SlideShare a Scribd company logo
Prepared by:


            Jimit Dhruv
         Elect.Engg,Dept.
Valiya Institute Of Technology-Valiya
Introduction
 Core material:
   Basic material are Alloy Steel having main
    content Silicon & carbon
   Which increases permeability & reduces losses
 HRS:

   HRS not used now a days
   As it has random direction &hard to measure
   Magnetic properties


 CRGOS:

   CRGOS shows excellent Magnetic properties
   So CRGOS is more used
Core construction
 Due to Pulsating flux, core should be
  laminated
 Transformer of larger size may forms in
  cut “C” or cut “E” type.




 Types of Interleaving:
    I.  Simple Interleaving
    II. Meter core Interleaving:

        1)45 ˙
       2) 33 ˙ /55 ˙ overlapping

  In 3-Ø Shell type transformer middle
   winding is reversed
  If not then 73% more core is used
   which leads in increase in over all cost
Transformer winding
Concentric
                                       Sandwich
 Spiral: It is used 100
  A& for low Voltage
  Winding
    Mechanically very
     strong                     Sandwich: mostly used
 Helical :Intermediate          for shell type transformer
  range of current                 Control leakage
    Suitable for LV winding
                                    reactance
     of large transformer          HV & LV are near so
                                    leakage flux is reduced
 Cross-over: suitable of
                                   mmf of each section is
  current not exceeding 20
                                    same.
  A
    Use for HV winding of
     small transformer
 Continuous disc: no of
  turns wound radially over
  one another
    separated by spacers
    HV winding
    Mechanically strong
Insulations
Two main kinds of Insulations:

1. Major Insulation:
    Insulating cylinder between LV & core
    Also between HV & LV
    Insulating barriers between limbs, coils & core
       yoke
    Oil impregnated paper used as it has high
       dielectric strength
2. Minor Insulation:
    Insulation between
   individual turns & between layers
    Conductor Insulation: paper&cotton
    Air insulated Transformer
       insulation used is glass tap
Bushing
 Up to 66kv non-condenser bushing are used is
  porcelain & oil filled

 Above 66kv condenser bushing are used for
  economic reasons.

 Condenser type bushing: It is formed by
  inserting Aluminum foiled layers into a paper
  winding at predetermined radius.

 “Partial capacitance”


 In outdoor substation the
  bushing are covered by a
  porcelain rain shade
Tapping
 Main two location:
  1. Inside Tank
  2. Outside Tank
 Considered as integral part of transformer


Tapping operation

 (1)On load    (2)Off load
tap changer    tap changer


 Tapping is terminated just bellow oil level
 External handle
 Taping is done on HV winding
 Provided in middle (axial & radial force)
Transformer Tank
 Plain sheet steel
  Tank

 Tube Tank


 Corrugated Tank


 Radiator Tank


 Tank with separate
   coolers
Conservator
 What is Conservator ?


 The expansion of oil from Transformer
  tank takes up in Conservator



 When oil contracts, air from
  atmosphere enters in Conservator .

 Risk of contamination of oil in transformer


 Breather valve is mounted to avoide
  moisture

 Breather contain silica in it
Buchholz Relay
 Operation:
 Gas operated relay
 AT the time of fault to maintain the continuity
  of the supply
 Fault detected particularly in incipient stage ,
  major fault can be avoided
 Which is placed between conservator
  and transformer tank
Transformer oil
 Double purpose :
   ie cooling & Insulating


 Permittivity is 2.5


 As per I.A.S breakdown strength of oil
  used must be 50kv RMS

 Major disadvantage is sluging


 To overcome this, synthetic oil is prefered


 One of the e.g is Chlorinated dephenyl is a
  synthetic oil its permittivity is 4.5
WORKSHOP(TPT DEPT.)

WINDING SHOP

  CORE & ACTIVE PART

      FINAL ASSEMBLY

          QUALITY TEST

             FINAL TESTING
WINDING SHOP
 TYPES OF WINDING

   i.   NORMAL WINDING
   ii. INTERLEAVE WINDING
   iii. TERITARY WINDING
                                             ROTARY

              HORIZONTAL      HELICAL
                                               K-
 MACHINES                                 TRANSPOSITION
                                              TYPE
                             CONTINUOUS
                VERTICAL
                                DISC




• End Rings & shielding for prevention purpose
 Conductor Insulation:

    1. Precompressed press board insulation(CRIP
       PAPER)
    2. Craft paper
    3. Also spacers as insulation




 Moisture Control

        Winding Auto Clave: Uses temp. of 110º
         C to 130º C and Vacuum of about 0.4 to
         0.5 mbar.
        Insulating Oven : Uses Heating Only

    Pressure Machine
    Brazing Machine with use of SILPHOS
     ALLOY
    Post Insulation
 PROCEDURE:
CORE & ACTIVE
 PART
 ACTIVE PART
 C.R.G.O. STRIPS
 1-STRIP HAS WIDTH OF 0.27 mm
 COIL OR WINDING ASSEMBLY
 PROCEDURE:
 Manufacturing of LIMB
 Core Insulation
 Removal of TOP FRAM for Coil assembly
 Winding insulation detail
 TOP YOKE FILLING
 VAPOUR PHASE OVEN
 HV & LV leads from top & bottom to the bushings
 REGULATING COILS to the tap changer
FINAL ASSEMBLY
 Installation of active part and assembly of
  accessories
 TRANSFORMER TANK


                      • JOINED AT
      BELL TYPE         BOTTOM
                        SIDE


                      • JOINED AT
   CONVECTIONAL
       TYPE
                        UPPER
                        SIDE
 ACCESSORIES:

  Blanker : Leakage of oil & Radiators
  adjointment

  Buchholz Relay: To trip the transformer


  OSR (oil serge relay): To indicate the level
  and quality of oil

  MOLG(magnate oil gage): It indicates the
  level of oil in the conservator

  Breather Valve: Provide dry air using silica
   gel and have air seal of neoprene
  Cooling Equipment: Generally for cooling
   of oil in a tank
     1.   Radiators
     2.   Thermosyphan
 Method of Cooling:
    i.   ONAN
    ii. ONAF
    iii. OFAF
    iv. For very high temp using HEAT
         EXCHANGER


 CT(Current Transformer):Two
         purposes;
    1.     Winding temp indicator (WTI)
    2.     Oil temp indicator (OTI)
        BUSHINGS: The leads from top and
         bottom of the winding are brought out to a
         length of few cm only and the outdoor
         terminal of the transformer are provided
         by bushings
 PROCEDURE
  Vacuuming of Tank(up to 0.3 mbar) for about
   24hrs to 36hrs

  The Leak Rate Test with the use of water & air


  Oil Test which includes BDV & PPM


  Oil Filling


  After the IMPREGNATION TIME the whole
   accessories are to be attached.
QUALITY TEST
 ANALYSIS WITH “SIGMA CARD”


 Sigma card includes below required data
    Design
    Process Time
    M/C size specification
    Process of manufacturing
    Dimension specification
    Testing specification
    Information about control points
FINAL TESTING

                  ROUTINE TESTS   TYPE TESTS


NO LOAD TETS
                                                        TEMPRETURE
                                                           TEST


 LOAD LOSS


INSULATION                              IMPULSE TEST
   TEST




CAPACITANCE &                                          ZERO SEQUENCE
    TAN δ                                                IMPEDANCE
                                                            TEST


  SEPARATE
   SOURCE                            HARMONIC AND
                                      NOISE LEVEL
                                         TEST


  INDUCED OVER
     VOLTAGE




WINDING TEST




  VOLTAGE RATIO
CT (CURRENT TRANSFORMER)
 Generally CT is use for the below four
  purposes:
    Measurement of Current
    Measurement of Power
    Isolation between High voltage and Low Voltage
    Inputs to Relays & Protection Systems
 PROCEDURE OF CURRENT
  TRANSFORMER:
 CO NDUCTORS USES :ALUMINIUM OR
  COPPER(HIGH CURRENT RATING)

 In the manufacturing of the primary winding or
  protection core there will be the creation of the
  capacitance as below.

    GRADING & SUB GRADING.
    MAIN GRADING HAS WRAPPED
     ALUMINIUM FOIL & CRIP PAPER
    AT 300MM DISTANCE PERFORATED ALU.
     FOIL (400MM) AND CRIP PAPER.
    SIMULTANEOUSLY INSULATION MAKE
     CAPACITANCE
PRESENTATION ON MANUFACTURING OF TRANSFORMER By Dhruv Jimit
 Quartz in CT

 Reduces the quantity of oil
 Provides mechanical strength for the
    conductors
   Improves the quality of oil by absorbing
    moisture
   Being a bad conductor of heat, it allows slow
    heating /cooling of the CT.
    Finally expansion tank is attached and after
    that evacuation of oil and gas filling will be
    there .
   There is also one imp term is D3 point which
    is also called the earth point.
Thank You

More Related Content

PPTX
Transformer Designing
PPTX
Transformer Repair Workshop Report [EEE]
PPTX
Industrial training in Transformer manufacturing company
PPTX
Transformer ppt
PPTX
How to reduce transformer losses
PPTX
Presentation on Power Transformer
PPTX
Manufaturing transformer
PDF
Transformer design-and-design-parameters
Transformer Designing
Transformer Repair Workshop Report [EEE]
Industrial training in Transformer manufacturing company
Transformer ppt
How to reduce transformer losses
Presentation on Power Transformer
Manufaturing transformer
Transformer design-and-design-parameters

What's hot (20)

PPT
Testing,maintenance&protection
DOCX
Transformer manufacturing and Internship Report
PPTX
Power Transformer ( Summer Training presentation BHEL )
PDF
Testing of Transformers.
PPTX
Presentation of Manufacturing Of Distribution Transformer (Prodip)
PPTX
Testing of transformer
DOCX
Industrial training report
PDF
33/11 KV SUBSTATION
PPT
Transformer basic
PDF
Full transformer
PPTX
Presentation on Power transformer
DOCX
Internship report
PPT
Transformer
PPTX
Transformer maintenance
PPTX
Transformer repairing & manufacturing.pptx
DOCX
132 kv sub-station, power transmission
PPTX
On load tap changer
PPT
Power transformer
PPT
Testing and Condition Monitoring of Substation Equipments
PPTX
Presentation on Distribution Transformer by nirob dhilon chowdhury
Testing,maintenance&protection
Transformer manufacturing and Internship Report
Power Transformer ( Summer Training presentation BHEL )
Testing of Transformers.
Presentation of Manufacturing Of Distribution Transformer (Prodip)
Testing of transformer
Industrial training report
33/11 KV SUBSTATION
Transformer basic
Full transformer
Presentation on Power transformer
Internship report
Transformer
Transformer maintenance
Transformer repairing & manufacturing.pptx
132 kv sub-station, power transmission
On load tap changer
Power transformer
Testing and Condition Monitoring of Substation Equipments
Presentation on Distribution Transformer by nirob dhilon chowdhury
Ad

Similar to PRESENTATION ON MANUFACTURING OF TRANSFORMER By Dhruv Jimit (20)

PPTX
Presentation_Power_Transformers-1
PPT
Power transformer
PPT
Powertransformer
PPT
power Tr 2 course.ppt
PDF
Ac Test Transformer
PDF
diseño y conocimineto sobre los transformadores electricos
PDF
Design Of Transformer - Classification of transformer
DOCX
Tbea vocatinal training
PPTX
TRANSFORMER DESIGN.pptx
PPTX
Transformers
PPTX
SUmmer Training PPT FINAL.pptx
PPTX
Presentation about transformer and its types
PPSX
Harshit agarwal
PPTX
Transformers
PPTX
Industrial training ppt bhel bhopal
PPTX
Inspection and Testing of various electrical equipment
PPTX
1.Transformer.pptx
PPTX
final yr project-1
PPTX
Presentation Design of Computer aided design of power transformer
PPTX
Summer traning on Power Transformer Construction
Presentation_Power_Transformers-1
Power transformer
Powertransformer
power Tr 2 course.ppt
Ac Test Transformer
diseño y conocimineto sobre los transformadores electricos
Design Of Transformer - Classification of transformer
Tbea vocatinal training
TRANSFORMER DESIGN.pptx
Transformers
SUmmer Training PPT FINAL.pptx
Presentation about transformer and its types
Harshit agarwal
Transformers
Industrial training ppt bhel bhopal
Inspection and Testing of various electrical equipment
1.Transformer.pptx
final yr project-1
Presentation Design of Computer aided design of power transformer
Summer traning on Power Transformer Construction
Ad

Recently uploaded (20)

PDF
Solara Labs: Empowering Health through Innovative Nutraceutical Solutions
PPTX
ICG2025_ICG 6th steering committee 30-8-24.pptx
PDF
COST SHEET- Tender and Quotation unit 2.pdf
PDF
A Brief Introduction About Julia Allison
PPTX
Amazon (Business Studies) management studies
PDF
DOC-20250806-WA0002._20250806_112011_0000.pdf
DOCX
Business Management - unit 1 and 2
PDF
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
PPTX
job Avenue by vinith.pptxvnbvnvnvbnvbnbmnbmbh
PPTX
Probability Distribution, binomial distribution, poisson distribution
PDF
WRN_Investor_Presentation_August 2025.pdf
PDF
Power and position in leadershipDOC-20250808-WA0011..pdf
PPTX
The Marketing Journey - Tracey Phillips - Marketing Matters 7-2025.pptx
PDF
Roadmap Map-digital Banking feature MB,IB,AB
PDF
Unit 1 Cost Accounting - Cost sheet
PDF
Business model innovation report 2022.pdf
PDF
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
PDF
MSPs in 10 Words - Created by US MSP Network
PDF
Ôn tập tiếng anh trong kinh doanh nâng cao
PDF
Elevate Cleaning Efficiency Using Tallfly Hair Remover Roller Factory Expertise
Solara Labs: Empowering Health through Innovative Nutraceutical Solutions
ICG2025_ICG 6th steering committee 30-8-24.pptx
COST SHEET- Tender and Quotation unit 2.pdf
A Brief Introduction About Julia Allison
Amazon (Business Studies) management studies
DOC-20250806-WA0002._20250806_112011_0000.pdf
Business Management - unit 1 and 2
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
job Avenue by vinith.pptxvnbvnvnvbnvbnbmnbmbh
Probability Distribution, binomial distribution, poisson distribution
WRN_Investor_Presentation_August 2025.pdf
Power and position in leadershipDOC-20250808-WA0011..pdf
The Marketing Journey - Tracey Phillips - Marketing Matters 7-2025.pptx
Roadmap Map-digital Banking feature MB,IB,AB
Unit 1 Cost Accounting - Cost sheet
Business model innovation report 2022.pdf
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
MSPs in 10 Words - Created by US MSP Network
Ôn tập tiếng anh trong kinh doanh nâng cao
Elevate Cleaning Efficiency Using Tallfly Hair Remover Roller Factory Expertise

PRESENTATION ON MANUFACTURING OF TRANSFORMER By Dhruv Jimit

  • 1. Prepared by: Jimit Dhruv Elect.Engg,Dept. Valiya Institute Of Technology-Valiya
  • 2. Introduction  Core material:  Basic material are Alloy Steel having main content Silicon & carbon  Which increases permeability & reduces losses
  • 3.  HRS:  HRS not used now a days  As it has random direction &hard to measure Magnetic properties  CRGOS:  CRGOS shows excellent Magnetic properties  So CRGOS is more used
  • 4. Core construction  Due to Pulsating flux, core should be laminated  Transformer of larger size may forms in cut “C” or cut “E” type.  Types of Interleaving: I. Simple Interleaving II. Meter core Interleaving: 1)45 ˙ 2) 33 ˙ /55 ˙ overlapping  In 3-Ø Shell type transformer middle winding is reversed  If not then 73% more core is used which leads in increase in over all cost
  • 6. Concentric Sandwich  Spiral: It is used 100 A& for low Voltage Winding  Mechanically very strong  Sandwich: mostly used  Helical :Intermediate for shell type transformer range of current  Control leakage  Suitable for LV winding reactance of large transformer  HV & LV are near so leakage flux is reduced  Cross-over: suitable of  mmf of each section is current not exceeding 20 same. A  Use for HV winding of small transformer  Continuous disc: no of turns wound radially over one another  separated by spacers  HV winding  Mechanically strong
  • 7. Insulations Two main kinds of Insulations: 1. Major Insulation:  Insulating cylinder between LV & core  Also between HV & LV  Insulating barriers between limbs, coils & core yoke  Oil impregnated paper used as it has high dielectric strength 2. Minor Insulation:  Insulation between individual turns & between layers  Conductor Insulation: paper&cotton  Air insulated Transformer insulation used is glass tap
  • 8. Bushing  Up to 66kv non-condenser bushing are used is porcelain & oil filled  Above 66kv condenser bushing are used for economic reasons.  Condenser type bushing: It is formed by inserting Aluminum foiled layers into a paper winding at predetermined radius.  “Partial capacitance”  In outdoor substation the bushing are covered by a porcelain rain shade
  • 9. Tapping  Main two location: 1. Inside Tank 2. Outside Tank  Considered as integral part of transformer Tapping operation (1)On load (2)Off load tap changer tap changer  Tapping is terminated just bellow oil level  External handle  Taping is done on HV winding  Provided in middle (axial & radial force)
  • 10. Transformer Tank  Plain sheet steel Tank  Tube Tank  Corrugated Tank  Radiator Tank  Tank with separate coolers
  • 11. Conservator  What is Conservator ?  The expansion of oil from Transformer tank takes up in Conservator  When oil contracts, air from atmosphere enters in Conservator .  Risk of contamination of oil in transformer  Breather valve is mounted to avoide moisture  Breather contain silica in it
  • 12. Buchholz Relay  Operation:  Gas operated relay  AT the time of fault to maintain the continuity of the supply  Fault detected particularly in incipient stage , major fault can be avoided  Which is placed between conservator and transformer tank
  • 13. Transformer oil  Double purpose :  ie cooling & Insulating  Permittivity is 2.5  As per I.A.S breakdown strength of oil used must be 50kv RMS  Major disadvantage is sluging  To overcome this, synthetic oil is prefered  One of the e.g is Chlorinated dephenyl is a synthetic oil its permittivity is 4.5
  • 14. WORKSHOP(TPT DEPT.) WINDING SHOP CORE & ACTIVE PART FINAL ASSEMBLY QUALITY TEST FINAL TESTING
  • 15. WINDING SHOP  TYPES OF WINDING i. NORMAL WINDING ii. INTERLEAVE WINDING iii. TERITARY WINDING ROTARY HORIZONTAL HELICAL K- MACHINES TRANSPOSITION TYPE CONTINUOUS VERTICAL DISC • End Rings & shielding for prevention purpose
  • 16.  Conductor Insulation: 1. Precompressed press board insulation(CRIP PAPER) 2. Craft paper 3. Also spacers as insulation  Moisture Control  Winding Auto Clave: Uses temp. of 110º C to 130º C and Vacuum of about 0.4 to 0.5 mbar.  Insulating Oven : Uses Heating Only  Pressure Machine  Brazing Machine with use of SILPHOS ALLOY  Post Insulation
  • 18. CORE & ACTIVE PART  ACTIVE PART  C.R.G.O. STRIPS  1-STRIP HAS WIDTH OF 0.27 mm  COIL OR WINDING ASSEMBLY  PROCEDURE:  Manufacturing of LIMB  Core Insulation  Removal of TOP FRAM for Coil assembly  Winding insulation detail  TOP YOKE FILLING  VAPOUR PHASE OVEN  HV & LV leads from top & bottom to the bushings  REGULATING COILS to the tap changer
  • 19. FINAL ASSEMBLY  Installation of active part and assembly of accessories  TRANSFORMER TANK • JOINED AT BELL TYPE BOTTOM SIDE • JOINED AT CONVECTIONAL TYPE UPPER SIDE
  • 20.  ACCESSORIES:  Blanker : Leakage of oil & Radiators adjointment  Buchholz Relay: To trip the transformer  OSR (oil serge relay): To indicate the level and quality of oil  MOLG(magnate oil gage): It indicates the level of oil in the conservator  Breather Valve: Provide dry air using silica gel and have air seal of neoprene  Cooling Equipment: Generally for cooling of oil in a tank 1. Radiators 2. Thermosyphan
  • 21.  Method of Cooling: i. ONAN ii. ONAF iii. OFAF iv. For very high temp using HEAT EXCHANGER  CT(Current Transformer):Two purposes; 1. Winding temp indicator (WTI) 2. Oil temp indicator (OTI)  BUSHINGS: The leads from top and bottom of the winding are brought out to a length of few cm only and the outdoor terminal of the transformer are provided by bushings
  • 22.  PROCEDURE  Vacuuming of Tank(up to 0.3 mbar) for about 24hrs to 36hrs  The Leak Rate Test with the use of water & air  Oil Test which includes BDV & PPM  Oil Filling  After the IMPREGNATION TIME the whole accessories are to be attached.
  • 23. QUALITY TEST  ANALYSIS WITH “SIGMA CARD”  Sigma card includes below required data  Design  Process Time  M/C size specification  Process of manufacturing  Dimension specification  Testing specification  Information about control points
  • 24. FINAL TESTING ROUTINE TESTS TYPE TESTS NO LOAD TETS TEMPRETURE TEST LOAD LOSS INSULATION IMPULSE TEST TEST CAPACITANCE & ZERO SEQUENCE TAN δ IMPEDANCE TEST SEPARATE SOURCE HARMONIC AND NOISE LEVEL TEST INDUCED OVER VOLTAGE WINDING TEST VOLTAGE RATIO
  • 25. CT (CURRENT TRANSFORMER)  Generally CT is use for the below four purposes:  Measurement of Current  Measurement of Power  Isolation between High voltage and Low Voltage  Inputs to Relays & Protection Systems  PROCEDURE OF CURRENT TRANSFORMER:  CO NDUCTORS USES :ALUMINIUM OR COPPER(HIGH CURRENT RATING)  In the manufacturing of the primary winding or protection core there will be the creation of the capacitance as below.  GRADING & SUB GRADING.  MAIN GRADING HAS WRAPPED ALUMINIUM FOIL & CRIP PAPER  AT 300MM DISTANCE PERFORATED ALU. FOIL (400MM) AND CRIP PAPER.  SIMULTANEOUSLY INSULATION MAKE CAPACITANCE
  • 27.  Quartz in CT  Reduces the quantity of oil  Provides mechanical strength for the conductors  Improves the quality of oil by absorbing moisture  Being a bad conductor of heat, it allows slow heating /cooling of the CT.  Finally expansion tank is attached and after that evacuation of oil and gas filling will be there .  There is also one imp term is D3 point which is also called the earth point.