SUI  SOUTHERN  GAS  COMPANY  LIMITED Karachi, 15 June 2007 PAKISTAN'S POWER CRISIS MUNAWAR BASEER AHMAD P.E. MANAGING DIRECTOR by
 
 
 
 
Presentation By Munawar Baseer Ahmed
PAKISTAN POWER SECTOR PRESENTATION SEQUENCE LOOMING POWER CRISIS  OR CRISIS OF POWER (PLANNING) HISTORICAL BACKGROUND OF POOR PLANNING IN POWER SECTOR TEN YEARS GROWTH / ADDITION IN POWER GENERATION INEFFECTIVE REGULATORY FRAME WORK AND ENFORCEMENT  CASE STUDY OF EFFECTIVE PLANNING AND IMPLEMENTATION  NATIONAL ENERGY PLAN 2005 – A SOLUTION? PROPOSED POWER GENERATION PROJECTS; IMPLEMENTATION? THE WAY FORWARD TO ENSURE……………… ENERGY SECURITY SOVEREIGNTY SUSTAINABILITY
1. Inadequate Energy demand forecasts 2. No integrated Energy or Power Planning 3. Lack of effective implementation modalities, and project development 4. Lack of Financing Plan, Structure or Vehicle 5. Lack of coordination between sectoral entities i.e. Hydel, Electric, Oil/Gas 6. Primary Energy supply chain development, enhancement and security issues not addressed 7. Regulatory framework out of focus with ground realities and supply constraints CRISIS OF POWER SEVEN CRUCIAL ASPECTS
INDIA AFGHANISTAN IRAN CHINA ARABIAN SEA Sindh Balochistan Punjab Islamabad NWFP JAMMU & KASHMIR (DISPUTED TERRITORY) (MW) PAKISTAN POWER SECTOR – INSTALLED CAPACITY Source: Power System Statistic, Feb 2007 by NTDC 220 Total 200 Hydel 20 Thermal  1947-1960 2,808 Total 1,450 Hydel 1,358 Thermal  1961-1980 325 Nuclear 10,652 Total 4,813 Hydel 5,514 Thermal  1981-2006 2,068.5 Total 420 Retired 1,648.5 Privatized Retired / Privatized 5,783 Total 30 Hydel 5,753 Thermal  IPP’s upto June 06 19,549.5 Grand Total 2,108 3,064 7,426.5 3,766 1,030 KESC 2,155 137 NUCLEAR 2,155 Total 1,756 KESC 262 IPP  KARACHI
PAKISTAN POWER SECTOR – GROWTH AT A GLANCE ACGR: 8.8% (MW) Source:  1. Power System Statistic, Feb 2007 by NTDC  2. Pakistan energy Year Book 2006 1,582.41 384.97 % INCREASE 1951 4,879 163.63 2006 ACGR % GDP  (RS BILLION) POPULATION (Million) 8.8 TOTAL 325 3.5 NUCLEAR (1972-2006) 7.5 THERMAL (1960-2006) 33.74 8.5 HYDRO (1925-2006)
Source:  BP Statistical Review of World Energy June 2006, ENERGY CONSUMPTION PER CAPITA, 2005-06
PAKISTAN POWER SECTOR – INSTALLED CAPACITY (MW) Source: Power System Statistic, Feb 2007 by NTDC 33.8 % increase
PAKISTAN POWER SECTOR ADDITIONAL GENERATION (MW) (Ghazi Brotha Shahddra Thermal  NOTE:  1. GBHP FULL UTILIZATION IN 2004 2. ESSENTIALLY NO NEW POWER GENERATION ADDITION AFTER 2001  Source: Power System Statistic, Feb 2007 by NTDC HUBCO Kot Addu Uch Japan Fauji Chashma Liberty AES Habibullah
PAKISTAN POWER SECTOR  KESC – ADDITIONAL GENERATION (MW) NOTE: NO NEW ADDITION FOR 9 YEARS Source: Power System Statistic, Feb 2007 by NTDC IPPs : 262 MW Thermal KESC: 231 MW  Nuclear
PAKISTAN POWER SECTOR ENERGY GENERATION BY FUEL TYPE - FY 2006 (WAPDA) (KESC) Source:   1.  BP Statistical Review of World Energy June 2006,   2.  Power System Statistic, Feb 2007 by NTDC 24.38% USA 56.16% India 70.17% China Indigenous Coal
FUEL COST AND AVERAGE SALE PRICE (Rs /kWh) ACGR: 5.6% ACGR: 6.2% ACGR%:  GAS: 8.6 FURNACE OIL: 14.8   AVERAGE FUEL PRICE INCREASED: 11.70% CGAR Source:  1. Power System Statistic, Feb 2007 by NTDC  2. Pakistan energy Year Book 2006
PAKISTAN POWER SECTOR - SYSTEM LOSSES (%)  Source: Power System Statistic, Feb 2007 by NTDC NOTE:  * ASSUMING A MINIMUM OF 6% TECHNICAL LOSSES, ADDITIONAL THEFT/LEAKAGE FOR KESC  AMOUNT TO RS. 11,120 MILLION  ** ASSUMING A MINIMUM OF 10% TECHNICAL LOSSES, ADDITIONAL THEFT/LEAKAGE FOR WAPDA  AMOUNT TO RS. 50 BILLION * **
ROLE OF NEPRA  ?? Seven Points to ponder: 1. Proper Power Sector structure and operations framework not done 2. Failure to undertake Tariff  rationalization necessary to support existing and induct new generation 3. Power sector development, and growth neither forecasted nor planned 4. Utility system operations service levels neither checked nor enforced Network System Augmentation, growth, and improvement not mandated 6. Unwarranted system losses and theft not curtailed through forceful intervention 7. Interest of primary stakeholders – public, compromised through closed door approach
CASE STUDY OF EFFECTIVE  PLANNING AND IMPLEMENTATION SUI SOUTHERN GAS COMPANY LIMITED
MERGER OF 3 COMPANIES IN 1989 KARACHI GAS COMPANY – PRIVATE SECTOR INDUS GAS COMPANY – PUBLIC SECTOR (PIDC) SUI GAS TRANSMISSION COMPANY – MULTINATIONAL RESULTING IN 3 UNIQUELY DISTINCT CULTURES AND CONTINUOUS DISTORTION OF WORK PRACTICES LACK OF COORDINATION, INTEGRATED PLANNING AND SETTING OF OBJECTIVES EMPLOYEES AND MANAGEMENT MOSTLY MIRED IN STATUS QUO. OUR ISSUES
NO PLAN FOR GROWTH NO CLEAR OBJECTIVES NO EFFECTIVE BUSINESS SYSTEMS LACK OF BEST BUSINESS PRACTICES INEFFICIENT WORK PRACTICES & PROCEDURES MIXED CONCEPT OF CUSTOMER SERVICES MANAGEMENT  AND EMPLOYEES INVOLVED IN ROUTINE WORK LOW CAPEX RESULTING IN LOW RETURN ON FIXED ASSETS NO PLAN FOR MEETING EMERGING CUSTOMER DEMANDS NO PLAN TO AUGMENT OUTDATED EQUIPMENTS AND INFRASTRUCTURE NO INNOVATION OR NEW TECHNOLOGY INDUCTION CONSEQUENCES
STRATEGIC MANAGEMENT OBJECTIVES;  TO MAKE SSGC THE BEST PUBLIC SECTOR COMPANY IN PAKISTAN   (SET AS PART OF 5 YEARS PLAN FOR 2003-2008) EXPANSION OF DISTRIBUTION AND TRANSMISSION NETWORK;   FOR ENHANCEMENT OF GAS SUPPLY TO POWER PLANTS, INDUSTRIES AND COMMERCIAL SECTOR INCLUDING SUPPLY OF GAS TO PREVIOUSLY DEPRIVED AREAS IN THE DOMESTIC SECTOR “ SERVICE WITH A SMILE ”   CULTURE FOR CUSTOMER SATISFACTION THRU INNOVATION & QUALITY SERVICES CONSISTENT APPRECIATION IN SHAREHOLDER’S VALUE;   BY INCREASING THE COMPANY’S ASSET BASE AND SIGNIFICANT IMPROVEMENT IN PRODUCTIVITY AND EFFICIENCY BUSINESS PROCESS RE-ENGINEERING (BPR);   RE-STRUCTURING OF SELECT DEPARTMENTS AND IMPLEMENTATION OF ERP TO PROVIDE EFFECTIVE M.I.S. FOR BUSINESS OPERATIONS AND CONTROL
STRATEGIC MANAGEMENT OBJECTIVES;  TO MAKE SSGC THE BEST PUBLIC SECTOR COMPANY IN PAKISTAN   MAKE SSGC THE  “MOST IT ENABLED COMPANY”   THRU ENTERPRISE INFORMATION SYSTEM (EIS) AND TECHNOLOGY IMPLEMENTATION IN ALL AREAS OF BUSINESS EMPOWERMENT OF EMPLOYEES   THRU CAREER PLANNING, HRD AND EXTENSIVE TRAINING AND SKILL DEVELOPMENT  BE A GOOD CORPORATE CITIZEN   THRU COMMUNITY SUPPORT SERVICES AND ENVIRONMENTAL PROTECTION INITIATIVES TO MEET THE NATIONAL AND SOCIAL RESPONSIBILITIES
SSGC CORE INVESTMENT PROGRAMME RUPEES MILLION 368.8 501.1 640.1 800.3 271.2 25.6 296.4 OTHERS 6,488.5  1,897.4  2,046.8  592.7 235.6 1218.5 - 2,544.3  256.6 - 208.8 1,782.5 2004-05 359.2 348.1 375.6 279.3 331.4 121.0 REHABILITATION 1,536.0 1,577.2 1,768.4 1,945.6 - 509.8 UNDER PLANNING/ APPROVAL 1,904.8 2,560.9 3,913.7 4,329.0 3,382.0 1,978.2  SUB TOTAL (A) - - - 240.8 173.8 25.6 LEFTOVER PROJECTS - 482.6 1,505.2 1,001.1 648.1 338.7 ONGOING OTHER PROJECTS - - - 341.2 2,288.9 1,078.5 ONGOING- GIREP II  A) TRANSMISSION PROJECTS: 885.5  853.3  823.3  1,725.1 864.7 497.1  C) OTHER CAPITAL  EXPENDITURE 5,398.9  2,608.6  460.2 2,233.0 - 2010-11 6,414.9  3,000.7 670.1 1,971.4 - 2009-10 TOTAL (A+B+C) SUB TOTAL (B) NEW TOWNS NORMAL EXPANSION DISTRIBUTION PROJECTS B) DISTRIBUTION SYSTEM: PROJECT DESCRIPTION - 816.5 238.2 648.3 1,729.7 2,468.1 1,770.2 1761.1 1,040.2 1,618.1 1,258.1 533.3 3,118.0  5,182.0 3,597.9 3,063.7  7,855.0  11,236.1 7,844.7 5,539.0  2008-09 2007-08 2006-07 2005-06
GAS INFRASTRUCTURE REHABILITATION AND EXPANSION PROJECTS Quetta Sibi Pirkoh Loti Dera Bugti Sui Jacobabad Shikarpur Larkana Dadu Zamzama Sari Hyderabad Nawabshah Sawan Kadanwari Miano Badin Karachi Bhit Hasan Sukkur FJFC Pesh Bogi GAS INFRASTRUCTURE  REHABILITATION AND EXPANSION PROJECTS  2006-08 Mazarani Zarghun SNGPL transmission line Naimat Basal 42” Ø 13 Km Bin Qasim Distribution  Pipeline Rs.807 million 18” Ø 15 Km Mach – Kolpur And 31 Km Dingra – Sibi Loop line + Sibi Compressor  Rs. 1,138 Million 18” Ø 15 Km Re – routing  in Dingra Nala  Rs. 272 Million 18” Ø 18 Km Abegum – Mach  Loopline  Rs. 306 Million 24” Ø 66 Km Bajara to Karchat 134 Km Karchat to Karachi Rs. 2795 million 30” Ø 9 Km By-pass HQ3 to SMS Sindh University Rs. 364 Million 24” Ø 116 km Snaghar – Nawabshah – Karachi  Pipelinepahse -1 Rs. 2,262 million 24” Ø 14 Km loop  Line Pahse-2 HQ3-Masu Rs. 323 Million 48 Km Shahdadpur to Masu 24” Ø 140  Km Sanghar –  Nawabshah – Hyderabad Karachi loopline  50 Km Shahadpur –  MVA Karam Jamali 12” ø 64 Km Zarghun  Pipeline Rs. 900 million Compressor Bin Qasim Masu MVA Karam Jamali Shahdadpur  Bajara Karchat HQ2
Proposed LNG setup KARACHI GAS DEVELOPMENT MASTER PLAN 92 MMCFD SMS KT 242 MMCFD SMS MALIR 95 MMCFD SMS STEEL 36 MMCFD 250 MMCFD KTPS BQPS Proposed 36”x30Km (140 mmcfd) Distribution main * LNG not included * * TOTAL :  1,200 ADDL 2010 :  410 EXISTING : 750-790 LOAD MMCFD
SIX YEARS PERFORMANCE HIGHLIGHTS Estimated
KEY PERFORMANCE INDICATORS Estimated
KEY PERFORMANCE INDICATORS Design capacity is 275,000 Capacity increase through BPR and improved work flow management Estimated
KEY PERFORMANCE INDICATORS Estimated
KEY PERFORMANCE INDICATORS Estimated
IMPERATIVES OF SUSTAINABLE ENERGY SUPPLY 1. ENERGY IS PRIMARY VEHICLE FOR ECONOMIC GROWTH AND SOCIAL DEVELOPMENT AND MUST BE MADE AVAILABLE FOR MANAGED GROWTH 2. DEVELOPING SOCIETIES REQUIRE MORE ENERGY TO MAKE THE TRANSITION OUT OF LOW INCOME ECONOMIES (AND POVERTY) 3. INDIGENOUS SOURCES MUST BE MAXIMIZED WITH MORE HYDEL CONTENT 4. LONG TERM ENERGY SUPPLIES MUST BE SECURED (OIL, GAS, COAL) FROM MULTIPLE SOURCES (BOTH INDIGENOUS AND OVERSEAS) 5. ENERGY MIX TO HAVE INCREASING SHARE OF RENEWABLE (WIND, SOLAR) WITH UP TO 10% OVER THE NEXT 20 YEARS 6. ENERGY CONSERVATION EFFICIENCY IMPROVEMENT AND LOSS REDUCTION MUST BE ENFORCED 7. UTILITIES MUST UNDERTAKE EFFECTIVE LOAD CYCLE MANAGEMENT FOR MAXIMUM CAPACITY UTILIZATION
ENERGY MIX PLAN  BASED ON PIP/OCAC STUDY OF GOP MODERATE GROWTH RATE OF 6.5% Source: Pakistan Energy Plan 2005-2030 by P.C., Islamabad 2.9 6.3 2.6 4.5 2.7 3.6 2.6 2.5 0.6 0.4 1.0 0.6 NUCLEAR 1.1 2.4 1.1 1.8 0.9 1.2 0.6 0.6 0.4 0.3 - - RENEWABLE 13.8 30.0 13.2 22.4 13.7 17.9 13.9 13.6 12.9 9.3 12.7 7.4 HYDEL 15.0 32.7 13.0 22.1 11.5 15.1 10.0 9.8 8.1 5.8 7.0 4.0 COAL 48.6 106.0 49.9 84.8 47.7 62.5 48.3 47.3 49.4 35.6 50.4 29.2 NATURAL GAS 18.6 40.6 20.2 34.4 23.4 30.7 24.7 24.2 28.6 20.6 28.4 16.4 OIL % 218 * % 170 % 131 % 98 % 72 % 57.7 TOTAL ENERGY 2030 2025 2020 2015 2010 2005-06 LONG TERM  MEDIUM TERM SHORT TERM CURRENT     % MTOE
PROJECTED HYDEL POWER PROJECTS Source: Pakistan Energy Plan 2005-2030 by P.C., Islamabad MW 19,200 5,000 “  UPTO 2030 14,200 6,800 “  UPTO 2020 7,400 1,200 ADDITION UPTO 2010 6,200 6,200 EXISTING  INCLUDING GHAZI BAROTHA (FULL) CUMULATIVE CAPACITY 5,000 6,877 1,206 3,000 3,877 2,000 3,000 600 120 740 655 649 240 133 740 19 121 130 72 81 96 130 106 79 132 84 97 60 Small projects Large Project TOTAL UPTO 2030 NEW POWER PROJECTS (CAPACITY IN MW) Neelam Jhelum Taunsa Munda Suki Kinari Swat Cascade Karot Partind Kohala TOTAL Large Project TOTAL Pehur Allai Khwar Duber Khwar Khan Khwar Malakand-III Jinnah Barrage Keyal Khwar Golen Gol New Bong Hydro power Rajdhani Power Project Matiltan Distt Swat Kotli Hydro Power Project Gulpur Hydro Project TOTAL UPTO 2020 UPTO 2010
PROJECTED NUCLEAR POWER PROJECTS Source: Pakistan Energy Plan 2005-2030 by P.C., Islamabad MW 8,000 1,000 x 5 “  UPTO 2030 3,000 600 x 4 “  UPTO 2020 600 300 ADDITION UPTO 2010 360 360 EXISTING  CUMULATIVE CAPACITY 7,400 600 360 * TO BE RETIRED BY 2010 1200 1200 2000 2000 1000 300 300 60 300 NPP-4  NPP-5 NPP-6 NPP-7 NPP-8 NPP-9 UPTO 2030 NEW POWER PROJECTS (CAPACITY IN MW) CHASNUPP-2 NPP-3 KANUPP-1* CHASNUPP-1 UPTO 2020 UPTO 2010
GENERATION EXPANSION PLAN  ( WAPDA SYSTEM) 1 Rental :150 MW 1 Renta : 136 MW 1 Hydel :  81 MW 3 Hydel   :  323 MW  14 Thermal : 2927 MW 1 Alt. Energy:  100 MW 1  Hydel :  96 MW  8 Thermal : 1209 MW  2 Hydel : 184 MW  1 Thermal : 150 MW 1 Nuclear : 325 MW
PROJECTED COAL POWER PROJECTS Source: Pakistan Energy Plan 2005-2030 by P.C., Islamabad 26 (58) 11 (24.9) 2.1 (4.7) 0.09 (0.2) 36 (80) 17 (38) 6.1 (13.6) 2.69  (6) TOTAL MTOE (MT) MTOE (MT) MW 8.0 (18.0) 2.0 (4.5) 14,500 “  2030 4.0 (9.0) 2.0 (4.5) 5,800 “  2020 2.0 (4.5) 2.0 (4.5) 1,050 UPTO 2010 1.6 (3.6) 1.0 (2.2) 150 EXISTING CEMENT / BRICKS STEEL POWER 20 15 10 6 % IN ENERGY MIX 150 150 Existing  1,050 900 TOTAL 300  450 150 Dadabhoy Energy  Lakhra coal Habibullah Energy ADDITION UPTO 2010 MW 14,500 8,700 “  UPTO 2030 5,800 4,750 “  UPTO 2020 CUMULATIVE CAPACITY
THE WAY FORWARD 1. GOP TO SET-UP  NATIONAL ENERGY COMMISSION  OR  NATIONAL ENERGY PLAN   AUTHORITY  TO ACT AS CENTRAL STATUTORY BODY FOR ENERGY PLANNING AND PROJECT MANAGEMENT. 2. GOP TO SET-UP  COAL POWER DEVELOPMENT AUTHORITY  WITH MANDATE AND FUNDS TO SET-UP COAL POWER PROJECTS BASED ON LOCAL COAL. 3. TRANSITION OF OIL, GAS AND POWER COMPANIES TO FULLY EMPOWERED  CORPORATE STRUCTURE  WITH  PROFESSIONAL MANAGEMENT . 4. ARRANGE FOR GOP FUNDING, DONOR SUPPORT ETC FOR  MEGA PROJECTS  IN  HYDEL, COAL AND NUCLEAR SECTORS. 5. SECURE LONG TERM SUPPLIES  OF  OIL & GAS  FROM MID EAST AND CAS THROUGH UPSTREAM INVOLVEMENT AND GOVERNMENT TO GOVERNMENT LEVEL COOPERATION. 6. FAST TRACK AGREEMENTS AND IMPLEMENTATION OF  TRANS NATIONAL OIL AND GAS PIPELINES . 7. DEVELOP  PRESIDENT’S VISION OF PAKISTAN AS “ASIAN ENERGY CORRIDOR”,  THUS SECURING PAKISTAN’S STRATEGIC ROLE IN REGION AND ENSURING SUSTAINABLE ENERGY SUPPLIES FOR THE FUTURE. For Pakistan’s Energy –  Security,   Sustainability   Sovereignty
MOVING AHEAD ….. TOGETHER FOR PAKISTAN’S POWER SECURITY, SOVEREIGNTY, SUSTAINABILITY. THANK YOU
BACKUP SLIDES
 
FUEL MIX IN ENERGY GENERATION (GENCOs) 1.33 0.88 0.77 0.66 0.63 0.61 0.59 0.67 0.94 0.81 Cost/kWh (Rs) 12.68 11.03 9.91 11.28 9.49 9.51 3.56 3.40 2.27 3.15 Cost/kWh (Rs) 5.04 3.27 2.71 2.89 2.49 2.62 1.74 1.40 1.61 1.46 Cost/kWh (Rs) 2.35 1.97 1.82 1.75 1.74 1.64 1.27 1.24 1.16 1.12 Cost/kWh (Rs) Generation (GWh) Generation (GWh) Generation (GWh) Generation (GWh) 129 2 4976 17402 2006 175 198 231 284 240 410 501 406 375 Coal 5 26 76 64 65 43 79 84 139 H.S.D. 3213 2734 6619 6631 4824 5274 4191 4966 6276 Furnace Oil 1879 18053 12648 11680 11711 13417 11121 12003 12303 GAS 2005 2004 2003 2002 2001 2000 1999 1998 1997 FUEL
AVERAGE FUEL COST AND SALE PRICE KESC ( Paisa) / kWh)
AVERAGE FUEL COST AND SALE PRICE WAPDA (GENCOs) ( Paisa) / kWh)

More Related Content

PPTX
Transmission & distribution network of ssgc
DOCX
Chapters ssgc
DOCX
Chapters ssgc
PDF
SSGC Complete Report
PDF
DOCX
Marrium's Internship Report (1)
DOCX
SSGC INTERNSHIP REPORT
PDF
Stolt Nielsen Capital Markets 2014
Transmission & distribution network of ssgc
Chapters ssgc
Chapters ssgc
SSGC Complete Report
Marrium's Internship Report (1)
SSGC INTERNSHIP REPORT
Stolt Nielsen Capital Markets 2014

Viewers also liked (20)

PDF
Enda connolly - HRB Strategic Business Plan 2010-2014 - 2009
ODP
Sales business development account plan ahnna w
PPT
MERGER,ACQUISITION AND CORPORATE RESTRUCTURING
PDF
TOWN OF BERTHOUD BUSINESS DEVELOPMENT STRATEGIC PLAN 2016
PPT
Session Two Projects And Activities To Create A Strategic Plan And A Supporti...
PPTX
Bpr ppt
ODP
Strategic Business Plan - Starting A Small Business
PPTX
Advanced strategic planning
PPT
5 Paradigms And Kingdom Business For Alict August 2009
PPTX
Get Strategic Business Development Plan
PPT
Brand Merger & Acquisition Lenovo Acquisiion Of Ibm Pc(Final Version)
PPTX
PDF
2030 Strategic Plan and 2014-25018 Business Plan
PDF
Real Estate Development Business Plan
PPTX
Business plan writing power point
PPT
Best Practices In Business Development
PPTX
Business process reengineering
PPTX
Business Process Reengineering Complete
PPT
Business process reengineering
PPT
Business Development Presentation
Enda connolly - HRB Strategic Business Plan 2010-2014 - 2009
Sales business development account plan ahnna w
MERGER,ACQUISITION AND CORPORATE RESTRUCTURING
TOWN OF BERTHOUD BUSINESS DEVELOPMENT STRATEGIC PLAN 2016
Session Two Projects And Activities To Create A Strategic Plan And A Supporti...
Bpr ppt
Strategic Business Plan - Starting A Small Business
Advanced strategic planning
5 Paradigms And Kingdom Business For Alict August 2009
Get Strategic Business Development Plan
Brand Merger & Acquisition Lenovo Acquisiion Of Ibm Pc(Final Version)
2030 Strategic Plan and 2014-25018 Business Plan
Real Estate Development Business Plan
Business plan writing power point
Best Practices In Business Development
Business process reengineering
Business Process Reengineering Complete
Business process reengineering
Business Development Presentation
Ad

Similar to Presentation By Munawar Baseer Ahmed (20)

PPTX
Presentation1
PDF
Detailed Analysis Of Power Plant Equipments (Power Sector)
PPTX
Energy distribution in Pakistan
PPTX
Mf project final.ppt
PPTX
A Presentation on the Rural Electrification Corporation Limited (RECL)- Mini ...
PPS
Presentation By Mukhtar Ahmed
PDF
Overview of Pakistan Power Sector
PDF
2010 11 - Indian Energy Sector by ibef
PPT
Infrastructure development in india
PPTX
National energy policy ppt
PPTX
Energy Sector Pakistan
PPTX
Policy Assessment: Import of Gas to fuel starved power stations in the wester...
PDF
Summer Internship and Project Report on Power System Operation Corporation Li...
DOCX
Power sector
PPTX
Energy crises in pakistan butt presentation
PDF
Future of the Indian power sector
PDF
K ELECTRIC
PDF
Energy Scenario _chapter 1 .pdf
PDF
Energy scenario
Presentation1
Detailed Analysis Of Power Plant Equipments (Power Sector)
Energy distribution in Pakistan
Mf project final.ppt
A Presentation on the Rural Electrification Corporation Limited (RECL)- Mini ...
Presentation By Mukhtar Ahmed
Overview of Pakistan Power Sector
2010 11 - Indian Energy Sector by ibef
Infrastructure development in india
National energy policy ppt
Energy Sector Pakistan
Policy Assessment: Import of Gas to fuel starved power stations in the wester...
Summer Internship and Project Report on Power System Operation Corporation Li...
Power sector
Energy crises in pakistan butt presentation
Future of the Indian power sector
K ELECTRIC
Energy Scenario _chapter 1 .pdf
Energy scenario
Ad

More from IEEEP Karachi (20)

PDF
Wi-Fi 802.11n Based Access Network for IPTV Service Delivery in Pakistan
PDF
Strategic Advancement in Turbulent Environment thru Organizational Project Ma...
PDF
Uncertain Times Can Bring New Opportunities
PDF
Total Quality & Organizational Change
PDF
An Autonomous Robot for NERC Contest
PDF
Electronic Hand Glove for Speed Impaired and Paralyzed Patients
PDF
Ocean Based Power and its Huge Potential as a Renewable Energy Source
PDF
Intelligent Heart Disease Recognition using Neural Networks
PDF
Towards an Efficient and Robust Wireless Disaster Management Architecture for...
PDF
Spectrum Measurements for IEEE 802.22 Wireless Regional Area Networks
PDF
Indoor Radio Positioning Systems
PDF
Design & Fabrication of a Ground Survellance Robot
PDF
Impact of the Extensive Usage of Energy Savers on Power Quality
PDF
Engineering Excellence - IEEEP
PPT
Wind & Solar Energy By Mayura Botejeu
PPT
Wamicon 2005 1 G Hz Clearwater Florida
PPT
Tidal Energy By Majida Islam
PPT
Quality Model By Riffat Ali
PPT
Power Supply Management System Of A Small Satellite By Wajid
PPT
Plc Paper Presentation By Durreshahwar
Wi-Fi 802.11n Based Access Network for IPTV Service Delivery in Pakistan
Strategic Advancement in Turbulent Environment thru Organizational Project Ma...
Uncertain Times Can Bring New Opportunities
Total Quality & Organizational Change
An Autonomous Robot for NERC Contest
Electronic Hand Glove for Speed Impaired and Paralyzed Patients
Ocean Based Power and its Huge Potential as a Renewable Energy Source
Intelligent Heart Disease Recognition using Neural Networks
Towards an Efficient and Robust Wireless Disaster Management Architecture for...
Spectrum Measurements for IEEE 802.22 Wireless Regional Area Networks
Indoor Radio Positioning Systems
Design & Fabrication of a Ground Survellance Robot
Impact of the Extensive Usage of Energy Savers on Power Quality
Engineering Excellence - IEEEP
Wind & Solar Energy By Mayura Botejeu
Wamicon 2005 1 G Hz Clearwater Florida
Tidal Energy By Majida Islam
Quality Model By Riffat Ali
Power Supply Management System Of A Small Satellite By Wajid
Plc Paper Presentation By Durreshahwar

Recently uploaded (20)

PDF
NewMind AI Weekly Chronicles - August'25 Week I
PPT
“AI and Expert System Decision Support & Business Intelligence Systems”
PPT
Teaching material agriculture food technology
DOCX
The AUB Centre for AI in Media Proposal.docx
PDF
Architecting across the Boundaries of two Complex Domains - Healthcare & Tech...
PDF
Agricultural_Statistics_at_a_Glance_2022_0.pdf
PDF
Reach Out and Touch Someone: Haptics and Empathic Computing
PPTX
Programs and apps: productivity, graphics, security and other tools
PPTX
Big Data Technologies - Introduction.pptx
PDF
TokAI - TikTok AI Agent : The First AI Application That Analyzes 10,000+ Vira...
PPTX
Understanding_Digital_Forensics_Presentation.pptx
PDF
Network Security Unit 5.pdf for BCA BBA.
PDF
Blue Purple Modern Animated Computer Science Presentation.pdf.pdf
PPTX
MYSQL Presentation for SQL database connectivity
PPTX
sap open course for s4hana steps from ECC to s4
PDF
Unlocking AI with Model Context Protocol (MCP)
PPTX
Detection-First SIEM: Rule Types, Dashboards, and Threat-Informed Strategy
PDF
How UI/UX Design Impacts User Retention in Mobile Apps.pdf
PDF
KodekX | Application Modernization Development
PDF
Optimiser vos workloads AI/ML sur Amazon EC2 et AWS Graviton
NewMind AI Weekly Chronicles - August'25 Week I
“AI and Expert System Decision Support & Business Intelligence Systems”
Teaching material agriculture food technology
The AUB Centre for AI in Media Proposal.docx
Architecting across the Boundaries of two Complex Domains - Healthcare & Tech...
Agricultural_Statistics_at_a_Glance_2022_0.pdf
Reach Out and Touch Someone: Haptics and Empathic Computing
Programs and apps: productivity, graphics, security and other tools
Big Data Technologies - Introduction.pptx
TokAI - TikTok AI Agent : The First AI Application That Analyzes 10,000+ Vira...
Understanding_Digital_Forensics_Presentation.pptx
Network Security Unit 5.pdf for BCA BBA.
Blue Purple Modern Animated Computer Science Presentation.pdf.pdf
MYSQL Presentation for SQL database connectivity
sap open course for s4hana steps from ECC to s4
Unlocking AI with Model Context Protocol (MCP)
Detection-First SIEM: Rule Types, Dashboards, and Threat-Informed Strategy
How UI/UX Design Impacts User Retention in Mobile Apps.pdf
KodekX | Application Modernization Development
Optimiser vos workloads AI/ML sur Amazon EC2 et AWS Graviton

Presentation By Munawar Baseer Ahmed

  • 1. SUI SOUTHERN GAS COMPANY LIMITED Karachi, 15 June 2007 PAKISTAN'S POWER CRISIS MUNAWAR BASEER AHMAD P.E. MANAGING DIRECTOR by
  • 2.  
  • 3.  
  • 4.  
  • 5.  
  • 7. PAKISTAN POWER SECTOR PRESENTATION SEQUENCE LOOMING POWER CRISIS OR CRISIS OF POWER (PLANNING) HISTORICAL BACKGROUND OF POOR PLANNING IN POWER SECTOR TEN YEARS GROWTH / ADDITION IN POWER GENERATION INEFFECTIVE REGULATORY FRAME WORK AND ENFORCEMENT CASE STUDY OF EFFECTIVE PLANNING AND IMPLEMENTATION NATIONAL ENERGY PLAN 2005 – A SOLUTION? PROPOSED POWER GENERATION PROJECTS; IMPLEMENTATION? THE WAY FORWARD TO ENSURE……………… ENERGY SECURITY SOVEREIGNTY SUSTAINABILITY
  • 8. 1. Inadequate Energy demand forecasts 2. No integrated Energy or Power Planning 3. Lack of effective implementation modalities, and project development 4. Lack of Financing Plan, Structure or Vehicle 5. Lack of coordination between sectoral entities i.e. Hydel, Electric, Oil/Gas 6. Primary Energy supply chain development, enhancement and security issues not addressed 7. Regulatory framework out of focus with ground realities and supply constraints CRISIS OF POWER SEVEN CRUCIAL ASPECTS
  • 9. INDIA AFGHANISTAN IRAN CHINA ARABIAN SEA Sindh Balochistan Punjab Islamabad NWFP JAMMU & KASHMIR (DISPUTED TERRITORY) (MW) PAKISTAN POWER SECTOR – INSTALLED CAPACITY Source: Power System Statistic, Feb 2007 by NTDC 220 Total 200 Hydel 20 Thermal 1947-1960 2,808 Total 1,450 Hydel 1,358 Thermal 1961-1980 325 Nuclear 10,652 Total 4,813 Hydel 5,514 Thermal 1981-2006 2,068.5 Total 420 Retired 1,648.5 Privatized Retired / Privatized 5,783 Total 30 Hydel 5,753 Thermal IPP’s upto June 06 19,549.5 Grand Total 2,108 3,064 7,426.5 3,766 1,030 KESC 2,155 137 NUCLEAR 2,155 Total 1,756 KESC 262 IPP KARACHI
  • 10. PAKISTAN POWER SECTOR – GROWTH AT A GLANCE ACGR: 8.8% (MW) Source: 1. Power System Statistic, Feb 2007 by NTDC 2. Pakistan energy Year Book 2006 1,582.41 384.97 % INCREASE 1951 4,879 163.63 2006 ACGR % GDP (RS BILLION) POPULATION (Million) 8.8 TOTAL 325 3.5 NUCLEAR (1972-2006) 7.5 THERMAL (1960-2006) 33.74 8.5 HYDRO (1925-2006)
  • 11. Source: BP Statistical Review of World Energy June 2006, ENERGY CONSUMPTION PER CAPITA, 2005-06
  • 12. PAKISTAN POWER SECTOR – INSTALLED CAPACITY (MW) Source: Power System Statistic, Feb 2007 by NTDC 33.8 % increase
  • 13. PAKISTAN POWER SECTOR ADDITIONAL GENERATION (MW) (Ghazi Brotha Shahddra Thermal NOTE: 1. GBHP FULL UTILIZATION IN 2004 2. ESSENTIALLY NO NEW POWER GENERATION ADDITION AFTER 2001 Source: Power System Statistic, Feb 2007 by NTDC HUBCO Kot Addu Uch Japan Fauji Chashma Liberty AES Habibullah
  • 14. PAKISTAN POWER SECTOR KESC – ADDITIONAL GENERATION (MW) NOTE: NO NEW ADDITION FOR 9 YEARS Source: Power System Statistic, Feb 2007 by NTDC IPPs : 262 MW Thermal KESC: 231 MW Nuclear
  • 15. PAKISTAN POWER SECTOR ENERGY GENERATION BY FUEL TYPE - FY 2006 (WAPDA) (KESC) Source: 1. BP Statistical Review of World Energy June 2006, 2. Power System Statistic, Feb 2007 by NTDC 24.38% USA 56.16% India 70.17% China Indigenous Coal
  • 16. FUEL COST AND AVERAGE SALE PRICE (Rs /kWh) ACGR: 5.6% ACGR: 6.2% ACGR%: GAS: 8.6 FURNACE OIL: 14.8 AVERAGE FUEL PRICE INCREASED: 11.70% CGAR Source: 1. Power System Statistic, Feb 2007 by NTDC 2. Pakistan energy Year Book 2006
  • 17. PAKISTAN POWER SECTOR - SYSTEM LOSSES (%) Source: Power System Statistic, Feb 2007 by NTDC NOTE: * ASSUMING A MINIMUM OF 6% TECHNICAL LOSSES, ADDITIONAL THEFT/LEAKAGE FOR KESC AMOUNT TO RS. 11,120 MILLION ** ASSUMING A MINIMUM OF 10% TECHNICAL LOSSES, ADDITIONAL THEFT/LEAKAGE FOR WAPDA AMOUNT TO RS. 50 BILLION * **
  • 18. ROLE OF NEPRA ?? Seven Points to ponder: 1. Proper Power Sector structure and operations framework not done 2. Failure to undertake Tariff rationalization necessary to support existing and induct new generation 3. Power sector development, and growth neither forecasted nor planned 4. Utility system operations service levels neither checked nor enforced Network System Augmentation, growth, and improvement not mandated 6. Unwarranted system losses and theft not curtailed through forceful intervention 7. Interest of primary stakeholders – public, compromised through closed door approach
  • 19. CASE STUDY OF EFFECTIVE PLANNING AND IMPLEMENTATION SUI SOUTHERN GAS COMPANY LIMITED
  • 20. MERGER OF 3 COMPANIES IN 1989 KARACHI GAS COMPANY – PRIVATE SECTOR INDUS GAS COMPANY – PUBLIC SECTOR (PIDC) SUI GAS TRANSMISSION COMPANY – MULTINATIONAL RESULTING IN 3 UNIQUELY DISTINCT CULTURES AND CONTINUOUS DISTORTION OF WORK PRACTICES LACK OF COORDINATION, INTEGRATED PLANNING AND SETTING OF OBJECTIVES EMPLOYEES AND MANAGEMENT MOSTLY MIRED IN STATUS QUO. OUR ISSUES
  • 21. NO PLAN FOR GROWTH NO CLEAR OBJECTIVES NO EFFECTIVE BUSINESS SYSTEMS LACK OF BEST BUSINESS PRACTICES INEFFICIENT WORK PRACTICES & PROCEDURES MIXED CONCEPT OF CUSTOMER SERVICES MANAGEMENT AND EMPLOYEES INVOLVED IN ROUTINE WORK LOW CAPEX RESULTING IN LOW RETURN ON FIXED ASSETS NO PLAN FOR MEETING EMERGING CUSTOMER DEMANDS NO PLAN TO AUGMENT OUTDATED EQUIPMENTS AND INFRASTRUCTURE NO INNOVATION OR NEW TECHNOLOGY INDUCTION CONSEQUENCES
  • 22. STRATEGIC MANAGEMENT OBJECTIVES; TO MAKE SSGC THE BEST PUBLIC SECTOR COMPANY IN PAKISTAN (SET AS PART OF 5 YEARS PLAN FOR 2003-2008) EXPANSION OF DISTRIBUTION AND TRANSMISSION NETWORK; FOR ENHANCEMENT OF GAS SUPPLY TO POWER PLANTS, INDUSTRIES AND COMMERCIAL SECTOR INCLUDING SUPPLY OF GAS TO PREVIOUSLY DEPRIVED AREAS IN THE DOMESTIC SECTOR “ SERVICE WITH A SMILE ” CULTURE FOR CUSTOMER SATISFACTION THRU INNOVATION & QUALITY SERVICES CONSISTENT APPRECIATION IN SHAREHOLDER’S VALUE; BY INCREASING THE COMPANY’S ASSET BASE AND SIGNIFICANT IMPROVEMENT IN PRODUCTIVITY AND EFFICIENCY BUSINESS PROCESS RE-ENGINEERING (BPR); RE-STRUCTURING OF SELECT DEPARTMENTS AND IMPLEMENTATION OF ERP TO PROVIDE EFFECTIVE M.I.S. FOR BUSINESS OPERATIONS AND CONTROL
  • 23. STRATEGIC MANAGEMENT OBJECTIVES; TO MAKE SSGC THE BEST PUBLIC SECTOR COMPANY IN PAKISTAN MAKE SSGC THE “MOST IT ENABLED COMPANY” THRU ENTERPRISE INFORMATION SYSTEM (EIS) AND TECHNOLOGY IMPLEMENTATION IN ALL AREAS OF BUSINESS EMPOWERMENT OF EMPLOYEES THRU CAREER PLANNING, HRD AND EXTENSIVE TRAINING AND SKILL DEVELOPMENT BE A GOOD CORPORATE CITIZEN THRU COMMUNITY SUPPORT SERVICES AND ENVIRONMENTAL PROTECTION INITIATIVES TO MEET THE NATIONAL AND SOCIAL RESPONSIBILITIES
  • 24. SSGC CORE INVESTMENT PROGRAMME RUPEES MILLION 368.8 501.1 640.1 800.3 271.2 25.6 296.4 OTHERS 6,488.5 1,897.4 2,046.8 592.7 235.6 1218.5 - 2,544.3 256.6 - 208.8 1,782.5 2004-05 359.2 348.1 375.6 279.3 331.4 121.0 REHABILITATION 1,536.0 1,577.2 1,768.4 1,945.6 - 509.8 UNDER PLANNING/ APPROVAL 1,904.8 2,560.9 3,913.7 4,329.0 3,382.0 1,978.2 SUB TOTAL (A) - - - 240.8 173.8 25.6 LEFTOVER PROJECTS - 482.6 1,505.2 1,001.1 648.1 338.7 ONGOING OTHER PROJECTS - - - 341.2 2,288.9 1,078.5 ONGOING- GIREP II A) TRANSMISSION PROJECTS: 885.5 853.3 823.3 1,725.1 864.7 497.1 C) OTHER CAPITAL EXPENDITURE 5,398.9 2,608.6 460.2 2,233.0 - 2010-11 6,414.9 3,000.7 670.1 1,971.4 - 2009-10 TOTAL (A+B+C) SUB TOTAL (B) NEW TOWNS NORMAL EXPANSION DISTRIBUTION PROJECTS B) DISTRIBUTION SYSTEM: PROJECT DESCRIPTION - 816.5 238.2 648.3 1,729.7 2,468.1 1,770.2 1761.1 1,040.2 1,618.1 1,258.1 533.3 3,118.0 5,182.0 3,597.9 3,063.7 7,855.0 11,236.1 7,844.7 5,539.0 2008-09 2007-08 2006-07 2005-06
  • 25. GAS INFRASTRUCTURE REHABILITATION AND EXPANSION PROJECTS Quetta Sibi Pirkoh Loti Dera Bugti Sui Jacobabad Shikarpur Larkana Dadu Zamzama Sari Hyderabad Nawabshah Sawan Kadanwari Miano Badin Karachi Bhit Hasan Sukkur FJFC Pesh Bogi GAS INFRASTRUCTURE REHABILITATION AND EXPANSION PROJECTS 2006-08 Mazarani Zarghun SNGPL transmission line Naimat Basal 42” Ø 13 Km Bin Qasim Distribution Pipeline Rs.807 million 18” Ø 15 Km Mach – Kolpur And 31 Km Dingra – Sibi Loop line + Sibi Compressor Rs. 1,138 Million 18” Ø 15 Km Re – routing in Dingra Nala Rs. 272 Million 18” Ø 18 Km Abegum – Mach Loopline Rs. 306 Million 24” Ø 66 Km Bajara to Karchat 134 Km Karchat to Karachi Rs. 2795 million 30” Ø 9 Km By-pass HQ3 to SMS Sindh University Rs. 364 Million 24” Ø 116 km Snaghar – Nawabshah – Karachi Pipelinepahse -1 Rs. 2,262 million 24” Ø 14 Km loop Line Pahse-2 HQ3-Masu Rs. 323 Million 48 Km Shahdadpur to Masu 24” Ø 140 Km Sanghar – Nawabshah – Hyderabad Karachi loopline 50 Km Shahadpur – MVA Karam Jamali 12” ø 64 Km Zarghun Pipeline Rs. 900 million Compressor Bin Qasim Masu MVA Karam Jamali Shahdadpur Bajara Karchat HQ2
  • 26. Proposed LNG setup KARACHI GAS DEVELOPMENT MASTER PLAN 92 MMCFD SMS KT 242 MMCFD SMS MALIR 95 MMCFD SMS STEEL 36 MMCFD 250 MMCFD KTPS BQPS Proposed 36”x30Km (140 mmcfd) Distribution main * LNG not included * * TOTAL : 1,200 ADDL 2010 : 410 EXISTING : 750-790 LOAD MMCFD
  • 27. SIX YEARS PERFORMANCE HIGHLIGHTS Estimated
  • 29. KEY PERFORMANCE INDICATORS Design capacity is 275,000 Capacity increase through BPR and improved work flow management Estimated
  • 32. IMPERATIVES OF SUSTAINABLE ENERGY SUPPLY 1. ENERGY IS PRIMARY VEHICLE FOR ECONOMIC GROWTH AND SOCIAL DEVELOPMENT AND MUST BE MADE AVAILABLE FOR MANAGED GROWTH 2. DEVELOPING SOCIETIES REQUIRE MORE ENERGY TO MAKE THE TRANSITION OUT OF LOW INCOME ECONOMIES (AND POVERTY) 3. INDIGENOUS SOURCES MUST BE MAXIMIZED WITH MORE HYDEL CONTENT 4. LONG TERM ENERGY SUPPLIES MUST BE SECURED (OIL, GAS, COAL) FROM MULTIPLE SOURCES (BOTH INDIGENOUS AND OVERSEAS) 5. ENERGY MIX TO HAVE INCREASING SHARE OF RENEWABLE (WIND, SOLAR) WITH UP TO 10% OVER THE NEXT 20 YEARS 6. ENERGY CONSERVATION EFFICIENCY IMPROVEMENT AND LOSS REDUCTION MUST BE ENFORCED 7. UTILITIES MUST UNDERTAKE EFFECTIVE LOAD CYCLE MANAGEMENT FOR MAXIMUM CAPACITY UTILIZATION
  • 33. ENERGY MIX PLAN BASED ON PIP/OCAC STUDY OF GOP MODERATE GROWTH RATE OF 6.5% Source: Pakistan Energy Plan 2005-2030 by P.C., Islamabad 2.9 6.3 2.6 4.5 2.7 3.6 2.6 2.5 0.6 0.4 1.0 0.6 NUCLEAR 1.1 2.4 1.1 1.8 0.9 1.2 0.6 0.6 0.4 0.3 - - RENEWABLE 13.8 30.0 13.2 22.4 13.7 17.9 13.9 13.6 12.9 9.3 12.7 7.4 HYDEL 15.0 32.7 13.0 22.1 11.5 15.1 10.0 9.8 8.1 5.8 7.0 4.0 COAL 48.6 106.0 49.9 84.8 47.7 62.5 48.3 47.3 49.4 35.6 50.4 29.2 NATURAL GAS 18.6 40.6 20.2 34.4 23.4 30.7 24.7 24.2 28.6 20.6 28.4 16.4 OIL % 218 * % 170 % 131 % 98 % 72 % 57.7 TOTAL ENERGY 2030 2025 2020 2015 2010 2005-06 LONG TERM MEDIUM TERM SHORT TERM CURRENT     % MTOE
  • 34. PROJECTED HYDEL POWER PROJECTS Source: Pakistan Energy Plan 2005-2030 by P.C., Islamabad MW 19,200 5,000 “ UPTO 2030 14,200 6,800 “ UPTO 2020 7,400 1,200 ADDITION UPTO 2010 6,200 6,200 EXISTING INCLUDING GHAZI BAROTHA (FULL) CUMULATIVE CAPACITY 5,000 6,877 1,206 3,000 3,877 2,000 3,000 600 120 740 655 649 240 133 740 19 121 130 72 81 96 130 106 79 132 84 97 60 Small projects Large Project TOTAL UPTO 2030 NEW POWER PROJECTS (CAPACITY IN MW) Neelam Jhelum Taunsa Munda Suki Kinari Swat Cascade Karot Partind Kohala TOTAL Large Project TOTAL Pehur Allai Khwar Duber Khwar Khan Khwar Malakand-III Jinnah Barrage Keyal Khwar Golen Gol New Bong Hydro power Rajdhani Power Project Matiltan Distt Swat Kotli Hydro Power Project Gulpur Hydro Project TOTAL UPTO 2020 UPTO 2010
  • 35. PROJECTED NUCLEAR POWER PROJECTS Source: Pakistan Energy Plan 2005-2030 by P.C., Islamabad MW 8,000 1,000 x 5 “ UPTO 2030 3,000 600 x 4 “ UPTO 2020 600 300 ADDITION UPTO 2010 360 360 EXISTING CUMULATIVE CAPACITY 7,400 600 360 * TO BE RETIRED BY 2010 1200 1200 2000 2000 1000 300 300 60 300 NPP-4 NPP-5 NPP-6 NPP-7 NPP-8 NPP-9 UPTO 2030 NEW POWER PROJECTS (CAPACITY IN MW) CHASNUPP-2 NPP-3 KANUPP-1* CHASNUPP-1 UPTO 2020 UPTO 2010
  • 36. GENERATION EXPANSION PLAN ( WAPDA SYSTEM) 1 Rental :150 MW 1 Renta : 136 MW 1 Hydel : 81 MW 3 Hydel : 323 MW 14 Thermal : 2927 MW 1 Alt. Energy: 100 MW 1 Hydel : 96 MW 8 Thermal : 1209 MW 2 Hydel : 184 MW 1 Thermal : 150 MW 1 Nuclear : 325 MW
  • 37. PROJECTED COAL POWER PROJECTS Source: Pakistan Energy Plan 2005-2030 by P.C., Islamabad 26 (58) 11 (24.9) 2.1 (4.7) 0.09 (0.2) 36 (80) 17 (38) 6.1 (13.6) 2.69 (6) TOTAL MTOE (MT) MTOE (MT) MW 8.0 (18.0) 2.0 (4.5) 14,500 “ 2030 4.0 (9.0) 2.0 (4.5) 5,800 “ 2020 2.0 (4.5) 2.0 (4.5) 1,050 UPTO 2010 1.6 (3.6) 1.0 (2.2) 150 EXISTING CEMENT / BRICKS STEEL POWER 20 15 10 6 % IN ENERGY MIX 150 150 Existing 1,050 900 TOTAL 300 450 150 Dadabhoy Energy Lakhra coal Habibullah Energy ADDITION UPTO 2010 MW 14,500 8,700 “ UPTO 2030 5,800 4,750 “ UPTO 2020 CUMULATIVE CAPACITY
  • 38. THE WAY FORWARD 1. GOP TO SET-UP NATIONAL ENERGY COMMISSION OR NATIONAL ENERGY PLAN AUTHORITY TO ACT AS CENTRAL STATUTORY BODY FOR ENERGY PLANNING AND PROJECT MANAGEMENT. 2. GOP TO SET-UP COAL POWER DEVELOPMENT AUTHORITY WITH MANDATE AND FUNDS TO SET-UP COAL POWER PROJECTS BASED ON LOCAL COAL. 3. TRANSITION OF OIL, GAS AND POWER COMPANIES TO FULLY EMPOWERED CORPORATE STRUCTURE WITH PROFESSIONAL MANAGEMENT . 4. ARRANGE FOR GOP FUNDING, DONOR SUPPORT ETC FOR MEGA PROJECTS IN HYDEL, COAL AND NUCLEAR SECTORS. 5. SECURE LONG TERM SUPPLIES OF OIL & GAS FROM MID EAST AND CAS THROUGH UPSTREAM INVOLVEMENT AND GOVERNMENT TO GOVERNMENT LEVEL COOPERATION. 6. FAST TRACK AGREEMENTS AND IMPLEMENTATION OF TRANS NATIONAL OIL AND GAS PIPELINES . 7. DEVELOP PRESIDENT’S VISION OF PAKISTAN AS “ASIAN ENERGY CORRIDOR”, THUS SECURING PAKISTAN’S STRATEGIC ROLE IN REGION AND ENSURING SUSTAINABLE ENERGY SUPPLIES FOR THE FUTURE. For Pakistan’s Energy – Security, Sustainability Sovereignty
  • 39. MOVING AHEAD ….. TOGETHER FOR PAKISTAN’S POWER SECURITY, SOVEREIGNTY, SUSTAINABILITY. THANK YOU
  • 41.  
  • 42. FUEL MIX IN ENERGY GENERATION (GENCOs) 1.33 0.88 0.77 0.66 0.63 0.61 0.59 0.67 0.94 0.81 Cost/kWh (Rs) 12.68 11.03 9.91 11.28 9.49 9.51 3.56 3.40 2.27 3.15 Cost/kWh (Rs) 5.04 3.27 2.71 2.89 2.49 2.62 1.74 1.40 1.61 1.46 Cost/kWh (Rs) 2.35 1.97 1.82 1.75 1.74 1.64 1.27 1.24 1.16 1.12 Cost/kWh (Rs) Generation (GWh) Generation (GWh) Generation (GWh) Generation (GWh) 129 2 4976 17402 2006 175 198 231 284 240 410 501 406 375 Coal 5 26 76 64 65 43 79 84 139 H.S.D. 3213 2734 6619 6631 4824 5274 4191 4966 6276 Furnace Oil 1879 18053 12648 11680 11711 13417 11121 12003 12303 GAS 2005 2004 2003 2002 2001 2000 1999 1998 1997 FUEL
  • 43. AVERAGE FUEL COST AND SALE PRICE KESC ( Paisa) / kWh)
  • 44. AVERAGE FUEL COST AND SALE PRICE WAPDA (GENCOs) ( Paisa) / kWh)