SlideShare a Scribd company logo
1. A condenser for a distillation unit must be designed to condense 2000 kg/h of vapor. The effective condensation temperature for the vapor is 132 o C.The heat of condensation for the vapor is 350000 J/kg. Cooling water is available at 15 o C.The cost of cooling water is $25/1000m 3 .The optimum Heat Transfer Coefficient is 300 W/m 2 K.The cost of the installed heat exchanger is $400/m 2  and life of the equipment is 10 years. The heat capacity of water is 4184 J/kgK. If the condenser is to operate 7200 hrs/yr, determine the cooling water flow rate in kg/hr and exit temperature for optimum economic conditions.
 
 

More Related Content

PPT
Group3-ps number 9
PPT
Problem set 1 number 10
PPT
final (problem 6, 12 and 18)
PPT
Problem Set 1
PPTX
Aqa heating and insulating buildings
PPTX
P1.14 heating and insulating buildings
PPTX
P1.1.4 heating and insulating buildings
Group3-ps number 9
Problem set 1 number 10
final (problem 6, 12 and 18)
Problem Set 1
Aqa heating and insulating buildings
P1.14 heating and insulating buildings
P1.1.4 heating and insulating buildings

Recently uploaded (20)

PDF
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
PPTX
Business Ethics - An introduction and its overview.pptx
PPTX
3. HISTORICAL PERSPECTIVE UNIIT 3^..pptx
PPTX
2025 Product Deck V1.0.pptxCATALOGTCLCIA
PDF
Power and position in leadershipDOC-20250808-WA0011..pdf
PPTX
Probability Distribution, binomial distribution, poisson distribution
PDF
Module 3 - Functions of the Supervisor - Part 1 - Student Resource (1).pdf
PDF
TyAnn Osborn: A Visionary Leader Shaping Corporate Workforce Dynamics
PPTX
ICG2025_ICG 6th steering committee 30-8-24.pptx
PDF
Nidhal Samdaie CV - International Business Consultant
PPTX
Board-Reporting-Package-by-Umbrex-5-23-23.pptx
PPTX
svnfcksanfskjcsnvvjknsnvsdscnsncxasxa saccacxsax
PDF
Ôn tập tiếng anh trong kinh doanh nâng cao
PDF
SIMNET Inc – 2023’s Most Trusted IT Services & Solution Provider
PDF
Daniels 2024 Inclusive, Sustainable Development
PDF
IFRS Notes in your pocket for study all the time
PPTX
DMT - Profile Brief About Business .pptx
PDF
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
PDF
SBI Securities Weekly Wrap 08-08-2025_250808_205045.pdf
PDF
Hindu Circuler Economy - Model (Concept)
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
Business Ethics - An introduction and its overview.pptx
3. HISTORICAL PERSPECTIVE UNIIT 3^..pptx
2025 Product Deck V1.0.pptxCATALOGTCLCIA
Power and position in leadershipDOC-20250808-WA0011..pdf
Probability Distribution, binomial distribution, poisson distribution
Module 3 - Functions of the Supervisor - Part 1 - Student Resource (1).pdf
TyAnn Osborn: A Visionary Leader Shaping Corporate Workforce Dynamics
ICG2025_ICG 6th steering committee 30-8-24.pptx
Nidhal Samdaie CV - International Business Consultant
Board-Reporting-Package-by-Umbrex-5-23-23.pptx
svnfcksanfskjcsnvvjknsnvsdscnsncxasxa saccacxsax
Ôn tập tiếng anh trong kinh doanh nâng cao
SIMNET Inc – 2023’s Most Trusted IT Services & Solution Provider
Daniels 2024 Inclusive, Sustainable Development
IFRS Notes in your pocket for study all the time
DMT - Profile Brief About Business .pptx
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
SBI Securities Weekly Wrap 08-08-2025_250808_205045.pdf
Hindu Circuler Economy - Model (Concept)
Ad
Ad

solution to no. 11 (plant design assignment)

  • 1. 1. A condenser for a distillation unit must be designed to condense 2000 kg/h of vapor. The effective condensation temperature for the vapor is 132 o C.The heat of condensation for the vapor is 350000 J/kg. Cooling water is available at 15 o C.The cost of cooling water is $25/1000m 3 .The optimum Heat Transfer Coefficient is 300 W/m 2 K.The cost of the installed heat exchanger is $400/m 2 and life of the equipment is 10 years. The heat capacity of water is 4184 J/kgK. If the condenser is to operate 7200 hrs/yr, determine the cooling water flow rate in kg/hr and exit temperature for optimum economic conditions.
  • 2.  
  • 3.