 Fill here maintenance plan category- Maintenance Order. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 164 of 241
  • 165. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Fill the maintenance plan cycle with its unit i.e. when we require the Maintenance order to be generated. As we select yearly cycle then the order will generate every year. Here fill the detail of maintenance item on which the Maintenance Order will generate. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 165 of 241
  • 166. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Here fill the detail of calibration task list. As its type & its no. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 166 of 241
  • 167. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Call horizon – here fill percentage when the call to be come for maintenance. Exp.- If cycle = 100 days, & call horizon =90%, means at 90th day we will receive the order, for planning the man & material required to complete the maintenance order. Scheduling Period Now we fill the maintenance plan scheduling parameters i.e. the time for which we will schedule this plan. If we take sch. Period 10 year then total 10 Nos. maintenance orders will generate with yearly cycle. & then Save iii) Maintenance Plan Scheduling Once the maintenance plans are created, then these plans are scheduled. It is important to input “Start date” or “Starting counter reading” in the individual maintenance plan. This date or counter reading decides the schedule dates. Scheduling can be done manually as well as by system. It is recommended to do the scheduling by system to avoid manual errors. Whenever a schedule falls due, the system creates a maintenance order, notification Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 167 of 241
  • 168. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 or service entry sheet depending on definition of the call object of the plan. The maintenance planner shall schedule the maintenance plan. Before the call objects are created by the system, maintenance planner may manually call the job or skip the job, depending on the situation. If the call object is a maintenance order, then maintenance planner shall release it manually after checking the order. There is provision in the system to shift the next scheduled maintenance date of a maintenance plan, if there is considerable delay in completing the order or the orders are completed much ahead of the schedule. These tolerance ranges for shifting can be decided while defining maintenance plan by the maintenance planner depending on the nature of the job. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 168 of 241
  • 169. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Tcode:IP10 Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 169 of 241
  • 170. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 170 of 241
  • 171. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 171 of 241
  • 172. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Tcode : IW39 iv) Maintenance Order Processing The maintenance order is a detailed planning assistance for maintenance tasks to be performed. The order is used to:  Add tasks (if required) in Task List attached in Preventive Maintenance Order with detail regard to type, scope, dates and resources  Monitor the execution of tasks (operations)  Define rules for account assignment, settlement and budgets  Enter, assign and settle the costs which arise from tasks Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 172 of 241
  • 173. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 The order can be processed internally by own employees, or can be processed externally, that is, assign it to another company for processing. An order consists of:  Order header  Object list  Operations  Material list  Settlement rule  Costs Observe the system status, during creation and order processing : CRTD - Order created MANC - Material availability not checked NTUP - Dates Not updated NMAT - No Material components PRC - Order Precosted SETC - Settlement Rule created TECO - Technical Completion CNF - Complete confirmation REL - Order released CLSD - Order Closed PCNF - Partial confirmation Order Release Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 173 of 241
  • 174. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Preventive Maintenance orders will be already released. If order has been released and subsequently additional operations are entered for it, these are automatically released. Following activities can only be performed when order is released:  Printing shop papers  Withdrawing material  Posting goods receipts  Entering time completion confirmations Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 174 of 241
  • 175. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Tcode:IW32 Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 175 of 241
  • 176. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 176 of 241
  • 177. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Fill the Material Group,Purchasing Group,Requisitioner name,Tracking No. Then Click on this Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 177 of 241
  • 178. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Fill the various components /spares with No. (From component list) & quantity required for completing the work. Notes : Item category - significance of „L‟ and „N‟ . L – Generally stockable item, when a component is selected „L‟ - a reservation is created . Reservation creation is irrespective of material stock. (Means, even if the material is not available in the Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 178 of 241
  • 179. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 storage Location, reservation will be created.). N – means Non-stockable, but coded item. – Even if stock is available , „N‟ can be indicated. The system will create a PR for the Items for which „N‟ is indicated. Reservation Number Generated for Stock Item. Material Issue against Reservation process can be viewd in MM End User Manual as it is MM Process. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 179 of 241
  • 180. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Field name Required User action and allowed values / Optional Component R Indicate Material code of the component. Requirement Qty O Indicate the quantity of the components Description and O Automatically copied from the system. UM I Category R Indicate whether it is stockable or Non- stockable, „L‟ or „N‟ S LOC O Stock can be checked thro. this. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 180 of 241
  • 181. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 181 of 241
  • 182. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Change of Purchase Requisition (Tcode : ME52N) We Need to fill the DOP Clause & Pre Qualification for each PR. Creation of PO & Material Issue is covered under MM Module. v) SERVICE ENTRY SHEET SERVICE ENTRY SHEET HAS TO BE FILLED FOR CLEARING THE INVOICE. Trigger: Requirement for recording services performed by service provider Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 182 of 241
  • 183. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Business Process Description Overview This document describes the procedure for creating a service entry sheet. Within purchasing, this service entry sheet document is designed for the recording of the services that have been performed by the service provider. The service entry sheet is a list of all planned services that have actually been performed. It can also be used to lust and specify unplanned services that have been performed and whose precise scope and nature were unknown at time of planning phase. Output – Results Comments Service Entry Sheet Menu Path Via Menus Logistics> Plant Maintenance> Maintenance Processing> Completion Confirmation> Services Via Transaction Code ML81n Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 183 of 241
  • 184. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 or use transaction code “ML81N” to reach the following screen Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 184 of 241
  • 185. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Click select Purchase order number as shown in next screen Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 185 of 241
  • 186. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 click on the Enter / Continue icon Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 186 of 241
  • 187. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Click on the service selection tab SERVICE SELECTION TAB Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 187 of 241
  • 188. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 then click on Services Push button Click to Select line item The following screen will appear ACCEPTING SERVICE ENTRY SHEET Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 188 of 241
  • 189. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 1. Service Entry sheet Number 2. Confirm the required quantity Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 189 of 241
  • 190. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Only Authorized person can release the Service Entry Sheet. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 190 of 241
  • 191. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 3. Save Tcode ML85 or ML81n Can be used to release the Service Entry Sheet with proper autherization. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 191 of 241
  • 192. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Fill the release code & release Group then Execute Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 192 of 241
  • 193. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 2. Release 1.Select the Line Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 193 of 241
  • 194. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 194 of 241
  • 195. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Released Saved vi) COMPLETION CONFIRMATION A.TIME CONFIRMATION Trigger: Actual hours worked and materials used need to be recorded and posted to the PM order. Business Process Procedure Overview The actual hours worked per operation are recorded/posted to the PM/CS order via time confirmation. Any materials used may be posted at this time. Technical reporting to the notification may also be performed at this time. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 195 of 241
  • 196. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Output – Results Comments Time confirmed to PM order Refer to Business Process Procedure 'Display PM Order' (and view cost report) or 'Display PM Order Confirmation' to verify results. The document flow on the PM order will also show any time confirmations posted. Press Enter key or double click (with mouse Left key) to reach the following screen; Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 196 of 241
  • 197. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 ENTER ORDER NO OR SELECT FROM LIST PRESS ENTER KEY TO REACH THE FOLLOWING SCREEN SELECT THE OPERATIONS TO BE CONFIRMED AND FOLLOW THE MENU PATH SHOWN IN THE NEXT SCREEN Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 197 of 241
  • 198. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 CLICK ON THE ACTUAL DATA FOLLOWING SCREEN WILL APPEAR Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 198 of 241
  • 199. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 FOR NEXT OPERATION ENTER THE OPERATION ENTER THE START & END DATE WITH TIME CONFIRM ACTUAL MAN HOURS IF WE ARE DOING FINAL CONFIRMATION SELECT THE FINAL CONFIRMATION BOX CLICK ON CLEAR OPEN RES. IF NO MORE MATERIALS ARE REQUIRED AGAINST THE RESERVATION. IF THERE IS NO REMAINING JOBS TICK THE NO REMAIN WORK BOX CLICK ON RIGHT ARROW KEY FOR NEXT OPERATION SAVE THE CONFIRMATION BY CLICKING ON AND FOLLOWING MESSAGE WILL APPEAR ON THE SCREEN Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 199 of 241
  • 200. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 vii) ORDER TECHNICAL COMPLETION SELECT THE ORDER FROM MENU PATH Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 200 of 241
  • 201. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Complete the order by clicking on Complete Flag Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 201 of 241
  • 202. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 WHILE COMPLETING TECHNICALLY SYSTEM DEFAULTS CURRENT DATE & TIME BUT STILL IT CAN BE CHANGED FOR PAST CONFIRMATIONS Check status – TECO viii) Order Settlement Order settlement is used to control costs and to identify where maximum costs are being incurred for maintenance. Costs associated with the maintenance work are assigned to Cost centres. Costs arising out of executing an order are initially collected on the order. These costs are then transferred to a receiver, for e.g. Cost centre. The receiver of costs are specified in the order and settlement carried out at regular intervals by FI. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 202 of 241
  • 203. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 ix) Business Completion The business completion of an order is usually performed when no further costs are expected to be posted to the order. An order can only have business completion when: It has been technically completed It has been settled and the order balance is 0 No outstanding purchase orders (commitments) exist for it All data that refers to the reference object of the maintenance order is available and correct All relevant data in the operations and sub-operations is available and correct The business completion function for an order defines the following information for the order: The order obtains the status Completed. It is indicated as fully completed. The order cannot receive any more postings, even for posting of costs. It is locked for all collective-processing changes. Business completion can be performed for An individual order Several orders using collective processing Business completion of the order can also be cancelled. 4.4 Regular Maintenance : i) Notification Creation: Notification for new Requirement/or any kind of Modification request. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 203 of 241
  • 204. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 >Fill the Description of the Request/Modification >Fill/Select Functional location & Equipment >Fill the Reported BY >Press ENTER Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 204 of 241
  • 205. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Click / Press ENTER >WE find this screen which show last 3 activities status on that particular equipment & then Save notification. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 205 of 241
  • 206. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Notification number generated. You can see the list of Notifications through Tcode :IW29 Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 206 of 241
  • 207. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Select the Desired Notification & create the Regular maintenance Order (Type:PM07). Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 207 of 241
  • 208. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 208 of 241
  • 209. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 ii) Maintenance Order Do your Planning in Regular Maintenance Order. Tcode:IW32 After that whole Process is same as Breakdown Maintenance Process. So Kindly follow the Breakdown process( mentioned Above). 4.5 Calibration Process: Test equipment is used for performing quality inspections. In order to ensure that the test equipment used always fulfils the defined performance criteria, we have to regularly test and calibrate these test equipment. Using the functions in the component Test Equipment Management, we can manage equipment data, plan and schedule inspections, and perform calibration inspections for the equipment. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 209 of 241
  • 210. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 i) Task List for Calibration Calibration task lists describe a sequence of individual calibration activities, which must be performed repeatedly within a company. Creation of Task List Transaction code – IA05 Fill the External AlphaNumeric Number for Calibration TaskList & the in Profile fill -PDIL And press enter. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 210 of 241
  • 211. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Fill the header data for the Calibration task list. As Usage-4, Status-4, System condition-0, Work Center, planner Goup And Now click on operations. Fill the operations required to carry out the calibration process with estimated time & manpower required. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 211 of 241
  • 212. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Calibration Task list is saved with number generated. ii) Creation of Calibration Plan Tcode :IP01 Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 212 of 241
  • 213. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Fill here maintenance plan category- Maintenance Order. Fill the maintenance plan cycle with its unit i.e. when we require the Maintenance order to be generated. As we select yearly cycle then the order will generate every year. Here fill the detail of maintenance item on which the Maintenance Order will generate. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 213 of 241
  • 214. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Here fill the detail of maintenance item on which the Maintenance Order will generate. Order Type of Calibration Order should be PM05. Here fill the detail of calibration task list. As its type & its no. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 214 of 241
  • 215. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Call horizon – here fill percentage when the call to be come for maintenance. Exp.- If cycle = 100 days, & call horizon =90%, means at 90th day we will receive the order, for planning the man & material required to complete the maintenance order. Now we fill the maintenance plan scheduling parameters i.e. the time for which we will schedule this plan. If we take sch. Period 10 year then total 10 Nos. maintenance orders will generate with yearly cycle. Now save the maintenance plan. Number displays here. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 215 of 241
  • 216. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 After Wards Calibration Process is same as Prevntive Maintenance. So Kindly Follow Preventive Maintenance Cycle. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 216 of 241
  • 217. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 5. Plant Maintenance Information System 5.1 Standard Reports There are so many Standard Reports in PM. Some of the UseFul reports are shown below: Transaction code : IK17 Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 217 of 241
  • 218. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Trigger: Need to display measurement documents with similar characteristics. Business Process Procedure Overview Search for measurement documents by various search criteria to compile a list of measurement documents to display. You may search for a measurement document whose number is unknown or perform collective processing for measurement documents that have particular characteristics in common. Output – Results Comments One or many measurement documents selected for display Input – Required Fields Field Value/Comments Procedural Steps Via Menus Logistics  Plant Maintenance  Maintenance Processing  Completion Confirmation  Measurement Document  List Editing  Display Via Transaction Code IK17 Select the transaction as shown in following screen Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 218 of 241
  • 219. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 on double click you will reach the following screen Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 219 of 241
  • 220. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Input data for selection , you can get the report based on the input data like Measuring points Equipment Functional location etc., After the entry of required data click on to execute the transaction and you will get the following report Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 220 of 241
  • 221. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Spares and consumables consumption Report Transaction code : MB51 Trigger: User wishes to search for material movements by material. Business Process Description Overview This process describes the method to search for and display the material movements by material. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 221 of 241
  • 222. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Output – Results Comments Materials with the associated movement types. Procedural Steps Via Menus (a) Logistics > Materials Management > Inventory Management > Environment > List Displays > Material Documents Logistics > Materials Management > Physical Inventory >Environment > Mat. Doc. For Material Via Transaction Code MB51 Select the transaction as shown in following screen Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 222 of 241
  • 223. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 on double click you will reach the following screen Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 223 of 241
  • 224. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Enter required data like Plant, Storage Location, Movement type etc., as per your report requirement After the entry of required data click on to execute the transaction and you will get the following report Report of spares consumption against Maintenance Orders Transaction code : IW3M Reach the selection screen with help of following menu Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 224 of 241
  • 225. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Selection screen Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 225 of 241
  • 226. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Enter required selection filed values like Order no, Material, storage location as per your requirement requirement and click on click on to execute the transaction and you will get the report Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 226 of 241
  • 227. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Status Report of Notifications Transaction codes : IW28 / IW29 Reach the selection screen with help of following menu Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 227 of 241
  • 228. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Selection screen Status check boxes Enter Plant Enter the selection screen values like Maint. Plants, Start & end dates, Notification no., Equipment or Function locations and select required check boxes according to the status. Click on to execute the transaction and you will get the following report Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 228 of 241
  • 229. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Status Report of Maintenance Orders Transaction codes : IW38 / IW39 Trigger: To review a list of maintenance orders and make any necessary changes Business Process Procedure Overview To generate a work list of maintenance orders to modify. Output – Results Comments A list of orders. Orders will be displayed based on the selection criteria. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 229 of 241
  • 230. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Procedural Steps Via Menus A: Logistics  Plant Maintenance  Maintenance Processing  Order  Order List Change B: Logistics  Plant Maintenance  Maintenance Processing  History  List of Orders Change Via Transaction Code IW38 Reach the selection screen with help of following menu Selection screen Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 230 of 241
  • 231. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Status check boxes Enter the selection screen values like Start & end dates, Notification no., Equipment aor Function locations and select required check boxes according to the status. Click on to execute the transaction and you will get the following report Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 231 of 241
  • 232. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Display (Multi Level) : List of Orders Transaction code : IW40 Trigger: To review a list of PM orders and associated documents and master records Business Process Procedure Overview This transaction allows the planner to review a specific order along with several selected master records and documents associated with the notification. Output – Results Comments A list of orders with associated documents and master records Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 232 of 241
  • 233. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Procedural Steps Via Menus Logistics  Plant Maintenance  Maintenance Processing  Order  List of Orders  Display (Multi-level) Via Transaction Code IW40 Reach the selection screen with help of following menu Selection Screen Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 233 of 241
  • 234. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Select Required Order type, Enter period dates and select different parameters for the multilevel display Now click on to execute the transaction and you will get the following report Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 234 of 241
  • 235. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Functional Location List Transaction code : IH06 Trigger: Need to look up Functional Locations. Business Process Procedure Overview You wish to search for Functional Locations by various search criteria. You may search for a location whose label is unknown, compile a list of locations that have particular characteristics in common. Output – Results Comments List of Functional Locations Procedural Steps Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 235 of 241
  • 236. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Via Menus Logistics  Plant Maintenance  Technical Objects  Functional location  List editing  Display Via Transaction Code IH06 Reach the selection screen with help of following menu Selection Screen Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 236 of 241
  • 237. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Select Required Planning Plant, Maintenenace Plant, Planner Gorup etc. different parameters for the display Now click on to execute the transaction and you will get the following report Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 237 of 241
  • 238. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Equipment List Transaction code : IH08 Trigger: To display a list of equipment by certain selection criteria. Business Process Procedure Overview This report is used to output a list of equipment. Equipment data comprises general data, serial number data, location data, maintenance data and sales/distribution data. You can use an equipment list to:  Search for a piece of equipment whose number you do not know  Compile a list of equipment based on particular criteria  Perform collective processing for pieces of equipment with particular characteristics Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 238 of 241
  • 239. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Output – Results Comments A list of equipment records Procedural Steps Access transaction by: Via Menus A. Logistics  Plant Maintenance  Information System  Report Selection Management of Technical Objects  Display Equipment B. Logistics  Plant Maintenance  Planned Maintenance  Maintenance Task Lists  Environment  Engineering  Environment  Technical Objects  Equipment  List Editing  Display Via Transaction Code IH08 Reach the selection screen with help of following menu Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 239 of 241
  • 240. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Selection Screen Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 240 of 241
  • 241. End User Manual Title: SAP PM Module: PLANT MAINTENANCE Release: ECC 6.0 Created by: RAVINDER KUMAR Created on: 23 Nov‟10 Select Required Planning Plant, Maintenenace Plant, Planner Gorup etc. different parameters for the display Now click on to execute the transaction and you will get the following report. Last changed on: Last changed by: Version: Page: (23/11/2010) RAVINDER KUMAR 1.0 241 of 241