ABOUT US
• For implementation and subsequent
  operation of Delhi MRTS, a company
  under the name DELHI METRO RAIL
  CORPORATION was registered on 03-05-
  95 under the Companies Act, 1956. DMRC
  has equal equity participation from GOI
  and GNCTD.
Structure   • Chairman - Dr. Sudhir Krishna
            • Managing Director - Mr.
              Mangu Singh
            • Total No. of Directors - 16
            • Nominee of Govt. of India - 5
            • Nominee of Govt. of NCTD - 5
              (Including MD)
            • No. of full-time functional
              Directors at present including
              MD - 7
            • The corporate office of the
              company is located at Metro
              Bhawan, Fire Brigade Lane,
              Barakhamba Road New Delhi -
              110001, India
• To cover the whole of
  Delhi with a Metro
  Network by the year
  2021.
• Metro to operate on
  sound commercial lines
  obviating the need for
  Government support.
Delhi Metro is a world class Metro
 Delhi Metro is a world-class metro. To ensure
 reliability and safety in train operations, it is
 equipped with the most modern
 communication and train control system. It
 has state-of-art air-conditioned coaches.
 Ticketing and passenger control are through
 Automatic Fare Collection System, which is
 introduced in the country for the first time.
Our Corporate Culture
Delhi Metro is a world class Metro
Ticketing and passenger Control are through Automatic
Fare Collection System.


Delhi Metro is a pleasure with trains ultimately available at three
minutes frequency




Delhi Metro is a trendsetter for such systems in other
cities of the conutry and in the South Asian region
Our Corporal Culture

As cities grow in size, the number of
vehicular trips on road system goes up. This
necessitates a pragmatic policy shift to
discourage private modes and encourage
public transport once the level of traffic
along any travel corridor in one direction
exceeds 20,000 persons per hour.
CAREER /
                  RECRUITMENT


Requirement of Civil Engineers (Executive and Non-Executive)
on Three Years Contract Basis for DMRC KOCHI Project.

Recruitment for the post of Assistant Manager (Environment)

Result of Interview for the post of DGM (Property
Development)
Result of Interview for the post of DGM (Marketing)
Rescheduled Date and Time of Interview for the post of
Director (Works)

More Related Content

PPTX
Stakeholder analysis of Delhi Metro
PDF
Reserach study on Delhi Metro project
PPTX
Marketing plan of DMRC
PPTX
Delhi metro - Project Finance
PDF
Delhi metro case study
PPTX
Delhi metro project
PPTX
Delhi Metro Rail Project Management
PPTX
Delhi metro project evaluation
Stakeholder analysis of Delhi Metro
Reserach study on Delhi Metro project
Marketing plan of DMRC
Delhi metro - Project Finance
Delhi metro case study
Delhi metro project
Delhi Metro Rail Project Management
Delhi metro project evaluation

What's hot (20)

PPTX
The delhi-metro-project
PPTX
Delhi metro and Economics
PDF
Metro Plus How can the Metro System be more effective? Case Study of Delhi Metro
PPTX
Summer training DMRC ppt
PPTX
Delhi metro rail corporation slides slides
DOCX
Delhi metro case study
PPTX
E. Sreedharan as Project manager
PPT
Delhi metro Case
PPTX
E sreedharan
PPTX
Delhi Metro Rail
PDF
Business model 15.8.17
PDF
36551105 delhi-metro
DOCX
Kochi Metro Rail Project.doc
PPTX
Metro Rail in India ppt
PPTX
a study of suspentable transportation system in ahmedabad & dehli
DOCX
L&T DMRC Summer Internship 2017
DOCX
Dmrc and l&t tranning report
PPTX
Transportation dubai
PPT
Global Innov Profile
PPTX
Metro rail seminor
The delhi-metro-project
Delhi metro and Economics
Metro Plus How can the Metro System be more effective? Case Study of Delhi Metro
Summer training DMRC ppt
Delhi metro rail corporation slides slides
Delhi metro case study
E. Sreedharan as Project manager
Delhi metro Case
E sreedharan
Delhi Metro Rail
Business model 15.8.17
36551105 delhi-metro
Kochi Metro Rail Project.doc
Metro Rail in India ppt
a study of suspentable transportation system in ahmedabad & dehli
L&T DMRC Summer Internship 2017
Dmrc and l&t tranning report
Transportation dubai
Global Innov Profile
Metro rail seminor
Ad

Viewers also liked (18)

PPTX
PPTX
Operating systems
PDF
Jurnal ilmiah m kn unud edisi 10 oktober 2014
PDF
Jurnal Ilmiah MKn Unud April 2012
ODP
PPTX
Presentation1
PPT
Cleanword
DOCX
Documenting and presenting data
PDF
Jurnal ilmiah MKn unud april 2011
DOC
Iiiiiiiiii
PDF
Jurnal Ilmiah MKn Unud Edisi 9 Oktober 2014
PDF
Jurnal Ilmiah MKN Unud edisi 08 april 2014
PPTX
Stammer stutter help
PDF
Terapi jus jenis penyakit dan resep terapinya(2)
DOCX
Strategii, tehnici şi tactici de negociere
PDF
Jurnal Ilmiah MKn Unud Oktober 2012
PDF
Jurnal Ilmiah MKn Unud April 2013
PPTX
Operating systems
Jurnal ilmiah m kn unud edisi 10 oktober 2014
Jurnal Ilmiah MKn Unud April 2012
Presentation1
Cleanword
Documenting and presenting data
Jurnal ilmiah MKn unud april 2011
Iiiiiiiiii
Jurnal Ilmiah MKn Unud Edisi 9 Oktober 2014
Jurnal Ilmiah MKN Unud edisi 08 april 2014
Stammer stutter help
Terapi jus jenis penyakit dan resep terapinya(2)
Strategii, tehnici şi tactici de negociere
Jurnal Ilmiah MKn Unud Oktober 2012
Jurnal Ilmiah MKn Unud April 2013
Ad

Similar to Presentation1... (20)

PPTX
Delhi Metro
PPTX
Delhi metro
PPTX
Delhi metro
PPT
PPT
Delhi metro
DOCX
Delhi metro rail corporation secondary research
PPTX
delhimetro
DOCX
DMRC_COLLEGE_REPORT
PDF
36551105 delhi-metro-120908024323-phpapp01
PDF
The Largest Metro System in India
PPTX
Delhi Metro
DOC
vikanksh
DOCX
DMRC REPORT ON UNDERGROUND CONSTRUCTION
PPT
Kochi Metro The Way Forward
PPTX
Delhi Metro Railway's Stakeholder Management
PDF
Summer internship report on DMRC(Delhi Metro Rail Pvt. Ltd.)
PPTX
Fmg 18 A Dmrc Group 2
PPTX
Infrastructure Management - DMRC Study
PPTX
Delhi Metro
Delhi Metro
Delhi metro
Delhi metro
Delhi metro
Delhi metro rail corporation secondary research
delhimetro
DMRC_COLLEGE_REPORT
36551105 delhi-metro-120908024323-phpapp01
The Largest Metro System in India
Delhi Metro
vikanksh
DMRC REPORT ON UNDERGROUND CONSTRUCTION
Kochi Metro The Way Forward
Delhi Metro Railway's Stakeholder Management
Summer internship report on DMRC(Delhi Metro Rail Pvt. Ltd.)
Fmg 18 A Dmrc Group 2
Infrastructure Management - DMRC Study
Delhi Metro

Recently uploaded (20)

PDF
Coordination Protocols for Multi-Agent Ecosystems.pdf
PDF
Nashik Kumbh Mela Package 2027 – Your Complete Travel Guide
PDF
Top Boarding Schools in Shimla for 2026 Nurturing Future Leaders.pdf
PDF
Manaslu circuit trek useful information.pdf
PDF
Explore Gujarat with the Best Tour Packages
PPTX
Copy of Japan Animated Template slidesppt.net.pptx
PPTX
Discovering Saigonssdwsdsdsdsdsdergrg.pptx
PDF
Discover The Charm of Dublin with isango!
PPTX
How Can You Collect Hotel Pricing and Availability Data for Smarter Revenue M...
PDF
Eric Albuja 5 Ways AI is Revolutionizing the Travel Experience.pdf
PDF
Nainital vs Shimla Ropeway: Which Hill Station Ride Wins Your Heart?
PDF
Tips for Kailash Mansarovar for travelers safety from Mumbai.pdf
PDF
Private Chauffeur Service Boston – Ride in Style
PDF
Travel plan of Indian Rail kldlnlknsfKN'knasfkN
DOCX
Solid Waste Reduction and Recycling Policy.docx
PDF
Your Nashik Kumbh Mela Travel Packages Guide.pdf
DOC
Best Astrologer in Agra .
PDF
Meet Your Medical Transport Team: The People Powered Care
PPTX
Japan and its beautiful ancient history.pptx
PPTX
Luxury in the Skies: Business Class Flights to Tokyo with FlightsLux
Coordination Protocols for Multi-Agent Ecosystems.pdf
Nashik Kumbh Mela Package 2027 – Your Complete Travel Guide
Top Boarding Schools in Shimla for 2026 Nurturing Future Leaders.pdf
Manaslu circuit trek useful information.pdf
Explore Gujarat with the Best Tour Packages
Copy of Japan Animated Template slidesppt.net.pptx
Discovering Saigonssdwsdsdsdsdsdergrg.pptx
Discover The Charm of Dublin with isango!
How Can You Collect Hotel Pricing and Availability Data for Smarter Revenue M...
Eric Albuja 5 Ways AI is Revolutionizing the Travel Experience.pdf
Nainital vs Shimla Ropeway: Which Hill Station Ride Wins Your Heart?
Tips for Kailash Mansarovar for travelers safety from Mumbai.pdf
Private Chauffeur Service Boston – Ride in Style
Travel plan of Indian Rail kldlnlknsfKN'knasfkN
Solid Waste Reduction and Recycling Policy.docx
Your Nashik Kumbh Mela Travel Packages Guide.pdf
Best Astrologer in Agra .
Meet Your Medical Transport Team: The People Powered Care
Japan and its beautiful ancient history.pptx
Luxury in the Skies: Business Class Flights to Tokyo with FlightsLux

Presentation1...

  • 2. • For implementation and subsequent operation of Delhi MRTS, a company under the name DELHI METRO RAIL CORPORATION was registered on 03-05- 95 under the Companies Act, 1956. DMRC has equal equity participation from GOI and GNCTD.
  • 3. Structure • Chairman - Dr. Sudhir Krishna • Managing Director - Mr. Mangu Singh • Total No. of Directors - 16 • Nominee of Govt. of India - 5 • Nominee of Govt. of NCTD - 5 (Including MD) • No. of full-time functional Directors at present including MD - 7 • The corporate office of the company is located at Metro Bhawan, Fire Brigade Lane, Barakhamba Road New Delhi - 110001, India
  • 4. • To cover the whole of Delhi with a Metro Network by the year 2021. • Metro to operate on sound commercial lines obviating the need for Government support.
  • 5. Delhi Metro is a world class Metro Delhi Metro is a world-class metro. To ensure reliability and safety in train operations, it is equipped with the most modern communication and train control system. It has state-of-art air-conditioned coaches. Ticketing and passenger control are through Automatic Fare Collection System, which is introduced in the country for the first time.
  • 7. Delhi Metro is a world class Metro Ticketing and passenger Control are through Automatic Fare Collection System. Delhi Metro is a pleasure with trains ultimately available at three minutes frequency Delhi Metro is a trendsetter for such systems in other cities of the conutry and in the South Asian region
  • 8. Our Corporal Culture As cities grow in size, the number of vehicular trips on road system goes up. This necessitates a pragmatic policy shift to discourage private modes and encourage public transport once the level of traffic along any travel corridor in one direction exceeds 20,000 persons per hour.
  • 9. CAREER / RECRUITMENT Requirement of Civil Engineers (Executive and Non-Executive) on Three Years Contract Basis for DMRC KOCHI Project. Recruitment for the post of Assistant Manager (Environment) Result of Interview for the post of DGM (Property Development) Result of Interview for the post of DGM (Marketing) Rescheduled Date and Time of Interview for the post of Director (Works)