SlideShare a Scribd company logo
PROBLEM SET IN OPTIMIZATION IN FLOW OF HEAT   Submitted by: QTX Chemicals Inc. Collado, Ellaine Vanezza Dumandan, Florenze Jesse Gecha, Andrea Ulep, Michael
Problem 5: Determine the optimum economic thickness of insulation that should be used under the following conditions: saturated steam is being passed continuously in a vertical 1” Sch 40 steel pipe. The temperature of the steam is 180°C, and the steam is valued at $0.0035/kg. The pipe is to be insulated with a material that has a thermal conductivity of 0.06 W/mK. The cost of the installed insulation per m of pipe length is $ 200x, where x is the thickness of the insulation in meters. Life of the installation is 10 years with time value of money equal to 15%. The total length of the pipe is 250 m, and the average temperature of the surroundings is 27°C. Heat transfer resistances due to steam film, scale, pipe wall are negligible. The air film coefficient at the outside of the insulation may be assumed constant for all insulation thicknesses and given by the equation:
Solution:
Solution:
Solution:
Problem 11: A condenser for a distillation unit must be designed to condense 2000 kg/h of vapor. The effective condensation temperature for the vapor is 132°C.The heat of condensation for the vapor is 350000 J/kg. Cooling water is available at 15°C.The cost of cooling water is $25/1000m 3 .The optimum Heat Transfer Coefficient is 300 W/m 2 K.The cost of the installed heat exchanger is $400/m2 and life of the equipment is 10 years. The heat capacity of water is 4184 J/kgK. If the condenser is to operate 7200 hrs/yr, determine the cooling water flow rate in kg/hr and exit temperature for optimum economic conditions.
Solution:
Solution:
Problem 17: An air cooler consisting of a bundle of 2” Sch 40 steel pipes enclosed in a well baffled shell is being built to cool 250 kg/hr of air from 82°C to 27°C. The air flows under pressure through the tubes of a 1-shell 2-tube pass heat exchanger. Cooling water at 21°C is under sufficient pressure to force it through at any desired rate, flows through the shell. The heat transfer coefficient based on the inside fluid is 50 W/m2K and for the outside fluid, 2100 W/m2K. Cooling water costs PhP 0.55/m3 and the annual fixed charges is 15% with cooler cost at PhP 18,000/m2. Calculate the Optimum exit temperature of cooling water and optimum length of tubes.
Solution:
Solution:
Solution:
Solution:
Solution:
Solution:
Thank You!  

More Related Content

PPT
final (problem 6, 12 and 18)
PPT
5 Ch E A Ratatouthiele Inc.
PPT
5CHEAGroup6
PPT
5 Chea Group3
PPT
Group 4 Chea
PPT
Problem Set
PPT
Answers to Problem Set
PDF
Heat and Mass Transfer Assignment
final (problem 6, 12 and 18)
5 Ch E A Ratatouthiele Inc.
5CHEAGroup6
5 Chea Group3
Group 4 Chea
Problem Set
Answers to Problem Set
Heat and Mass Transfer Assignment

What's hot (19)

PPT
5 B Group B6 Optimization Problem Set
PPT
5 Cheb Group2
PDF
CH EN 3453 Heat Transfer 2014 Fall Utah Homework HW 03 Assignment
PDF
CH EN 3453 Heat Transfer 2014 Fall Utah Homework HW 07 Assignment
PPT
Group3-ps number 9
PPTX
P1.14 heating and insulating buildings
PPT
solution to no. 11 (plant design assignment)
PDF
Case study Professional ethics
PPT
4ChEB G2 Unit Operations#2
PDF
Ejercicio uno procesos
PDF
CH EN 3453 Heat Transfer 2014 Fall Utah Homework HW 02 Assignment
PPT
Problem Set
PPTX
Aqa heating and insulating buildings
PPTX
Breakdown due to Internal Discharges and Surface Breakdown
PPT
Building Climatology - HEAT
PPT
4B group 4
PPTX
THERMAL BREAKDOWN|BREAKDOWN IN SOLIDS|HIGH VOLTAGE ENGINEERING
5 B Group B6 Optimization Problem Set
5 Cheb Group2
CH EN 3453 Heat Transfer 2014 Fall Utah Homework HW 03 Assignment
CH EN 3453 Heat Transfer 2014 Fall Utah Homework HW 07 Assignment
Group3-ps number 9
P1.14 heating and insulating buildings
solution to no. 11 (plant design assignment)
Case study Professional ethics
4ChEB G2 Unit Operations#2
Ejercicio uno procesos
CH EN 3453 Heat Transfer 2014 Fall Utah Homework HW 02 Assignment
Problem Set
Aqa heating and insulating buildings
Breakdown due to Internal Discharges and Surface Breakdown
Building Climatology - HEAT
4B group 4
THERMAL BREAKDOWN|BREAKDOWN IN SOLIDS|HIGH VOLTAGE ENGINEERING
Ad

Similar to Problem Set 1 (20)

PPT
5 Chea Group3
PPT
Probs5,11,17
PPT
Problem Set Solution To No5
PPT
Problem Set Solution To No.5
DOCX
Tagliatela College of EngineeringEASC1112 – Methods of Engineeri.docx
PPT
4b Group1
PPT
4b Group1
PPT
Problem set 1 number 10
PPT
Problem Set No. 12
PDF
ECONOMIC INSULATION FOR INDUSTRIAL PIPING
PDF
CH EN 3453 Heat Transfer 2014 Fall Utah Homework HW 08 Assignment
DOCX
Heat Transfer Final Project, Peden
PPT
Group 7 4ChE A
PDF
Pipe Flow Optimization
PPT
Prob number 15
PPT
Problem Number 15
DOCX
H&MProject_TylerLenzen_Spring2014
PDF
Mid semester qp
PDF
X10709 (me8693)
DOCX
Mech 0036 exam 12 13 with answers (revision)
5 Chea Group3
Probs5,11,17
Problem Set Solution To No5
Problem Set Solution To No.5
Tagliatela College of EngineeringEASC1112 – Methods of Engineeri.docx
4b Group1
4b Group1
Problem set 1 number 10
Problem Set No. 12
ECONOMIC INSULATION FOR INDUSTRIAL PIPING
CH EN 3453 Heat Transfer 2014 Fall Utah Homework HW 08 Assignment
Heat Transfer Final Project, Peden
Group 7 4ChE A
Pipe Flow Optimization
Prob number 15
Problem Number 15
H&MProject_TylerLenzen_Spring2014
Mid semester qp
X10709 (me8693)
Mech 0036 exam 12 13 with answers (revision)
Ad

Recently uploaded (20)

PDF
Family Law: The Role of Communication in Mediation (www.kiu.ac.ug)
PDF
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
PDF
How to Get Funding for Your Trucking Business
PPT
Lecture 3344;;,,(,(((((((((((((((((((((((
PPT
Chapter four Project-Preparation material
PPT
340036916-American-Literature-Literary-Period-Overview.ppt
PDF
Laughter Yoga Basic Learning Workshop Manual
PPTX
Business Ethics - An introduction and its overview.pptx
PDF
Charisse Litchman: A Maverick Making Neurological Care More Accessible
PDF
Ôn tập tiếng anh trong kinh doanh nâng cao
PPTX
Belch_12e_PPT_Ch18_Accessible_university.pptx
PDF
TyAnn Osborn: A Visionary Leader Shaping Corporate Workforce Dynamics
PDF
Solara Labs: Empowering Health through Innovative Nutraceutical Solutions
PDF
Module 2 - Modern Supervison Challenges - Student Resource.pdf
PDF
Solaris Resources Presentation - Corporate August 2025.pdf
PDF
How to Get Business Funding for Small Business Fast
PDF
NEW - FEES STRUCTURES (01-july-2024).pdf
PPTX
svnfcksanfskjcsnvvjknsnvsdscnsncxasxa saccacxsax
PDF
Nidhal Samdaie CV - International Business Consultant
PDF
Daniels 2024 Inclusive, Sustainable Development
Family Law: The Role of Communication in Mediation (www.kiu.ac.ug)
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
How to Get Funding for Your Trucking Business
Lecture 3344;;,,(,(((((((((((((((((((((((
Chapter four Project-Preparation material
340036916-American-Literature-Literary-Period-Overview.ppt
Laughter Yoga Basic Learning Workshop Manual
Business Ethics - An introduction and its overview.pptx
Charisse Litchman: A Maverick Making Neurological Care More Accessible
Ôn tập tiếng anh trong kinh doanh nâng cao
Belch_12e_PPT_Ch18_Accessible_university.pptx
TyAnn Osborn: A Visionary Leader Shaping Corporate Workforce Dynamics
Solara Labs: Empowering Health through Innovative Nutraceutical Solutions
Module 2 - Modern Supervison Challenges - Student Resource.pdf
Solaris Resources Presentation - Corporate August 2025.pdf
How to Get Business Funding for Small Business Fast
NEW - FEES STRUCTURES (01-july-2024).pdf
svnfcksanfskjcsnvvjknsnvsdscnsncxasxa saccacxsax
Nidhal Samdaie CV - International Business Consultant
Daniels 2024 Inclusive, Sustainable Development

Problem Set 1

  • 1. PROBLEM SET IN OPTIMIZATION IN FLOW OF HEAT Submitted by: QTX Chemicals Inc. Collado, Ellaine Vanezza Dumandan, Florenze Jesse Gecha, Andrea Ulep, Michael
  • 2. Problem 5: Determine the optimum economic thickness of insulation that should be used under the following conditions: saturated steam is being passed continuously in a vertical 1” Sch 40 steel pipe. The temperature of the steam is 180°C, and the steam is valued at $0.0035/kg. The pipe is to be insulated with a material that has a thermal conductivity of 0.06 W/mK. The cost of the installed insulation per m of pipe length is $ 200x, where x is the thickness of the insulation in meters. Life of the installation is 10 years with time value of money equal to 15%. The total length of the pipe is 250 m, and the average temperature of the surroundings is 27°C. Heat transfer resistances due to steam film, scale, pipe wall are negligible. The air film coefficient at the outside of the insulation may be assumed constant for all insulation thicknesses and given by the equation:
  • 6. Problem 11: A condenser for a distillation unit must be designed to condense 2000 kg/h of vapor. The effective condensation temperature for the vapor is 132°C.The heat of condensation for the vapor is 350000 J/kg. Cooling water is available at 15°C.The cost of cooling water is $25/1000m 3 .The optimum Heat Transfer Coefficient is 300 W/m 2 K.The cost of the installed heat exchanger is $400/m2 and life of the equipment is 10 years. The heat capacity of water is 4184 J/kgK. If the condenser is to operate 7200 hrs/yr, determine the cooling water flow rate in kg/hr and exit temperature for optimum economic conditions.
  • 9. Problem 17: An air cooler consisting of a bundle of 2” Sch 40 steel pipes enclosed in a well baffled shell is being built to cool 250 kg/hr of air from 82°C to 27°C. The air flows under pressure through the tubes of a 1-shell 2-tube pass heat exchanger. Cooling water at 21°C is under sufficient pressure to force it through at any desired rate, flows through the shell. The heat transfer coefficient based on the inside fluid is 50 W/m2K and for the outside fluid, 2100 W/m2K. Cooling water costs PhP 0.55/m3 and the annual fixed charges is 15% with cooler cost at PhP 18,000/m2. Calculate the Optimum exit temperature of cooling water and optimum length of tubes.
  • 16. Thank You!