This document provides procedures for completing oil and gas wells using gravel packing. It describes:
1) General procedures for assembling and testing completion subassemblies like tailpipes, packers, and mandrels. This involves inspection, drift testing, pressure testing, and record keeping.
2) Detailed procedures for gravel packing including prepacking perforations, setting liners and packers, injectivity testing, and displacing gravel slurries with or without a lower telltale. The objective is to maximize gravel placement while controlling pressures.
3) Guidelines for prepacking perforations before or after running liners to improve zonal isolation and reduce formation impairment compared to standard gravel packing.
The procedures