Table of contents

    Background of the research project

    Technical details of the measurements

    Measurement results near:
            PV
            Wind turbines
            Disturbing loads
            Households
    Conclusion from measurements

    General conclusion
31/01/2011




                                                                        1
31-1-2011




Background of the research project

    EOS-LT KTI is a research project funded by the Dutch
     government investigating PQ related issues like:
            New probable boundary conditions technical (EN50160)
             + society
            Interaction of load and generators with the grid
            New developments of power electronic mitigation
             devices


    Research should result into most economical
     optimum structures and solutions

31/01/2011




Technical details of the measurements

    Part of the research is measuring PQ parameters at
     specific locations in the Dutch LV, MV and HV grid
            20 locations with specific loads or DER
            Equipment used: Alptec 2444d (IEC-61000-4-30)
            Using GSM data channel (9600 baud)
            Measuring > 100 parameters per location, most
             important:
     - Voltage level, Plt, Pst, THD, individual harmonics,
             unbalance, frequency, events, power



31/01/2011




                                                                           2
31-1-2011




Technical details of the measurements

    20 specific measurement locations with expected high
     levels of certain PQ parameters




31/01/2011




Technical details of the measurements

    Data is daily downloaded to a central server
            10-minute average RMS data for comparison with EN50160
            During events 6 seconds of samples (10,24 kHz) are stored
            Automatic reporting every week OK or NOK




31/01/2011




                                                                                3
31-1-2011




Measurement results near PV

    One PQ measurement in an area with 2 MWp installed
     PV power (‘Stad van de zon’)
            Measurement at the LV side of one of the 1 MVA
             transformers in this area




31/01/2011




Measurement results near PV

    During high PV production and low demand
            Sunny week
            THDu (%) should be ≤ 8%, 5th ≤ 6%, 7th ≤5% (95% values)
            Measured THDu (%): 1-3%, mainly 5th harmonic, 3rd harmonic low




                           PV      PV     PV        PV    Less PV      PV   PV




31/01/2011




                                                                                        4
31-1-2011




Measurement results near PV

    During no PV production and high demand
            Clouded week with snowed PV panels
            THDu (%): 1-2%, mainly 5th harmonic, same 3rd harmonic




                       No PV    No PV    No PV   No PV   No PV       No PV   No PV




31/01/2011




Measurement results near PV

    Semi-cloudy days and flicker
            Semi-Cloudy days  clearly more flicker but still low
            Plt 95% should be ≤1
            Summer Plt 95% <0,3, winter Plt 95%<0,2



                         PV         PV   PV        PV       PV        PV     PV




31/01/2011




                                                                                            5
31-1-2011




Measurement results near wind turbines

    One measurement in area with 33 wind turbines
            Measurement at MV- side at beginning MV cable with
             many connected (small) wind turbines
    One measurement at the wind turbine terminals (600
     kW)
            Measurement at LV- side of the 630 kVA transformer
             connecting the wind turbine to the grid




31/01/2011




Measurement results near wind turbines

    Wind turbines use power electronics
            Measured harmonic current spectrum at the terminals




31/01/2011




                                                                          6
31-1-2011




Measurement results near wind turbines

    Voltage distortion at the LV terminals
            THDu (%) should be ≤ 8%, 5th ≤ 6%, 7th ≤5% (95% values)




31/01/2011




Measurement results near wind turbines

    Flicker at the LV terminals
            Plt 95% should be ≤1




31/01/2011




                                                                              7
31-1-2011




Measurement results near wind turbines

    Harmonic distortion at MV level at beginning of the MV
     cable with many connected wind turbines
            THDu (%) should be ≤ 8%, 5th ≤ 6%, 7th ≤5% (95% values)




31/01/2011




Measurement results near wind turbines

    Yearly average THDu (%) at MV in function of produced
     power
            THDu (%) should be ≤ 8% for 95% of the 10-minute values in a week




31/01/2011




                                                                                        8
31-1-2011




Measurement results near wind turbines

    Flicker at MV level shows very small Plt increase
     during production fluctuations
            Plt 95% should be ≤1




31/01/2011




Measurement results near a stone factory

    Heavy flicker at LV- side transformer
            Plt 95% should be ≤1
            Clear relation with processes in the stone factory, breaking and crushing




31/01/2011




                                                                                                9
31-1-2011




Measurement results near a plastics factory

    Many processes running with VSD’s, MV measurement
            THDu (%) should be ≤ 8%, 5th ≤ 6%, 7th ≤ 5%, 11th ≤ 3,5%, 13th ≤ 3%(95% values)




31/01/2011




Measurement results near a plastics factory

    Average harmonic voltage spectrum of the MV
     measurement near a plastics factory
            THDu (%) should be ≤ 8%, 5th ≤ 6%, 7th ≤ 5%, 11th ≤ 3,5%, 13th ≤ 3%(95% values)




                                                                 Theoretical current harmonics




                             Measured voltage harmonics

                               Weekend                     Weekend




31/01/2011




                                                                                                       10
31-1-2011




Measurement results in household area

    LV measurement at a feeder of a 630kVA transformer in
     area with households + small stores
            THDu (%) should be ≤ 8%, 3rd ≤ 5%, 5th ≤ 6%, 7th ≤ 5% (95% values)




31/01/2011




Measurement results in household area

    LV flicker level near households
            Plt 95% should be ≤1




31/01/2011




                                                                                        11
31-1-2011




Conclusion from measurements

    There are no PQ problems shown at the measured
     locations
            Measurements near DG are located in grids which are
             designed for it (‘low impedance, enough capacity’)
            Very low Plt rise near PV, clearly visible rise in
             harmonics  but still low
            Low Plt rise near wind turbines, Pst can be high
            Clear rise in voltage distortion near wind turbines
    Measurement at ‘problem’ locations show direct
     relation PQ processes

31/01/2011




Conclusion from measurements

    Measurements in household area’s show no problems
     and change in the 4- year measurement campaign
            THDu (%) 95% between 2-3% (limit is 8%)
            Plt 95% between 0,05 – 0,25 (limit is 1)
    Because there is found extra distortion due to power
     electronics, there is a chance that in grids with a
     higher impedance compared with the measurement
     locations, PQ problems can occur

    Decreasing harmonic current at the POC is therefore
     an important topic

31/01/2011




                                                                         12
31-1-2011




General conclusion

    The measurements showed a small decrease of the
     PQ due to power electronics, in ‘strong’ grids the
     influence is therefore low
            DER at the end of long cables can cause higher
             voltages than measured
            Connecting power electronics in grids with higher
             impedance compared to the measurement locations
             can have more influence on the power quality level
    It’s recommended to do measurements in existing
     grids were DG/power electronics is integrated
     afterwards, the majority of the LV grids has higher
     impedance than at the measurement locations
31/01/2011




                                                                         FIVE REASONS FOR YOU TO CHOOSE LABORELEC
                                                                            One-stop shopping for your energy related services
                                                                            More than 45 years of experience
                                                                            Increased profitability of your installations
                                                                            Independent and confidential advice
                                                                            Recognized and certified laboratory



             Laborelec Belgium               Laborelec The Netherlands
             Rodestraat 125                  Amerikalaan 35
             1630 Linkebeek                  6199 AE
             Belgium                         Maastricht-Airport
                                             The Netherlands
             T. +32 2 382 02 11
             F. +32 2 382 02 41              T. +31 63 88 26 022
             RPR/RPM Brussels 0400.902.582
             BTW/TVA BE 0400 902 582
                                             Laborelec Germany
             www.laborelec.com
                                             Brombergerstrasse 39-41,
             info@laborelec.com
                                             42281 Wuppertal
                                             Germany




                                                                                                                                        13

More Related Content

PDF
Consequences of intrinsic thermoacoustic feedback for combustion dynamics an...
PPT
Radiation Safety Instruments
PDF
Power quality-energy-saving-fluke
PDF
ETS Handbook
PDF
Application Note – UPS Power System Design Parameters
PPT
Minute Lecture - Earthing Configurations
PDF
Harmonics: Causes and Effects
PDF
Future Electricity Markets: key pillars with high shares of wind and PV
Consequences of intrinsic thermoacoustic feedback for combustion dynamics an...
Radiation Safety Instruments
Power quality-energy-saving-fluke
ETS Handbook
Application Note – UPS Power System Design Parameters
Minute Lecture - Earthing Configurations
Harmonics: Causes and Effects
Future Electricity Markets: key pillars with high shares of wind and PV

Similar to Power quality-measurements-der (20)

PDF
Comparative Analysis of Power Quality Indices for Different Lighting Techniog...
PDF
Detection and analysis of power quality disturbances under faulty conditions ...
PDF
Detection and analysis of power quality disturbances under faulty conditions ...
PPT
Optimization of distributed generation of renewable energy sources by intelli...
PPT
Optimization of distributed generation of renewable energy sources by intelli...
PPT
Optimization of distributed generation of renewable energy sources by intelli...
PDF
Introduction to power quality (Megger)
PDF
Power quality-requirements-point-connection
PPSX
Power Quality Issues _Literature Survey
PDF
2.Ourside.vip.Power quality improvement using dynamic voltage restorer.pdf
PDF
12 webinar-power-quality
PDF
Control of Dvr with Battery Energy Storage System Using Srf Theory
PDF
Power Quality Site Survey Presentation
PPTX
Impacts of Distributed Generation on Power Quality
PDF
K factor
PPTX
Transcat and Megger: Power Quality 101 Webinar
PDF
IRJET- Low Cost Harmonic Measurement using Arduino UNO
PDF
A comparative study for detection and measurement of voltage disturbance in o...
PDF
Power Quality Parameters Measurement Techniques
PDF
Quality control test for unreliable meteorological and electrical photovoltai...
Comparative Analysis of Power Quality Indices for Different Lighting Techniog...
Detection and analysis of power quality disturbances under faulty conditions ...
Detection and analysis of power quality disturbances under faulty conditions ...
Optimization of distributed generation of renewable energy sources by intelli...
Optimization of distributed generation of renewable energy sources by intelli...
Optimization of distributed generation of renewable energy sources by intelli...
Introduction to power quality (Megger)
Power quality-requirements-point-connection
Power Quality Issues _Literature Survey
2.Ourside.vip.Power quality improvement using dynamic voltage restorer.pdf
12 webinar-power-quality
Control of Dvr with Battery Energy Storage System Using Srf Theory
Power Quality Site Survey Presentation
Impacts of Distributed Generation on Power Quality
K factor
Transcat and Megger: Power Quality 101 Webinar
IRJET- Low Cost Harmonic Measurement using Arduino UNO
A comparative study for detection and measurement of voltage disturbance in o...
Power Quality Parameters Measurement Techniques
Quality control test for unreliable meteorological and electrical photovoltai...
Ad

More from Leonardo ENERGY (20)

PDF
A new generation of instruments and tools to monitor buildings performance
PDF
Addressing the Energy Efficiency First Principle in a National Energy and Cli...
PDF
Auctions for energy efficiency and the experience of renewables
PDF
Energy efficiency first – retrofitting the building stock final
PDF
How auction design affects the financing of renewable energy projects
PDF
Energy Efficiency Funds in Europe (updated)
PDF
Energy Efficiency Funds in Europe
PDF
Five actions fit for 55: streamlining energy savings calculations
PDF
Recent energy efficiency trends in the EU
PDF
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
PDF
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
PPTX
Energy efficiency, structural change and energy savings in the manufacturing ...
PPTX
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
PDF
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
PDF
Modelling and optimisation of electric motors with hairpin windings
PDF
Casting zero porosity rotors
PDF
Direct coil cooling through hollow wire
PDF
Motor renovation - Potential savings and views from various EU Member States
PDF
The need for an updated European Motor Study - key findings from the 2021 US...
PDF
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
A new generation of instruments and tools to monitor buildings performance
Addressing the Energy Efficiency First Principle in a National Energy and Cli...
Auctions for energy efficiency and the experience of renewables
Energy efficiency first – retrofitting the building stock final
How auction design affects the financing of renewable energy projects
Energy Efficiency Funds in Europe (updated)
Energy Efficiency Funds in Europe
Five actions fit for 55: streamlining energy savings calculations
Recent energy efficiency trends in the EU
Energy and mobility poverty: Will the Social Climate Fund be enough to delive...
Does the EU Emission Trading Scheme ETS Promote Energy Efficiency?
Energy efficiency, structural change and energy savings in the manufacturing ...
Energy Sufficiency Indicators and Policies (Lea Gynther, Motiva)
The Super-efficient Equipment and Appliance Deployment (SEAD) Initiative Prod...
Modelling and optimisation of electric motors with hairpin windings
Casting zero porosity rotors
Direct coil cooling through hollow wire
Motor renovation - Potential savings and views from various EU Member States
The need for an updated European Motor Study - key findings from the 2021 US...
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
Ad

Recently uploaded (20)

PDF
AI-driven educational solutions for real-life interventions in the Philippine...
PDF
Practical Manual AGRO-233 Principles and Practices of Natural Farming
PDF
LDMMIA Reiki Yoga Finals Review Spring Summer
PDF
Vision Prelims GS PYQ Analysis 2011-2022 www.upscpdf.com.pdf
PPTX
Computer Architecture Input Output Memory.pptx
PDF
Weekly quiz Compilation Jan -July 25.pdf
PPTX
Introduction to Building Materials
PDF
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
PPTX
A powerpoint presentation on the Revised K-10 Science Shaping Paper
PPTX
Unit 4 Computer Architecture Multicore Processor.pptx
PDF
Paper A Mock Exam 9_ Attempt review.pdf.
PDF
FORM 1 BIOLOGY MIND MAPS and their schemes
PPTX
ELIAS-SEZIURE AND EPilepsy semmioan session.pptx
PDF
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
PDF
MBA _Common_ 2nd year Syllabus _2021-22_.pdf
PPTX
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
PDF
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
PPTX
TNA_Presentation-1-Final(SAVE)) (1).pptx
PDF
Trump Administration's workforce development strategy
PPTX
Share_Module_2_Power_conflict_and_negotiation.pptx
AI-driven educational solutions for real-life interventions in the Philippine...
Practical Manual AGRO-233 Principles and Practices of Natural Farming
LDMMIA Reiki Yoga Finals Review Spring Summer
Vision Prelims GS PYQ Analysis 2011-2022 www.upscpdf.com.pdf
Computer Architecture Input Output Memory.pptx
Weekly quiz Compilation Jan -July 25.pdf
Introduction to Building Materials
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
A powerpoint presentation on the Revised K-10 Science Shaping Paper
Unit 4 Computer Architecture Multicore Processor.pptx
Paper A Mock Exam 9_ Attempt review.pdf.
FORM 1 BIOLOGY MIND MAPS and their schemes
ELIAS-SEZIURE AND EPilepsy semmioan session.pptx
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
MBA _Common_ 2nd year Syllabus _2021-22_.pdf
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
TNA_Presentation-1-Final(SAVE)) (1).pptx
Trump Administration's workforce development strategy
Share_Module_2_Power_conflict_and_negotiation.pptx

Power quality-measurements-der

  • 1. 31-1-2011 Power Quality measurements near DER and disturbing loads Ir. M. van Lumig (Laborelec NL) 1/31/2011 Table of contents  Background of the research project  Technical details of the measurements  Measurement results near:  PV  Wind turbines  Disturbing loads  Households  Conclusion from measurements  General conclusion 31/01/2011 1
  • 2. 31-1-2011 Background of the research project  EOS-LT KTI is a research project funded by the Dutch government investigating PQ related issues like:  New probable boundary conditions technical (EN50160) + society  Interaction of load and generators with the grid  New developments of power electronic mitigation devices  Research should result into most economical optimum structures and solutions 31/01/2011 Technical details of the measurements  Part of the research is measuring PQ parameters at specific locations in the Dutch LV, MV and HV grid  20 locations with specific loads or DER  Equipment used: Alptec 2444d (IEC-61000-4-30)  Using GSM data channel (9600 baud)  Measuring > 100 parameters per location, most important: - Voltage level, Plt, Pst, THD, individual harmonics, unbalance, frequency, events, power 31/01/2011 2
  • 3. 31-1-2011 Technical details of the measurements  20 specific measurement locations with expected high levels of certain PQ parameters 31/01/2011 Technical details of the measurements  Data is daily downloaded to a central server  10-minute average RMS data for comparison with EN50160  During events 6 seconds of samples (10,24 kHz) are stored  Automatic reporting every week OK or NOK 31/01/2011 3
  • 4. 31-1-2011 Measurement results near PV  One PQ measurement in an area with 2 MWp installed PV power (‘Stad van de zon’)  Measurement at the LV side of one of the 1 MVA transformers in this area 31/01/2011 Measurement results near PV  During high PV production and low demand  Sunny week  THDu (%) should be ≤ 8%, 5th ≤ 6%, 7th ≤5% (95% values)  Measured THDu (%): 1-3%, mainly 5th harmonic, 3rd harmonic low PV PV PV PV Less PV PV PV 31/01/2011 4
  • 5. 31-1-2011 Measurement results near PV  During no PV production and high demand  Clouded week with snowed PV panels  THDu (%): 1-2%, mainly 5th harmonic, same 3rd harmonic No PV No PV No PV No PV No PV No PV No PV 31/01/2011 Measurement results near PV  Semi-cloudy days and flicker  Semi-Cloudy days  clearly more flicker but still low  Plt 95% should be ≤1  Summer Plt 95% <0,3, winter Plt 95%<0,2 PV PV PV PV PV PV PV 31/01/2011 5
  • 6. 31-1-2011 Measurement results near wind turbines  One measurement in area with 33 wind turbines  Measurement at MV- side at beginning MV cable with many connected (small) wind turbines  One measurement at the wind turbine terminals (600 kW)  Measurement at LV- side of the 630 kVA transformer connecting the wind turbine to the grid 31/01/2011 Measurement results near wind turbines  Wind turbines use power electronics  Measured harmonic current spectrum at the terminals 31/01/2011 6
  • 7. 31-1-2011 Measurement results near wind turbines  Voltage distortion at the LV terminals  THDu (%) should be ≤ 8%, 5th ≤ 6%, 7th ≤5% (95% values) 31/01/2011 Measurement results near wind turbines  Flicker at the LV terminals  Plt 95% should be ≤1 31/01/2011 7
  • 8. 31-1-2011 Measurement results near wind turbines  Harmonic distortion at MV level at beginning of the MV cable with many connected wind turbines  THDu (%) should be ≤ 8%, 5th ≤ 6%, 7th ≤5% (95% values) 31/01/2011 Measurement results near wind turbines  Yearly average THDu (%) at MV in function of produced power  THDu (%) should be ≤ 8% for 95% of the 10-minute values in a week 31/01/2011 8
  • 9. 31-1-2011 Measurement results near wind turbines  Flicker at MV level shows very small Plt increase during production fluctuations  Plt 95% should be ≤1 31/01/2011 Measurement results near a stone factory  Heavy flicker at LV- side transformer  Plt 95% should be ≤1  Clear relation with processes in the stone factory, breaking and crushing 31/01/2011 9
  • 10. 31-1-2011 Measurement results near a plastics factory  Many processes running with VSD’s, MV measurement  THDu (%) should be ≤ 8%, 5th ≤ 6%, 7th ≤ 5%, 11th ≤ 3,5%, 13th ≤ 3%(95% values) 31/01/2011 Measurement results near a plastics factory  Average harmonic voltage spectrum of the MV measurement near a plastics factory  THDu (%) should be ≤ 8%, 5th ≤ 6%, 7th ≤ 5%, 11th ≤ 3,5%, 13th ≤ 3%(95% values) Theoretical current harmonics Measured voltage harmonics Weekend Weekend 31/01/2011 10
  • 11. 31-1-2011 Measurement results in household area  LV measurement at a feeder of a 630kVA transformer in area with households + small stores  THDu (%) should be ≤ 8%, 3rd ≤ 5%, 5th ≤ 6%, 7th ≤ 5% (95% values) 31/01/2011 Measurement results in household area  LV flicker level near households  Plt 95% should be ≤1 31/01/2011 11
  • 12. 31-1-2011 Conclusion from measurements  There are no PQ problems shown at the measured locations  Measurements near DG are located in grids which are designed for it (‘low impedance, enough capacity’)  Very low Plt rise near PV, clearly visible rise in harmonics  but still low  Low Plt rise near wind turbines, Pst can be high  Clear rise in voltage distortion near wind turbines  Measurement at ‘problem’ locations show direct relation PQ processes 31/01/2011 Conclusion from measurements  Measurements in household area’s show no problems and change in the 4- year measurement campaign  THDu (%) 95% between 2-3% (limit is 8%)  Plt 95% between 0,05 – 0,25 (limit is 1)  Because there is found extra distortion due to power electronics, there is a chance that in grids with a higher impedance compared with the measurement locations, PQ problems can occur  Decreasing harmonic current at the POC is therefore an important topic 31/01/2011 12
  • 13. 31-1-2011 General conclusion  The measurements showed a small decrease of the PQ due to power electronics, in ‘strong’ grids the influence is therefore low  DER at the end of long cables can cause higher voltages than measured  Connecting power electronics in grids with higher impedance compared to the measurement locations can have more influence on the power quality level  It’s recommended to do measurements in existing grids were DG/power electronics is integrated afterwards, the majority of the LV grids has higher impedance than at the measurement locations 31/01/2011 FIVE REASONS FOR YOU TO CHOOSE LABORELEC  One-stop shopping for your energy related services  More than 45 years of experience  Increased profitability of your installations  Independent and confidential advice  Recognized and certified laboratory Laborelec Belgium Laborelec The Netherlands Rodestraat 125 Amerikalaan 35 1630 Linkebeek 6199 AE Belgium Maastricht-Airport The Netherlands T. +32 2 382 02 11 F. +32 2 382 02 41 T. +31 63 88 26 022 RPR/RPM Brussels 0400.902.582 BTW/TVA BE 0400 902 582 Laborelec Germany www.laborelec.com Brombergerstrasse 39-41, info@laborelec.com 42281 Wuppertal Germany 13