Plasticon Composites International Contracting B.V.
Field Fabricated Fiberglass Tanks
The ultimate solution for your storage of
chemicals
• Headquarter in NL, founded in 1952.
• Worldwide presence, production
facilities and sales all over the world.
• More than 700 employees in 16
Production Locations with approx.
80.000 m² size in 13 countries.
• Approx. 1.500.000 hours production
capacity per year.
• Capability of 200.000 h/a to do
Installation projects.
• 15 stationary and 5 onsite winding
machines.
Introduction
Characteristics of FRP
• Little to no maintenance is required
• A long product life span, up to 50 years
• High-performance insulation
• Abrasion and corrosion resistant
• Lightweight (1.8 g/cm3)
• High Chemical Resistance
• Delivery time
• GRP replaces expensive alloys like Hastelloy, Super Duplex, Ni, as well
as steel rubber lined components.
• Able to work with temperature limits of approximately – 50°C to 125°C
Fire retardance
• Fire retardant resins are tested according the ASTM E 84 (Steiner tunnel test) and
have class 1 flame rating of 25 or less.
• Normal FRP is classified as : DIN 4102 B2 and ASTM E84 class 2
• Bigger wall thickness and 9 x higher heat transfer factor means that the liquid will
not heat up as fast in a steel tank and it will take much more time that the liquid
will start to boil. Boiling liquid is a major problem during an inferno.
• Because of the thicker wall and higher safety
factor (7-10 in case of FRP and 1,5 -2 to steel)
a FRP tank will stay longer.
• The mechanical properties of steel reduces
fast above the 260 °C. ( SS -40% at 260 °C).
The tank will have a uncontrolled collapse.
What to store
Fiberglass Components are corrosion and
chemical resistant, so that you can store
different types of (aggressive) fluids such
as:
- Hydrochloric Acid
- Sulphur Acid
- Phosphoric Acid
- Acid solutions
- Other Acids
- Caustic Solutions
- Brines
- Salt solutions
- Chlorides
- Caustic Liquides
- Flue gases
- Lime slurry
- Fuels
- Fertilizers
- Starch solutions
- Vegetable oils
- Water
SERVICES
• Design
• Engineering
• Production
• Field fabrication & installation
• Installation
• Maintenance
• Repair
6
Generally
• Storage tanks
• Diameter 0 – 6 m Shop fabricated
• Diameter 6 – 21 m Produced onsite with our onsite winding
equipment.
Under certain conditions we are able
to wind up to 30 m in diameter.
• Silo’s
• Process Apparatus & Equipment
• Piping Systems / Pipelines
• Specialty products
PRODUCTS
7
Power industry
• Chimney Liner
• Ducts
• Chimneys
• Spray headers
• Tanks
• Recirculation pipes
• Process piping
• Cooling water pipes
PRODUCTS
8
Field fabrication
The field fabrication of large diameter fiberglass
components, consist of a few simple steps:
1. Design and Engineering completely executed by Plasticon’s experienced designers
2. Shipment of equipment and raw materials to site, in only a few containers
3. Quick setup of the winding and site facilities
4. Winding of the tank shells with Plasticon’s state-of-the-art proprietary winding equipment
5. Assembly and installation of the tanks by Plasticon’s experienced and trained field crew
6. Quality inspection & testing
7. Demobilization of the site facilities
Innovation
Variable mould
 Step-less variation of mould diameter
- 1 mould for 4 – 7,5 m
- 1 mould for 7 – 12,5 m
- 1 mould for 12 – 21 m
 Mould diameter can be changed within a day
 No (new) mould investment for each product
 Economical advantage for projects that require a wide
variety of (large diameter) products i.e. tanks
Production
GRP Absorber & Tanks
4.500 m3
atmospheric Tank
Carbon steel SS 304 GRP Carbon steel
Rubber lined
SS 316
Corrosion resistance Poor Adequate Excellent Inside: Excellent
Outside: Poor
Excellent
Maintenance High demand Periodic Close to nothing Lining: High
demand,
Periodic
Aging Undistinguished Good Good
No peeling
Approx. all 15
years 100%
replacement of
lining
Close to nothing
Welding points Strong corrosion
on seams
Corrosion on
seams
No corrosion Strong corrosion
on seams
Slight corrosion
on seams
Construction time 4 – 6 month 5 – 7 month 4 – 6 month 6 – 8 month 5 – 7 month
Lifetime without
serious maintenance
5 years 30 years Up to 50 years 15 years Up to 50 years
Appr. cost ratio 100 % 140 % 150 % 200 % 180 %
GRP Absorber & Tanks
- The price for installed GRP products does not vary as extreme as for steel and
stainless steel. The price is usually subjected to the normal inflation only.
- Caused by the shorter construction time the EPC is saving money for overhead.
- Longer lifetime and less maintenance cost may be a sales argument towards the
end user.
References
• Alstom Power – ESKOM Kusile Power Plant (South Africa)
• 6 x duct with D=8.9m, L=250 m
REFERENCES
CS Mining / USA
– 3 x D = 7.450 mm x H = 9.000 mm
• Vinyl ester resin in structural laminate (Derakane 411-350 or a equivalent
• SIC, anti-abrasive additive
in CBL (20%)
– 4 x Settler 7.000 mm x 13.500 x H = 1.200
– 4 X Half-dome roofs for settler tanks 7.000 mm x 13.500
REFERENCES
Plasticon Composites has successfully finished all 3 contracts with CS mining, despite a demanding schedule
and navigated through diverse project impediments.
1. Leach Tanks
Three cylindrical tanks have been wound on site, assembled with prefabricated bottom panels and built up by
Plasticon in early October. All internal fixtures and apparatus were installed in a timely manner. Later, preceding
commissioning in the middle of December, the tanks were subjected to hydro-testing.
2. Settler Tanks
Simultaneously works were progressing on rectangular SX Settlers. All four tubs constructed from the very
scratch using flat FRP panels produced by a local US vendor. All tanks were equipped by Plasticon with different
accessories and applications designated for guiding and controlling the flow. Plasticon determined several
internal details to optimize working procedures. The final installation inside all four tanks proceeded parallel, and
thanks to crafty automatization of selected operations, time deadlines set at the end of october could be met.
3. Half-dome roofs for settler tanks
Recognizing Plasticon's professional conduct, CS Mining in the meantime have pondered awarding us with a
contract extension. Using capacity of Winding Machine, Plasticon was requested to wind, fabricate and install
half-dome roofs on all four rectangular tanks. After receiving additional materials and initiating contract formally,
production proceeded swiftly without major hindrances. In different configurations a complete shell has been
wound for each settler tank, to enable accurate tracing and trimming into three separate roof segments. Four
cans have been wound in total, with twelve roof modules individually tailored. The finalization on roofs has been
fulfilled one week before the deadline on December, the 5th.
The project has been completed. The site structures are already demobilized.
REFERENCES
REFERENCES
REFERENCES
References
S.E.S. in Wormer, NL
– 12 x D = 9.100 mm x H = 10.000 mm; 600 m3
– Liquid oils and Fats
– Design temp. 90 °C
– Insulated
– Heating Coils inside
– Won against SS
- Client: Daelim Industrial Co., Ltd / Sahara Petrochemical Company
- Location: Saudi Arabia
- Project: CA/EDC plant construction
- 245 KTA caustic/300 KTA EDC
- Based on Uhde technology and specs
- Scope: All Piping and fittings
Tanks and apparatus (36 items)
Design and Engineering (stress)
Installation supervision
On-site welding, lamination
Spool building
- Materials: PP/PVC/PVDF/GRP
- Budget: 10 M€
Arabian Chlor Vinyl Project
References
Solvay - IKRA Project
- Client: Technip / Rusvinyl
- Location: Nizhny Novgorod
- Project: PVC plant
(Based on Solvay technology and specs)
- Scope: All piping and fittings
All tanks and apparatus
Complete installation scope (with local partner)
Design and Engineering (stress)
Pipe supports
Spool building
- Materials: PP/PVC/PVDF/GRP
- Budget: 13 M€
References
References
• Babcock-Noell – Turow (PL)
• 3x chimney liner and ducts with
D = 5.3 m, L = appr. 700 m
Power Plant Neurath BoA 2/3
References
Clean gas duct Absorber to cooling tower
(2 lines)
- Diameter 10,0 m / Length 150m + 30m Elbow
- Turnkey incl. Engineering, Prefabrication,
Transport, Lifting, Installation, Supervision and
Quality control.
- Horizontal on site winding machine.
- Project scope M€ 20
Innovations (in progress)
Leak Monitoring System (LMS)
• In testing phase at 3 customers
• Including remote diagnostics in CCR or on computer
• Planned maintenance stop instead of unplanned
• Can replace traditional independent safety back-ups like concrete
containment and/or double wall systems
THANK YOU!
www.plasticoncomposites.com

More Related Content

PPSX
Plasticon Composites - Non-corosive products for the Power market
PDF
Basis corrosion coating &CP system for pipeline in Oil & Gas Sector
PDF
Coatings standards-and
PDF
Wrapping coating
PDF
Akiet casings for anti-corrosion applications - Imperial (Fred Nilson's confl...
PPT
Sesión técnica, sala KM 19, Epoxy pipeline technology
PPT
2. pipeline materials overview
PPTX
Corrosion Protection in Energy From Waste Sector
Plasticon Composites - Non-corosive products for the Power market
Basis corrosion coating &CP system for pipeline in Oil & Gas Sector
Coatings standards-and
Wrapping coating
Akiet casings for anti-corrosion applications - Imperial (Fred Nilson's confl...
Sesión técnica, sala KM 19, Epoxy pipeline technology
2. pipeline materials overview
Corrosion Protection in Energy From Waste Sector

What's hot (20)

PDF
International paint surfaces 23
PDF
Nilcra Zirconia ceramic for severe service pumps and valves
PDF
A Systematic Approach for Repairs to Parking Structures
PDF
Dn tanks prestressed_concretetank
PDF
Chris brooks storage tanks inspection, maintenance and failure
PDF
Precast post tensioned tank brochure
PDF
Vsl pt concrete_storage_structures
PDF
cement-plant-operation-handbook
PDF
Thermoplastic Liners
PDF
Sewer pipes-and-fittings
PDF
Riser Design Overview
PDF
Groundworks and Civil Engineering Products
PPTX
Industrial report presentation
PDF
Geelong galvanzing brochure_digital final
PPTX
Kettle development and use GAA Conference 2011 - adam furphy
PDF
GRP-Glass Reinforced Plastic
PPTX
SCC WITH KIM.PPTX
PDF
Agricultural pipes and Fittings
PDF
EADIPS FGR annual journal 2010
International paint surfaces 23
Nilcra Zirconia ceramic for severe service pumps and valves
A Systematic Approach for Repairs to Parking Structures
Dn tanks prestressed_concretetank
Chris brooks storage tanks inspection, maintenance and failure
Precast post tensioned tank brochure
Vsl pt concrete_storage_structures
cement-plant-operation-handbook
Thermoplastic Liners
Sewer pipes-and-fittings
Riser Design Overview
Groundworks and Civil Engineering Products
Industrial report presentation
Geelong galvanzing brochure_digital final
Kettle development and use GAA Conference 2011 - adam furphy
GRP-Glass Reinforced Plastic
SCC WITH KIM.PPTX
Agricultural pipes and Fittings
EADIPS FGR annual journal 2010
Ad

Viewers also liked (12)

PPTX
Bravo páez ied
DOCX
Brett Anderson Resume4
PPTX
As.. as
DOCX
Curriculum vitae- Suraj Namboodiri
PPTX
SAMAKH
PPT
Coneguem el riu ripoll
PDF
Eco-Mind Meeting Book - What's next r3.5
PDF
Proyecto de expresion oral
PPTX
Trabajo práctico n° 5
PPTX
INTERNATIONAL BUSINESS
PPT
بوربوينت أهمية القراءة
DOCX
GYM LIFE AND HEALTHY FOOD.
Bravo páez ied
Brett Anderson Resume4
As.. as
Curriculum vitae- Suraj Namboodiri
SAMAKH
Coneguem el riu ripoll
Eco-Mind Meeting Book - What's next r3.5
Proyecto de expresion oral
Trabajo práctico n° 5
INTERNATIONAL BUSINESS
بوربوينت أهمية القراءة
GYM LIFE AND HEALTHY FOOD.
Ad

Similar to Presentation FFFT (20)

PDF
FPI-Corporate Brochure for information about
PPT
Linex presentationeng
PPT
Presentation_ larjjllku temo streeto.ppt
PDF
corrocoat newsletter web
PDF
Projects MeerkatII Copy
PPT
CH3080_pressure_vessels.ppt
PPT
pressure vessel details for design and it components
PPTX
Custom Metal Fabricated Industrial Ducts
PDF
Projects Oil and Gas Brochure
DOCX
Center Enamel can Provide external floating roof for Belarus Oil & Gas Stor...
PPT
Prozinco introduction english me v8_o
PDF
Copper Mould
PPTX
Metalog Presentation 2015
PDF
Industeel cryogenic steel-grades-low-temperatures
PPT
autoclaved aerated concrete
PDF
Anders Brødsjø - Airborne
PDF
Gregory severyn michael cordell
PDF
2012-08-22-C-Ikeagu-of-Subsea-7_-Material-Selection-for-Subsea-Applications.pdf
FPI-Corporate Brochure for information about
Linex presentationeng
Presentation_ larjjllku temo streeto.ppt
corrocoat newsletter web
Projects MeerkatII Copy
CH3080_pressure_vessels.ppt
pressure vessel details for design and it components
Custom Metal Fabricated Industrial Ducts
Projects Oil and Gas Brochure
Center Enamel can Provide external floating roof for Belarus Oil & Gas Stor...
Prozinco introduction english me v8_o
Copper Mould
Metalog Presentation 2015
Industeel cryogenic steel-grades-low-temperatures
autoclaved aerated concrete
Anders Brødsjø - Airborne
Gregory severyn michael cordell
2012-08-22-C-Ikeagu-of-Subsea-7_-Material-Selection-for-Subsea-Applications.pdf

Presentation FFFT

  • 1. Plasticon Composites International Contracting B.V. Field Fabricated Fiberglass Tanks The ultimate solution for your storage of chemicals
  • 2. • Headquarter in NL, founded in 1952. • Worldwide presence, production facilities and sales all over the world. • More than 700 employees in 16 Production Locations with approx. 80.000 m² size in 13 countries. • Approx. 1.500.000 hours production capacity per year. • Capability of 200.000 h/a to do Installation projects. • 15 stationary and 5 onsite winding machines. Introduction
  • 3. Characteristics of FRP • Little to no maintenance is required • A long product life span, up to 50 years • High-performance insulation • Abrasion and corrosion resistant • Lightweight (1.8 g/cm3) • High Chemical Resistance • Delivery time • GRP replaces expensive alloys like Hastelloy, Super Duplex, Ni, as well as steel rubber lined components. • Able to work with temperature limits of approximately – 50°C to 125°C
  • 4. Fire retardance • Fire retardant resins are tested according the ASTM E 84 (Steiner tunnel test) and have class 1 flame rating of 25 or less. • Normal FRP is classified as : DIN 4102 B2 and ASTM E84 class 2 • Bigger wall thickness and 9 x higher heat transfer factor means that the liquid will not heat up as fast in a steel tank and it will take much more time that the liquid will start to boil. Boiling liquid is a major problem during an inferno. • Because of the thicker wall and higher safety factor (7-10 in case of FRP and 1,5 -2 to steel) a FRP tank will stay longer. • The mechanical properties of steel reduces fast above the 260 °C. ( SS -40% at 260 °C). The tank will have a uncontrolled collapse.
  • 5. What to store Fiberglass Components are corrosion and chemical resistant, so that you can store different types of (aggressive) fluids such as: - Hydrochloric Acid - Sulphur Acid - Phosphoric Acid - Acid solutions - Other Acids - Caustic Solutions - Brines - Salt solutions - Chlorides - Caustic Liquides - Flue gases - Lime slurry - Fuels - Fertilizers - Starch solutions - Vegetable oils - Water
  • 6. SERVICES • Design • Engineering • Production • Field fabrication & installation • Installation • Maintenance • Repair 6
  • 7. Generally • Storage tanks • Diameter 0 – 6 m Shop fabricated • Diameter 6 – 21 m Produced onsite with our onsite winding equipment. Under certain conditions we are able to wind up to 30 m in diameter. • Silo’s • Process Apparatus & Equipment • Piping Systems / Pipelines • Specialty products PRODUCTS 7
  • 8. Power industry • Chimney Liner • Ducts • Chimneys • Spray headers • Tanks • Recirculation pipes • Process piping • Cooling water pipes PRODUCTS 8
  • 9. Field fabrication The field fabrication of large diameter fiberglass components, consist of a few simple steps: 1. Design and Engineering completely executed by Plasticon’s experienced designers 2. Shipment of equipment and raw materials to site, in only a few containers 3. Quick setup of the winding and site facilities 4. Winding of the tank shells with Plasticon’s state-of-the-art proprietary winding equipment 5. Assembly and installation of the tanks by Plasticon’s experienced and trained field crew 6. Quality inspection & testing 7. Demobilization of the site facilities
  • 10. Innovation Variable mould  Step-less variation of mould diameter - 1 mould for 4 – 7,5 m - 1 mould for 7 – 12,5 m - 1 mould for 12 – 21 m  Mould diameter can be changed within a day  No (new) mould investment for each product  Economical advantage for projects that require a wide variety of (large diameter) products i.e. tanks
  • 12. GRP Absorber & Tanks 4.500 m3 atmospheric Tank Carbon steel SS 304 GRP Carbon steel Rubber lined SS 316 Corrosion resistance Poor Adequate Excellent Inside: Excellent Outside: Poor Excellent Maintenance High demand Periodic Close to nothing Lining: High demand, Periodic Aging Undistinguished Good Good No peeling Approx. all 15 years 100% replacement of lining Close to nothing Welding points Strong corrosion on seams Corrosion on seams No corrosion Strong corrosion on seams Slight corrosion on seams Construction time 4 – 6 month 5 – 7 month 4 – 6 month 6 – 8 month 5 – 7 month Lifetime without serious maintenance 5 years 30 years Up to 50 years 15 years Up to 50 years Appr. cost ratio 100 % 140 % 150 % 200 % 180 %
  • 13. GRP Absorber & Tanks - The price for installed GRP products does not vary as extreme as for steel and stainless steel. The price is usually subjected to the normal inflation only. - Caused by the shorter construction time the EPC is saving money for overhead. - Longer lifetime and less maintenance cost may be a sales argument towards the end user.
  • 14. References • Alstom Power – ESKOM Kusile Power Plant (South Africa) • 6 x duct with D=8.9m, L=250 m
  • 15. REFERENCES CS Mining / USA – 3 x D = 7.450 mm x H = 9.000 mm • Vinyl ester resin in structural laminate (Derakane 411-350 or a equivalent • SIC, anti-abrasive additive in CBL (20%) – 4 x Settler 7.000 mm x 13.500 x H = 1.200 – 4 X Half-dome roofs for settler tanks 7.000 mm x 13.500
  • 16. REFERENCES Plasticon Composites has successfully finished all 3 contracts with CS mining, despite a demanding schedule and navigated through diverse project impediments. 1. Leach Tanks Three cylindrical tanks have been wound on site, assembled with prefabricated bottom panels and built up by Plasticon in early October. All internal fixtures and apparatus were installed in a timely manner. Later, preceding commissioning in the middle of December, the tanks were subjected to hydro-testing. 2. Settler Tanks Simultaneously works were progressing on rectangular SX Settlers. All four tubs constructed from the very scratch using flat FRP panels produced by a local US vendor. All tanks were equipped by Plasticon with different accessories and applications designated for guiding and controlling the flow. Plasticon determined several internal details to optimize working procedures. The final installation inside all four tanks proceeded parallel, and thanks to crafty automatization of selected operations, time deadlines set at the end of october could be met. 3. Half-dome roofs for settler tanks Recognizing Plasticon's professional conduct, CS Mining in the meantime have pondered awarding us with a contract extension. Using capacity of Winding Machine, Plasticon was requested to wind, fabricate and install half-dome roofs on all four rectangular tanks. After receiving additional materials and initiating contract formally, production proceeded swiftly without major hindrances. In different configurations a complete shell has been wound for each settler tank, to enable accurate tracing and trimming into three separate roof segments. Four cans have been wound in total, with twelve roof modules individually tailored. The finalization on roofs has been fulfilled one week before the deadline on December, the 5th. The project has been completed. The site structures are already demobilized.
  • 20. References S.E.S. in Wormer, NL – 12 x D = 9.100 mm x H = 10.000 mm; 600 m3 – Liquid oils and Fats – Design temp. 90 °C – Insulated – Heating Coils inside – Won against SS
  • 21. - Client: Daelim Industrial Co., Ltd / Sahara Petrochemical Company - Location: Saudi Arabia - Project: CA/EDC plant construction - 245 KTA caustic/300 KTA EDC - Based on Uhde technology and specs - Scope: All Piping and fittings Tanks and apparatus (36 items) Design and Engineering (stress) Installation supervision On-site welding, lamination Spool building - Materials: PP/PVC/PVDF/GRP - Budget: 10 M€ Arabian Chlor Vinyl Project References
  • 22. Solvay - IKRA Project - Client: Technip / Rusvinyl - Location: Nizhny Novgorod - Project: PVC plant (Based on Solvay technology and specs) - Scope: All piping and fittings All tanks and apparatus Complete installation scope (with local partner) Design and Engineering (stress) Pipe supports Spool building - Materials: PP/PVC/PVDF/GRP - Budget: 13 M€ References
  • 23. References • Babcock-Noell – Turow (PL) • 3x chimney liner and ducts with D = 5.3 m, L = appr. 700 m
  • 24. Power Plant Neurath BoA 2/3 References Clean gas duct Absorber to cooling tower (2 lines) - Diameter 10,0 m / Length 150m + 30m Elbow - Turnkey incl. Engineering, Prefabrication, Transport, Lifting, Installation, Supervision and Quality control. - Horizontal on site winding machine. - Project scope M€ 20
  • 25. Innovations (in progress) Leak Monitoring System (LMS) • In testing phase at 3 customers • Including remote diagnostics in CCR or on computer • Planned maintenance stop instead of unplanned • Can replace traditional independent safety back-ups like concrete containment and/or double wall systems