PPAP TRAINING PROGRAMME
(17th AUGUST-2013)
Presented by:
B.D.Sharma (PMC)
SHIVANI LOCKS PVT. LTD.
APQP INTRODUCTION
This system was jointly developed by M/S. Chrysler Corporation, Ford Motor Company &
General Motors Corporation in the year 1994, to provide systematic working environment in
the organisation. All the methods related to above system are captured in this program.
The two main requirements of a good Product Development are, first to developing a robust
product and 2nd developing the product in a shortest time.
The first & important principle for the success of this system is the ability to work in a team.
For this it is necessary to develop and implement the team working culture in the
organization. If we do not adhere to this principle of team working, we may end up without
the benefits.
PPAP TRAINING PROGRAMME – 13th AUG. 2013
WHAT IS PPAP ?
Production Part Approval Process is a structured & systematic method to assure that a product
satisfies the customer’s requirements.
The commitment from the Top Management an essential requirement for the success of this
process.
THE OBJECTIVENESS OF PPAP
Effective communication with everyone involved.
On-time completion of all required steps
Minimal or no quality problems
Minimal product launch quality risks
Minimal cycle time to launch the product
THE BENEFITS OF PPAP
Resources are directed toward customer satisfaction
Required changes are identified early
Changes close to or after product launch are avoided
A quality product is provided on time at the lowest cost.
An element of Continuous Improvement is built into the company.
PPAP TRAINING PROGRAMME – 13th AUG. 2013
LEVEL – 5.
LEVEL – 1.
LEVEL – 2 .
LEVEL – 3 .
LEVEL – 4 .
PPAP LEVEL
PPAP LEVEL :
PPAP TRAINING PROGRAMME – 13th AUG. 2013
Advanced Product Quality Planning Date: 25.06.2009
Status Report Review No.: 00
Diamond Point:
Supplier SHIVANI LOCKS PVT LTD Program AMBASSADOR MODEL
Location FARIDABAD-HARYANA Model Year
Supplier Code Lead Part No. M-03S-121000/ Cust.Part No :4308300026
Risk Assessment Part Name
New: Site Technology Process Eng. Level 00
Other Risks Follow source support Not Avbl User Plant(s) HINDUSTAN MOTORS LIMITED (HML) KOLKATA
Team Members Company/Title Phone/Fax
0129-4049479: Fax: 0129-2279479
0129-4049479: Fax: 0129-2279479
0129-4049479: Fax: 0129-2279479
0129-4049479: Fax: 0129-2279479
0129-4049479: Fax: 0129-2279479
0129-4049479: Fax: 0129-2279479
0129-4049479: Fax: 0129-2279479
0129-4049479: Fax: 0129-2279479
Build Level Material Quantity Concurred P.I.S.T. P.I.P.C.
Required Date No. SC's No. CC's % %
PROTOTYPE -
TOOLED UP - - -
PRODUCTION TRIAL RUN
START OF PRODUCTION
APQP Elements GYR Focus Program Supplier Closed Resp. Remarks or
Status Element Need Timing Date Engineer Assistance Required
Rating Date Date Initials
1) Design FMEA 25.06.09 25.06.09 A Kalra
2) Design Review(s) A.Kalra
3) Design Verification Plan 25.06.09 25.06.09 A.Kalra
4) Subcontractor APQP Status N.A N.A S.K.Sharma
5) Facilities, Tools and Gages N.A. N.A. S.K.JHA / S.C.Sharma
6) Prototype Build Control Plan 26.06.09 26.06.09 A.K.Singh
7) Prototype Builds 26.06.09 26.06.09 05.07.09 A.K.Tyagi
8) Drawings and Specifications 25.06.09 25.06.09 10.07.09 A.Kalra
9) Team Feasibility Commitment 25.06.09 25.06.09 25.06.09 CFT
10) Manufacturing Process Flow Chart 26.06.09 26.06.09 S.K.J / S.C.S./ A.K.S.
11) Process FMEA 26.06.09 26.06.09 S.K.Jha /A.K.Singh
12) Measurement Systems Evaluation A.K.Singh
13) Pre-Launch Control Plan 20.07.09 20.07.09 A.K.Singh
14) Operator Process Instructions 20.07.09 20.07.09 S.K.Jha /A.K.Singh
15) Packaging Specifications 20.07.09 20.07.09 A.Kalra
16) Production Trial Run 30.07.09 30.07.09 S.K.Jha / A.K.Tyagi
17) Production Control Plan 25.07.09 25.07.09 S.K.Jha /A.K.Singh
18) Preliminary Process Capability Study 30.07.09 30.07.09 S.K.Jha / A.K.Tyagi
19) Production Validation Testing 01.08.09 01.08.09 A.K.Singh / A.K.Tyagi
20) Production Part Approval (PSW ) 5.08.09 5.08.09 A.K.Tyagi /S.K.J./A.Kalra
21) PSW Part Delivery at MRD 15.08.09 15.08.09 A.K.Tyagi / S.K.Jha
Head (PDC)
A K Singh Head (PDMC)
S.K.Jha Head (Manufacturing Operations)
S.C.Sharma Head (Tool Engg. Center)
Head (Marketing)
A.KALRA Head (PRODUCT DESIGN CENTRE)
10.08.2009
A.K. GUPTA
Atul Kumar Head (Central Quality Assurance)
S.K.Sharma Head (PURCHASE & STA)
A K Tyagi
2009
-
-
SEE NOTE-1
G
R
LEVER T/LID RELEASE
26.06.2009
25.07.2009 50 NOS.
300 NOS.
ON GOING
R
G
G
G
G
G
G
G
G
G
G
G
R
R
R
project goahead no:-162
EXISTING
R
G
5 NOS.
R
G
30.07.2009
COMMENTS :
1. ALL PARTS ARE COMMON WITH M 01S-8800 EXCEPT DELETION OF LEVER FUEL LID AND ADDITION OF WASHER .
2. 03 NOS. SAMPLES SUBMITTED TO CUSTOMER,FEED BACK AWAITED FROM CUSTOMER END.
3.ANNUAL VOLLUME :6000 NOS, & SUPPLY FROM S3 (PRITHLA PLANT).
4.ELEMENT NO. 6 ,10 & 11 ARE DELAY/RED DUE TO PROJECT GO AHEAD RECEIVED ON JULY 2009.
APQP TRAINING PROGRAMME - 29th July -2009
APQP FORMAT
PLAN AND DEFINE PROGRAM OBJECTIVES
Determine customer needs Plan a quality program (which includes Scope, Time, Budget, etc.)
INPUT
-Voice of the customer
-market research
-historical warranty and quality information
-team experience
-Business plan/marketing strategy
-Product/process benchmark data
-Product/process assumptions
-Product reliability
-Customer inputs
OUTPUTS
-Design goals
-Reliability and quality goals
-Preliminary bill of material
-Preliminary process flow chart
-Preliminary listing of special product and process characteristics
-Product assurance plan
-Management support
APQP TRAINING PROGRAMME - 29th July -2009
PRODUCT DESIGN AND DEVELOPMENT
OBJECTIVES
-Develop design features and characteristic
-Critically review engineering requirements
-Assess potential manufacturing problems
INPUTS
-Design goals
-Reliability and quality goals
-Preliminary process flow chart
-Preliminary listing of special product and process characteristics
OUTPUTS BY DESIGN RESPONSIBLE ACTIVITY
-Design failure mode and effects analysis(DFMEA)
-Design for manufacturing and assembly
-Design verification
-Design reviews
-Prototype build – control plan
-Material specification
-Drawing and specification changes
OUTPUTS BY PRODUCT QUALITY PLANNING TEAM
-New equipment tooling and facilities requirements
-Special product and process characteristics
-Gages/testing equipment requirement
APQP TRAINING PROGRAMME - 29th July -2009
PROCESS DESIGN AND DEVELOPMENT
OBJECTIVES
Develop a comprehensive and effective manufacturing system Ensure that the manufacturing systems meets customer
requirements
INPUTS
-Process failure mode and effect analysis (PFMEA)
-Process for manufacturability and assembly
-Process verification
-Process reviews
-Prototype build-control plan
-Engineering drawings (including math data)
-Engineering specifications
-Material specifications
-Drawing and specification changes
-New equipment tooling and facilities requirements
-Special product and process characteristics
-Gages/testing equipment requirement
-Team feasibility commitment and management support
OUTPUTS
-Packaging standards
-Product process quality system review
-Process flow chart
-Floor plan chart
-Characteristics matrixProcess failure mode and effects analysis (PFMEA)
-Pre-launch control plan
-Process instruction
-Measurement systems analysis plan
-Preliminary process capability study plan
-Packaging specification
-Management support
PRODUCT AND PROCESS VALIDATION
OBJECTIVES
Validate the manufacturing process & the product
Ensure that customer’s expectations will be met
Identify additional concerns
INPUTS
-Packaging standards
-Product process quality system review
-Process flow chart
-Floor plan layout
-Characteristics matrix
-Process Failure Mode and Effects Analysis (PFMEA)
-Pre-launch control plan
-Process instruction
-Measurement Systems Analysis Plan
-Preliminary process capability study plan
-Packaging specification
-Management support
OUTPUTS
-Production trial run
-Measurement systems evaluation
-Preliminary process capability study
- Production part approval
-Production validation testing
-Packaging evaluation
-Production control plan
-Quality planning sign-off and management support
APQP TRAINING PROGRAMME - 29th July -2009
FEEDBACK.ASSESSMENT AND CORRECTIVE ACTION
OBJECTIVES
-To plan the next phase of product development or modification
-To improve the system of planning (from lessons learnt)
-To identify opportunities for Improvement
INPUTS
-Production trial run
-Measurement systems evaluation
-Preliminary process capability study
-Production part approval
-Production validation testing
-Packaging evaluation
-Production control plan
-Quality planning sign-off and management support
OUTPUTS
-Reduced variation
-Customer satisfaction
-Delivery and service
APQP TRAINING PROGRAMME - 29th July -2009
PROGRAM MANAGEMENT
TEAM LEADER
Each program has a team leader, but a team leader may manage one or more programs.
The team Leader :-
-should be a senior Production or Quality Manager
- interfaces with the customer
- ensures that the Program Need Dates (PND) are met
- is responsible for resources
- is responsible until product launch
- forms and manages one or more PPAP Teams
PPAP TEAMS
-Team should be cross-functional; it is not composed of only people from the Quality Department.
Typical members might come from:-
- Engineering
- Manufacturing operations
- Material Control
- Marketing
- Manufacturing Engg. Centre
- Tool Engg. Centre
-Customers (as appropriate)
PPAP TRAINING PROGRAMME – 13th AUG. 2013
TGW & BENCHMARK EXERCISE
TGW & Benchmarking helps to make the product trouble
free & robust / eligent
Following to be captured during TGW & Bench Marking :-
Identify the gap between current status and the benchmark,
Collect data and summaries :-
ROLE OF TGW BENCHMARKING IN PROCESS :-
1. Helps to Remove/ minimize the JIG –JAG process,
2. Max.operation in Min. stages,
3. Mistake proof / fool proofing in the process
4. Process will be safe, fast, cheaper, easy & short time.
5. Process will meet the specifications 100%
PPAP TRAINING PROGRAMME – 13th AUG. 2013
ROLE OF TGW & BENCHMARKING IN PRODUCT
RELIABILITY
Its provide a better methodology related to testing of the
Product, To reduce the frequency of repair / replacement of
the product and the results of long-term reliability /
durability.
ROLE OF TGW & BENCH MARKING IN DESIGN :-
- Easily Manufacturable
- Fitment wise
- Functional performance
- Dimensions
- Weight
- Materials
- Aesthetic
PPAP TRAINING PROGRAMME – 13th AUG. 2013
THANKS

More Related Content

PPT
Spc training
PPT
PPAP
PDF
Failure Mode Effect Analysis (FMEA)
PDF
Fmea handout
PDF
Apqp ppt
PPT
Spc training
PPAP
Failure Mode Effect Analysis (FMEA)
Fmea handout
Apqp ppt

What's hot (20)

PDF
Process F.M.E.A
PPT
Ppap training-presentation
PDF
Process fmea
PDF
Basic SPC Training
PPT
Apqp fundamentals
PDF
Fmea alignment aiag_and_vda_-_eng
PPTX
Production part approval process ppt 1
PDF
PPAP 101: What You Should Know About PPAP
PPTX
Root cause analysis
PPTX
IATF Awareness
PPT
Ppap training ppt
PPT
Training ppt for control plan
PPTX
8D Training, Eight Disciplines Training : Tonex Training
PPT
Apqp training presentation
PPTX
The Basics 7 QC Tools - ADDVALUE - Nilesh Arora
PPT
PPAP.ppt
PDF
Design fmea
PDF
Basic 8D Problem Solving Tools & Methods - Part 2
PPTX
APQP Training presentation
PPTX
ADVANCED PRODUCT QUALITY
Process F.M.E.A
Ppap training-presentation
Process fmea
Basic SPC Training
Apqp fundamentals
Fmea alignment aiag_and_vda_-_eng
Production part approval process ppt 1
PPAP 101: What You Should Know About PPAP
Root cause analysis
IATF Awareness
Ppap training ppt
Training ppt for control plan
8D Training, Eight Disciplines Training : Tonex Training
Apqp training presentation
The Basics 7 QC Tools - ADDVALUE - Nilesh Arora
PPAP.ppt
Design fmea
Basic 8D Problem Solving Tools & Methods - Part 2
APQP Training presentation
ADVANCED PRODUCT QUALITY
Ad

Similar to Ppap training presentation (20)

PPTX
PPTX
PPAP Awareness training.pptx
PDF
Advanced Product Quality Planning And Control Plans Based On APQP 2 Nd Edition
PDF
APQP and PPAP Complete presentation .pdf
PDF
APQP and PPAP.pdfbdndndnndndndmdndmmdmdmdmdm
PPT
apqp tool for manufacturing trainingg.ppt
PPT
APQP-PPAP[1].ppt for engineering products
PPT
PPT
Apqp to print
PPT
APQP 2nd Edition.ppt
PPTX
Advanced Product Quality Planning (APQP) and Production Part Approval Process...
PDF
Advanced Product Quality Planning presentation
PPT
04 ppap training material
PPTX
APQP Training Content with the full of details of
PDF
Maatta_Kimmo.pdf
PPT
Apqp process flow
PDF
Automotive Core Tools APQP Training.pdf
PPTX
ADVANCED PRODUCT QUALITY PLANING TRAINING MATERIAL
PPTX
GP_Training_APQP-PPAP_RevAF.pptx
PDF
PPAP Awareness training.pptx
Advanced Product Quality Planning And Control Plans Based On APQP 2 Nd Edition
APQP and PPAP Complete presentation .pdf
APQP and PPAP.pdfbdndndnndndndmdndmmdmdmdmdm
apqp tool for manufacturing trainingg.ppt
APQP-PPAP[1].ppt for engineering products
Apqp to print
APQP 2nd Edition.ppt
Advanced Product Quality Planning (APQP) and Production Part Approval Process...
Advanced Product Quality Planning presentation
04 ppap training material
APQP Training Content with the full of details of
Maatta_Kimmo.pdf
Apqp process flow
Automotive Core Tools APQP Training.pdf
ADVANCED PRODUCT QUALITY PLANING TRAINING MATERIAL
GP_Training_APQP-PPAP_RevAF.pptx
Ad

More from Jitesh Gaurav (20)

PDF
What i es do iie iab v2
PDF
Weld material
PDF
Six sigma
PDF
Spi link
PDF
6 Sigma - Chapter3
PDF
6 Sigma - Chapter2
PDF
6 Sigma - Chapter1
PDF
6 Sigma - Chapter8
PDF
6 Sigma - Chapter7
PDF
6 Sigma - Chapter6
PDF
6 Sigma - Chapter5
PDF
6 Sigma - Chapter4
PPT
Pattern production
PPT
PPT
Methods of kaizen
PPT
Dfmea rating
PPT
Rodebaugh sixsigma[1]
PPT
Tpm+basics
What i es do iie iab v2
Weld material
Six sigma
Spi link
6 Sigma - Chapter3
6 Sigma - Chapter2
6 Sigma - Chapter1
6 Sigma - Chapter8
6 Sigma - Chapter7
6 Sigma - Chapter6
6 Sigma - Chapter5
6 Sigma - Chapter4
Pattern production
Methods of kaizen
Dfmea rating
Rodebaugh sixsigma[1]
Tpm+basics

Recently uploaded (20)

PDF
composite construction of structures.pdf
PPTX
UNIT-1 - COAL BASED THERMAL POWER PLANTS
PPTX
Strings in CPP - Strings in C++ are sequences of characters used to store and...
PDF
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
PDF
Operating System & Kernel Study Guide-1 - converted.pdf
PDF
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...
DOCX
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
PPTX
KTU 2019 -S7-MCN 401 MODULE 2-VINAY.pptx
PPTX
Lecture Notes Electrical Wiring System Components
PPTX
additive manufacturing of ss316l using mig welding
PDF
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
PPTX
Sustainable Sites - Green Building Construction
PPTX
CH1 Production IntroductoryConcepts.pptx
PPTX
web development for engineering and engineering
PDF
Structs to JSON How Go Powers REST APIs.pdf
PPT
Mechanical Engineering MATERIALS Selection
PPTX
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
PPTX
OOP with Java - Java Introduction (Basics)
PPTX
UNIT 4 Total Quality Management .pptx
PDF
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
composite construction of structures.pdf
UNIT-1 - COAL BASED THERMAL POWER PLANTS
Strings in CPP - Strings in C++ are sequences of characters used to store and...
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
Operating System & Kernel Study Guide-1 - converted.pdf
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
KTU 2019 -S7-MCN 401 MODULE 2-VINAY.pptx
Lecture Notes Electrical Wiring System Components
additive manufacturing of ss316l using mig welding
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
Sustainable Sites - Green Building Construction
CH1 Production IntroductoryConcepts.pptx
web development for engineering and engineering
Structs to JSON How Go Powers REST APIs.pdf
Mechanical Engineering MATERIALS Selection
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
OOP with Java - Java Introduction (Basics)
UNIT 4 Total Quality Management .pptx
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...

Ppap training presentation

  • 1. PPAP TRAINING PROGRAMME (17th AUGUST-2013) Presented by: B.D.Sharma (PMC) SHIVANI LOCKS PVT. LTD.
  • 2. APQP INTRODUCTION This system was jointly developed by M/S. Chrysler Corporation, Ford Motor Company & General Motors Corporation in the year 1994, to provide systematic working environment in the organisation. All the methods related to above system are captured in this program. The two main requirements of a good Product Development are, first to developing a robust product and 2nd developing the product in a shortest time. The first & important principle for the success of this system is the ability to work in a team. For this it is necessary to develop and implement the team working culture in the organization. If we do not adhere to this principle of team working, we may end up without the benefits. PPAP TRAINING PROGRAMME – 13th AUG. 2013
  • 3. WHAT IS PPAP ? Production Part Approval Process is a structured & systematic method to assure that a product satisfies the customer’s requirements. The commitment from the Top Management an essential requirement for the success of this process. THE OBJECTIVENESS OF PPAP Effective communication with everyone involved. On-time completion of all required steps Minimal or no quality problems Minimal product launch quality risks Minimal cycle time to launch the product THE BENEFITS OF PPAP Resources are directed toward customer satisfaction Required changes are identified early Changes close to or after product launch are avoided A quality product is provided on time at the lowest cost. An element of Continuous Improvement is built into the company. PPAP TRAINING PROGRAMME – 13th AUG. 2013
  • 4. LEVEL – 5. LEVEL – 1. LEVEL – 2 . LEVEL – 3 . LEVEL – 4 . PPAP LEVEL PPAP LEVEL : PPAP TRAINING PROGRAMME – 13th AUG. 2013
  • 5. Advanced Product Quality Planning Date: 25.06.2009 Status Report Review No.: 00 Diamond Point: Supplier SHIVANI LOCKS PVT LTD Program AMBASSADOR MODEL Location FARIDABAD-HARYANA Model Year Supplier Code Lead Part No. M-03S-121000/ Cust.Part No :4308300026 Risk Assessment Part Name New: Site Technology Process Eng. Level 00 Other Risks Follow source support Not Avbl User Plant(s) HINDUSTAN MOTORS LIMITED (HML) KOLKATA Team Members Company/Title Phone/Fax 0129-4049479: Fax: 0129-2279479 0129-4049479: Fax: 0129-2279479 0129-4049479: Fax: 0129-2279479 0129-4049479: Fax: 0129-2279479 0129-4049479: Fax: 0129-2279479 0129-4049479: Fax: 0129-2279479 0129-4049479: Fax: 0129-2279479 0129-4049479: Fax: 0129-2279479 Build Level Material Quantity Concurred P.I.S.T. P.I.P.C. Required Date No. SC's No. CC's % % PROTOTYPE - TOOLED UP - - - PRODUCTION TRIAL RUN START OF PRODUCTION APQP Elements GYR Focus Program Supplier Closed Resp. Remarks or Status Element Need Timing Date Engineer Assistance Required Rating Date Date Initials 1) Design FMEA 25.06.09 25.06.09 A Kalra 2) Design Review(s) A.Kalra 3) Design Verification Plan 25.06.09 25.06.09 A.Kalra 4) Subcontractor APQP Status N.A N.A S.K.Sharma 5) Facilities, Tools and Gages N.A. N.A. S.K.JHA / S.C.Sharma 6) Prototype Build Control Plan 26.06.09 26.06.09 A.K.Singh 7) Prototype Builds 26.06.09 26.06.09 05.07.09 A.K.Tyagi 8) Drawings and Specifications 25.06.09 25.06.09 10.07.09 A.Kalra 9) Team Feasibility Commitment 25.06.09 25.06.09 25.06.09 CFT 10) Manufacturing Process Flow Chart 26.06.09 26.06.09 S.K.J / S.C.S./ A.K.S. 11) Process FMEA 26.06.09 26.06.09 S.K.Jha /A.K.Singh 12) Measurement Systems Evaluation A.K.Singh 13) Pre-Launch Control Plan 20.07.09 20.07.09 A.K.Singh 14) Operator Process Instructions 20.07.09 20.07.09 S.K.Jha /A.K.Singh 15) Packaging Specifications 20.07.09 20.07.09 A.Kalra 16) Production Trial Run 30.07.09 30.07.09 S.K.Jha / A.K.Tyagi 17) Production Control Plan 25.07.09 25.07.09 S.K.Jha /A.K.Singh 18) Preliminary Process Capability Study 30.07.09 30.07.09 S.K.Jha / A.K.Tyagi 19) Production Validation Testing 01.08.09 01.08.09 A.K.Singh / A.K.Tyagi 20) Production Part Approval (PSW ) 5.08.09 5.08.09 A.K.Tyagi /S.K.J./A.Kalra 21) PSW Part Delivery at MRD 15.08.09 15.08.09 A.K.Tyagi / S.K.Jha Head (PDC) A K Singh Head (PDMC) S.K.Jha Head (Manufacturing Operations) S.C.Sharma Head (Tool Engg. Center) Head (Marketing) A.KALRA Head (PRODUCT DESIGN CENTRE) 10.08.2009 A.K. GUPTA Atul Kumar Head (Central Quality Assurance) S.K.Sharma Head (PURCHASE & STA) A K Tyagi 2009 - - SEE NOTE-1 G R LEVER T/LID RELEASE 26.06.2009 25.07.2009 50 NOS. 300 NOS. ON GOING R G G G G G G G G G G G R R R project goahead no:-162 EXISTING R G 5 NOS. R G 30.07.2009 COMMENTS : 1. ALL PARTS ARE COMMON WITH M 01S-8800 EXCEPT DELETION OF LEVER FUEL LID AND ADDITION OF WASHER . 2. 03 NOS. SAMPLES SUBMITTED TO CUSTOMER,FEED BACK AWAITED FROM CUSTOMER END. 3.ANNUAL VOLLUME :6000 NOS, & SUPPLY FROM S3 (PRITHLA PLANT). 4.ELEMENT NO. 6 ,10 & 11 ARE DELAY/RED DUE TO PROJECT GO AHEAD RECEIVED ON JULY 2009. APQP TRAINING PROGRAMME - 29th July -2009 APQP FORMAT
  • 6. PLAN AND DEFINE PROGRAM OBJECTIVES Determine customer needs Plan a quality program (which includes Scope, Time, Budget, etc.) INPUT -Voice of the customer -market research -historical warranty and quality information -team experience -Business plan/marketing strategy -Product/process benchmark data -Product/process assumptions -Product reliability -Customer inputs OUTPUTS -Design goals -Reliability and quality goals -Preliminary bill of material -Preliminary process flow chart -Preliminary listing of special product and process characteristics -Product assurance plan -Management support APQP TRAINING PROGRAMME - 29th July -2009
  • 7. PRODUCT DESIGN AND DEVELOPMENT OBJECTIVES -Develop design features and characteristic -Critically review engineering requirements -Assess potential manufacturing problems INPUTS -Design goals -Reliability and quality goals -Preliminary process flow chart -Preliminary listing of special product and process characteristics OUTPUTS BY DESIGN RESPONSIBLE ACTIVITY -Design failure mode and effects analysis(DFMEA) -Design for manufacturing and assembly -Design verification -Design reviews -Prototype build – control plan -Material specification -Drawing and specification changes OUTPUTS BY PRODUCT QUALITY PLANNING TEAM -New equipment tooling and facilities requirements -Special product and process characteristics -Gages/testing equipment requirement APQP TRAINING PROGRAMME - 29th July -2009
  • 8. PROCESS DESIGN AND DEVELOPMENT OBJECTIVES Develop a comprehensive and effective manufacturing system Ensure that the manufacturing systems meets customer requirements INPUTS -Process failure mode and effect analysis (PFMEA) -Process for manufacturability and assembly -Process verification -Process reviews -Prototype build-control plan -Engineering drawings (including math data) -Engineering specifications -Material specifications -Drawing and specification changes -New equipment tooling and facilities requirements -Special product and process characteristics -Gages/testing equipment requirement -Team feasibility commitment and management support OUTPUTS -Packaging standards -Product process quality system review -Process flow chart -Floor plan chart -Characteristics matrixProcess failure mode and effects analysis (PFMEA) -Pre-launch control plan -Process instruction -Measurement systems analysis plan -Preliminary process capability study plan -Packaging specification -Management support
  • 9. PRODUCT AND PROCESS VALIDATION OBJECTIVES Validate the manufacturing process & the product Ensure that customer’s expectations will be met Identify additional concerns INPUTS -Packaging standards -Product process quality system review -Process flow chart -Floor plan layout -Characteristics matrix -Process Failure Mode and Effects Analysis (PFMEA) -Pre-launch control plan -Process instruction -Measurement Systems Analysis Plan -Preliminary process capability study plan -Packaging specification -Management support OUTPUTS -Production trial run -Measurement systems evaluation -Preliminary process capability study - Production part approval -Production validation testing -Packaging evaluation -Production control plan -Quality planning sign-off and management support APQP TRAINING PROGRAMME - 29th July -2009
  • 10. FEEDBACK.ASSESSMENT AND CORRECTIVE ACTION OBJECTIVES -To plan the next phase of product development or modification -To improve the system of planning (from lessons learnt) -To identify opportunities for Improvement INPUTS -Production trial run -Measurement systems evaluation -Preliminary process capability study -Production part approval -Production validation testing -Packaging evaluation -Production control plan -Quality planning sign-off and management support OUTPUTS -Reduced variation -Customer satisfaction -Delivery and service APQP TRAINING PROGRAMME - 29th July -2009
  • 11. PROGRAM MANAGEMENT TEAM LEADER Each program has a team leader, but a team leader may manage one or more programs. The team Leader :- -should be a senior Production or Quality Manager - interfaces with the customer - ensures that the Program Need Dates (PND) are met - is responsible for resources - is responsible until product launch - forms and manages one or more PPAP Teams PPAP TEAMS -Team should be cross-functional; it is not composed of only people from the Quality Department. Typical members might come from:- - Engineering - Manufacturing operations - Material Control - Marketing - Manufacturing Engg. Centre - Tool Engg. Centre -Customers (as appropriate) PPAP TRAINING PROGRAMME – 13th AUG. 2013
  • 12. TGW & BENCHMARK EXERCISE TGW & Benchmarking helps to make the product trouble free & robust / eligent Following to be captured during TGW & Bench Marking :- Identify the gap between current status and the benchmark, Collect data and summaries :- ROLE OF TGW BENCHMARKING IN PROCESS :- 1. Helps to Remove/ minimize the JIG –JAG process, 2. Max.operation in Min. stages, 3. Mistake proof / fool proofing in the process 4. Process will be safe, fast, cheaper, easy & short time. 5. Process will meet the specifications 100% PPAP TRAINING PROGRAMME – 13th AUG. 2013
  • 13. ROLE OF TGW & BENCHMARKING IN PRODUCT RELIABILITY Its provide a better methodology related to testing of the Product, To reduce the frequency of repair / replacement of the product and the results of long-term reliability / durability. ROLE OF TGW & BENCH MARKING IN DESIGN :- - Easily Manufacturable - Fitment wise - Functional performance - Dimensions - Weight - Materials - Aesthetic PPAP TRAINING PROGRAMME – 13th AUG. 2013