P R O J E C T  IRS HOUSING COMPLEX,  ON PLOT NO. 6, 7 & 8  AT  ULWE NODE, NAVI MUMBAI. PROJECT BY SHAH CONSTRUCTION CO. 24/A, Shree Laxmi Nivas, M. G. Road, Ghatkopar (West), Mumbai 400 086 Now Renamed as
LOCATION PLAN
LOCATION – I : PLOT NO. 6, 7 & 8,  LOCATION – II : PLOT NO. 80 & 81,  LOCATION– III : Plot No. 78, 79, 82, 83 & 41.
DESIGN PROCESS...............
B R I E F : 1 .  Wing A & B Stilt + 10 Stories, 4 flats per floor, Total number of  flats  80 nos. 2.  Wing C Stilt + 4 Stories, 2 flats per floor, Total number of  flats 8 nos.   OR  up to Utilization of  1.50 F.S.I.  Whichever is higher. (With provision to consumed  2.00 F. S. I.  in future). 3.  Total 88 nos. of flats  in Wing A, B & C. 4 .  Each flat  1007.00 sq. ft. of Carpet area,  3 bedrooms with three toilets. 5 .  Gymnasium, Society Office and Meeting Room  at Basement Floor Level. 6.  Entrance lobby  at stilt level. 7.  Party terrace  with gents & ladies toilets & pantry  in Wing A & B. 8.  Elec. Substation, Generator room & Security cabin  at ground level. 9.  Refuge floor  on 4 th , 6 th  & 8 th  floor.
 
L A Y O U T  P L A N SUB STATION GENERATOR ROOM UG TANK, PUMP ROOM & RAIN WATER HARVESTING TANK SECURITY - 1 SECURITY - 2
BASEMENT FLOOR PLAN – ALT. - 1 BASEMENT FLOOR PLAN WING - C WING - A WING - B
TYPICAL FLOOR PLAN (1 st , 3 rd , 5 th , 7 th  AND  9th)
TYPICAL FLOOR PLAN (2 nd , AND 10 th  )
TYPICAL FLOOR PLAN (4 th , 6 th , AND 8 th )
TERRACE FLOOR PLAN
Post Occupation Plan (8 Entrance Doors )
WING – C  ( provision to consume 2.00 F. S. I. in future). WING - C WING - A WING - B
On Gudipadva  Both IRS (Mumbai) & Integrated Spaces Ltd.  Jointly organized a BHOOMI-POOJAN  at Ulwe Node Site for IRS tower I & II.
 
 
 
 
MOU Signed by IRS (Mumbai) Housing Society for IRS Tower being constructed by Integrated Spaces Ltd. Floor wise Carpet & Built-up Area For Building Wing A proposed on Plot No.6,7&8 along with landing cost to the Flat Purchaser MOU Spread Sheet
P R O J E C T  IRS TOWER - I IRS HOUSING COMPLEX,  ON PLOT NO. 6, 7 & 8  AT  ULWE NODE, NAVI MUMBAI. P R O J E C T  B Y Thank You.

More Related Content

PPTX
Birla mandir
PDF
Town planning of chittaranjan township
PPTX
CDP Amritsar
PDF
Surat & Tapi
PPTX
New mumbai
PDF
A study of reconstruction in India
PPTX
Ar.Richard Roger
PPTX
Worli bdd chawl case study in detail
Birla mandir
Town planning of chittaranjan township
CDP Amritsar
Surat & Tapi
New mumbai
A study of reconstruction in India
Ar.Richard Roger
Worli bdd chawl case study in detail

What's hot (20)

PPTX
NBO - National Buildings Organization
PPTX
Hyderabad international convention centre
PPT
Anand Vihar Integrated Circulation Plan
PPTX
Hiranandani powai ppt 24.06
DOCX
Indore
PPTX
46721953 magarpatta-city
PDF
Case study- ATS Group housing
PDF
Integrated Township
PPTX
lit case study.pptx
PDF
Nehru place - Case Study
PDF
Landscape rajghat
PPTX
CHENNAI CITY -URBAN SPRAWL
PDF
Synopsis 1
PPTX
Evolution of Mumbai-A short study
PPTX
Sustainable housing
PPTX
Proposed Bus Terminal At Rajiv Chowk, Gurgaon, Haryana
PPTX
CHANDIGARH - CITY DEVELOPMENT PLAN UNDER JNNURM
PPTX
Shillong evolution
PDF
Plotted housing aniruddh jain 2.5
NBO - National Buildings Organization
Hyderabad international convention centre
Anand Vihar Integrated Circulation Plan
Hiranandani powai ppt 24.06
Indore
46721953 magarpatta-city
Case study- ATS Group housing
Integrated Township
lit case study.pptx
Nehru place - Case Study
Landscape rajghat
CHENNAI CITY -URBAN SPRAWL
Synopsis 1
Evolution of Mumbai-A short study
Sustainable housing
Proposed Bus Terminal At Rajiv Chowk, Gurgaon, Haryana
CHANDIGARH - CITY DEVELOPMENT PLAN UNDER JNNURM
Shillong evolution
Plotted housing aniruddh jain 2.5
Ad

Viewers also liked (20)

PPTX
Housing project
PPTX
Housing project in New Mumbai ppt
PPTX
HOUSING CASE STUDY
PPTX
Housing Presentation
PDF
Living + Learning Design Project. Mass Housing Project in Antwerp
PPTX
Cluster Housing
PDF
Aranya Low Cost Housing
PDF
Living + Learning - Design Project. Mass Housing Project in Antwerp - Full Pr...
PPTX
National Judicial Reference System (NJRS) in Income Tax Dept
PPTX
Quadro by Michel Abboud
PDF
test e misura 4.0
PPT
Camella altea project presentation
PPTX
Developing A Residential Subdivision by iriskleo
PPTX
Working on sole selling project
PPTX
Mass housing
PPTX
Transbaviaans 2014
PPT
Adarsh housing society
PPTX
Tata Eden Court Phase 2 – New Housing Project at Kolkata Call 9555666555
PPTX
ADARSH SCAM PPT
Housing project
Housing project in New Mumbai ppt
HOUSING CASE STUDY
Housing Presentation
Living + Learning Design Project. Mass Housing Project in Antwerp
Cluster Housing
Aranya Low Cost Housing
Living + Learning - Design Project. Mass Housing Project in Antwerp - Full Pr...
National Judicial Reference System (NJRS) in Income Tax Dept
Quadro by Michel Abboud
test e misura 4.0
Camella altea project presentation
Developing A Residential Subdivision by iriskleo
Working on sole selling project
Mass housing
Transbaviaans 2014
Adarsh housing society
Tata Eden Court Phase 2 – New Housing Project at Kolkata Call 9555666555
ADARSH SCAM PPT
Ad

More from Sandip Garg (20)

PPTX
IBBI S4 - Provisioning, Impact of NPA - VP Usharia.pptx
PPTX
IBBI S3 - Resolution of NPAs - RS Sunda.pptx
PPTX
IBBI S2 - Life cycle of NPAs - Anil Mittal.pptx
PPTX
murray-harris-scola-2022.pptx
PPT
relval.ppt
PPT
470f76csk_insolvency_rajkot_sc_ppt.ppt
PPTX
IBFD-Presentation-Ethics.pptx
DOC
Cat seniority-02-11-10
XLS
Members-Details
DOC
Membership & Options Form
DOC
IRS-CHS-MOU-31-12-07
PDF
Vigilance Manual New 2005
DOC
GBM Minutes-27-02-09
PPT
Creative Cashier
PPT
I M Possible
PPT
When Work Is Not Fun
PPS
Be Simple In Life
DOC
Crazy Bikes
PPS
My Dad Is Great
PPS
Holiday Plans2009
IBBI S4 - Provisioning, Impact of NPA - VP Usharia.pptx
IBBI S3 - Resolution of NPAs - RS Sunda.pptx
IBBI S2 - Life cycle of NPAs - Anil Mittal.pptx
murray-harris-scola-2022.pptx
relval.ppt
470f76csk_insolvency_rajkot_sc_ppt.ppt
IBFD-Presentation-Ethics.pptx
Cat seniority-02-11-10
Members-Details
Membership & Options Form
IRS-CHS-MOU-31-12-07
Vigilance Manual New 2005
GBM Minutes-27-02-09
Creative Cashier
I M Possible
When Work Is Not Fun
Be Simple In Life
Crazy Bikes
My Dad Is Great
Holiday Plans2009

Recently uploaded (20)

PDF
NewBase 12 August 2025 Energy News issue - 1812 by Khaled Al Awadi_compresse...
PDF
Deliverable file - Regulatory guideline analysis.pdf
PDF
NEW - FEES STRUCTURES (01-july-2024).pdf
PDF
Technical Architecture - Chainsys dataZap
PDF
Comments on Crystal Cloud and Energy Star.pdf
PDF
Booking.com The Global AI Sentiment Report 2025
PDF
How to Get Approval for Business Funding
PDF
How to Get Business Funding for Small Business Fast
PDF
SIMNET Inc – 2023’s Most Trusted IT Services & Solution Provider
PPTX
svnfcksanfskjcsnvvjknsnvsdscnsncxasxa saccacxsax
PPTX
Slide gioi thieu VietinBank Quy 2 - 2025
PDF
IFRS Notes in your pocket for study all the time
PPTX
3. HISTORICAL PERSPECTIVE UNIIT 3^..pptx
PDF
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
PPTX
sales presentation، Training Overview.pptx
PDF
Solaris Resources Presentation - Corporate August 2025.pdf
PDF
Daniels 2024 Inclusive, Sustainable Development
PDF
Introduction to Generative Engine Optimization (GEO)
PDF
ANALYZING THE OPPORTUNITIES OF DIGITAL MARKETING IN BANGLADESH TO PROVIDE AN ...
PDF
Module 3 - Functions of the Supervisor - Part 1 - Student Resource (1).pdf
NewBase 12 August 2025 Energy News issue - 1812 by Khaled Al Awadi_compresse...
Deliverable file - Regulatory guideline analysis.pdf
NEW - FEES STRUCTURES (01-july-2024).pdf
Technical Architecture - Chainsys dataZap
Comments on Crystal Cloud and Energy Star.pdf
Booking.com The Global AI Sentiment Report 2025
How to Get Approval for Business Funding
How to Get Business Funding for Small Business Fast
SIMNET Inc – 2023’s Most Trusted IT Services & Solution Provider
svnfcksanfskjcsnvvjknsnvsdscnsncxasxa saccacxsax
Slide gioi thieu VietinBank Quy 2 - 2025
IFRS Notes in your pocket for study all the time
3. HISTORICAL PERSPECTIVE UNIIT 3^..pptx
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
sales presentation، Training Overview.pptx
Solaris Resources Presentation - Corporate August 2025.pdf
Daniels 2024 Inclusive, Sustainable Development
Introduction to Generative Engine Optimization (GEO)
ANALYZING THE OPPORTUNITIES OF DIGITAL MARKETING IN BANGLADESH TO PROVIDE AN ...
Module 3 - Functions of the Supervisor - Part 1 - Student Resource (1).pdf

Presentation-IRS Housing Project

  • 1. P R O J E C T IRS HOUSING COMPLEX, ON PLOT NO. 6, 7 & 8 AT ULWE NODE, NAVI MUMBAI. PROJECT BY SHAH CONSTRUCTION CO. 24/A, Shree Laxmi Nivas, M. G. Road, Ghatkopar (West), Mumbai 400 086 Now Renamed as
  • 3. LOCATION – I : PLOT NO. 6, 7 & 8, LOCATION – II : PLOT NO. 80 & 81, LOCATION– III : Plot No. 78, 79, 82, 83 & 41.
  • 5. B R I E F : 1 . Wing A & B Stilt + 10 Stories, 4 flats per floor, Total number of flats 80 nos. 2. Wing C Stilt + 4 Stories, 2 flats per floor, Total number of flats 8 nos. OR up to Utilization of 1.50 F.S.I. Whichever is higher. (With provision to consumed 2.00 F. S. I. in future). 3. Total 88 nos. of flats in Wing A, B & C. 4 . Each flat 1007.00 sq. ft. of Carpet area, 3 bedrooms with three toilets. 5 . Gymnasium, Society Office and Meeting Room at Basement Floor Level. 6. Entrance lobby at stilt level. 7. Party terrace with gents & ladies toilets & pantry in Wing A & B. 8. Elec. Substation, Generator room & Security cabin at ground level. 9. Refuge floor on 4 th , 6 th & 8 th floor.
  • 6.  
  • 7. L A Y O U T P L A N SUB STATION GENERATOR ROOM UG TANK, PUMP ROOM & RAIN WATER HARVESTING TANK SECURITY - 1 SECURITY - 2
  • 8. BASEMENT FLOOR PLAN – ALT. - 1 BASEMENT FLOOR PLAN WING - C WING - A WING - B
  • 9. TYPICAL FLOOR PLAN (1 st , 3 rd , 5 th , 7 th AND 9th)
  • 10. TYPICAL FLOOR PLAN (2 nd , AND 10 th )
  • 11. TYPICAL FLOOR PLAN (4 th , 6 th , AND 8 th )
  • 13. Post Occupation Plan (8 Entrance Doors )
  • 14. WING – C ( provision to consume 2.00 F. S. I. in future). WING - C WING - A WING - B
  • 15. On Gudipadva Both IRS (Mumbai) & Integrated Spaces Ltd. Jointly organized a BHOOMI-POOJAN at Ulwe Node Site for IRS tower I & II.
  • 16.  
  • 17.  
  • 18.  
  • 19.  
  • 20. MOU Signed by IRS (Mumbai) Housing Society for IRS Tower being constructed by Integrated Spaces Ltd. Floor wise Carpet & Built-up Area For Building Wing A proposed on Plot No.6,7&8 along with landing cost to the Flat Purchaser MOU Spread Sheet
  • 21. P R O J E C T IRS TOWER - I IRS HOUSING COMPLEX, ON PLOT NO. 6, 7 & 8 AT ULWE NODE, NAVI MUMBAI. P R O J E C T B Y Thank You.